Interim Results
Cardinal Resources plc
27 September 2006
CARDINAL RESOURCES PLC ANNOUNCES 2006 INTERIM RESULTS
LONDON - Wednesday, 27th September 2006
Cardinal Resources plc (AIM:CDL) ('Cardinal' or 'the Company'), an independent
oil and gas production and exploration company operating in Ukraine, today
announces its interim results for the six month period ending 30th June 2006.
Financial highlights for the period:
• Group turnover, including the Company's share of joint venture
turnover at the Bytkiv Field, increased 205% to $5.8 million.
• Gross profit increased to $3 million from $0.3 million.
• Cash at bank and in hand at the end of the period totalled $14.8
million. A further $14.1 million remains un-drawn from the $38 million
Silver Point Capital (SPC) facility.
• EBITDA improved to a loss of $1 million from a loss of $2.1 million in
the same period last year.
• Loss per ordinary share was $0.035, compared to $0.042 in the same
period last year, and $0.093 at 2005 year end.
Operational highlights during the period:
• Well swap announced in March with joint activity partner,
Ukrgazvydobuvannya (Ukrgaz), increased Cardinal's ownership and
operational control of the Bilousivsko-Chornukhinska (BC) licence area.
Work programme on Rudis assets was subsequently initiated.
• Exploration well #2 on the Dubrivska (DB) licence reached total depth
in March and workovers on wells BC #13 and Bytkiv #506 were
successfully completed in January and March, respectively.
• Highlights of Scott Pickford Ltd's reserve report were published in
May, estimating Cardinal's P1 and P2 reserves at 32.5 MMBOE and the
pre-tax present value of the Company's reserves, discounted at 10%, at
$124.7 million.
• Average gas realisations for the Company during the period, including
VAT, were $3.24/Mcf, an increase of 36% since year end 2005. The price
reached a high of $3.55/Mcf in April.
Post reporting period operational highlights:
• BC well #3A reached total depth in September and is being prepared for
testing.
• Well NY #4 spudded in September.
• 3-D seismic survey commenced on the DB licence in September.
• Recovery of production of BC well #111 was carried out and, in
September, was being tested.
Commenting on today's results, Robert J. Bensh, Chairman and Chief Executive
Officer of Cardinal said, 'During the period Cardinal has made considerable
progress on the Rudis work programme, which has been the key focus of our
activity since the acquisition of these assets in October of last year. We are
already yielding results and hope to significantly increase production by the
end of 2007 as previously announced. While the political uncertainty in Ukraine
has somewhat impacted our business, particularly with regards to negotiating the
RC Field reinstatement, we remain committed to resolving this issue.'
For further information please contact:
Cardinal Resources Parkgreen Communications
Kate Spiro Justine Howarth / Victoria Thomas
+44 (0) 20 7936 5258 +44 (0) 20 7493 3713
kspiro@cardinal-uk.com victoria.thomas@parkgreenmedia.com
CHAIRMAN'S STATEMENT
The first half of 2006 has been an active period for Cardinal. We have initiated
the work programme on the oil and gas fields acquired in the Rudis acquisition,
which we believe, if successful, should be capable of generating substantial
production and cash flow by the end of 2007. I believe we are making steady
progress towards the Company's goal of aggregating an asset base of under-
developed oil and gas properties in Ukraine and comparable regions that we can
develop using modern equipment, technology and the know-how of an experienced
management team. After almost 18 months since the Company's admission to AIM,
reserves and production have increased considerably and an active development
programme is underway to exploit the optimum production potential of reserves in
the ground.
Progress at the RC Field continues to be constrained pending a resolution to
Cardinal's attempt to reinstate its working interest in the field to 45%.
Negotiations with our JAA partner, Ukrnafta, were halted prior to the Ukrainian
parliamentary elections on March 26, 2006 and have yet to resume due to the
extended time it has taken to form a coalition government. Now that a new Prime
Minister is in office I expect some stability to return to the country. Direct
discussions with our partner regarding the reinstatement of the RC Field are
forthcoming, as well as with other influential parties in the country. The Board
is also reviewing all of our options with regards to ensuring a swift resolution
to the reinstatement, including Cardinal's contractual right to initiate
arbitration in Stockholm. We will continue to update the market when
developments occur.
