3rd Quarter Preliminary Production Results

RNS Number : 9113P
Centamin Egypt Limited
11 October 2011
 



 

 

 

 

 

 

 

Immediate Release

11th October 2011

 

 

Centamin Egypt Limited ("Centamin" or "the Company")

(LSE:CEY, TSX:CEE)

 

 

 3rd Quarter Preliminary Production Results

 

Centamin Egypt Limited is pleased to announce its preliminary production results from its Sukari Gold Project in Egypt for the quarter ended 30 September 2011.

 

Total gold production for the quarter was 50,539 ounces, a 67% increase from the corresponding quarter last year and a 5% increase on the previous quarter's production. The resultant gold production was underpinned by record quarterly throughput in the Sukari process plant of 964kt (59% higher than the corresponding quarter last year and 13% higher than the previous quarter), as the ramp up to higher production rates progressed post-Stage 3 commissioning.

 

Open pit and underground production rates returned to budgeted production rates with the resumption of regular delivery and issuing of blasting products for the mine in late July. The open pit delivered greater than 2.2Mt per month material movement for both August and September (compared with 1.2Mt in July) and underground ore production for the quarter increased to 58,000t (up 35% on Q2 2011). With higher material movements from the open pit, the run of mine ore stockpile balance increased by 168kt to 456kt by the end of the quarter.

 

Centamin remains on track to reach target production of 200-210,000oz at a cash cost of approximately $550/oz in 2011.

 


September 2011 Quarter (estimate)

June 2011 Quarter

September 2010 Quarter

Total Material Movement  - Open Pit (kt)

5,747

3,030

4,916

Process Plant Throughput (kt)

964

850

605

Underground Ore Production (kt)

58

43

-

Gold Produced (oz)

50,539

47,991

30,243

 

Josef El-Raghy, Chairman of Centamin, said: "The Company is pleased with the return to normal operations, the rapidly improving performance of the process plant and the consistent development and maturing of the underground operation, which positions Sukari well for a strong and consistent performance in the future."

 

Notice of Results

 

Centamin will announce its results for the quarter ended 30 September 2011 (Q3) on Monday, 31 October 2011. The announcement will be screened via the Regulatory News Service of the London Stock Exchange at 7am (UK time). A conference call with the Centamin management team will be held at 11am (UK time) on the day of the Q3 results announcement. Dial in details for the conference call will be announced at the time of the Q3 results.

 

 

For more information please contact:

Centamin Egypt Limited

Josef El-Raghy, Executive Chairman

Katharine Sutton, Head of Investor Relations

(katharine.sutton@centamin.com)

+61 8 9316 2640 or +20 3 5411 259

 

 



Buchanan

Bobby Morse

Gabriella Clinkard

+44 (0) 20 7466 5000









 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCMMBATMBJBBBB
UK 100

Latest directors dealings