TASEKO REPORTS FOURTH QUARTER AND ANNUAL EARNINGS
This release should be read with the Company’s Financial Statements and Management Discussion & Analysis ("MD&A"), available at www.tasekomines.com and filed on www.sedar.com. Except where otherwise noted, all currency amounts are stated in Canadian dollars. Taseko’s 75% owned Gibraltar Mine is located north of the City of Williams Lake in south-central British Columbia. Production and sales volumes stated in this release are on a 100% basis unless otherwise indicated. |
February 24, 2023, VANCOUVER , BC – Taseko Mines Limited (TSX: TKO; NYSE American: TGB; LSE: TKO) ("Taseko" or the "Company") reports Adjusted EBITDA* of $109 million and Earnings from mining operations before depletion* of $106 million for the full year 2022. Revenues for the year were $392 million and Adjusted net income* was $1.7 million, or $0.01 per share. In the fourth quarter 2022, Taseko generated Adjusted EBITDA* of $35 million, $38 million of earnings from mining operations before depletion* and Adjusted net income* of $7 million, or $0.02 per share.
Stuart McDonald, President and CEO of Taseko, commented, “The upward move in copper and molybdenum prices during the fourth quarter helped drive stronger financial performance in the period. Fourth quarter earnings from mining operations before depletion were 103% higher than the third quarter and Adjusted EBITDA was 3% higher. Annual earnings for 2022 were affected by lower average copper prices (US$3.99/lb. compared to US$4.23/lb. in 2021) and higher production costs related to fuel price increases and lower production.
Average head grade for the year was 20% below the life of mine reserve average, and a site-wide power outage late in the year also contributed to the lower annual copper production of 97 million pounds. Despite the mill downtime in the fourth quarter, Gibraltar produced 27 million pounds of copper. Recoveries in the fourth quarter improved to 83%, an 8% increase over the prior quarter due to better quality ore.”
Mr. McDonald added, “The quarterly production profile in 2023 is expected to be less variable than the last two years and we believe there is potential for mill throughput to average above design capacity. An in-pit crusher move is scheduled for the third quarter which will partially shut down ore processing for approximately two weeks. We expect annual copper production to increase to 115 million pounds (+/-5%) in 2023.”
“Yesterday we announced that we had signed a definitive agreement to acquire an additional 12.5% of Gibraltar from Sojitz Corporation. We believe this is a smart transaction and well structured so that Taseko maintains the financial capacity to fund the construction of our Florence Copper project. Based on our 2023 guidance, this additional stake in Gibraltar will increase our attributable production by 38% over 2022. The acquisition price consists of a minimum amount of C$60 million payable over a five-year period and potential contingent payments depending on Gibraltar mine revenues and copper prices over the next five years. An initial C$10 million will be paid to Sojitz upon closing and the remaining minimum amount will be paid in C$10 million annual instalments over the next five years (see news release dated February 22, 2023 for details about the transaction).”
“We’ve recently announced several key financing initiatives for our Florence copper project, and we expect to start construction in the coming months, upon receipt of the final Underground Injection Control permit. Under the terms of our strategic partnership agreement with Mitsui & Co. (USA), they will make an initial investment of US$50 million for a 2.67% copper stream. Mitsui also retains an option to invest an additional US$50 million (for a total of US$100 million) to convert the copper stream into a 10% equity interest in Florence Copper. We are very pleased to have completed this transaction which validates the significant value of this project and also highlights the marketing advantages of low impact mining, US produced copper,” continued Mr. McDonald.
Mr. McDonald concluded, “We are very excited about the long-term fundamentals of our North American copper business. Improved copper production from Gibraltar and continued robust copper pricing is setting Taseko up for a year of strong financial returns. The important permitting catalyst for our Florence Copper project is on the near horizon, which we believe will unlock significant value of that asset.”
2022 Annual Review
Fourth Quarter Review
*Non-GAAP performance measure. See end of news release.
*Non-GAAP performance measure. See end of news release.
