22 October 2015
Anglo American plc
Production Report for the third quarter ended 30 September 2015
Click on, or paste the following link into your web browser, to view the associated PDF document
http://www.rns-pdf.londonstockexchange.com/rns/0390D_-2015-10-21.pdf
Overview
Q3 2015 |
Q3 2014 |
% vs. Q3 2014 |
YTD 2015 |
YTD 2014 |
% vs. YTD 2014 |
|
Iron ore - Kumba (Mt) |
11.4 |
13.0 |
(12)% |
33.9 |
35.8 |
(5)% |
Iron ore - Minas-Rio (Mt)(1) |
2.9 |
- |
nm |
5.9 |
- |
nm |
Export metallurgical coal (Mt) |
5.5 |
5.1 |
8% |
15.7 |
16.0 |
(2)% |
Export thermal coal (Mt) |
8.8 |
9.0 |
(2)% |
26.1 |
25.0 |
5% |
Copper (t)(3) (4) |
171,100 |
176,900 |
(3)% |
527,400 |
573,300 |
(8)% |
Nickel (t)(5) |
6,800 |
10,700 |
(36)% |
19,800 |
30,500 |
(35)% |
Platinum (produced ounces) (koz)(6) |
614 |
541 |
14% |
1,739 |
1,267 |
37% |
Diamonds (Mct)(7) |
6.0 |
8.2 |
(27)% |
21.6 |
24.2 |
(11)% |
· Q3 2015 production increased by 2% (on a copper equivalent basis) compared to Q3 2014 and by 3% compared to Q2 2015.
· Iron ore production from Kumba decreased by 12% to 11.4 million tonnes due to a temporary lack of sufficient exposed high quality ore for blending purposes at Sishen and adjustments to the mine plan and schedule as it transitions to the lower cost pit configuration.
· Minas-Rio produced 2.9 million tonnes (wet basis) of iron ore, a 60% increase compared to Q2 2015, reflecting the ongoing ramp up of the operation.
· Export metallurgical coal production increased by 8% to 5.5 million tonnes, driven by productivity improvements at Grasstree, which more than offset the loss of production from Peace River Coal being placed on care and maintenance in December 2014.
· Export thermal coal production was broadly flat at 8.8 million tonnes, with higher production at Cerrejón offsetting lower production from South Africa.
· Copper production from retained operations increased by 1%, while total production decreased by 3% to 171,100 tonnes as a result of the sale of the Norte assets, effective for reporting from 1 September.
· Nickel production decreased by 36% to 6,800 tonnes due to the planned Barro Alto furnace rebuilds. Both furnace rebuilds are now complete, ahead of schedule and below budgeted cost, with Furnace 2 operating at design capacity and Furnace 1 currently being ramped up.
· Platinum production (expressed as metal in concentrate)(6) increased by 14% to 614,300 ounces due to Rustenburg, Amandelbult and Union mines ramping up to normal production levels during the comparable period in 2014 following the strike.
· Diamond production decreased by 27% to 6.0 million carats, following the decision to reduce production to better reflect current trading conditions.
(1) Wet basis; (2) Not meaningful (nm); (3) Copper production from the Copper business unit; (4) Copper production shown on a contained metal basis; (5) Nickel production from the Nickel business unit; (6) In keeping with industry benchmarks, production disclosure has been amended to reflect own mine production and purchases of metal in concentrate. Previous disclosure of own mine production and purchases of metal in concentrate was converted to equivalent refined production using standard smelting and refining recoveries; (7) De Beers production on 100% basis.
IRON ORE AND MANGANESE
Iron Ore and Manganese |
Q3 2015 |
Q3 2014 |
Q3 2015 vs. Q3 2014 |
Q2 2015 |
Q3 2015 vs. Q2 2015 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD2014 |
||
Iron ore - Kumba |
000t |
11,391 |
12,972 |
(12)% |
10,385 |
10% |
33,943 |
35,765 |
(5)% |
|
Iron ore - Minas-Rio(1) |
000t |
2,919 |
- |
nm |
1,826 |
60% |
5,922 |
- |
nm |
|
Manganese ore(2) |
000t |
923 |
866 |
7% |
806 |
15% |
2,516 |
2,427 |
3% |
|
Manganese alloys(3) |
000t |
44 |
68 |
(36)% |
54 |
(18)% |
170 |
206 |
(17)% |
|
(1) Wet basis
(2) Saleable production
(3) Production includes medium carbon ferro-manganese
Kumba Iron Ore - Production from Kumba Iron Ore decreased by 12% to 11.4 million tonnes.
Sishen produced 7.7 million tonnes, a decrease of 17% due to a temporary lack of sufficient exposed high quality ore for blending purposes and adjustments to the mine plan and schedule as it transitions to the lower cost pit configuration.
At Kolomela, revised mining plans were implemented, including deferral of mining at one of three pits. Efficiencies and throughput at the plant continued to improve, resulting in production of 3.3 million tonnes for the quarter.
Export sales of 9.8 million tonnes were achieved, an increase of 9%, due to improved rail and port operating performance. Total finished product stocks were 4.7 million tonnes, compared with 6.5 million tonnes at 30 September 2014.
Production guidance
While further operational improvement is expected in Q4, Sishen production for 2015 is revised to ~31 million tonnes (previous guidance of 33 million tonnes). Waste mining activities are currently at ~230 million tonnes and are expected to be maintained at this level for the remainder of 2015 and 2016 to ensure adequate volumes of high quality ore are exposed (previous guidance ~200 million tonnes).
Kolomela production for the year has been revised upwards to ~12 million tonnes (previous guidance of 11 million tonnes) and, in order to ensure feed to the plants at this rate going forward, waste mining has been increased to 44-45 million tonnes (previous guidance of 35-38 million tonnes).
Overall production guidance at Kumba for 2015 is revised to ~43 million tonnes (previous guidance ~44 million tonnes).
Iron Ore Brazil - Minas-Rio's ramp up is continuing and gained further momentum during the third quarter, with 2.9 million tonnes (wet basis) produced, 60% higher than in Q2 2015. The mine, pipeline and filtration plant productivity rates are in line with plan, however Q3 production was marginally lower than expected due to water quality issues (a result of ongoing drought conditions and the mix of ore mined which limits blending opportunities in the current shallow pit).
Production guidance
As a result, full year production guidance for Minas-Rio has been decreased to ~10 million tonnes (wet basis) from previous guidance of 11 to 14 million tonnes (wet basis).
Manganese ore - Manganese ore production increased by 7% in Q3 2015, largely driven by the Australian operations. Ore production from South African operations was adjusted lower to meet decreased demand from Metalloys, where furnaces were shut in response to market conditions.
Manganese alloy - Manganese alloy production decreased by 36% with only one furnace in operation at Metalloys, due to market conditions, compared with full operation in Q3 2014.
