Encouraging Initial Mt. Weld Drilling Results

Corcel PLC
13 June 2023
 


Corcel PLC

("Corcel" or the "Company")

Encouraging Initial Mt. Weld Drilling Results

13 June 2023

Corcel Plc (London AIM: CRCL), the pan Angolan / Brazilian Oil and Gas company, with interests across battery metals mining and oil and gas is delighted to announce the initial drilling results from the Company's Mt. Weld rare earth elements joint venture with Riversgold Limited (ASX: "RGL"), located 1.5km west/north-west of Lynas Rare Earth Element's Mt. Weld rare earth oxide mine, near Laverton, Western Australia. 

Highlights:

Initial composite RC drill samples assay up to 2,200ppm TREO

 

52% of the planned initial ~2,000m RC programme completed to date

 

Drilling program is on tenement P34/4489 - immediately to the west of Lynas' globally significant Mt Weld rare earth oxide mine

 

Corcel Chief Executive Officer, Scott Kaintz commented: "Elevated initial results out of Mt. Weld reinforce our fundamental view of the exciting mineral and commercial prospectivity of the project, located, as it is, adjacent to one of the world's largest REE operations, outside of China.  We look forward to additional results firming up the potential for a mineral resource estimate in due course."

Drill Results: 

The Company's JV partner, Riversgold, has drilled 5 holes to date totalling 1,036m of an initial seven-hole (~2,000m) reverse circulation ("RC") drilling program on the joint venture tenement P34/4489. The program was designed to test several magnetic features confirmed through both airborne and ground magnetic surveying[1].

The interesting elevated rare earth element ("REE)" results from four composite samples are shown in Tables 1 and 3, with locations in Table 2. The results from all 1m samples from the drill holes will be submitted for assaying shortly.

Table 1: Mt Weld - Material Intersection Elevated TREO Assay Results

Composite Sample Number

Drill Hole

From             m

To                 m

TREO1 ppm

TREO1 %

MTW001

MWRC002

196

200

1,600

0.160%

MTW002

MWRC002

162

166

0.190%

MTW003

MWRC003

116

120

2,200

0.220%

MTW004

MWRC003

106

110

1,600

0.160%

Notes:

1.     TREO are detailed in Appendix A, Section 1, "Verification of sampling and assaying"

The Mt Weld Project straddles the access road to Lynas' Mt Weld mine (see Figure 2). The tenement is predominantly covered by recent transported sediments obscuring the underlying geology, with four discrete undrilled magnetic features (T1-T4) (see Figures 1-3).

Figure 1: Drill Hole Locations completed to date at Mt Weld (P34/4489)

Hole one was abandoned due to difficult ground conditions at 84m.  All four remaining holes intersected the geophysical targets as modelled.  The magnetic high was deemed to be highly magnetic, black mafic volcanics which were intersected at a width of 10 to 20m from 190 to 210m downhole. 

To ascertain if REEs were indeed present, the Company prepared four composite 4 metre samples from holes 2 to 4 which had intersected highly magnetic, black mafic volcanics.  These samples were dispatched to the assay lab for rush analysis prior to completing the drill program.

Figure 2: Cross section for drillhole MWRC002, showing drill hole trace and modelled geophysics target

Figure 3: Long Section Showing 5 drill holes relative to the interpreted geophysics targets

The drilling in holes 4 to 5 was successful in intersecting the targeted interpreted magnetics, representing targets T2 and T3 in the announcement dated 2 May 2023 and detailed in Figure 2. T1 was not drilled due to temporary flooding of the small creek where the target drill hole was located.  On further assessment of the ground geophysics interpretation, T4 was downgraded to a be a secondary priority, although it is located closer to the operating Mt Weld Mine Site.

In hole 5, which was drilled after the rush assay was despatched, but before the assay results were received, the drilling also intersected medium grained, pink intermediate porphyry interpreted as syenite.  Syenite is the host rock at the neighbouring Wallaby Gold deposit currently being mined by Anglo American Gold. 

Figure 4: Location of the Mt Weld programme relative to Mt Weld REE Project and Anglo Gold's Granny Smith / Wallaby Project

About the Mt. Weld Joint Venture:

 

The Mt. Weld Joint Venture is currently being operated by Riversgold Ltd, Corcel's farm-in and joint venture partner, who through the expenditure of AUD 500,000 can earn a 50% stake in the project, as originally announced on 4 January 2023.  Currently, Corcel retains an 80% interest in the project, having previously sold a 20% interest as announced on 5 May 2023.     