HIGHLIGHTS
Operating Data (Gibraltar - 100% basis) |
Three months ended December 31, |
Year ended December 31, |
||||
2022 | 2021 | Change | 2022 | 2021 | Change | |
Tons mined (millions) | 22.9 | 23.3 | (0.4) | 88.7 | 105.4 | (16.7) |
Tons milled (millions) | 7.3 | 7.4 | (0.1) | 30.3 | 29.2 | 1.1 |
Production (million pounds Cu) | 26.7 | 28.8 | (2.1) | 97.0 | 112.3 | (15.3) |
Sales (million pounds Cu) | 25.5 | 23.8 | 1.7 | 101.3 | 104.9 | (3.6) |
Financial Data |
Three months ended December 31, |
Year ended December 31, |
||||
(Cdn$ in thousands, except for per share amounts) | 2022 | 2021 | Change | 2022 | 2021 | Change |
Revenues | 100,618 | 102,972 | (2,354) | 391,609 | 433,278 | (41,669) |
Earnings from mining operations before depletion and amortization* | 37,653 | 61,916 | (24,263) | 106,217 | 230,392 | (124,175) |
Cash flows (used for) provided by operations | (946) | 37,231 | (38,177) | 81,266 | 174,769 | (93,503) |
Adjusted EBITDA* | 35,181 | 52,988 | (17,807) | 109,035 | 200,733 | (91,698) |
Adjusted net income * | 7,146 | 13,312 | (6,166) | 1,723 | 44,745 | (43,022) |
Per share - basic (“Adjusted EPS”)* | 0.02 | 0.05 | (0.03) | 0.01 | 0.16 | (0.15) |
Net income (loss) (GAAP) | (2,275) | 11,762 | (14,037) | (25,971) | 36,472 | (62,443) |
Per share - basic (“EPS”) | (0.01) | 0.04 | (0.05) | (0.09) | 0.13 | (0.22) |
*Non-GAAP performance measure. See end of news release.
REVIEW OF OPERATIONS
Gibraltar mine (75% Owned)
Operating data (100% basis) | Q4 2022 | Q3 2022 | Q2 2022 | Q1 2022 | Q4 2021 | YE 2022 | YE 2021 |
Tons mined (millions) | 22.9 | 23.2 | 22.3 | 20.3 | 23.3 | 88.7 | 105.4 |
Tons milled (millions) | 7.3 | 8.2 | 7.7 | 7.0 | 7.4 | 30.3 | 29.2 |
Strip ratio | 1.1 | 1.5 | 2.8 | 2.6 | 2.2 | 1.8 | 2.5 |
Site operating cost per ton milled (Cdn$)* | $13.88 | $11.33 | $11.13 | $11.33 | $9.94 | $11.89 | $9.21 |
Copper concentrate | |||||||
Head grade (%) | 0.22 | 0.22 | 0.17 | 0.19 | 0.24 | 0.20 | 0.23 |
Copper recovery (%) | 83.4 | 77.1 | 77.3 | 80.2 | 80.4 | 79.5 | 82.4 |
Production (million pounds Cu) | 26.7 | 28.3 | 20.7 | 21.4 | 28.8 | 97.0 | 112.3 |
Sales (million pounds Cu) | 25.5 | 26.7 | 21.7 | 27.4 | 23.8 | 101.3 | 104.9 |
Inventory (million pounds Cu) | 5.4 | 4.2 | 2.7 | 4.0 | 9.9 | 5.4 | 9.9 |
Molybdenum concentrate | |||||||
Production (thousand pounds Mo) | 359 | 324 | 199 | 236 | 450 | 1,118 | 1,954 |
Sales (thousand pounds Mo) | 402 | 289 | 210 | 229 | 491 | 1,131 | 2,000 |
Per unit data (US$ per pound produced) * | |||||||
Site operating costs* | $2.79 | $2.52 | $3.25 | $2.95 | $2.02 | $2.85 | $1.91 |
By-product credits* | (0.40) | (0.15) | (0.15) | (0.18) | (0.30) | (0.23) | (0.27) |
Site operating costs, net of by-product credits* | $2.39 | $2.37 | $3.10 | $2.77 | $1.72 | $2.62 | $1.64 |
Off-property costs | 0.36 | 0.35 | 0.37 | 0.36 | 0.22 | 0.36 | 0.26 |
Total operating costs (C1)* | $2.75 | $2.72 | $3.47 | $3.13 | $1.94 | $2.98 | $1.90 |
Full Year Results
Gibraltar produced 97.0 million pounds of copper for the year compared to 112.3 million pounds in 2021. Head grades for the year averaged 0.20% copper, compared to 0.23% in 2021. The copper head grades were impacted by higher than expected mining dilution. Copper recoveries for 2022 was 79.5%, compared to 82.4% in 2021.
A total of 88.7 million tons were mined in the year compared to 105.4 million tons mined in the prior year period. The strip ratio of 1.8 was lower than the prior year as mining operations were focused in the Gibraltar pit in 2022 which has a lower strip ratio than the Pollyanna pit.