COAL
Coal |
Q3 2015 |
Q3 2014 |
Q3 2015 vs. Q3 2014 |
Q2 2015 |
Q3 2015 vs. Q2 2015 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
|
Australia & Canada |
|
|
|
|
|
|
|
|
|
Metallurgical - Export |
000 t |
5,476 |
5,090 |
8% |
5,253 |
4% |
15,724 |
15,974 |
(2)% |
Thermal - Export |
000 t |
1,366 |
1,575 |
(13)% |
1,327 |
3% |
4,126 |
3,302 |
25% |
Thermal - Domestic |
000 t |
1,800 |
2,074 |
(13)% |
1,622 |
11% |
5,073 |
5,148 |
(1)% |
South Africa |
|
|
|
|
|
|
|
|
|
Thermal - Export |
000 t |
4,887 |
5,008 |
(2)% |
4,297 |
14% |
13,526 |
13,430 |
1% |
Thermal - Domestic (Eskom) |
000 t |
6,763 |
8,000 |
(15)% |
6,774 |
0% |
20,488 |
23,554 |
(13)% |
Thermal - Domestic (Non-Eskom) |
000 t |
1,730 |
1,863 |
(7)% |
1,590 |
9% |
5,022 |
4,834 |
4% |
Colombia |
|
|
|
|
|
|
|
|
|
Thermal - Export |
000 t |
2,527 |
2,369 |
7% |
2,944 |
(14)% |
8,446 |
8,225 |
3% |
Australia and Canada - Export metallurgical coal production increased by 8% to 5.5 million tonnes due to record production from Capcoal's underground Grasstree operation and development coal delivered from Grosvenor, which more than offset the effect of Peace River Coal being placed on care and maintenance in December 2014 (Q3 2014 production of 0.4 million tonnes) and an extended longwall move at Moranbah in Q3 to rectify equipment design issues.
Australian export thermal coal production decreased by 13% to 1.4 million tonnes due to expected lower production from Drayton as the mine nears the end of its life.
South Africa - Export thermal coal production reduced by 2% to 4.9 million tonnes. Lower production at Mafube, as the operation transitioned into new reserves, and the planned closure of one section at Goedehoep was partly offset by productivity improvements across all operations, notably at Zibulo (+10%) and Greenside (+6%).
Eskom production decreased by 15% to 6.8 million tonnes predominantly due to reduced demand from Eskom.
Domestic thermal (Non-Eskom) production reduced by 7% to 1.7 million tonnes due to a safety related stoppage at Isibonelo.
Colombia - Cerrejón's production increased by 7% to 2.5 million tonnes, due to improved productivity and heavy rain in the comparable period in Q3 2014.
Production guidance
Full year production guidance remains unchanged at 20 to 21 million tonnes for export metallurgical coal and 28 to 30 million tonnes for export thermal coal from South Africa and Colombia.
COPPER
Copper |
Q3 2015 |
Q3 2014 |
Q3 2015 vs. Q3 2014 |
Q2 2015 |
Q3 2015 vs. Q2 2015 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
|
Copper(1) |
t |
171,100 |
176,900 |
(3%) |
184,500 |
(7%) |
527,400 |
573,300 |
(8%) |
Copper retained operations(2) |
t |
153,100 |
150,900 |
1% |
156,700 |
(2%) |
456,600 |
496,700 |
(8%) |
(1) Copper production shown on a contained metal basis
(2) Anglo American Norte excluded for all periods
Copper - Copper production decreased by 3% to 171,100 tonnes, largely driven by the sale of the Norte assets, effective for reporting from 1 September 2015. Production from retained operations increased by 1%.
Production from Los Bronces increased by 3% to 98,600 tonnes. Higher grade material was processed to offset water constraints during July and August. High levels of plant throughput were achieved in September. The total year-to-date production impact of water constraints was ~18,000 tonnes, net of mitigating actions. Following high levels of precipitation during the latter part of Q3, no further water constraints are expected to impact production in 2015.
At Collahuasi, attributable production decreased by 10% to 43,500 tonnes. This was primarily due to major maintenance on two of the three smaller SAG lines (together ~40% of capacity) to address previously reported vibration and structural issues. Plant operating times are expected to increase during Q4 2015, with no major maintenance shutdowns expected.
On 29 September 2015, Collahuasi announced an intention to focus solely on the higher margin sulphide production and to curtail the higher cost oxide production, with a gradual ramp-down beginning from 1 October 2015.
El Soldado production increased by 64% to 11,000 tonnes due to higher grade ore processed.
Production guidance
Following the sale of the Norte assets (~37,000 tonnes impact) and the announced changes at Collahuasi (~3,000 tonnes impact at 44% share), full year production guidance is adjusted to 680,000 to 710,000 tonnes (previously 720,000 to 750,000 tonnes).
The annualised impact of the sale of the Norte assets is ~110,000 tonnes, whilst the annual impact of the curtailment of Collahuasi oxide production is ~10,000 tonnes (at 44% share).
NICKEL
Nickel |
Q3 2015 |
Q3 2014 |
Q3 2015 vs. Q3 2014 |
Q2 2015 |
Q3 2015 vs. Q2 2015 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
|
Nickel |
t |
6,800 |
10,700 |
(36)% |
6,300 |
8% |
19,800 |
30,500 |
(35)% |
Nickel - Nickel production decreased by 36% to 6,800 tonnes, due to the planned furnace rebuilds at Barro Alto. The Furnace 2 rebuild was concluded ahead of schedule, with first metal tapped in April 2015 and is now producing at nameplate capacity. First metal was tapped following the Furnace 1 rebuild in September 2015, also ahead of schedule, and ramp up is under way with nameplate capacity expected to be achieved by the end of 2016. The overall furnace rebuild is now expected to be completed at below budgeted cost.
Production from Codemin decreased by 13% to 2,100 tonnes mainly due to differences in maintenance timing between years.
Production guidance
Full year production guidance has been revised upwards to 28,000 to 30,000 tonnes (previously 25,000 to 30,000 tonnes).
NIOBIUM
Niobium |
Q3 2015 |
Q3 2014 |
Q3 2015 vs. Q3 2014 |
Q2 2015 |
Q3 2015 vs. Q2 2015 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
|
Niobium |
t |
1,800 |
1,200 |
50% |
1,600 |
13% |
4,700 |
3,400 |
38% |
Niobium - Niobium production increased by 50% to 1,800 tonnes following the ramp up of the Boa Vista Fresh Rock (BVFR) plant. Production from installed capacity is expected to increase to 6,800 tonnes per year once the BVFR plant reaches nameplate capacity in mid-2016 (previously 2017).
PHOSPHATES
Phosphates |
Q3 2015 |
Q3 2014 |
Q3 2015 vs. Q3 2014 |
Q2 2015 |
Q3 2015 vs. Q2 2015 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
|
Phosphates |
|
|
|
|
|
|
|
|
|
Concentrate |
t |
363,100 |
362,700 |
0% |
303,300 |
20% |
985,700 |
1,060,100 |
(7)% |
Phosphoric Acid |
t |
75,600 |
81,300 |
(7)% |
62,400 |
21% |
201,200 |
216,400 |
(7)% |
Fertiliser |
t |
294,400 |
284,700 |
3% |
274,200 |
7% |
807,400 |
827,600 |
(2)% |
Dicalcium phosphate (DCP) |
t |
33,700 |
44,100 |
(24)% |
38,700 |
(13)% |
108,600 |
119,300 |
(9)% |
Phosphates - Concentrate and fertiliser production was broadly in line with Q3 2014. Phosphoric acid production decreased by 7% to 75,600 tonnes mainly due to plant repairs at Cubatão and DCP production decreased by 24% as priority was given to phosphoric acid sales.
