6 March 2013
Bowleven plc ('Bowleven' or 'the Company')
IM-5 Preliminary Volumetrics Update
IM-5 well, Block MLHP-7, Etinde Permit, Cameroon
Following assessment of the IM-5 well data, including logs, fluid samples, revised depth conversion and structure mapping, Bowleven, the Africa focused oil and gas exploration group traded on AIM, is pleased to announce a substantial increase to the Isongo Marine field (IM) in-place hydrocarbon volumes.
Highlights
· Intra Isongo discovery represents material volume addition.
· Combined P90 WGIIP increased by over 300% to 531 bscf post IM-5 drilling.
· Validation of more than sufficient gas volumes on a P90 basis to meet fertiliser plant requirements.
· Combined Mean WGIIP and CIIP increased by 162% and 868% to 1,222 bscf and 184 mmbbls respectively.
· Preparing to test both Middle and Intra Isongo reservoir intervals.
Volumetrics Update
Bowleven, as operator, provides the following preliminary estimates of unrisked in-place volumetrics for the IM reservoir intervals intersected by the IM-5 well:
WGIIP (bscf) |
P90 |
P50 |
P10 |
Mean |
Middle Isongo |
175 |
389 |
863 |
467 |
Intra Isongo |
275 |
539 |
1,094 |
626 |
Upper Isongo |
81 |
122 |
187 |
129 |
Total WGIIP post IM-5* |
531 |
1,050 |
2,144 |
1,222 |
Total WGIIP pre IM-5* |
128 |
319 |
975 |
466 |
% Increase |
315 |
229 |
120 |
162 |
|
|
|
|
|
CIIP (mmbbls) |
P90 |
P50 |
P10 |
Mean |
Middle Isongo |
25 |
56 |
127 |
68 |
Intra Isongo |
44 |
91 |
193 |
107 |
Upper Isongo |
5 |
8 |
13 |
9 |
Total CIIP post IM-5* |
74 |
155 |
333 |
184 |
Total CIIP pre IM-5* |
7 |
12 |
30 |
19 |
% Increase |
957 |
1,192 |
1,010 |
868 |
|
|
|
|
|
Notes:
(1) Volumes have been derived on a probabilistic basis but totals* have been arithmetically summed.
(2) Volumes are presented as gross figures. The WGIIP figures include NGLs, which comprise condensate and LPGs.
The liquids to gas ratios used to calculate volumetrics are based on initial sample analysis and use a minimum to maximum range of 80 to 200 bbls/mmscf for the Middle Isongo and 100 to 285 bbls/mmscf for the Intra Isongo.
The volumetrics, including liquids ratios and fluid type, will be refined, as appropriate, post testing.
Forward plan
The IM-5 well reached the current TD of 3,430 metres MD and liner has now been set prior to proposed testing operations in both the Middle and Intra Isongo reservoir intervals.
Maps relating to the preliminary volumetrics prepared post IM-5 drilling operations are available on the homepage of our website www.bowleven.com under the heading "Presentations"; the presentation is titled "IM-5 volumetrics update - 6 March 2013".
Further announcements on testing operations will be made as appropriate.
Bowleven will announce its interim results for the six months ended 31 December 2012 on Wednesday 20 March 2013.
Kevin Hart, Chief Executive, said:
"We are very pleased with the results of the IM-5 well to date which have significantly exceeded our pre-drill expectations. The substantial increase in gas volumes and more importantly liquid hydrocarbons place Bowleven in an excellent position to progress with the development of Etinde. We look forward to the results of testing."
ENQUIRIES
For further information please contact:
Bowleven plc
Kevin Hart, Chief Executive 00 44 131 524 5678
Kerry Crawford, Head of Investor Relations
Brunswick Group LLP
Patrick Handley 00 44 207 404 5959
Catriona McDermott
Bank of America Merrill Lynch (Nomad)
Derek Ross 00 44 207 628 1000
Tony White
Notes to Editors:
Bowleven is an African focused oil and gas exploration group, based in Edinburgh and traded on AIM. Bowleven's strategy is focused on creating and realising material value through exploration led organic growth. Bowleven holds equity interests in five blocks in Cameroon, with three blocks located offshore in shallow water and two onshore. All of these blocks are operated by Bowleven. Bowleven also holds an equity interest in an onshore block in Kenya operated by Adamantine Energy.
Notes to Announcement:
(1) The information in this release reflects the views and opinions of Bowleven as operator and has not been reviewed in advance by its joint venture partners.
(2) The technical information in this release has been reviewed by Ed Willett, who is a qualified person for the purposes of the AIM Guidance Note for Mining, Oil and Gas Companies. Ed Willett, Exploration Director of Bowleven plc, is a geologist and geophysicist, a Fellow of the Geological Society (FGS) and a member of the Petroleum Exploration Society of Great Britain (PESGB) with over 25 years' experience in oil and gas exploration and production.
GLOSSARY OF TERMS
The following are the main terms and abbreviations used in this announcement:
AIM |
Alternative Investment Market |
bbls/mmscf |
barrels per million standard cubic feet of gas |
Bowleven |
Bowleven plc and/or its subsidiaries as appropriate |
bscf |
billion standard cubic feet of gas |
CIIP |
condensate initially in place |
Company |
Bowleven plc |
Etinde Permit or Etinde |
the production sharing contract between the Republic of Cameroon and EurOil Limited (an indirectly wholly owned subsidiary of the Company) dated 22 December 2008 in respect of the area of approximately 2,316 km², comprising former blocks MLHP-5, MLHP-6 and MLHP-7, offshore Cameroon; or, as the context may require, the contract area to which this production sharing contract relates |
Group |
the Company and its direct and indirect subsidiaries |
LPG |
Liquefied Petroleum Gas |
MD |
measured depth |
Mean |
in the context of estimated resource volumes, means the arithmetic sum of a range of resource estimate cases divided by the number of cases |
mmbbls |
million barrels |
NGL |
natural gas liquids, being liquid hydrocarbons found in association with natural gas |
P10 |
10% probability that volumes will be equal to or greater than stated volumes |
P50 |
50% probability that volumes will be equal to or greater than stated volumes |
P90 |
90% probability that volumes will be equal to or greater than stated volumes |
TD |
total depth |
WGIIP |
wet gas initially in place |