Average production net to the Company in June 2006 was 999 boepd. The decrease
since the end of 2005 is due to wells being worked over and the decline in
production of the two wells on the Kulickykhin Field, which is explained in
further detail below. Average net daily production on the Rudis properties at
the end of the period was 536 boepd versus 672 boepd at the end of December
2005. Net production at the RC and Bytkiv Fields at 30th June was 325 boepd and
138 boepd respectively.
Gas prices have continued to rise during the first half of 2006. Cardinal's
average realisations during the period were $3.24/Mcf - an uplift of 36% since
the end of 2005. With further increases in import prices expected for 2007, I am
optimistic that prices will remain at these higher levels over the next twelve
months.
Financial Review
The 205% increase in Group turnover was partially offset by higher general and
administration costs (G&A) as a result of the amortisation of fees for the SPC
financing in accordance with FRS 4, recruitment costs for operating and
engineering staff in Ukraine, advisory fees and additional staffing and
facilities costs related to the Rudis acquisition. Excluding exploration costs
and non-cash items, such as depreciation, and the application of FRS 4 and FRS
20, G&A totalled $4.0 million, compared with $3.0 million for the same period
last year.
Earnings before interest, taxes, depreciation and amortisation (EBITDA) for the
period was a loss of $1 million, compared to a loss of $2.1 million in 2005,
excluding non-recurring costs.
30 June 2006 30 June 2005 31 December 2005
$'000 $'000 $'000
Restated Restated
Operating loss (1,895 ) (3,139 ) (8,348 )
Depreciation/depletion charge 419 279 196
Share of joint venture (16 ) 185 1,173
Amortisation of finance charges 506 - -
EBITDA (including non-recurring costs) (986 ) (2,675 ) (6,979 )
Non-recurring costs - 601 1,976
EBITDA (excluding non-recurring costs) (986 ) (2,074 ) (5,003 )
Review of Operations
The work programme on the Rudis properties, on which Cardinal owns the licences
and controls operations, is progressing well. It is our intention, as announced
in March, to complete seven workovers and drill four of seven new wells on the
BC and NY licences by the end of 2007. If the work progresses as planned, we
believe that production could increase by approximately 2,500 to 3,000 boepd by
the end of this period. The uplift in production is dependent upon the gas
gathering facility which is currently under construction on the BC licence and
scheduled to be completed in the second quarter of 2007.
Following the well swap with Ukrgaz announced in March, which provided Cardinal
with increased ownership and operating control of the BC licence, two workovers
have been completed in January and September and one well (BC #3A) reached total
depth in September with indications of the presence of hydrocarbons found in two
zones. The exploratory well on the Dubrivska (DB) licence, which was drilling at
the time of the Rudis acquisition, also reached total depth in March, has been
tested and is now temporarily suspended. One new well is being drilled and a
workover is underway on the NY licence. Workovers also continue at the Bytkiv
Field but, as previously announced in May, the economics for drilling new wells
in the field have diminished significantly.
• The workover on BC well #13 was successfully completed in January. Gas is
flared at this well to permit condensate production. The well will
eventually be tied in to Cardinal's gas gathering facility on the BC licence
area which is expected to be completed during the second quarter of 2007.
The design of the facility is nearly complete, equipment has been sourced
and construction has begun. A tie-in point to the main pipeline which runs
through the licence has also been identified.
• The drilling of BC well #3A was completed in early September using a
Ukrainian rig hybridised with modern drill bits and mud conditioning
equipment. Two zones (Visean-18 and 20) between 3,000 to 3,150 metres were
found which appear to be hydrocarbon-bearing based on log analyses. These
zones are currently being tested to see whether they are capable of
commercial production.
• The exploratory well #2 on the DB licence was completed in March and testing
ended in September. A secondary objective in the Visean-19 (V-19) formation
was tested with encouraging indications of gas and condensate but with
water dominating, believed to be from water-bearing sand below the V-19. A
3-D seismic survey is now being carried out to evaluate part of the licence
area and determine whether further drilling should take place. The well has
been temporarily abandoned pending the results of the 3-D survey which are
expected by spring 2007.