PLATINUM
Platinum |
|
Q3 2015 |
Q3 2014 |
Q3 2015 vs. Q3 2014 |
Q2 2015 |
Q3 2015 vs. Q3 2015 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
Refined |
|
|
|
|
|
|
|
|
|
Platinum |
000 oz |
611 |
460 |
33% |
561 |
9% |
1,714 |
1,316 |
30% |
Palladium |
000 oz |
391 |
316 |
23% |
388 |
1% |
1,127 |
868 |
30% |
Rhodium |
000 oz |
78 |
48 |
60% |
77 |
1% |
220 |
158 |
39% |
Copper - Refined |
t |
4,200 |
2,800 |
50% |
4,000 |
5% |
12,100 |
9,900 |
22% |
Copper - Matte(1) |
t |
- |
1,300 |
(100)% |
- |
- |
300 |
4,800 |
(94)% |
Nickel - Refined |
t |
6,400 |
5,200 |
23% |
6,000 |
7% |
18,100 |
15,700 |
15% |
Nickel - Matte(1) |
t |
- |
1,800 |
(100)% |
- |
- |
400 |
5,900 |
(93)% |
Gold |
000 oz |
23 |
15 |
58% |
30 |
(24)% |
84 |
67 |
25% |
Produced ounces(2) |
|
|
|
|
|
|
|
|
|
Platinum |
000 oz |
614 |
541 |
14% |
581 |
6% |
1,739 |
1,267 |
37% |
(1) Nickel and copper refined through third parties is shown as production of nickel matte and copper matte
(2) In keeping with industry benchmarks, production disclosure has been amended to reflect own mine production and purchases of metal in concentrate. Previous disclosure of own mine production and purchases of metal in concentrate was converted to equivalent refined production using standard smelting and refining recoveries.
Platinum - Platinum production increased by 14% to 614,300 ounces compared to 541,000 ounces in Q3 2014, where strike-affected mines were ramping up to normal production during the quarter. Production increased by 6% compared to Q2 2015 due to increased volumes, as the third quarter has the highest number of working days in the year.
Platinum production from own mines and tailings retreatment increased by 25% to 395,000 ounces due to the Rustenburg, Amandelbult and Union operations ramping up following the strike in the comparable period in Q3 2014. Lost production in Q3 2014 as a result of the ramp-up following the strike was approximately 92,000 ounces. In addition, as part of the on-going optimisation of Union mine, production decreased by 11,000 ounces in Q3 2015 following the closure of the mine declines at the end of 2014.
Mogalakwena production increased by 2% to 90,000 ounces due to higher achieved head grade and improved recoveries at the concentrator. The mine was affected by community disruption during the quarter which led to a loss of production of 9,000 ounces.
Rustenburg (including WLTR) increased platinum production from 101,000 ounces to 122,000 ounces; Union mine increased from 34,000 to 38,000 ounces; and Amandelbult increased from 75,000 to 126,000 ounces due to the mines ramping up to normal production in 2014 following the strike.
Independently managed production (mined and purchased) was broadly unchanged at 209,000 ounces.
Refined platinum production increased by 33% to 610,900 ounces, following a return to normal production after the industrial action and subsequent ramp up in Q3 2014. Refined palladium and rhodium increased for similar reasons. The mix of metals returned to normal compositions as all mines produced at normal rates.
Production guidance
Full year production guidance is unchanged at 2.3 to 2.4 million ounces.
DIAMONDS
Diamonds (100% basis) |
Q3 2015 |
Q3 2014 |
Q3 2015 vs. Q3 2014 |
Q2 2015 |
Q3 2015 vs. Q2 2015 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
|
Diamonds |
000 carats |
6,012 |
8,193 |
(27)% |
7,963 |
(25)% |
21,640 |
24,239 |
(11)% |
De Beers - Diamond production decreased by 27% to 6.0 million carats, following the decision to reduce production to better reflect current trading conditions.
At Debswana, production decreased by 35% to 4.1 million carats as a result of planned maintenance being prioritised in light of current trading conditions at both Jwaneng and Orapa, whilst at Jwaneng there was also a focus on waste mining and the processing of lower grade material.
Production at DBCM (South Africa) decreased by 8% to 1.0 million carats, largely as a result of reduced throughput and processing lower grades at Venetia, again as a response to current trading conditions.
Production in Namibia increased by 4% due to higher volumes from the marine operations, partly as a result of increased availability of the Mafuta vessel.
Production in Canada increased by 11%, due principally to improved grades at Snap Lake.
Production guidance
Full year production guidance is now ~29 million carats (previously 29 to 31 million carats), subject to trading conditions.
EXPLORATION AND EVALUATION
Exploration and Evaluation expenditure totalled $70 million, a decrease of 34% compared to Q3 2014. Exploration expenditure for the quarter was $32 million, a decrease of 26%. Evaluation expenditure for the quarter was $38 million, a decrease of 40%, primarily in relation to iron ore.
NOTE
This Production Report for the third quarter ended 30 September 2015 is unaudited.
PRODUCTION SUMMARY
The figures below include the entire output of consolidated entities and the Group's attributable share of joint operations, associates and joint ventures where applicable, except for De Beers' joint ventures which are quoted on a 100% basis.