 

Future Operations:

 

A further detailed analysis of the anomalous REE assays and minerology is currently underway, and the operator is expected to make further decisions once these assessments have been completed and additional announcements will be made as required. 

For further information, please contact:

Scott Kaintz                                                                                         Corcel Plc CEO

Development@corcelplc.com                                                                             

James Joyce / James Bavister /Andrew de Andrade                 WH Ireland Ltd NOMAD & Broker

0207 220 1666                                                                                        

Patrick d'Ancona                                                                                  Vigo Communications IR

0207 3900 230                                                                                      

           

 

The information contained within this announcement is deemed to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 which is part of UK law by virtue of the European Union (withdrawal) Act 2018. Upon the publication of this announcement, this inside information is now considered to be in the public domain.

 

Competent Person/Qualified Person Statement:

The information in this document that relates to exploration is based on information compiled or reviewed by Edward Mead, who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Mead is a Director of Riversgold Ltd. Mr Mead has sufficient experience that is relevant to the style of mineralisation under consideration and to the activity which he is undertaking to qualify as a Competent Person (Qualified Person) as defined in the 2012 Edition of the 'Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves'. Mr Mead consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.

Table 2: Drill hole information

Hole_ID

Hole_Type

Azimuth

Dip

Max_Depth

Nat_East

Nat_North

Nat_RL

MWRC001

RC

353.44

-60.00

84

451702

6808730

423

MWRC002

RC

351.3

-59.86

246

451746

6808679

423

MWRC003

RC

355.17

-60.08

252

451814

6808680

423

MWRC004

RC

355.35

-62.63

250

451867

6808675

423

MWRC005

RC

353.96

-60.64

204

452125

6808705

423

 

Table 3: ALS Reported assay results for the four composite samples. Only relevant REEs reported.

Method

ME-XRF30

ME-XRF30

ME-XRF30

ME-XRF30

ME-XRF30

ME-XRF30

ME-XRF30

ME-XRF30

ME-XRF30

ME-MS61

ME-MS61

ME-MS61

ME-MS61

ME-MS61

 

Analyte

CeO2

Dy2O3

Er2O3

Gd2O3

La2O3

Nd2O3

Pr6O11

Sm2O3

Y

Ce

Hf

La

Nb

Y

 


%

%

%

%

%

%

%

%

%

ppm

ppm

ppm

ppm

ppm



0.01

0.01

0.01

0.01

0.01

)

0.01

0.01

0.01

0.01

0.1

0.5

0.1

0.1

TREO  ppm

MTW001

0.05

0.01

0.02

0.01

0.03

0.02

0.01

<0.01

0.01

359

10.6

194

152.5

32.6

1,600

MTW002

0.07

0.01

0.01

0.01

0.04

0.03

0.01

<0.01

0.01

482

11.2

239

142

39.8

1,900

MTW003

0.08

0.01

0.02

0.01

0.04

0.03

0.01

0.01

0.01

503

7.5

281

162

32.5

2,200

MTW004

0.05

0.01

0.01

0.01

0.03

0.02

0.01

0.01

0.01

354

10.4

180

180

44.6

1,600

TREO = Lanthanide Oxides + Yitrrium oxides + Scandium Oxides

Appendix : Table 1 JORC Tables

Section 1 Sampling Techniques and Data

(Criteria in this section apply to all succeeding sections.)

Criteria

JORC Code explanation

Commentary

Sampling techniques

·    Nature and quality of sampling (eg cut channels, random chips, or specific specialised industry standard measurement tools appropriate to the minerals under investigation, such as down hole gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as limiting the broad meaning of sampling.

·    Include reference to measures taken to ensure sample representivity and the appropriate calibration of any measurement tools or systems used.

·    Aspects of the determination of mineralisation that are Material to the Public Report.

·    In cases where 'industry standard' work has been done this would be relatively simple (eg 'reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a 30 g charge for fire assay'). In other cases more explanation may be required, such as where there is coarse gold that has inherent sampling problems. Unusual commodities or mineralisation types (eg submarine nodules) may warrant disclosure of detailed information.

·    Fine to -25mm rock fragments are obtained using Reverse Circulation drilling methods.

·    Every metre drilled was sampled at the drill rig using a rig mounted static cone splitter to collect 2 - 3kg sub samples.

·    Four standard samples, two duplicates and two blanks are inserted with every 100 samples submitted for analysis .