• NY well #4, which is covered by JAA #429 with Ukrgaz, spudded in early
September.
• Equipment is being moved to BC #116A in anticipation of an October 2006 spud
date, and the BC #13A, originally scheduled for first quarter 2007, is
expected to spud in December 2006.
• An agreement was made with Ukrgaz in September 2006 to take wells #18 and
#26 on the Kulickykhin Field out of JAA #429 and return them 100% to Ukrgaz.
Production at these wells has declined significantly since the beginning of
the year: July production averaged 42 boepd versus 256 boepd in February. In
return, Ukrgaz has verbally agreed to complete the workovers of North
Yablunivska (NY) wells #201, #203 and #300 at their expense.
• Recovery operations on the previously abandoned well #111 on the
Bilousivsko-Chornukhinska (BC) licence commenced in late June 2006 and were
completed in September. The well is currently being tested.
• The workover on NY well #203 is currently in progress. When completed it has
been verbally agreed with Ukrgaz that the rig will move to work over NY
wells #201 and #300 in succession.
• The workover of Bytkiv well #524 is in progress. The well plan for Bytkiv
well #1007 is currently being modified by Ukrnafta but the well is not
anticipated to spud before the fourth quarter of 2006. The results of this
well are expected to determine whether further drilling will take place on
the field or not.
Outlook
I expect activity on the oil and gas fields acquired in the Rudis transaction to
continue to dominate Company news flow between now and the end of the year. In
addition to the well currently drilling on the NY licence, two further wells and
several workovers are expected to commence on the BC and NY licence areas during
the second half of 2006, as well as ongoing construction of the gas gathering
facility. If the work and outcome progress as we plan, the Board believes that
production could increase significantly by the end of 2007 when we will be in a
prime position to take further advantage of the continued increases in gas
prices in Ukraine.
Robert J. Bensh
Chairman and Chief Executive Officer
27th September 2006
Cliff West, Executive Vice President and Chief Operating Officer of Cardinal
(Member of the American Association of Petroleum Geologists - Certified
Petroleum Geologist # 1563) is the qualified person that has reviewed and
approved the technical information within this press announcement.
Glossary of Terms
boepd Barrels of oil equivalent per day
Mcf Thousand cubic feet of gas
MMBOE Million barrels of oil equivalent
P1 (Proved) Those oil or gas reserves considered to have at least a
90% chance of being recovered (using the Society of
Petroleum Engineers definitions)
P2 (Probable) Those oil or gas reserves considered to have at least a
50% chance of being recovered (using the Society of
Petroleum Engineers definitions)
PV Present value
###
Notes to Editor
Cardinal Resources plc
Cardinal Resources plc is an independent oil and gas company engaged in the
acquisition, development, production and exploration of oil and natural gas
properties in Ukraine. Cardinal is an experienced operator in the country
focused on expanding its existing operations through the farm-in or acquisition
of additional upstream oil and gas assets that can be further developed through
the application of modern technology and expertise.
Cardinal's main assets are:
Rudivsko-Chernovozavodske (RC) Field
Rudivsko-Chernovozavodske is a large under-developed gas field (1.54 TCF
original gas in place), located in the Dnieper-Donets basin, 200km east of Kiev
in the Poltava Oblast. Cardinal has a Joint Activity Agreement (JAA) with a
subsidiary of Ukrnafta for production and further development in which Cardinal
holds a 14.9% net profit interest.
Bytkiv-Babchenske (Bytkiv) Field
Bytkiv-Babchenske is an oil field, located in the Carpathian fold belt, 45km
south-west of Ivano-Frankivsk in the Nadvirna Oblast. Cardinal has a 45%
interest through UkrCarpatOil, a Joint Venture (JV) with Ukrnafta, to operate
and develop the field.
Plus the following assets which were acquired as part of the Rudis Drilling
Company transaction in 2005:
Bilousivsko-Chornukhinska (BC) Licence
Bilousivsko-Chornukhinska is a producing gas-condensate licence in the Dnieper-
Donets basin, 100% owned and operated by Cardinal.