Iron ore (tonnes) |
Q3 2015 |
Q2 2015 |
Q1 2015 |
Q4 2014 |
Q3 2014 |
Q3 2015 vs. Q2 2015 |
Q3 2015 vs. Q3 2014 |
YTD 2015 |
YTD 2014 |
H1 2015 vs. H1 2014 |
Kumba Iron Ore |
|
|
|
|
|
|
|
|
|
|
Lump |
7,322,300 |
6,761,800 |
7,889,900 |
8,048,000 |
8,235,700 |
8% |
(11)% |
21,974,100 |
23,220,800 |
(5)% |
Fines |
4,068,600 |
3,622,900 |
4,277,500 |
4,383,600 |
4,736,400 |
12% |
(14)% |
11,968,900 |
12,544,100 |
(5)% |
Total Kumba production |
11,390,900 |
10,384,700 |
12,167,400 |
12,431,600 |
12,972,100 |
10% |
(12)% |
33,943,000 |
35,764,900 |
(5)% |
Sishen |
7,669,800 |
7,176,200 |
8,885,500 |
9,286,300 |
9,260,200 |
7% |
(17)% |
23,731,600 |
26,254,300 |
(10)% |
Kolomela |
3,347,800 |
2,880,300 |
2,972,500 |
2,727,800 |
3,379,000 |
16% |
(1)% |
9,200,600 |
8,840,300 |
4% |
Thabazimbi |
373,300 |
328,200 |
309,400 |
417,500 |
332,900 |
14% |
12% |
1,010,800 |
670,300 |
51% |
Total Kumba production |
11,390,900 |
10,384,700 |
12,167,400 |
12,431,600 |
12,972,100 |
10% |
(12)% |
33,943,000 |
35,764,900 |
(5)% |
Kumba sales volumes |
|
|
|
|
|
|
|
|
|
|
RSA export iron ore |
9,846,500 |
11,732,600 |
11,471,600 |
11,699,000 |
9,058,800 |
(16)% |
9% |
33,050,700 |
28,768,700 |
15% |
RSA domestic iron ore |
960,700 |
1,348,000 |
1,434,600 |
901,800 |
1,129,200 |
(29)% |
(15)% |
3,743,300 |
3,918,000 |
(4)% |
Minas-Rio |
|
|
|
|
|
|
|
|
|
|
Pellet feed (wet basis) |
2,918,800 |
1,826,200 |
1,176,700 |
687,700 |
- |
60% |
nm |
5,921,700 |
- |
nm |
Minas-Rio sales volumes |
|
|
|
|
|
|
|
|
|
|
Export - pellet feed (wet basis) |
2,793,900 |
1,344,400 |
1,294,300 |
239,600 |
- |
108% |
nm |
5,432,600 |
- |
nm |
Samancor |
|
|
|
|
|
|
|
|
|
|
Manganese ore(1) |
923,200 |
805,700 |
786,700 |
882,100 |
866,000 |
15% |
7% |
2,515,600 |
2,426,500 |
3% |
Manganese alloys(1)(2) |
43,700 |
53,600 |
72,800 |
80,400 |
68,400 |
(18)% |
(36)% |
170,100 |
205,700 |
(17)% |
Samancor sales volumes |
|
|
|
|
|
|
|
|
|
|
Manganese ore |
813,900 |
720,700 |
829,900 |
841,100 |
853,000 |
13% |
(5)% |
2,364,500 |
2,541,000 |
(7)% |
Manganese alloys |
42,400 |
55,300 |
63,600 |
72,800 |
68,400 |
(23)% |
(38)% |
178,800 |
222,000 |
(19)% |
Coal (tonnes) |
Q3 2015 |
Q2 2015 |
Q1 2015 |
Q4 2014 |
Q3 2014 |
Q3 2015 vs. Q2 2015 |
Q3 2015 vs. Q3 2014 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
Australia |
|
|
|
|
|
|
|
|
|
|
Metallurgical - Export Coking |
4,115,000 |
3,743,800 |
3,746,900 |
3,364,400 |
3,196,200 |
10% |
29% |
11,605,700 |
10,077,900 |
15% |
Metallurgical - Export PCI |
1,360,500 |
1,508,800 |
1,248,800 |
1,395,800 |
1,493,900 |
(10)% |
(9)% |
4,118,000 |
4,595,000 |
(10)% |
|
5,475,500 |
5,252,600 |
4,995,700 |
4,760,200 |
4,690,100 |
4% |
17% |
15,723,800 |
14,672,900 |
7% |
Thermal - Export |
1,366,400 |
1,326,600 |
1,433,200 |
1,871,600 |
1,574,600 |
3% |
(13)% |
4,126,200 |
3,302,300 |
25% |
Thermal - Domestic |
1,800,500 |
1,622,400 |
1,649,900 |
1,966,300 |
2,074,400 |
11% |
(13)% |
5,072,800 |
5,148,300 |
(1)% |
|
3,166,900 |
2,949,000 |
3,083,100 |
3,837,900 |
3,649,000 |
7% |
(13)% |
9,199,000 |
8,450,600 |
9% |
Canada |
|
|
|
|
|
|
|
|
|
|
Metallurgical - Export Coking |
- |
- |
- |
160,200 |
385,000 |
0% |
nm |
- |
1,233,400 |
(100)% |
Metallurgical - Export PCI |
- |
- |
- |
11,200 |
15,000 |
0% |
nm |
- |
67,800 |
(100)% |
|
- |
- |
- |
171,400 |
400,000 |
0% |
nm |
- |
1,301,200 |
(100)% |
South Africa |
|
|
|
|
|
|
|
|
|
|
Thermal - Export |
4,887,200 |
4,296,700 |
4,341,700 |
4,782,800 |
5,007,600 |
14% |
(2)% |
13,525,600 |
13,430,400 |
1% |
Thermal - Domestic (Eskom) |
6,763,000 |
6,774,000 |
6,950,700 |
7,434,600 |
8,000,200 |
(0)% |
(15)% |
20,487,700 |
23,553,900 |
(13)% |
Thermal - Domestic (Non-Eskom) |
1,730,400 |
1,590,000 |
1,702,000 |
1,761,400 |
1,862,800 |
9% |
(7)% |
5,022,400 |
4,833,500 |
4% |
|
13,380,600 |
12,660,700 |
12,994,400 |
13,978,800 |
14,870,600 |
6% |
(10)% |
39,035,700 |
41,817,800 |
(7)% |
Colombia |
|
|
|
|
|
|
|
|
|
|
Thermal - Export |
2,526,800 |
2,944,400 |
2,975,000 |
3,002,300 |
2,368,800 |
(14)% |
7% |
8,446,200 |
8,224,700 |
3% |
Total Metallurgical coal production |
5,475,400 |
5,252,600 |
4,995,700 |
4,931,600 |
5,090,100 |
4% |
8% |
15,723,800 |
15,974,100 |
(2)% |
Total Export Thermal coal production |
8,780,400 |
8,567,700 |
8,749,900 |
9,656,700 |
8,951,000 |
2% |
(2)% |
26,098,000 |
24,957,400 |
5% |
Total Domestic Thermal coal production |
10,293,900 |
9,986,400 |
10,302,600 |
11,162,300 |
11,937,400 |
3% |
(14)% |
30,582,900 |
33,535,700 |
(9)% |
Total Coal production |
24,549,800 |
23,806,700 |
24,048,200 |
25,750,600 |
25,978,500 |
3% |
(5)% |
72,404,700 |
74,467,200 |
(3)% |
Sales volumes (own mined) |
|
|
|
|
|
|
|
|
|
|
Australia and Canada |
|
|
|
|
|
|
|
|
|
|
Metallurgical - Export(4) |
5,480,900 |
5,103,100 |
5,113,400 |
5,025,600 |
5,003,800 |
7% |
10% |
15,697,400 |
15,542,600 |
