Drilling Report

Brancote Holdings PLC 5 March 2002 Date 5 March 2002 Contacts: Richard Prickett, Chairman Bill Humphries, Managing Director Brancote Holdings PLC 020 7493 1002 David Bick Holborn 020 7929 5599 david.bick@holbornpr.co.uk BRANCOTE HOLDINGS PLC Esquel Gold Project (76.4%) Progress Report on the Phase V Drilling Programme. Feasibility infill drilling. Close spaced drilling of the remaining 120 metre 'gap' in the Julia resource, centred on last seasons outstanding drill-hole JD 51A, has confirmed the presence of a large shallow dipping vein containing very high grade gold. The continuity of a high grade zone, >200g/m, within the Julia vein system has now been established for almost a kilometre from the Football Field in the north to the edge of the scarp in the south. Results from Julia include; Table 1 Galadriel Sur Diamond Core Drilling Hole Easting Northing Depth From Intersection Grade N degrees 156 525 metres metres metres g/t gold JD 52 4396.3 1470.6 135.9 102.0 19.0 12.6 JD 57 4329.0 1457.2 148.0 73.2 29.5 11.4 JD 58 4350.3 1381.4 91.1 25.0 15.2 8.4 JD 59 4340.1 1405.1 135.9 57.5 37.4 20.2 JD 61 4323.4 1371.9 125.2 47.1 26.0 17.0 JD 62 4413.3 1492.5 157.0 98.4 15.6 10.6 The success of the Phase V infill-drilling programme has exceeded all expectations, and has ensured a substantial increase in both the Julia and Galadriel resources together with the Feasibility mining reserves. Results from the programme are currently being compiled and, when completed, will be forwarded to mine engineering consultants Pincock Allen and Holt for resource definition. A total of 9778 metres of diamond-core drilling was completed in the Phase V programme. Assay results are awaited from the last eight drill-holes on Julia and the Football Field. Ungoliant Exploration Drilling A 550 metre, reverse circulation, drilling programme has been completed on the northern section of the Ungoliant vein which occupies a sub-parallel structure to the east of the Galadriel/Julia system and is traceable, through outcrop and float, for over two kilometres. The drilling has returned spectacular results confirming that gold values are increasing with depth with grades of 1oz. Gold/ton over a minimum true width of five metres at a depth of 90 metres below surface. Results received include; Table II Ungoliant Reverse Circulation Drilling Hole Easting Northing Depth From Intersection Grade N degrees 156 525 metres metres metres g/t gold UR 08 5173.7 1273.3 83.0 51.00 8.0 15.8 UR 11 5193.5 1256.3 126.0 61.0 38.0 12.3 Including 82.0 9.0 34.3 Further exploration drilling is planned for an area 300 metres to the south later in this season in preparation for a diamond-core drilling campaign to commence in October of this year. Feasibility Studies. Golder Associates, a world recognised leader in open pit mining slope stability, has commenced Geotechnical works on site for open pit design, groundwater hydrology, waste dump stability and plant site foundation. A 1,100 metres diamond core-drilling programme will be completed in March to support their work. A 1400 metre drilling programme, for additional metallurgical testing to be carried out by Hazen Research of Golden Colorado, commenced on February 27th and is scheduled for completion later this month. - ENDS - Geological information in this report has been compiled by Marc J. Sale, who: • Is a consultant to Brancote Holdings plc; • Has relevant experience in relation to the mineralisation being reported on to qualify as a Competent Person as defined in the Australian Code for Reporting of Identified Mineral Resources and Ore Reserves; • Is a member of the Australian Institute of Mining and Metallurgy and has more than five years experience in this field of activity reported herein; • Has consented to the inclusion of this data. This information is provided by RNS The company news service from the London Stock Exchange
UK 100

Latest directors dealings