North Yablunivska (NY) Licence
North Yablunivska is a producing gas-condensate licence in the Dnieper-Donets
basin, 100% owned by Cardinal and operated under the JAA. For four wells on the
licence covered by JAA 429, Cardinal's interest is only 50% in each such well.
Dubrivska (DB) Licence
Cardinal has drilled an exploration well as part of the JAA with
Ukrgazvydobuvannya.
Ukrgazvydobuvannya JAA #429
Cardinal has a 50% percent interest in a JAA with Ukrgazvydobuvannya which
covers certain wells on the NY licence area and one well in the Bilskie field.
This release may contain certain forward-looking statements. These statements
relate to future events or future performance and reflect management's
expectations regarding Cardinal's growth, results of operations, performance and
business prospects and opportunities. Such forward-looking statements reflect
management's current beliefs, are based on information currently available to
management and are based on reasonable assumptions as of this date. No
assurance, however, can be given that the expectations will be achieved. A
number of factors could cause actual results to differ materially from the
projections, anticipated results or other expectations expressed in this
release. While Cardinal makes these forward-looking statements in good faith,
neither Cardinal, nor its directors and management, can guarantee that the
anticipated future results will be achieved.
Consolidated Profit and Loss Account
for the six months ended 30 June 2006
Six months ended Six months ended Year ended
30 June 2006 30 June 2005 31 December 2005
Unaudited Unaudited Audited
$'000 $'000 $'000
Note (Restated) (Restated)
Turnover
Group and share of joint venture 5,818 1,906 4,587
Less: share of joint venture (1,344 ) (974 ) (1,556 )
turnover
4,474 932 3,031
Cost of sales (1,523 ) (632 ) (1,595 )
Gross profit 2,951 300 1,436
Costs of admission to AIM - - (467 )
Reorganisation expenses - (601 ) (1,509 )
Other general & administrative (4,846 ) (2,838 ) (7,808 )
expenses
Total general & administrative (4,846 ) (3,439 ) (9,784 )
expenses
Operating loss (1,895 ) (3,139 ) (8,348 )
Share of operating (losses)/profit (16 ) 185 1,173
of joint venture
Interest receivable 381 54 96
Interest payable (1,869 ) (5 ) (221 )
Loss on ordinary activities before (3,399 ) (2,905 ) (7,300 )
taxation
Corporation tax (645 ) (134 ) (473 )
Loss on ordinary activities (4,044 ) (3,039 ) (7,773 )
transferred to reserves
Loss per ordinary share ($) 2 (0.035 ) (0.042 ) (0.093 )
There were no recognised gains or losses other than the result for the financial
period.
Consolidated Balance Sheet
at 30 June 2006
30 June 2006 30 June 2005 31 December 2005
Unaudited Unaudited Audited
$'000 $'000 $'000
Note (Restated) (Restated)
Fixed assets
Intangible fixed assets 4,082 - 1,587
Tangible fixed assets 15,269 2,915 16,345
19,351 2,915 17,932
Investments
Joint venture
Share of gross assets 3,067 2,168 2,428
Share of gross liabilities (1,378 ) (1,682 ) (1,171 )
1,689 486 1,257
21,040 3,401 19,189
Current assets
Stock 7 8 160
Debtors 6,556 2,227 1,543
Cash at bank and in hand 14,834 13,034 23,995
21,397 15,269 25,698
Creditors: amounts falling due (3,785 ) (2,843 ) (5,045 )
within one year
Net current assets 17,612 12,426 20,653
Total assets less current 38,652 15,827 39,842
liabilities
Creditors: amounts falling due 4 (20,137 ) (1,220 ) (19,233 )
after more than one year
Provision for liabilities and (1,016 ) (144 ) (897 )
charges
17,499 14,463 19,712
Capital and reserves
Called up share capital 42,165 32,435 42,165
Share premium account 2,968 3,393 2,968
Reverse acquisition reserve (1,278 ) (1,278 ) (1,278 )
Other reserves 3,111 1,439 2,117
Profit and loss account (29,467 ) (21,526 ) (26,260 )
Total shareholders' funds 3 17,499 14,463 19,712
Consolidated Cash Flow Statement
for the six months ended 30 June 2006
Six months ended Six months ended Year ended
30 June 2006 30 June 2005 31 December 2005
