Q1 2017 Preliminary Production Results

RNS Number : 9947B
Centamin PLC
10 April 2017
 

For immediate release


10th April 2017




Centamin plc ("Centamin" or "the Company")

(LSE:CEY, TSX:CEE)

 

Q1 2017 Preliminary Production Results

 

Centamin is pleased to announce preliminary production results for the quarter ended 31 March 2017 from its Sukari Gold Mine ("Sukari") in Egypt.

 

Preliminary total gold production for the quarter was 109,187 ounces, a 20% decrease on the previous quarter and 13% lower than Q1 2016. The reduction in quarterly production is in line with Centamin's forecast and the Company maintains its 2017 guidance of 540,000 ounces at a cash operating cost of US$580 per ounce and all-in-sustaining cost (AISC) of US$790 per ounce.

 

Quarterly throughput at the process plant was 2,908kt, a 1% decrease on the previous quarter and in line with our 2017 annual forecast of 11.75 million tonnes (Mt) milled.

 

Open pit total material movement (ore plus waste) increased 8% on the previous quarter to 17,128kt. Open pit ore production increased by 14% to 2,478kt at an average mined grade of 0.47g/t. The average head grade to the plant from the open pit was 0.58g/t. This was below both the reserve grade and our forecast average grade for the full year 2017, as the open pit continued to develop a low-grade cutback in the east wall of the pit in line with the mine plan.

 

The run of mine ore stockpile balance decreased by 191kt to 386kt at the end of the period.

 

The underground operation delivered 252kt of ore at an average mined grade of 7.44g/t. On an annualised basis, the productivity rate was in line with our 2017 forecast of 1 million tonnes at 7.26g/t. Ore from stoping was 153kt at 6.9g/t and ore from development was 99kt at 8.3g/t.

 


Q1 2017 (preliminary)

Q4 2016

Q1 2016

Open Pit - Total Material Movement (kt)

17,128

15,810

15,157

Open Pit - Ore Production (kt)

2,478

2,183

2,405

Underground Ore Production (kt)

252

228

281

Process Plant Throughput (kt)

2,908

2,948

2,876

Process Plant Productivity (tph)

1,420

1,415

1,421

Gold Produced (oz)

109,187

136,787

125,268

 

Andrew Pardey, CEO of Centamin, commented:

 

"As previously outlined in the 2016 full year results, production rates were forecast to decrease in the first quarter due to a planned reduction in average grade from the open pit. During the second quarter, we expect to see ore grades increase towards the reserve average as the cutback in the east wall of the pit is further progressed. With the processing and underground mining operations also continuing to deliver strong levels of productivity, we remain on course to meet our full year 2017 production guidance of 540,000 ounces at a cash operating cost of US$580 per ounce and all-in-sustaining cost (AISC) of US$790 per ounce."

 

 

 

 

 

 

For more information, please contact:

 

Centamin plc

Josef El-Raghy, Chairman

Andrew Pardey, CEO

Andy Davidson, Head of Investor Relations

(andy.davidson@centamin.je)  +44 (0) 1534 828708

 

Buchanan

Bobby Morse

Chris Judd

Patrick Hanrahan

+ 44 (0) 20 7466 5000

 

This announcement contains ongoing regulated information and inside information for the purposes of Article 7 of EU Regulation 596/2014.

 

LEI: 213800PDI9G7OUKLPV84

Company No: 109180

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLILMLTMBTMBTR
UK 100

Latest directors dealings