1% |
Thermal - Export |
1,638,600 |
1,505,800 |
1,418,200 |
2,345,400 |
1,703,800 |
9% |
(4)% |
4,562,500 |
3,620,800 |
26% |
Thermal - Domestic |
1,871,900 |
1,670,500 |
1,591,000 |
1,989,400 |
2,102,300 |
12% |
(11)% |
5,133,400 |
5,303,700 |
(3)% |
South Africa |
|
|
|
|
|
|
|
|
|
|
Thermal - Export |
4,568,600 |
4,967,400 |
5,195,200 |
5,139,300 |
4,473,700 |
(8)% |
2% |
14,731,100 |
12,433,500 |
18% |
Thermal - Domestic |
7,977,783 |
8,203,900 |
8,746,600 |
8,770,400 |
9,690,900 |
(3)% |
(18)% |
24,928,300 |
28,447,000 |
(12)% |
Colombia |
|
|
|
|
|
|
|
|
|
|
Thermal - Export |
2,853,400 |
2,765,700 |
3,005,100 |
2,732,000 |
3,076,800 |
3% |
(7)% |
8,624,200 |
8,582,100 |
0% |
Coal by mine (tonnes) |
Q3 2015 |
Q2 2015 |
Q1 2015 |
Q4 2014 |
Q3 2014 |
Q3 2015 vs. Q2 2015 |
Q3 2015 vs. Q3 2014 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
Australia |
|
|
|
|
|
|
|
|
|
|
Callide |
1,988,900 |
1,789,300 |
1,857,000 |
2,164,700 |
2,318,500 |
11% |
(14)% |
5,635,200 |
5,392,300 |
5% |
Capcoal (incl. Grasstree) |
2,353,300 |
1,793,500 |
2,259,100 |
2,074,300 |
1,816,300 |
31% |
30% |
6,405,900 |
5,568,500 |
15% |
Dawson |
1,249,400 |
1,375,500 |
663,800 |
1,074,800 |
1,041,400 |
(9)% |
20% |
3,288,700 |
3,165,400 |
4% |
Drayton |
600,400 |
462,800 |
707,500 |
920,200 |
817,000 |
30% |
(27)% |
1,770,700 |
2,184,600 |
(19)% |
Foxleigh |
494,800 |
511,200 |
478,300 |
579,200 |
551,200 |
(3)% |
(10)% |
1,484,300 |
1,455,300 |
2% |
Grosvenor |
147,300 |
121,800 |
51,600 |
- |
- |
21% |
0% |
320,700 |
- |
0% |
Jellinbah |
798,400 |
766,400 |
763,900 |
757,100 |
732,800 |
4% |
9% |
2,328,700 |
2,166,600 |
7% |
Moranbah North |
1,009,900 |
1,381,100 |
1,297,600 |
1,027,800 |
1,061,900 |
(27)% |
(5)% |
3,688,600 |
3,190,800 |
16% |
|
8,642,400 |
8,201,600 |
8,078,800 |
8,598,100 |
8,339,100 |
5% |
4% |
24,922,800 |
23,123,500 |
8% |
Canada |
|
|
|
|
|
|
|
|
|
|
Peace River Coal |
- |
- |
- |
171,400 |
400,000 |
0% |
(100)% |
- |
1,301,200 |
(100)% |
|
- |
- |
- |
171,400 |
400,000 |
0% |
(100)% |
- |
1,301,200 |
(100)% |
South Africa |
|
|
|
|
|
|
|
|
|
|
Goedehoop |
1,151,200 |
1,106,100 |
1,133,800 |
1,245,800 |
1,210,200 |
4% |
(5)% |
3,391,100 |
3,525,800 |
(4)% |
Greenside |
1,059,600 |
992,300 |
927,500 |
1,010,700 |
1,003,400 |
7% |
6% |
2,979,400 |
2,613,500 |
14% |
Zibulo |
1,592,500 |
1,385,000 |
1,281,100 |
1,367,900 |
1,450,000 |
15% |
10% |
4,258,500 |
3,685,900 |
16% |
Kleinkopje |
895,200 |
572,000 |
860,300 |
950,200 |
1,011,500 |
57% |
(11)% |
2,327,500 |
2,961,600 |
(21)% |
Landau |
1,144,600 |
1,065,000 |
979,900 |
1,208,800 |
1,195,900 |
7% |
(4)% |
3,189,500 |
2,969,600 |
7% |
Mafube |
370,100 |
344,500 |
361,500 |
414,700 |
525,400 |
7% |
(30)% |
1,076,000 |
1,260,700 |
(15)% |
New Vaal |
3,576,700 |
4,211,200 |
3,548,600 |
3,701,400 |
4,755,200 |
(15)% |
(25)% |
11,336,600 |
12,971,500 |
(13)% |
New Denmark |
881,600 |
441,100 |
872,600 |
1,312,400 |
724,900 |
100% |
22% |
2,195,300 |
2,455,500 |
(11)% |
Kriel |
1,613,000 |
1,546,000 |
1,813,300 |
1,462,400 |
1,614,000 |
4% |
(0)% |
4,972,300 |
5,415,600 |
(8)% |
Isibonelo |
1,096,100 |
997,500 |
1,215,800 |
1,304,500 |
1,380,100 |
10% |
(21)% |
3,309,500 |
3,958,100 |
(16)% |
|
13,380,600 |
12,660,700 |
12,994,400 |
13,978,800 |
14,870,600 |
6% |
(10)% |
39,035,700 |
41,817,800 |
(7)% |
Colombia |
|
|
|
|
|
|
|
|
|
|
Carbones del Cerrejón |
2,526,800 |
2,944,400 |
2,975,000 |
3,002,300 |
2,368,800 |
(14)% |
7% |
8,446,200 |
8,224,700 |
3% |
Total Coal production |
24,549,800 |
23,806,700 |
24,048,200 |
25,750,600 |
25,978,500 |
3% |
(5)% |
72,404,700 |
74,467,200 |
(3)% |
Copper (tonnes) on a contained metal basis unless otherwise stated (5) |
Q3 2015 |
Q2 2015 |
Q1 2015 |
Q4 2014 |
Q3 2014 |
Q3 2015 vs. Q2 2015 |
Q3 2015 vs. Q3 2014 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
Collahuasi 100% basis (Anglo American share 44%) |
|
|
|
|
|
|
|
|
|
|
Ore mined |
18,879,300 |
20,130,700 |
18,094,700 |
15,594,200 |
16,442,500 |
(6)% |
15% |
57,104,700 |
50,251,100 |
14% |
Ore processed - Oxide |
1,484,900 |
1,835,700 |
1,333,300 |
1,552,300 |
1,744,800 |
(19)% |
(15)% |
4,653,900 |
5,105,200 |
(9)% |
Ore processed - Sulphide |
9,464,800 |
10,464,200 |
11,060,300 |
11,991,600 |
11,689,600 |
(10)% |
(19)% |
30,989,300 |
36,944,500 |
(16)% |
Ore grade processed - Oxide (% ASCu)(6) |
0.63 |
0.60 |
0.69 |
0.68 |
0.78 |
6% |
(19)% |
0.63 |
0.74 |
(14)% |
Ore grade processed - Sulphide (% TCu)(7) |
1.09 |
1.15 |
1.08 |
1.1 |
1.12 |
(5)% |
(2)% |
1.11 |
1.08 |
3% |
Production - Copper cathode |
6,000 |
6,600 |
6,500 |
9,100 |
6,200 |
(9)% |
(3)% |
19,100 |
15,900 |
20% |
Production - Copper in concentrate |
92,800 |
105,500 |
98,000 |
110,400 |
104,000 |
(12)% |
(11)% |
296,300 |
335,000 |
(12)% |
Total copper production for Collahuasi |
98,800 |
112,100 |
104,500 |
119,500 |