·    A total of 4 composite samples were submitted to ALS laboratory.

·    Four composite samples were taken using the spear sampling method, over 5m intervals per sample, to generate the four composites. Two composite samples were taken from drill hole MWRC002 and two composite samples from MWRC003.

·    Collected samples were chosen using geological observation and represent logged magnetic basalt with magnetite/ titano-magnetite.

 

 

 

Drilling techniques

·    Drill type (eg core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, sonic, etc) and details (eg core diameter, triple or standard tube, depth of diamond tails, face-sampling bit or other type, whether core is oriented and if so, by what method, etc).

·    Reverse circulation drilling with 1m sample interval.

Drill sample recovery

·    Method of recording and assessing core and chip sample recoveries and results assessed.

·    Measures taken to maximise sample recovery and ensure representative nature of the samples.

·    Whether a relationship exists between sample recovery and grade and whether sample bias may have occurred due to preferential loss/gain of fine/coarse material.

·    Samples consisted of RC chips collected using an inverted 1m cone  to sample the cyclone underflow .

·    Cyclone was "air flushed" at the end of each sample and cleaned every 6m to avoid contamination.

Logging

·    Whether core and chip samples have been geologically and geotechnically logged to a level of detail to support appropriate Mineral Resource estimation, mining studies and metallurgical studies.

·    Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc) photography.

·    The total length and percentage of the relevant intersections logged.

·    Collected chips were logged for geology, alteration, relative abundance of mineral species and mineralisation.

·    This logging is qualitative in nature.

 

Sub-sampling techniques and sample preparation

·    If core, whether cut or sawn and whether quarter, half or all core taken.

·    If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry.

·    For all sample types, the nature, quality and appropriateness of the sample preparation technique.

·    Quality control procedures adopted for all sub-sampling stages to maximise representivity of samples.

·    Measures taken to ensure that the sampling is representative of the in situ material collected, including for instance results for field duplicate/second-half sampling.

·    Whether sample sizes are appropriate to the grain size of the material being sampled.

·      Samples collected weighed approximately 2kg.

·      Sample conditions were recorded by field crew during collection.

·      At the laboratory, samples were dried at 105 degrees Celsius before being pulverized using a Tungsten Carbide bowl to avoid contamination.

·      Pulverized samples were then split and a sub-sample used for ICP analysis.

 

 

Quality of assay data and laboratory tests

·    The nature, quality and appropriateness of the assaying and laboratory procedures used and whether the technique is considered partial or total.

·    For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in determining the analysis including instrument make and model, reading times, calibrations factors applied and their derivation, etc.

·    Nature of quality control procedures adopted (eg standards, blanks, duplicates, external laboratory checks) and whether acceptable levels of accuracy (ie lack of bias) and precision have been established.

·    Samples were submitted to ALS laboratory for analysis by  Lithium borate fusion XRF and a 4-acid digest with MS/ICP finish for a 48 element suite.

·      The methods utilized are appropriate and typical for the industry for Rare Earth and other tested elements.

 

Verification of sampling and assaying

·    The verification of significant intersections by either independent or alternative company personnel.

·    The use of twinned holes.

·    Documentation of primary data, data entry procedures, data verification, data storage (physical and electronic) protocols.

·    Discuss any adjustment to assay data.

·      Results have been verified by company personnel.

·      The REE assay data were converted from reported elemental assays to the equivalent oxide compound as applicable to rare earth oxides. The oxides were calculated from the element according to the following factors:

·      CeO2      1.1526

·      La2O3     1.1728

·      Nd2O3    1.1664

·      Pr6O11   1.2082

·      Ho2O3    1.1455

·      Lu2O3     1.1371

·      Sm2O3   1.1596

·      Tb2O3     1.1762

·      Tm2O3    1.1421

·      Y2O3      1.2699

·      Yb2O3    1.1387

·      Dy2O3    1.1477

·      Er2O3     1.1435

·      Eu2O3    1.1579

·      Gd2O3    1.1526

Location of data points

·    Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys), trenches, mine workings and other locations used in Mineral Resource estimation.

·    Specification of the grid system used.

·    Quality and adequacy of topographic control.

·      The coordinate system used by the company is MGA zone 50 reference grid with geodetic datum GDA94.

·      Drillholes were located using a handheld GPS received with a typical horizontal accuracy of +/-4m.

 

Data spacing and distribution

·    Data spacing for reporting of Exploration Results.