Unaudited Unaudited Audited
$'000 $'000 $'000
(Restated) (Restated)
Net cash outflow from operating (6,702 ) (3,459 ) (6,193 )
activities
Returns on investment and
servicing of finance
Interest received 381 54 96
Interest paid - (5 ) (220 )
Net cash inflow/(outflow) from 381 49 (124 )
returns on investments and
servicing of finance
Taxation (687 ) (134 ) (256 )
Capital expenditure and financial
investment
Purchase of intangible fixed (2,495 ) (1,131 )
assets
Purchase of tangible fixed assets (652 ) (577 ) (380 )
Net cash outflow from capital (3,147 ) (577 ) (1,511 )
expenditure and financial
investment
Acquisitions
Cash paid for purchase of - - (6,000 )
subsidiary undertaking
Net cash from purchase of - - 723
subsidiary undertaking
Net cash outflow from - - (5,277 )
acquisitions
Financing
Share option & warrants valuation 183 136 288
Silver Point loan advance - - 23,900
Costs of loan arrangement - - (4,817 )
Share and warrant issues 811 19,843 20,341
Costs of admission to AIM - (5,009 ) (4,541 )
Net cash inflow from financing 994 14,970 35,171
(Decrease)/increase in cash (9,161 ) 10,849 21,810
Notes to the interim statement
for the six months ended 30 June 2006
1. Accounting policy
This interim statement has been prepared in accordance with the accounting
standards adopted by the Company in its Annual Report and Accounts for 2005,
with the exception that the Company adopted FRS 20 (Share Based Payments) from 1
January 2006 and this required prior period adjustments to the previously
published statements. This also resulted in an increase in General &
Administrative expenses as set out in the table below.
Six months ended Six months ended Year ended
30 June 2006 30 June 2005 31 December 2005
Value of share options/warrants $'000 183 136 288
expensed for the period
2. Loss per ordinary share
Six months ended Six months ended Year ended
30 June 2006 30 June 2005 31 December 2005
(Restated) (Restated)
Loss for the period $'000 (4,044 ) (3,039 ) (7,773 )
Weighted average number of '000 114,554 68,654 83,201
shares
Loss per ordinary share $ (0.035 ) (0.044 ) (0.093 )
3. Reconciliation of movement in shareholders funds
30 June 2006 30 June 2005 31 December 2005
(Restated) (Restated)
$'000 $'000 $'000
Loss for the period (4,044 ) (3,039 ) (7,773 )
Shares issued - 19,843 42,889
Share issue costs - (5,008 ) (4,541 )
Warrants issued 811 386 498
Shares to be issued - - (14,209 )
Warrants and options expensed 183 136 288
Dividends received 837 - -
Other reserves movement - (415 ) -
Net (decrease)/increase in (2,213 ) 11,903 17,152
shareholders funds
Opening shareholders funds 19,712 2,560 2,560
Closing shareholders funds 17,499 14,463 19,712
4. Creditors: amounts falling due after more than one year
30 June 2006 30 June 2005 31 December 2005
$'000 $'000
$'000
Gross bank borrowings one to five years 23,900 - 23,900
Interest payable in PIK notes 1,950 - -
25,850 - 23,900
Less: costs of raising bank borrowings (4,555 ) - (4,817 )
FRS25 equity portion of loan (1,308 ) - -
19,987 - 19,083
Other creditors 150 1,220 150
20,137 1,220 19,233
5. The directors do not recommend the payment of a dividend.
6. The financial information contained in this document does not constitute
statutory accounts within the meaning of Section 240 of the Companies Act 1985.
The financial information for the year ended 31 December 2005 is extracted from
the audited financial statements for that period on which the auditors gave an
unqualified report, with the exception of the prior period adjustment. A copy of
those financial statements has been filed with the Registrar of Companies.
7. Copies of this statement will be made available on the Company website at
www.cardinal-uk.com and will be available, on request, from the Company's
registered office at Whitefriars House, 6 Carmelite Street, London EC4Y 0BS.
This information is provided by RNS
The company news service from the London Stock Exchange