Total site costs* at Gibraltar of $301.8 million (which includes capitalized stripping of $32.0 million) for Taseko’s 75% share were $40.0 million higher than 2021, primarily due to higher diesel prices (55% higher than 2021) and increased diesel volume consumed (21% higher than 2021) due to the longer hauls and higher truck hours and with grinding media and other input costs also increasing due to inflationary pressures.
*Non-GAAP performance measure. See end of news release.
REVIEW OF OPERATIONS – CONTINUED
Molybdenum production was 1.1 million pounds in the year compared to 2.0 million pounds in the prior year. Molybdenum prices strengthened in 2022 with an average molybdenum price of US$18.73 per pound, an increase of 18% compared to the 2021 average price of US$15.94 per pound. By-product credits per pound of copper produced was US$0.23 in the year compared to US$0.27 in the prior year. The higher molybdenum price and favorable provisional price adjustments at year end were offset by lower molybdenum sales in 2022 compared to the prior year.
Off-property costs per pound produced* were US$0.36 for the year, which is US$0.10 higher than the prior year. In 2021 the Company benefited from lower benchmark treatment and refining charges (“TCRC”) and realized lower TCRCs for spot tenders due to tight copper market conditions last year. Also contributing to the increased off-property costs per pound produced in 2022 is the fact that sales of copper exceeded production by 4.3 million pounds.
Total operating costs per pound produced (C1)* were US$2.98 for the year, compared to US$1.90 in the prior year as shown in the bridge graph below:
Fourth Quarter Results
Gibraltar produced 26.7 million pounds of copper for the quarter, a 6% decrease over the third quarter. Copper production in December was impacted by unplanned mill downtime, including a sitewide power outage late in the month.
Although the power outage was only 24 hours in duration, the severe cold temperatures of -35° Celsius (-31° Fahrenheit) immediately froze a number of essential systems in the mills. This extreme weather delayed the restart of milling operations for several days followed by a gradual return to full capacity by the end of December. Mill throughput in October and November averaged above design capacity at 88,000 tons per day, but mill throughput averaged only 63,000 tons per day in December.
Head grades were in line with the prior quarter and management continues to work on reducing the mining dilution being experienced in the Gibraltar pit. Copper recoveries in the fourth quarter were 83%, an improvement over the prior quarters in 2022 due to improving ore quality as mining advances deeper into the Gibraltar pit.
*Non-GAAP performance measure. See end of news release.
REVIEW OF OPERATIONS – CONTINUED
A total of 22.9 million tons were mined in the fourth quarter. The strip ratio of 1.1 was lower than prior quarter and included some initial stripping activity in the Connector pit. The ore stockpiles increased by 3.8 million tons in the fourth quarter.
Total site costs* at Gibraltar of $79.7 million (which includes capitalized stripping of $3.9 million) for Taseko’s 75% share were $5.6 million higher than the average of the first three quarters of 2022 due to higher diesel costs, timing of repairs and maintenance and year-end wage related costs. Site operating cost per ton milled* was $13.88 was higher than the previous quarters in 2022 due to the higher site costs and lower mill throughput.
Molybdenum production was 359 thousand pounds in the fourth quarter. At an average molybdenum price of US$21.39 per pound and the impact of favorable provisional price adjustments of $3.9 million for Taseko’s 75% share, molybdenum generated a by-product credit per pound of copper produced of US$0.40 in the fourth quarter.
Off-property costs per pound produced* were US$0.36 for the fourth quarter reflecting higher ocean freight costs (including bunker fuel) and increased treatment and refining charges (TCRC) compared to the same quarter in the prior year.
Total operating costs per pound produced (C1)* were US$2.75 for the quarter and was in line with the previous quarter.
GIBRALTAR OUTLOOK
Gibraltar is expected to produce 115 million pounds of copper (+/-5%) in 2023 on a 100% basis. The Gibraltar pit will be the sole source of mill feed in 2023 and the quarterly production profile is expected to be less variable than 2022 due to improving quality and consistency of ore as mining progresses deeper into the pit. Annual mill throughput is expected to exceed design capacity in 2023 due to the softer ore in Gibraltar pit.
Stripping activities are underway in the new Connector pit. While the strip ratio is expected to be in line with the LOM average, the allocation of costs to capitalized stripping in 2023 will be higher than in 2022. The primary crusher for mill 1 which overlays the Connector zone is scheduled to be moved to its new location in the third quarter of this year.