110,200 |
(12)% |
(10)% |
315,400 |
350,900 |
(10)% |
Anglo American's share of copper production for Collahuasi(8) |
43,500 |
49,300 |
46,000 |
52,600 |
48,500 |
(12)% |
(10)% |
138,800 |
154,400 |
(10)% |
Anglo American Sur |
|
|
|
|
|
|
|
|
|
|
Los Bronces mine(9) |
|
|
|
|
|
|
|
|
|
|
Ore mined |
10,112,600 |
13,345,700 |
13,548,000 |
15,655,600 |
14,215,400 |
(24)% |
(29)% |
37,006,300 |
42,010,600 |
(12)% |
Marginal ore mined |
7,733,600 |
10,929,100 |
8,916,800 |
8,993,400 |
7,012,900 |
(29)% |
10% |
27,579,500 |
17,242,700 |
60% |
Ore processed - Sulphide |
11,584,300 |
10,447,300 |
9,250,100 |
12,739,000 |
14,202,100 |
11% |
(18)% |
31,281,700 |
41,408,700 |
(24)% |
Ore grade processed - Sulphide (% TCu) |
0.87 |
0.98 |
1.07 |
0.75 |
0.71 |
(11)% |
23% |
0.97 |
0.79 |
23% |
Production - Copper cathode |
8,500 |
7,800 |
9,000 |
8,300 |
9,100 |
9% |
(7)% |
25,300 |
27,900 |
(9)% |
Production - Copper in concentrate |
90,100 |
89,600 |
85,700 |
78,900 |
86,600 |
1% |
4% |
265,400 |
289,400 |
(8)% |
Production total |
98,600 |
97,400 |
94,700 |
87,200 |
95,700 |
1% |
3% |
290,700 |
317,300 |
(8)% |
El Soldado mine(9) |
|
|
|
|
|
|
|
|
|
|
Ore mined |
951,600 |
1,915,700 |
1,060,800 |
563,900 |
210,700 |
(50)% |
352% |
3,928,100 |
2,554,500 |
54% |
Ore processed - Sulphide |
1,441,800 |
1,752,100 |
1,214,000 |
1,762,700 |
1,806,600 |
(18)% |
(20)% |
4,407,900 |
5,440,900 |
(19)% |
Ore grade processed - Sulphide (% TCu) |
0.90 |
0.71 |
0.66 |
0.55 |
0.53 |
27% |
70% |
0.76 |
0.59 |
28% |
Production - Copper cathode |
0 |
0 |
200 |
400 |
300 |
nm |
nm |
200 |
800 |
(75)% |
Production - Copper in concentrate |
11,000 |
10,000 |
5,900 |
7,000 |
6,400 |
10% |
72% |
26,900 |
24,200 |
11% |
Production total |
11,000 |
10,000 |
6,100 |
7,400 |
6,700 |
10% |
64% |
27,100 |
25,000 |
8% |
Chagres Smelter(9) |
|
|
|
|
|
|
|
|
|
|
Ore smelted |
39,900 |
36,200 |
37,100 |
28,900 |
33,300 |
10% |
20% |
113,200 |
103,200 |
10% |
Production |
38,900 |
35,300 |
36,000 |
28,300 |
32,300 |
10% |
20% |
110,200 |
100,200 |
10% |
Total copper production for Anglo American Sur |
109,600 |
107,400 |
100,800 |
94,600 |
102,400 |
2% |
7% |
317,800 |
342,300 |
(7)% |
Anglo American Norte |
|
|
|
|
|
|
|
|
|
|
Mantos Blancos mine |
|
|
|
|
|
|
|
|
|
|
Ore processed - Sulphide |
718,400 |
1,043,300 |
1,073,800 |
1,059,300 |
1,156,100 |
(31)% |
(38)% |
2,835,500 |
3,343,100 |
(15)% |
Ore grade processed - Sulphide (% TCu) |
0.75 |
0.79 |
0.75 |
0.75 |
0.68 |
(5)% |
10% |
0.76 |
0.62 |
23% |
Production - Copper cathode |
5,000 |
8,500 |
6,900 |
7,300 |
6,500 |
(41)% |
(23)% |
20,400 |
19,400 |
5% |
Production - Copper in concentrate |
4,500 |
6,800 |
6,800 |
6,800 |
6,500 |
(34)% |
(31)% |
18,100 |
18,900 |
(4)% |
Production total |
9,500 |
15,300 |
13,700 |
14,100 |
13,000 |
(38)% |
(27)% |
38,500 |
38,300 |
1% |
Mantoverde mine |
|
|
|
|
|
|
|
|
|
|
Ore processed - Oxide |
1,838,000 |
2,487,900 |
2,279,400 |
2,582,100 |
2,634,100 |
(26)% |
(30)% |
6,605,300 |
7,730,700 |
(15)% |
Ore processed - Marginal ore |
1,658,000 |
2,790,000 |
1,496,800 |
2,274,500 |
2,077,300 |
(41)% |
(20)% |
5,944,800 |
6,371,600 |
(7)% |
Ore grade processed - Oxide (% ASCu) |
0.51 |
0.54 |
0.51 |
0.49 |
0.47 |
(6)% |
8% |
0.52 |
0.48 |
8% |
Ore grade processed - Marginal ore (% ASCu) |
0.20 |
0.21 |
0.22 |
0.23 |
0.23 |
(3)% |
(12)% |
0.21 |
0.23 |
(9)% |
Production - Copper cathode |
8,500 |
12,500 |
11,300 |
13,500 |
13,000 |
(32)% |
(35)% |
32,300 |
38,300 |
(16)% |
Total copper production for Anglo American Norte |
18,000 |
27,800 |
25,000 |
27,600 |
26,000 |
(35)% |
(31)% |
70,800 |
76,600 |
(8)% |
Total Copper segment copper production |
226,400 |
247,300 |
230,300 |
241,700 |
238,600 |
(8)% |
(5)% |
704,000 |
769,800 |
(9)% |
Total Attributable copper production(10) |
171,100 |
184,500 |
171,800 |
174,800 |
176,900 |
(7)% |
(3)% |
527,400 |
573,300 |
(8)% |
Total Attributable payable copper production |
165,800 |
179,000 |
166,800 |
169,700 |
171,700 |
(7)% |
(3)% |
511,600 |
556,200 |
(8)% |
Total Attributable sales volumes |
178,400 |
179,400 |
164,800 |
187,400 |
179,300 |
(1)% |
(1)% |
522,600 |
567,700 |
(8)% |
Total Attributable payable sales volumes |
172,900 |
173,800 |
160,100 |
181,700 |
173,900 |
(1)% |
(1)% |
506,800 |
550,800 |
(8)% |
Nickel (tonnes) unless otherwise stated (11) |
Q3 2015 |
Q2 2015 |
Q1 2015 |
Q4 2014 |
Q3 2014 |
Q3 2015 vs. Q2 2015 |
Q3 2015 vs. Q3 2014 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
Barro Alto |
|
|
|
|
|
|
|
|
|
|
Ore mined |
1,351,700 |
903,300 |
235,300 |
400,500 |
1,019,300 |
50% |
33% |
2,490,400 |
2,109,900 |
18% |
Ore processed |
330,700 |
281,100 |
294,600 |
276,000 |
531,900 |
18% |
(38)% |
906,400 |
1,551,400 |
(42)% |
Ore grade processed - %Ni |
1,79 |
1,80 |
1.77 |
1.86 |
1.86 |
(1)% |
(4)% |
1,79 |
1.81 |
(1)% |
Production |
