Drill core from metallurgy drill holes (PQ and HQ sized) was shipped to CORE Laboratories in Brisbane, Australia under the direction of the ARS's Vice President of Exploration, Stephen Hughes. Composites for testing were prepared based on material types and grade, the mining schedule as proposed in the Preliminary Economic Assessment ("PEA") and the copper mineralogy and zonation as defined by ARS geologists. Selected drill intercepts correspond to material types that would nominally be mined in the annual mine schedule from Years 1 through 8, as defined in the PEA. This resulted in the preparation of six separate drill core composite samples being prepared by CORE. Highlights of the program to date include:
o SHORT COLUMNS - leachable copper recoveries for the 12.5mm size fraction have exceeded 87%, and recoveries for the 19mm size fraction have exceeded 75% in some composites
o LONG COLUMNS - leachable copper recoveries for 12.5mm size fraction have exceeded 72%, and leachable copper recoveries for the 19mm size fraction have exceeded 73% in some composites
These results as reported are provided as an interim update of ARS's continuing metallurgical testing program. The short column tests are expected to be finalised in July 2017 and the long column tests in October 2017, with the metallurgical data and conclusions progressively incorporated into the ongoing BKM feasibility study.
This test work forms the basis upon which the proposed leaching, solvent extraction and electro-winning facilities will be designed. The detailed chemical characterisation of the tested composites will provide critical information on the leaching kinetics of the ore; the geo-mechanical and hydrodynamic behaviour of the heap leach; and the leach recovery targets for the operation. Four different composites and the two predominant, single-material types from the BKM deposit are being evaluated in the leach column program.
The positive results achieved to date are supporting additional activities including: refined diagnostic assay procedures, optical mineralogy assessments, and hydrodynamic testing. These elements have been initiated in the past month.
The detailed program is thoroughly evaluating the metallurgical model developed as part of the PEA. Copper recoveries in the early phase of the test work program are in line with expectations and confirm that the copper minerals in the BKM deposit are amenable to heap leaching. The PEA mine plan was based on an average life-of-mine grade of 0.57% Total Copper (CuT) in the heap leach feed. It was assumed, based on the sequential assay procedure used at the time, that the Leachable Copper (Culeachable) averaged 0.43%. The leaching response curve used in the PEA assumed an 85% recovery of soluble copper in a 270 day leach cycle, and the goal of this test work is to confirm the initial assumptions interpreted from the PEA evaluations.
The leach column test work will continue to be advanced in the coming months, with completion of these activities anticipated in Q3 and Q4, 2017 as planned. Once interpretation of the results is complete the Asiamet team will be able to confirm the metallurgical performance of the BKM ore and update the project plans and metrics as appropriate.
Peter Bird, Asiamet's Chief Executive Officer commented:
"The detailed metallurgical program is a key element in de-risking, and proving up the economics, of the BKM project. The goal of the metallurgical test-work is to confirm the initial assumptions interpreted in the PEA and allow us to establish appropriate design criteria for the proposed processing facilities as the project moves into the more detailed engineering and project planning stages. The detailed evaluations being performed by our highly-experienced team provide a solid basis for the design and engineering work and are critical to ensuring that appropriate budget and schedule targets are set for the project construction phase to be outlined in the Feasibility Study."
To view the graphic, please click here
Figure 1: (Left) BKM 6-metre Leach Columns at CORE Laboratories (Right) PLS (Pregnant Liquor Solution) from Leach Column Discharge (Showing copper dissolution via characteristic green colour)
Qualified Person
Data disclosed in this press release have been reviewed and verified by ARS's qualified person, Stephen Hughes, P. Geo, Vice President Exploration of the Company and a Qualified Person within the meaning of NI 43-101 and for the purposes of the AIM Rules.
ON BEHALF OF THE BOARD OF DIRECTORS
Peter Bird, Deputy Chairman and CEO
For further information, please contact:
-Ends-
Peter Bird
Deputy Chairman and CEO, Asiamet Resources Limited
Telephone: +61 3 8644 1300
Email: peter.bird@asiametresources.com
Tony Manini
Executive Chairman, Asiamet Resources Limited
Telephone: +61 3 8644 1300
Email: tony.manini@asiametresources.com
FlowComms Limited
Sasha Sethi
Telephone: +44 (0) 7891 677 441
Email: Sasha@flowcomms.com
Asiamet Resources Nominated Adviser
RFC Ambrian Limited
Andrew Thomson / Stephen Allen
Telephone: +61 8 9480 2500
Email: Andrew.Thomson@rfcambrian.com / Stephen.Allen@rfcambrian.com
VSA Capital Limited
Andrew Raca / Justin McKeegan
Telephone: +44 20 3005 5004 / +44 20 3005 5009
Email: araca@vsacapital.com
Optiva Securities Limited
Christian Dennis
Telephone: +44 20 3137 1903
Email: Christian.Dennis@optivasecurities.com
This news release contains forward-looking statements that are based on the Company's current expectations and estimates. Forward-looking statements are frequently characterised by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "estimate", "suggest", "indicate" and other similar words or statements that certain events or conditions "may" or "will" occur. Such forward-looking statements involve known and unknown risks, uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results implied or expressed in such forward-looking statements. Such factors include, among others: the actual results of current exploration activities; conclusions of economic evaluations; changes in project parameters as plans continue to be refined; possible variations in ore grade or recovery rates; accidents, labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or financing; and fluctuations in metal prices. There may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Forward-looking statements are not guarantees of future performance and accordingly undue reliance should not be put on such statements due to the inherent uncertainty therein.
This announcement contains inside information as stipulated under the Market Abuse Regulations (EU) no. 596/2014 ("MAR").