Strong metal prices combined with our copper hedge protection continues to provide tailwinds for robust financial performance and operating margins at the Gibraltar mine over the coming year. Copper prices in 2022 averaged US$3.99 per pound and have started the current year above these levels. Molybdenum prices are currently US$35.70 per pound, 91% higher than the average price in 2022.
The Company currently has copper price collar contracts in place that secure a minimum copper price of US$3.75 per pound for 72 million pounds of copper until December 31, 2023. The Company has also executed price caps for its share of diesel purchases. Improving production combined with this copper hedge and diesel price protection program should continue to provide the foundation for stable financial performance and operating margins at the Gibraltar mine in 2023.
*Non-GAAP performance measure. See end of news release.
FLORENCE COPPER
The Company is awaiting the issuance of the final Underground Injection Control permit (“UIC”) from the U.S. Environmental Protection Agency (“EPA”), which is the final permitting step required prior to construction commencing on the commercial production facility. The EPA is currently addressing comments that were received during the public comment period, which was held in the fall of 2022. Public comments submitted to the EPA have demonstrated strong support for the Florence Copper project among local residents, business organizations, community leaders and state-wide organizations.
In December 2022, the Company signed agreements with Mitsui to form a strategic partnership to develop Florence Copper. Mitsui has committed to an initial investment of US$50 million, with proceeds to be used for construction of the commercial production facility. The initial investment will be in the form of a copper stream agreement on 2.67% of the copper produced at Florence Copper. In addition, Mitsui has the option to invest an additional US$50 million (for a total investment of US$100 million) for a 10% equity interest in Florence Copper.
Detailed engineering and design for the commercial production facility is substantially completed and procurement activities are well advanced. The Company has purchased the major processing equipment associated with the SX/EW plant and the equipment has now been delivered to the Florence site. The Company is well positioned to transition into construction once the final UIC permit is received. The Company incurred $101.3 million of capital expenditures at the Florence project in 2022 funded from available cash.
LONG-TERM GROWTH STRATEGY
Taseko’s strategy has been to grow the Company by acquiring and developing a pipeline of complementary projects focused on copper in stable mining jurisdictions. We continue to believe this will generate long-term returns for shareholders. Our other development projects are located in British Columbia.
Yellowhead Copper Project
Yellowhead Mining Inc. (“Yellowhead”) has an 817 million tonnes reserve and a 25-year mine life with a pre-tax net present value of $1.3 billion at an 8% discount rate using a US$3.10 per pound copper price based on the Company’s 2020 NI 43-101 technical report. Capital costs of the project are estimated at $1.3 billion over a 2-year construction period. Over the first 5 years of operation, the copper equivalent grade will average 0.35% producing an average of 200 million pounds of copper per year at an average C1* cost, net of by-product credit, of US$1.67 per pound of copper. The Yellowhead copper project contains valuable precious metal by-products with 440,000 ounces of gold and 19 million ounces of silver with a life of mine value of over $1 billion at current prices.
The Company Is preparing to advance into the environmental assessment process and is undertaking some additional engineering work in conjunction with ongoing engagement with local communities including First Nations. The Company is also collecting baseline data and modeling which will be used to support the environmental assessment and permitting of the project.
LONG-TERM GROWTH STRATEGY – CONTINUED
New Prosperity Gold-Copper Project
In late 2019, the T?ilhqot’in Nation, as represented by T?ilhqot’in National Government, and Taseko entered into a confidential dialogue, with the involvement of the Province of British Columbia, in order to obtain a long-term resolution of the conflict regarding Taseko’s proposed copper-gold mine previously known as New Prosperity, acknowledging Taseko’s commercial interests and the T?ilhqot’in Nation’s opposition to the project.
This dialogue has been supported by the parties’ agreement, beginning December 2019, to a series of one-year standstills on certain outstanding litigation and regulatory matters relating to Taseko’s tenures and the area in the vicinity of Teztan Biny (Fish Lake). The standstill agreement was most recently extended for a fourth one-year term in December 2022, with the goal of providing time and opportunity for the T?ilhqot’in Nation and Taseko to negotiate a final resolution.
The dialogue process has made tangible progress in the past 12 months but is not complete. In agreeing to extend the standstill through 2023, the T?ilhqot’in Nation and Taseko acknowledge the constructive nature of discussions to date, and the future opportunity to conclude a long-term and mutually acceptable resolution of the conflict that also makes an important contribution to the goals of reconciliation in Canada.
