Q3 Production Report
Antofagasta PLC
31 October 2007
Antofagasta plc
31 October 2007
Quarterly Production Report - Q3 2007
Highlights
• Group copper production in Q3 was 100,600 tonnes compared to 106,100
tonnes in Q2, mainly due to lower ore grades and plant throughput at Los
Pelambres.
• Molybdenum production at Los Pelambres in the first nine months of 2007
was 7,400 tonnes compared with 7,000 tonnes in the first nine months of
2006. Production in Q3 was 2,500 tonnes compared with 2,800 tonnes in Q2 due
to the lower throughput and marginally lower molybdenum ore grades.
• Group cash costs in Q3 were 30.1 cents per pound compared with 24.8
cents per pound in Q2, reflecting the continued strong by-product credits.
Group Total Q1 Q2 Q3 Q4 Acc Acc Full Year
2007 2007 2007 2007 2007 2006 2006
Total production of 105.9 106.1 100.6 312.6 334.3 465.5
payable copper ('000
tonnes)
Total production of 2.1 2.8 2.5 7.4 7.0 9.8
payable moly ('000
tonnes)
Weighted average 35.8 24.8 30.1 30.2 41.0 40.2
cash costs (cents
per pound)
Los Pelambres
Los Pelambres produced 66,600 tonnes of payable copper in Q3, 6.4% below Q2
production. This was mainly due to lower ore grades, and reduced plant
throughput as a result of the higher proportion of the harder primary ore
treated in the period. The forecast for full year production is now expected to
be approximately 285,000 tonnes, as the primary ore is continuing to affect the
plant throughput.
Molybdenum production was 2,500 tonnes in Q3 and 7,400 tonnes in the first nine
months of 2007, 5.7% above the first nine months of 2006. The increase was
mainly due to the higher molybdenum grade, partly offset by the lower
recoveries. Molybdenum production for the full year is expected to be around
11,000 tonnes.
Cash costs in Q3 were negative 19.6 cents per pound compared to negative 21.3
cents per pound in Q2, an increase of 1.7 cents per pound. This was mainly due
to lower by-product credits as well as higher tolling charges, partly offset by
reduced on-site and shipping costs.
Cash costs during the first nine months of 2007 were negative 12.1 cents per
pound compared with 17.2 cents per pound for the same period last year, a
decrease of 29.3 cents per pound. This was mainly due to higher by-product
credits (reflecting the increase in molybdenum production and the average
molybdenum price compared with the same period last year) and lower tolling
charges (mainly due to decreased price participation as a result of the 2007
calendar year negotiations). This was partly offset by higher on-site costs, as
a result of increased machinery hire, maintenance, energy, fuel and oil costs.
El Tesoro
Cathode production at El Tesoro in Q3 was 22,500 tonnes, slightly below Q2 but
above budget. Year-to-date production was also slightly ahead of budget due to
better ore grades and higher metallurgical recoveries, partly offset by a lower
level of ore treated. Full year cathode production is expected to be 92,000
tonnes.
Cash costs in Q3 were 116.9 cents per pound, an increase of 10.4 cents per pound
from the previous quarter, mainly due to higher variable energy costs (following
the re-negotiation of the power supply contract) as well as higher acid and fuel
prices. Cash costs for the first nine months of the year were 103.4 cents per
pound, in line with budget.
Michilla
Michilla produced 11,400 tonnes of copper cathodes in Q3, and 34,900 tonnes
during the first nine months of the year, 5% above the year-to-date budget. This
was the result of the higher than expected levels of ore treated and
metallurgical recoveries, partly offset by the lower than expected grades. Full
year cathode production is expected to be 46,000 tonnes.
Cash costs in Q3 were 148.8 cents per pound, 7.4 cents per pound above the prior
quarter, mainly due to higher costs of energy as well as other input costs. Year
to date cash costs of 137.7 cents are in line with budget.
Transport
The transport business continued its strong operational performance. Combined
rail and road volumes transported during the first nine months of the year were
9.3% higher than the same period in 2006. The increase is mainly attributable to
the impact of the Spence mine, where the combined volumes of sulphuric acid and
copper cathodes accounted for more than 270,000 tonnes of the increase.
Water
The water division continued to perform well. Volumes sold during the year are
5.8% above the same period of 2006, mainly explained by water volumes sold to
the Spence project.
