THIS ANNOUNCEMENT AND THE INFORMATION CONTAINED HEREIN IS RESTRICTED AND IS NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY, IN, INTO OR FROM THE UNITED STATES, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA OR ANY OTHER JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OR REGULATIONS OF THAT JURISDICTION. PLEASE SEE THE IMPORTANT NOTICES AT THE END OF THIS ANNOUNCEMENT.
THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION AS DEFINED IN ARTICLE 7 OF THE MARKET ABUSE REGULATION NO. 596/2014 ("MAR"). UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE INFORMATION IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.
88 Energy Limited
Oversubscribed Placing to raise A$17 million
88 Energy Limited ("88 Energy" or the "Company") (ASX, AIM: 88E) is pleased to announce that further to the notification on 30 April 2018, the Company has conditionally placed 460,811,112 ordinary shares of no par value (the "Placing Shares") at A$0.037 (equivalent to £0.02) per Placing Share (the "Placement Price") to raise gross proceeds of A$17 million (the "Placing"). The Placing was significantly oversubscribed.
The Placing was conducted in the UK through a bookbuilding process, managed by Cenkos Securities plc ("Cenkos") in the UK and Hartleys Limited ("Hartleys") in Australia.
The Placing Shares, which will rank pari passu with the existing ordinary shares in the Company, have been conditionally placed subject to admission to trading on both the ASX and AIM ("Admission"). Application will be made for the Placing Shares to be admitted to trading on both the ASX and AIM, with Admission expected to occur on 9 May 2018.
The issue of the Placing Shares is not subject to shareholder approval as the issuance will fall within the Company's placement capacity pursuant to ASX Listing Rule 7.1 and 7.1A.
The Company also announces that, following completion of the Placing, the trading halt on the ASX is anticipated to be lifted prior to ASX market open on the 2nd May 2018.
Following the issue of the Placing Shares, the Company will have 5,557,964,694 ordinary shares in issue, all of which have voting rights. The figure of 5,557,964,694 ordinary shares may be used by shareholders as the denominator for the calculations by which they will determine if they are required to notify their interest in, or change their interest in, the Company.
For further information please contact:
88 Energy Ltd |
admin@88energy.com |
Dave Wall, Managing Director |
Tel: +61 8 9485 0990 |
Finlay Thomson, Investor Relations |
Tel: +44 7976 248 471 |
|
|
Hartleys Ltd |
|
Dale Bryan |
Tel: +61 8 9268 2829 |
|
|
Cenkos Securities Plc |
|
Neil McDonald |
Tel: +44 (0)131 220 9771 / +44 (0)207 397 1953 |
Derrick Lee |
Tel: +44 (0)131 220 9100 / +44 (0)207 397 8900 |
Pursuant to the requirements of the ASX Listing Rules Chapter 5 and the AIM Rules for Companies, the technical information and resource reporting contained in this announcement was prepared by, or under the supervision of, Mr Brent Villemarette, who is a Non Executive Director of the Company. Mr Villemarette has more than 30 years' experience in the petroleum industry, is a member of the Society of Petroleum Engineers, and a qualified Reservoir Engineer who has sufficient experience that is relevant to the style and nature of the oil prospects under consideration and to the activities discussed in this document. Mr Villemarette has reviewed the information and supporting documentation referred to in this announcement and considers the prospective resource estimates to be fairly represented and consents to its release in the form and context in which it appears. His academic qualifications and industry memberships appear on the Company's website and both comply with the criteria for "Competence" under clause 3.1 of the Valmin Code 2015. Terminology and standards adopted by the Society of Petroleum Engineers "Petroleum Resources Management System" have been applied in producing this document.
Project Icewine Overview
In November 2014, the Company entered into a binding agreement with Burgundy Xploration (BEX) to acquire a significant working interest (87.5%, reducing to 77.5% on spud of the first well on the project) in a large acreage position on a multiple objective, liquids rich exploration opportunity onshore Alaska, North America, referred to as Project Icewine. The current gross acreage position is ~475,000 contiguous acres (301,000 acres net to the Company).
The Project is located on an all year operational access road with both conventional and unconventional oil potential. The primary term for the State leases is 10 years with no mandatory relinquishment and a low 16.5% royalty.
The HRZ liquids-rich resource play has been successfully evaluated based on core obtained in the recently completed (December 2015) Icewine #1 exploration well, marking the completion of Phase I of Project Icewine. Phase II has now commenced, with drilling at the follow-up appraisal well, Icewine#2, commencing early 2Q2017. Production testing is ongoing.
Significant conventional prospectivity has also been identified on recently acquired 2D seismic across the project acreage.
Exploration incentives provided by the State of Alaska with up to 35% of net operating loss refundable in cash were concluded for all expenditure post 31 December 2017.
The primary objective is an untested, unconventional liquids-rich shale play in a prolific source rock, the HRZ shale (Brookian Sequence), that co-sourced the largest oil field in North America; the giant Prudhoe Bay Oil Field Complex. Internal modelling and analysis indicates that Project Icewine is located in a high liquids vapour phase sweetspot analogous to those encountered in other Tier 1 shale plays e.g. the Eagle Ford, Texas.
Recently acquired 2D seismic has identified large conventional leads at Project Icewine within the same Brookian petroleum system and shallow to the HRZ shale, including potential high porosity channel and turbiditic sands associated with slope apron and deepwater fan plays. The Brookian conventional play is proven on the North Slope; the USGS (2013) estimated the remaining oil potential to be 2.1 billion barrels within the Brookian sequence. Two recent discoveries in the Brookian have already exceeded these estimates, with Armstrong/Repsol discovering 1.4 billion barrels in 2015 and Caelus announcing a 2.5 billion barrel discovery in 2016. Additional conventional potential exists in the Brookian delta topset play, deeper Kuparuk sands and the Ivishak Formation.
A Prospective Resources Report by DeGolyer and MacNaughton, was commissioned by 88 Energy to evaluate the unconventional resource potential of Project Icewine in February 2016 and was released to the market on 6th April 2016.
About 88 Energy
88 Energy has a 63% working interest and operatorship in ~342,000 acres onshore the prolific North Slope of Alaska ("Project Icewine"). Gross contiguous acreage position for the Joint Venture is ~475,000 acres (88E 301,000 net acres). The North Slope is the host to the 15 billion barrel Prudhoe Bay oilfield complex, the largest conventional oil pool in North America. The Company, with its Joint Venture partner Burgundy Xploration, has identified highly prospective play types that are likely to exist on the Project Icewine acreage - two conventional and one unconventional. The large unconventional resource potential of Project Icewine was independently verified by leading international petroleum resource consultant DeGolyer and MacNaughton. In addition to the interpreted high prospectivity, the project is strategically located on a year-round operational access road and only 35 miles south of Pump Station 1 where Prudhoe Bay feeds into the Trans Alaska Pipeline System. The Company acquired 2D seismic in early 2016 to take advantage of the globally unique fiscal system in Alaska, which allowed for up to 75% of 1H2016 exploration expenditure to be rebated in cash. Results from the seismic mapping and prospectivity review are encouraging, and form the basis of a conventional prospectivity portfolio for Project Icewine. In late 2015, the Company completed its maiden well at the project, Icewine#1, to evaluate an unconventional source rock reservoir play which yielded excellent results from analysis of core obtained from the HRZ shale. The follow-up well with a multi-stage stimulation and test of the HRZ shale, Icewine#2, spud in early 2Q2017. Flow testing at Icewine#2 is scheduled to re-commence in April/May 2018.