Aley Niobium Project
Environmental monitoring and product marketing initiatives on the Aley niobium project continue. The converter pilot test is ongoing and is providing additional process data to support the design of the commercial process facilities and will provide final product samples for marketing purposes. The Company has also initiated a scoping study to investigate the potential production of niobium oxide at Aley to supply the growing market for Niobium-based batteries.
The Company will host a telephone conference call and live webcast on Friday, February 24, 2023 at 11:00 a.m. Eastern Time (8:00 a.m. Pacific) to discuss these results. After opening remarks by management, there will be a question and answer session open to analysts and investors.
To join the conference call without operator assistance, you may pre-register at https://bit.ly/3HbbVpt to receive an instant automated call back just prior to the start of the conference call. Otherwise, the conference call may be accessed by dialing 416-764-8688 in Canada, 888-390-0546 in the United States, 08006522435 in the United Kingdom, or online at tasekomines.com/investors/events using the entry code 613140#.
The conference call will be archived for later playback until March 9, 2023 and can be accessed by dialing 416-764-8677 in Toronto, 888-390-0541 toll free in North America, or online at tasekomines.com/investors/events and using the entry code 613140#.
For further information on Taseko, please see the Company's website at www.tasekomines.com or contact:
Brian Bergot, Vice President, Investor Relations – 778-373-4554, toll free 1-800-667-2114
Stuart McDonald
President & CEO
No regulatory authority has approved or disapproved of the information in this news release.
NON-GAAP PERFORMANCE MEASURES
This document includes certain non-GAAP performance measures that do not have a standardized meaning prescribed by IFRS. These measures may differ from those used by, and may not be comparable to such measures as reported by, other issuers. The Company believes that these measures are commonly used by certain investors, in conjunction with conventional IFRS measures, to enhance their understanding of the Company’s performance. These measures have been derived from the Company’s financial statements and applied on a consistent basis. The following tables below provide a reconciliation of these non-GAAP measures to the most directly comparable IFRS measure.
Total operating costs and site operating costs, net of by-product credits
Total costs of sales include all costs absorbed into inventory, as well as transportation costs and insurance recoverable. Site operating costs are calculated by removing net changes in inventory, depletion and amortization, insurance recoverable, and transportation costs from cost of sales. Site operating costs, net of by-product credits is calculated by subtracting by-product credits from the site operating costs. Site operating costs, net of by-product credits per pound are calculated by dividing the aggregate of the applicable costs by copper pounds produced. Total operating costs per pound is the sum of site operating costs, net of by-product credits and off-property costs divided by the copper pounds produced. By-product credits are calculated based on actual sales of molybdenum (net of treatment costs) and silver during the period divided by the total pounds of copper produced during the period. These measures are calculated on a consistent basis for the periods presented.
(Cdn$ in thousands, unless otherwise indicated) – 75% basis |
2022
Q4 |
2022
Q3 |
2022
Q2 |
2022
Q1 |
2022
YE |
Cost of sales | 73,112 | 84,204 | 90,992 | 89,066 | 337,374 |
Less: | |||||
Depletion and amortization | (10,147) | (13,060) | (15,269) | (13,506) | (51,982) |
Net change in inventories of finished goods | 1,462 | 2,042 | (3,653) | (7,577) | (7,726) |
Net change in inventories of ore stockpiles | 18,050 | 3,050 | (3,463) | (3,009) | 14,628 |
Transportation costs | (6,671) | (6,316) | (4,370) | (5,115) | (22,472) |
Site operating costs | 75,806 | 69,920 | 64,237 | 59,859 | 269,822 |
Less by-product credits: | |||||
Molybdenum, net of treatment costs | (11,022) | (4,122) | (3,023) | (3,831) | (21,999) |