4,700 |
4,100 |
4,400 |
4,500 |
8,300 |
15% |
(43)% |
13,100 |
23,800 |
(45)% |
Codemin |
|
|
|
|
|
|
|
|
|
|
Ore mined |
- |
8,600 |
- |
- |
- |
(100)% |
- |
8,600 |
6,800 |
26% |
Ore processed |
140,000 |
145,700 |
151,400 |
151,500 |
154,100 |
(4)% |
(9)% |
437,100 |
442,100 |
(1)% |
Ore grade processed - %Ni |
1,70 |
1.71 |
1.66 |
1.66 |
1.67 |
0% |
2% |
1,69 |
1.67 |
1% |
Production |
2,100 |
2,200 |
2,300 |
2,200 |
2,400 |
(5)% |
(13)% |
6,700 |
6,700 |
0% |
Total Nickel segment nickel production |
6,800 |
6,300 |
6,700 |
6,700 |
10,700 |
8% |
(36)% |
19,800 |
30,500 |
(35)% |
Sales volumes |
6,400 |
8,600 |
7,500 |
8,400 |
8,800 |
(26)% |
(27)% |
22,500 |
27,700 |
(19)% |
Niobium (tonnes) unless otherwise stated |
Q3 2015 |
Q2 2015 |
Q1 2015 |
Q4 2014 |
Q3 2014 |
Q3 2015 vs. Q2 2015 |
Q3 2015 vs. Q3 2014 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
Niobium |
|
|
|
|
|
|
|
|
|
|
Ore mined |
597,300 |
605,600 |
291,100 |
166,300 |
424,900 |
(1)% |
41% |
1,494,000 |
819,600 |
82% |
Ore processed |
578,400 |
570,400 |
501,800 |
377,700 |
237,900 |
1% |
143% |
1,650,600 |
706,300 |
134% |
Ore grade processed - %Nb |
0.93 |
0.93 |
0.96 |
1.05 |
1.08 |
0% |
(14)% |
0.94 |
1.04 |
(10)% |
Production |
1,800 |
1,600 |
1,300 |
1,300 |
1,200 |
13% |
50% |
4,700 |
3,400 |
38% |
Sales volumes |
1,400 |
1,500 |
1,300 |
1,100 |
1,200 |
(7)% |
17% |
4,300 |
3,500 |
23% |
Phosphates (tonnes) unless otherwise stated |
Q3 2015 |
Q2 2015 |
Q1 2015 |
Q2 2014 |
Q3 2014 |
Q3 2015 vs. Q2 2015 |
Q3 2015 vs. Q3 2014 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
Phosphates |
|
|
|
|
|
|
|
|
|
|
Concentrate |
363,100 |
303,300 |
319,300 |
355,600 |
362,700 |
20% |
0% |
985,700 |
1,060,100 |
(7%) |
Concentrate grade - %P2O5 |
36.8 |
36.9 |
36.9 |
36.8 |
37.3 |
(0%) |
(1%) |
36.8 |
37.1 |
(1%) |
Phosphoric acid |
75,600 |
62,400 |
63,200 |
78,600 |
81,300 |
21% |
(7%) |
201,200 |
216,400 |
(7%) |
Fertiliser |
294,400 |
274,200 |
238,800 |
284,900 |
284,700 |
7% |
3% |
807,400 |
827,600 |
(2%) |
High analysis fertiliser |
42,400 |
56,100 |
37,500 |
50,200 |
60,200 |
(24%) |
(30%) |
136,000 |
134,500 |
1% |
Low analysis fertiliser |
252,000 |
218,100 |
201,200 |
234,600 |
224,500 |
16% |
12% |
671,300 |
693,100 |
(3%) |
Dicalcium phosphate (DCP) |
33,700 |
38,700 |
36,200 |
44,800 |
44,100 |
(13%) |
(24%) |
108,600 |
119,300 |
(9%) |
Fertiliser sales volumes |
339,600 |
317,500 |
208,500 |
277,400 |
311,700 |
7% |
9% |
865,600 |
819,200 |
6% |
Platinum |
Q3 2015 |
Q2 2015 |
Q1 2015 |
Q4 2014 |
Q3 2014 |
Q3 2015 vs. Q2 2015 |
Q3 2015 vs. Q3 2014 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
Refined production |
|
|
|
|
|
|
|
|
|
|
Platinum (troy oz) |
610,900 |
560,600 |
542,400 |
573,700 |
460,000 |
9% |
33% |
1,713,900 |
1,315,800 |
30% |
Palladium (troy oz) |
390,700 |
387,700 |
348,100 |
357,700 |
316,400 |
1% |
23% |
1,126,500 |
867,700 |
30% |
Rhodium (troy oz) |
77,600 |
76,900 |
65,000 |
71,700 |
48,400 |
1% |
60% |
219,500 |
157,700 |
39% |
Copper refined (tonnes)(12) |
4,200 |
4,000 |
3,900 |
2,600 |
2,800 |
5% |
50% |
12,100 |
9,900 |
22% |
Copper matte (tonnes)(12) |
- |
- |
300 |
1,400 |
1,300 |
- |
nm |
300 |
4,800 |
(94)% |
Nickel refined (tonnes)(12) |
6,400 |
6,000 |
5,700 |
4,800 |
5,200 |
7% |
23% |
18,100 |
15,700 |
15% |
Nickel matte (tonnes)(12) |
- |
- |
400 |
1,800 |
1,800 |
- |
nm |
400 |
5,900 |
(93)% |
Gold (troy oz) |
23,000 |
30,400 |
30,100 |
28,900 |
14,600 |
(24)% |
58% |
83,500 |
66,700 |
25% |
Produced ounces |
|
|
|
|
|
|
|
|
|
|
Platinum (troy oz)(13) |
614,300 |
580,900 |
544,100 |
602,900 |
541,000 |
6% |
14% |
1,739,300 |
1,267,000 |
37% |
4E built-up head grade (g/tonne milled)(14) |
3.27 |
3.27 |
3.14 |
3.19 |
3.06 |
- |
7% |
3.23 |
2.92 |
11% |
Platinum sales volumes |
690,100 |
635,600 |
523,900 |
523,400 |
546,600 |
9% |
26% |
1,849,600 |
1,591,400 |
16% |
De Beers |
Q3 2015 |
Q2 2015 |
Q1 2015 |
Q4 2014 |
Q3 2014 |
Q3 2015 vs. Q2 2015 |
Q3 2015 vs. Q3 2014 |
YTD 2015 |
YTD 2014 |
YTD 2015 vs. YTD 2014 |
Carats recovered |
|
|
|
|
|
|
|
|
|
|
100% basis |
||||||||||
Orapa |
1,959,000 |
2,792,000 |
2,610,000 |
2,732,000 |
2,651,000 |
(30)% |
(26)% |
7,361,000 |
9,342,000 |
(21)% |
Letlhakane |
134,000 |
111,000 |
188,000 |
83,000 |
157,000 |
21% |
(15)% |
433,000 |
465,000 |
(7)% |
Damtshaa |
45,000 |
60,000 |
57,000 |
94,000 |
83,000 |
(25)% |
(46)% |
162,000 |
209,000 |
(22)% |
Jwaneng |
1,936,000 |
2,950,000 |
2,777,000 |
3,080,000 |
3,333,000 |
(34)% |
(42)% |
7,663,000 |
8,232,000 |
(7)% |
Debswana |
4,074,000 |
5,913,000 |
5,632,000 |
5,989,000 |
6,224,000 |
(31)% |
(35)% |
15,619,000 |
18,248,000 |
(14)% |
|
|
|
|
|
|
|
|
|
|
|
Namdeb |
148,000 |
131,000 |
96,000 |
121,000 |
156,000 |
13% |
(5)% |
375,000 |
492,000 |
(24)% |
Debmarine Namibia |
318,000 |
300,000 |
366,000 |
375,000 |
293,000 |
6% |
