Operational Update

RNS Number : 3022T
Aminex PLC
05 December 2011
 



 

 

NTORYA-1 PROGRESS REPORT, TANZANIA

 

 

Aminex PLC ('Aminex') today announces important progress on preparations to drill the Ntorya-1 exploration well in the Ruvuma Production Sharing Agreement ("Ruvuma PSA") Area in southern Tanzania.

 

The Ntorya-1 drill site was completed at the end of October and the rig camp is now fully installed.  The Caroil-6 rig contracted for the well has been barged from its previous location on Nyuni Island to the southern port of Mtwara and is currently being trucked 30 kilometres to the drill site.  The well is expected to spud in the second half of December and to reach the main target around 30 days from spud.

 

Ntorya-1 is located onshore in the Mtwara licence 14 kilometres south of the Likonde-1 well, which was drilled in 2010 and proved the presence of an active petroleum system in the onshore Ruvuma Basin.  Ntorya-1 will be drilled to a planned total depth of 2026m and targets the same high quality Basal Tertiary and Upper Cretaceous sands encountered in the Likonde-1 well.

 

Aminex estimates a 20% probability of discovering hydrocarbons in the Ntorya prospect, with a mean recoverable resource potential of 100 million barrels of oil equivalent. 

 

Partners are: Ndovu Resources Ltd. (Aminex), operator, 56.25%, Tullow Tanzania B.V., 25%, Solo Oil PLC, 18.75%.

 

 

 

For further information:

 

Aminex PLC                                          +44 (0) 20 7291 3100

Stuard Detmer - CEO

 

M: Communications                           

Patrick d'Ancona                                 +44 (0) 20 7920 2347 or +44 (0) 7768 981 256

Eleanor Williamson                           +44 (0) 20 7920 2339 or +44 (0) 7970 246 725

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUGGMWPUPGGMP

Companies

Aminex (CDI) (AEX)
UK 100

Latest directors dealings