Silver, excluding amortization of deferred revenue | 263 | 25 | 36 | 202 | 526 |
Site operating costs, net of by-product credits | 65,047 | 65,823 | 61,250 | 56,230 | 248,349 |
Total copper produced (thousand pounds) | 20,020 | 21,238 | 15,497 | 16,024 | 72,778 |
Total costs per pound produced | 3.25 | 3.10 | 3.95 | 3.51 | 3.41 |
Average exchange rate for the period (CAD/US$) | 1.36 | 1.31 | 1.28 | 1.27 | 1.30 |
Site operating costs, net of by-product credits
(US$ per pound) |
2.39 | 2.37 | 3.10 | 2.77 | 2.62 |
Site operating costs, net of by-product credits | 65,047 | 65,823 | 61,250 | 56,230 | 248,349 |
Add off-property costs: | |||||
Treatment and refining costs | 3,104 | 3,302 | 2,948 | 2,133 | 11,486 |
Transportation costs | 6,671 | 6,316 | 4,370 | 5,115 | 22,472 |
Total operating costs | 74,822 | 75,441 | 68,568 | 63,478 | 282,307 |
Total operating costs (C1) (US$ per pound) | 2.75 | 2.72 | 3.47 | 3.13 | 2.98 |
NON-GAAP PERFORMANCE MEASURES – CONTINUED
(Cdn$ in thousands, unless otherwise indicated) – 75% basis |
2021
Q4 |
2021
Q3 |
2021
Q2 |
2021
Q1 |
2021
YE |
Cost of sales | 57,258 | 65,893 | 74,056 | 72,266 | 269,473 |
Less: | |||||
Depletion and amortization | (16,202) | (17,011) | (17,536) | (15,838) | (66,587) |
Net change in inventories of finished goods | 13,497 | 762 | (4,723) | 2,259 | 11,795 |
Net change in inventories of ore stockpiles | 4,804 | 6,291 | 2,259 | (8,226) | 5,128 |
Transportation costs | (4,436) | (5,801) | (4,303) | (3,305) | (17,845) |
Site operating costs | 54,921 | 50,134 | 49,753 | 47,156 | 201,964 |
Less by-product credits: | |||||
Molybdenum, net of treatment costs | (7,755) | (8,574) | (6,138) | (5,604) | (28,071) |
Silver, excluding amortization of deferred revenue | (330) | 300 | 64 | (238) | (204) |
Site operating costs, net of by-product credits | 46,836 | 41,860 | 43,679 | 41,314 | 173,689 |
Total copper produced (thousand pounds) | 21,590 | 25,891 | 20,082 | 16,684 | 84,247 |
Total costs per pound produced | 2.17 | 1.62 | 2.18 | 2.48 | 2.06 |
Average exchange rate for the period (CAD/USD) | 1.26 | 1.26 | 1.23 | 1.27 | 1.25 |
Site operating costs, net of by-product credits
(US$ per pound) |
1.72 | 1.28 | 1.77 | 1.96 | 1.64 |
Site operating costs, net of by-product credits | 46,836 | 41,860 | 43,679 | 41,314 | 173,689 |
Add off-property costs: | |||||
Treatment and refining costs | 1,480 | 3,643 | 1,879 | 2,414 | 9,416 |
Transportation costs | 4,436 | 5,801 | 4,303 | 3,305 | 17,845 |
Total operating costs | 52,752 | 51,304 | 49,861 | 47,033 | 200,950 |
Total operating costs (C1) (US$ per pound) | 1.94 | 1.57 | 2.02 | 2.23 | 1.90 |
Total Site Costs
Total site costs is comprised of the site operating costs charged to cost of sales as well as mining costs capitalized to property, plant and equipment in the period. This measure is intended to capture Taseko’s share of the total site operating costs incurred in the quarter at the Gibraltar mine calculated on a consistent basis for the periods presented.
(Cdn$ in thousands, unless otherwise indicated) – 75% basis |
2022
Q4 |
2022
Q3 |
2022
Q2 |
2022
Q1 |
2022
YE |
Site operating costs | 75,806 | 69,920 | 64,237 | 59,859 | 269,822 |
Add: | |||||
Capitalized stripping costs | 3,866 | 1,121 | 11,887 | 15,142 | 32,016 |
Total site costs | 79,672 | 71,041 | 76,124 | 75,001 | 301,838 |
NON-GAAP PERFORMANCE MEASURES – CONTINUED
(Cdn$ in thousands, unless otherwise indicated) – 75% basis |
2021
Q4 |
2021
Q3 |
2021
Q2 |
2021
Q1 |
2021
YE |
Site operating costs | 54,921 | 50,134 | 49,753 | 47,156 | 201,964 |
Add: | |||||
Capitalized stripping costs | 12,737 | 10,882 | 14,794 | 21,452 | 59,865 |
Total site costs | 67,658 | 61,016 | 64,547 | 68,608 | 261,829 |
Adjusted net income (loss)
Adjusted net income (loss) removes the effect of the following transactions from net income as reported under IFRS:
Management believes these transactions do not reflect the underlying operating performance of our core mining business and are not necessarily indicative of future operating results. Furthermore, unrealized gains/losses on derivative instruments, changes in the fair value of financial instruments, and unrealized foreign currency gains/losses are not necessarily reflective of the underlying operating results for the reporting periods presented.