9% |
984,000 |
898,000 |
10% |
Namdeb Holdings |
466,000 |
431,000 |
462,000 |
496,000 |
449,000 |
8% |
4% |
1,359,000 |
1,390,000 |
(2)% |
|
|
|
|
|
|
|
|
|
|
|
Kimberley |
192,000 |
182,000 |
221,000 |
202,000 |
207,000 |
5% |
(7)% |
595,000 |
520,000 |
14% |
Venetia |
712,000 |
763,000 |
624,000 |
1,060,000 |
776,000 |
(7)% |
(8)% |
2,099,000 |
2,141,000 |
(2)% |
Voorspoed |
132,000 |
172,000 |
216,000 |
140,000 |
143,000 |
(23)% |
(8)% |
520,000 |
571,000 |
(9)% |
DBCM |
1,036,000 |
1,117,000 |
1,061,000 |
1,402,000 |
1,126,000 |
(7)% |
(8)% |
3,214,000 |
3,232,000 |
(1)% |
|
|
|
|
|
|
|
|
|
|
|
Snap Lake |
283,000 |
352,000 |
328,000 |
301,000 |
253,000 |
(20)% |
12% |
963,000 |
900,000 |
7% |
Victor |
153,000 |
150,000 |
182,000 |
178,000 |
141,000 |
2% |
9% |
485,000 |
469,000 |
3% |
De Beers Canada |
436,000 |
502,000 |
510,000 |
479,000 |
394,000 |
(13)% |
11% |
1,448,000 |
1,369,000 |
6% |
Total carats recovered |
6,012,000 |
7,963,000 |
7,665,000 |
8,366,000 |
8,193,000 |
(25)% |
(27)% |
21,640,000 |
24,239,000 |
(11)% |
Sales volumes (15) |
|
|
|
|
|
|
|
|
|
|
Total sales volume - carats (100%) (Mct) |
3.0 |
5.4 |
8.6 |
8.0 |
7.4 |
(44)% |
(59)% |
17.0 |
26.4 |
(36)% |
Total consolidated sales volume - carats (Mct) |
3.0 |
4.9 |
8.4 |
7.5 |
7.1 |
(39)% |
(58)% |
16.3 |
25.2 |
(35)% |
(1) Saleable production
(2) Production includes medium carbon ferro-manganese
(3) Within export coking and export PCI coals there are different grades of coal with different weighted average prices compared to benchmark
(4) Includes both hard coking coal and PCI sales volumes
(5) Excludes Anglo American Platinum's copper production
(6) ASCu = acid soluble copper
(7) TCu = total copper
(8) Anglo American's share of Collahuasi production is 44%
(9) Anglo American ownership interest of Anglo American Sur is 50.1%. Production is stated at 100% as Anglo American consolidates Anglo American Sur
(10) Difference between total copper production and attributable copper production arises from Anglo American's 44% interest in Collahuasi
(11) Excludes Anglo American Platinum's nickel production
(12) Nickel and copper refined through third parties is now shown as production of nickel matte and copper matte.
(13) In keeping with industry benchmarks, production disclosure has been amended to reflect own mine production and purchases of metal in concentrate. Previous disclosure of own mine production and purchases of metal in concentrate was converted to equivalent refined production using standard smelting and refining recoveries.
(14) 4E: the grade measured as the combined content of the four most valuable precious metals: platinum, palladium, rhodium and gold
(15) Number of Sights (sales cycles) in each quarter as follows: Q3 2015: 2; Q2 2015: 2; Q1 2015: 3; Q4 2014: 3; Q3 2014: 2
Note:
Production figures are sometimes more precise than the rounded numbers shown in the commentary of this report. The percentage change will reflect the percentage change using the production figures shown in the Production Summary of this report.
Forward-looking statements:
This contains certain forward looking statements which involve risk and uncertainty because they relate to events and depend on circumstances that occur in the future. There are a number of factors that could cause actual results or developments to differ materially from those expressed or implied by these forward looking statements.
For further information, please contact:
Media |
|
Investors |
UK James Wyatt-Tilby Tel: +44 (0)20 7968 8759 |
|
UK Paul Galloway Tel: +44 (0)20 7968 8718
|
South Africa Pranill Ramchander Tel: +27 (0)11 638 2592
Shamiela Letsoalo Tel: +27 (0)11 638 3112
|
|
Edward Kite Tel: +44 (0)20 7968 2178
Caroline Crampton Tel: + 44 (0)20 7968 2192 |
|
|
|
Notes to editors:
Anglo American is a global and diversified mining business that provides the raw materials essential for economic development and modern life. Our people are at the heart of our business. It is our people who use the latest technologies to find new resources, plan and build our mines and who mine, process and move and market our products - from bulk commodities and base metals to precious metals and diamonds (through De Beers) - to our customers around the world. Our diversified portfolio of products spans the economic development cycle and, as a responsible miner, we are the custodians of precious resources. We work together with our key partners and stakeholders to unlock the long-term value that those resources represent for our shareholders, but also for the communities and countries in which we operate - creating sustainable value and making a real difference. Our mining operations, growth projects and exploration and marketing activities extend across southern Africa, South America, Australia, North America, Asia and Europe.