Los Pelambres Q1 Q2 Q3 Q4 Acc Acc Full Year
2007 2007 2007 2007 2007 2006 2006
Production statistics
Daily average ore 125.0 126.0 120.9 123.9 123.5 127.4
treated ('000 tonnes)
Average ore grade 0.71 0.70 0.68 0.70 0.81 0.81
(%)
Average recovery 92.5 91.9 91.1 91.8 88.6 88.7
(%)
Concentrate produced 186.5 202.6 208.8 597.9 602.4 842.6
('000 tonnes)
Average concentrate 39.6 36.5 32.9 36.2 40.0 39.9
grade(%)
Fine copper in 73.1 73.6 68.9 215.6 238.2 335.2
concentrate ('000 tonnes)
Payable copper in 70.7 71.1 66.6 208.4 230.4 324.2
concentrate ('000 tonnes)
Average moly ore grade 0.033 0.030 0.027 0.030 0.027 0.028
(%)
Average moly recovery 66.7 75.6 78.7 73.3 76.2 76.1
(%)
Payable moly 2.1 2.8 2.5 7.4 7.0 9.8
('000 tonnes)
Cash costs statistics
On-site and shipping 64.7 82.0 77.3 74.7 55.9 56.4
costs
(cents per pound)
Tolling charges for 25.7 31.9 33.8 30.4 40.6 39.7
concentrates
(cents per pound)
By - product credits (86.3) (135.2) (130.8) (117.2)(79.4) (79.7)
(cents per pound) *
Cash costs 4.2 (21.3) (19.6) (12.1) 17.2 16.4
(cents per pound)
(*) Note: By-products credits do not include any costs attributable to the
production of molybdenum concentrate. By-product calculations also do not take
into account unrealised mark-to-market gains at the beginning or end of each
period.
El Tesoro Q1 Q2 Q3 Q4 Acc Acc Full Year
2007 2007 2007 2007 2007 2006 2006
Daily average ore 27.8 26.3 24.7 26.3 28.7 28.7
treated ('000 tonnes)
Average ore grade 1.21 1.25 1.27 1.24 1.14 1.16
(%)
Average recovery 77.4 77.3 79.4 78.0 77.4 78.1
(%)
Copper cathodes 23.6 23.2 22.5 69.4 68.4 94.0
('000 tonnes)
Cash costs 87.4 106.5 116.9 103.4 78.3 78.6
(cents per pound)
Michilla Q1 Q2 Q3 Q4 Acc Acc Full Year
2007 2007 2007 2007 2007 2006 2006
Daily average ore 15.2 15.4 15.1 15.2 15.0 15.2
treated ('000 tonnes)
Average ore grade 1.04 1.04 1.04 1.04 1.07 1.05
(%)
Average recovery 81.2 78.3 78.3 79.2 77.8 78.2
(%)
Copper cathodes 11.6 11.8 11.4 34.9 35.4 47.3
('000 tonnes)
Cash costs 123.1 141.4 148.8 137.7 123.9 126.4
(cents per pound)
Transport Q1 Q2 Q3 Q4 Acc Acc Full Year
2007 2007 2007 2007 2007 2006 2006
Rail tonnage 1,253 1,301 1,195 3,749 3,237 4,486
transported
('000 tons)
Road tonnage 321 342 340 1,003 1,111 1,456
transported
('000 tons)
Water Q1 Q2 Q3 Q4 Acc Acc Full Year
2007 2007 2007 2007 2007 2006 2006
Water volume sold - 10,069 9,740 9,679 29,488 27,864 37,798
potable and
untreated ('000 m3)**
(**) Note: Water volumes include water transportation of 300,000 m3 in Q1,
266,000 m3 in Q2 and 348,000 m3 in Q3 (270,000 m3 in Q1 2006, 740,000 m3 in Q2
2006 and 254,000 m3 in Q3).
Enquiries - investor relations:
Alejandro Rivera
arivera@aminerals.cl Santiago: (56-2) 798 7145
Desmond O'Conor
doconor@antofagasta.co.uk London: (44) 20 7808 0988
Hussein Barma
hbarma@antofagasta.co.uk London: (44) 20 7808 0988
Enquiries - media:
Keith Irons, Bankside Consultants (44) 20 7367 8873
keith@bankside.com
Oliver Winters, Bankside Consultants (44) 20 7367 8874
oliver.winters@bankside.com
This information is provided by RNS