(Cdn$ in thousands, except per share amounts) |
2022
Q4 |
2022
Q3 |
2022
Q2 |
2022
Q1 |
2022
YE |
Net income (loss) | (2,275) | (23,517) | (5,274) | 5,095 | (25,971) |
Unrealized foreign exchange (gain) loss | (5,279) | 28,083 | 11,621 | (4,398) | 30,027 |
Unrealized (gain) loss on derivatives | 20,137 | (72) | (30,747) | 7,486 | (3,196) |
Estimated tax effect of adjustments | (5,437) | 19 | 8,302 | (2,021) | 863 |
Adjusted net income (loss) | 7,146 | 4,513 | (16,098) | 6,162 | 1,723 |
Adjusted EPS | 0.02 | 0.02 | (0.06) | 0.02 | 0.01 |
(Cdn$ in thousands, except per share amounts) |
2021
Q4 |
2021
Q3 |
2021
Q2 |
2021
Q1 |
2021
YE |
Net income (loss) | 11,762 | 22,485 | 13,442 | (11,217) | 36,472 |
Unrealized foreign exchange (gain) loss | (1,817) | 9,511 | (3,764) | 8,798 | 12,728 |
Realized foreign exchange gain on settlement of long- term debt |
- | - | - | (13,000) | (13,000) |
Loss on settlement of long-term debt | - | - | - | 5,798 | 5,798 |
Call premium on settlement of long-term debt | - | - | - | 6,941 | 6,941 |
Unrealized (gain) loss on derivatives | 4,612 | (6,817) | 370 | 802 | (1,033) |
Estimated tax effect of adjustments | (1,245) | 1,841 | (100) | (3,657) | (3,161) |
Adjusted net income (loss) | 13,312 | 27,020 | 9,948 | (5,535) | 44,745 |
Adjusted EPS | 0.05 | 0.10 | 0.04 | (0.02) | 0.16 |
NON-GAAP PERFORMANCE MEASURES – CONTINUED
Adjusted EBITDA
Adjusted EBITDA is presented as a supplemental measure of the Company’s performance and ability to service debt. Adjusted EBITDA is frequently used by securities analysts, investors and other interested parties in the evaluation of companies in the industry, many of which present Adjusted EBITDA when reporting their results. Issuers of “high yield” securities also present Adjusted EBITDA because investors, analysts and rating agencies consider it useful in measuring the ability of those issuers to meet debt service obligations.
Adjusted EBITDA represents net income before interest, income taxes, and depreciation and also eliminates the impact of a number of items that are not considered indicative of ongoing operating performance. Certain items of expense are added and certain items of income are deducted from net income that are not likely to recur or are not indicative of the Company’s underlying operating results for the reporting periods presented or for future operating performance and consist of:
(Cdn$ in thousands) |
2022
Q4 |
2022
Q3 |
2022
Q2 |
2022
Q1 |
2022
YE |
Net income (loss) | (2,275) | (23,517) | (5,274) | 5,095 | (25,971) |
Add: | |||||
Depletion and amortization | 10,147 | 13,060 | 15,269 | 13,506 | 51,982 |
Finance expense | 10,135 | 12,481 | 12,236 | 12,155 | 47,007 |
Finance income | (700) | (650) | (282) | (166) | (1,798) |
Income tax expense | 1,222 | 3,500 | 922 | 1,188 | 6,832 |
Unrealized foreign exchange (gain) loss | (5,279) | 28,083 | 11,621 | (4,398) | 30,027 |
Unrealized (gain) loss on derivatives | 20,137 | (72) | (30,747) | 7,486 | (3,196) |
Amortization of share-based compensation expense | 1,794 | 1,146 | (2,061) | 3,273 | 4,152 |
Adjusted EBITDA | 35,181 | 34,031 | 1,684 | 38,139 | 109,035 |
(Cdn$ in thousands) |
2021
Q4 |
2021
Q3 |
2021
Q2 |
2021
Q1 |
2021
YE |
Net income (loss) | 11,762 | 22,485 | 13,442 | (11,217) | 36,472 |
Add: | |||||
Depletion and amortization | 16,202 | 17,011 | 17,536 | 15,838 | 66,587 |
Finance expense (includes loss on settlement of long- term debt and call premium) |
12,072 | 11,875 | 11,649 | 23,958 | 59,554 |
Finance income | (218) | (201) | (184) | (75) | (678) |
Income tax (recovery) expense | 9,300 | 22,310 | 7,033 | (4,302) | 34,341 |
Unrealized foreign exchange (gain) loss | (1,817) | 9,511 | (3,764) | 8,798 | 12,728 |
Realized foreign exchange gain on settlement of long- term debt |
- | - | - | (13,000) | (13,000) |
Unrealized (gain) loss on derivatives | 4,612 | (6,817) | 370 | 802 | (1,033) |
Amortization of share-based compensation expense | 1,075 | 117 | 1,650 | 2,920 | 5,762 |
Adjusted EBITDA | 52,988 | 76,291 | 47,732 | 23,722 | 200,733 |
NON-GAAP PERFORMANCE MEASURES – CONTINUED
Earnings from mining operations before depletion and amortization
Earnings from mining operations before depletion and amortization is earnings from mining operations with depletion and amortization added back. The Company discloses this measure, which has been derived from our financial statements and applied on a consistent basis, to provide assistance in understanding the results of the Company’s operations and financial position and it is meant to provide further information about the financial results to investors.
(Cdn$ in thousands) |
2022
Q4 |
2022
Q3 |
2022
Q2 |
2022
Q1 |
2022
YE |
Earnings (loss) from mining operations | 27,506 | 5,510 | (8,048) | 29,267 | 54,235 |
Add: | |||||
Depletion and amortization | 10,147 | 13,060 | 15,269 | 13,506 | 51,982 |
Earnings from mining operations before depletion and amortization | 37,653 | 18,570 | 7,221 | 42,773 | 106,217 |
(Cdn$ in thousands) |
2021
Q4 |
2021
Q3 |
2021
Q2 |
2021
Q1 |
2021
YE |
Earnings from mining operations | 45,714 | 66,670 | 36,946 | 14,475 | 163,805 |
Add: | |||||
Depletion and amortization | 16,202 | 17,011 | 17,536 | 15,838 | 66,587 |
Earnings from mining operations before depletion and amortization | 61,916 | 83,681 | 54,482 | 30,313 | 230,392 |
Site operating costs per ton milled
The Company discloses this measure, which has been derived from our financial statements and applied on a consistent basis, to provide assistance in understanding the Company’s site operations on a tons milled basis.
(Cdn$ in thousands, except per ton milled amounts) |
2022
Q4 |
2022
Q3 |
2022
Q2 |
2022
Q1 |
2022
YE |
Site operating costs (included in cost of sales) | 75,806 | 69,920 | 64,237 | 59,859 | 269,822 |
Tons milled (thousands) (75% basis) | 5,462 | 6,172 | 5,774 | 5,285 | 22,692 |
Site operating costs per ton milled | $13.88 | $11.33 | $11.13 | $11.33 | $11.89 |
(Cdn$ in thousands, except per ton milled amounts) |
2021
Q4 |
2021
Q3 |
2021
Q2 |
2021
Q1 |
2021
YE |
Site operating costs (included in cost of sales) | 54,921 | 50,134 | 49,753 | 47,156 | 201,964 |
Tons milled (thousands) (75% basis) | 5,523 | 5,576 | 5,429 | 5,402 | 21,930 |
Site operating costs per ton milled | $9.94 | $8.99 | $9.16 | $8.73 | $9.21 |
CAUTION REGARDING FORWARD-LOOKING INFORMATION
This document contains “forward-looking statements” that were based on Taseko’s expectations, estimates and projections as of the dates as of which those statements were made. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as “outlook”, “anticipate”, “project”, “target”, “believe”, “estimate”, “expect”, “intend”, “should” and similar expressions.
Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the Company’s actual results, level of activity, performance or achievements to be materially different from those expressed or implied by such forward-looking statements. These included but are not limited to:
For further information on Taseko, investors should review the Company’s annual Form 40-F filing with the United States Securities and Exchange Commission www.sec.gov and home jurisdiction filings that are available at www.sedar.com.
Cautionary Statement on Forward-Looking Information
This discussion includes certain statements that may be deemed "forward-looking statements". All statements in this discussion, other than statements of historical facts, that address future production, reserve potential, exploration drilling, exploitation activities, and events or developments that the Company expects are forward-looking statements. Although we believe the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continued availability of capital and financing and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. All of the forward-looking statements made in this MD&A are qualified by these cautionary statements. We disclaim any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except to the extent required by applicable law. Further information concerning risks and uncertainties associated with these forward-looking statements and our business may be found in our most recent Form 40-F/Annual Information Form on file with the SEC and Canadian provincial securities regulatory authorities.