·    Whether the data spacing, and distribution is sufficient to establish the degree of geological and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation procedure(s) and classifications applied.

·    Whether sample compositing has been applied.

·      Drillholes locations reported in this release do not have a regular spacing.

·      The purpose of this drilling was regional exploration, and the reported results are not anticipated to be part of a resource estimate at this point.

·      Compositing to 5m sample length was undertaken over areas where magnetite in basalt was visually identified in the logging

Orientation of data in relation to geological structure

·    Whether the orientation of sampling achieves unbiased sampling of possible structures and the extent to which this is known, considering the deposit type.

·    If the relationship between the drilling orientation and the orientation of key mineralised structures is considered to have introduced a sampling bias, this should be assessed and reported if material.

·      Drilling Azimuth was oriented perpendicular to the main strike of the magnetic anomaly that may have the potential to be spatially correlated with REE mineralisation.

Sample security

·    The measures taken to ensure sample security.

·      Samples are collected in calico bags across a defined arc on the edge of the cone located under the cyclone. The calico bag features sample number and down hole interval data pre-written on it. Bags sent for analysis are collected by field technicians and placed in pre-numbered sample bag. Sample depth and number are recorded by field technician and compared with the  geologist's spreadsheet to assure accuracy of data. Samples collected are placed within bio-degradable plastic bags, which in turn are delivered to the laboratory with detailed sample submission documentation.

·      Laboratory assay samples feature a sample ID on the calico bag as reference.

·      After assaying, sample pulps are placed in paper bags and stored for Riversgold to collect.

·      All steps are supervised by a Riversgold geologist.

Audits or reviews

·    The results of any audits or reviews of sampling techniques and data.

·    No external audits or reviews of the sampling techniques and data has been conducted.

 

Section 2 Reporting of Exploration Results

(Criteria listed in the preceding section also apply to this section.)

Criteria

JORC Code explanation

Commentary

Mineral tenement and land tenure status

·    Type, reference name/number, location and ownership including agreements or material issues with third parties such as joint ventures, partnerships, overriding royalties, native title interests, historical sites, wilderness or national park and environmental settings.

·    The security of the tenure held at the time of reporting along with any known impediments to obtaining a licence to operate in the area.

·    Tenement P 38/4489 is located approximately 28km South-Southeast of Laverton. It is accessed by the sealed road between the Mt Weld project and Laverton. The tenement is 1.4Km west-northwest of Lynas Mt Weld REO operations.

·    The tenement is held by Corcel PLC and is currently subject to a farm in option by Riversgold.

 

 

Exploration done by other parties

·    Acknowledgment and appraisal of exploration by other parties.

·    17 RAB and auger holes were drilled by Placer Exploration Ltd in 1993 targeting gold.

·    1 hole of unknown type but probably RAB drilled by Torridon Exploration for gold and base metals

Geology

·    Deposit type, geological setting and style of mineralisation.

·    Carbonatite hosted REE mineralisation and/or gold below cover.

 

Drill hole Information

·    A summary of all information material to the understanding of the exploration results including a tabulation of the following information for all Material drill holes:

o easting and northing of the drill hole collar

o elevation or RL (Reduced Level - elevation above sea level in metres) of the drill hole collar

o dip and azimuth of the hole

o down hole length and interception depth

o hole length.

·    If the exclusion of this information is justified on the basis that the information is not Material and this exclusion does not detract from the understanding of the report, the Competent Person should clearly explain why this is the case.

·      Refer to Tables and Figures within the body of the release.

Data aggregation methods

·    In reporting Exploration Results, weighting averaging techniques, maximum and/or minimum grade truncations (eg cutting of high grades) and cut-off grades are usually Material and should be stated.

·    Where aggregate intercepts incorporate short lengths of high-grade results and longer lengths of low-grade results, the procedure used for such aggregation should be stated and some typical examples of such aggregations should be shown in detail.

·    The assumptions used for any reporting of metal equivalent values should be clearly stated.

·      Intersections have been calculated using no cut off or internal waste and represent the results of compositing at the sampling stage for early test for REE mineralisation

·      The results for the REE suite (lanthanide series) in ppm is reported for each element individually. 

·      TREO = Lanthanide Oxides + Yitrrium oxides + Scandium Oxides

Relationship between mineralisation widths and intercept lengths

·    These relationships are particularly important in the reporting of Exploration Results.

·    If the geometry of the mineralisation with respect to the drill hole angle is known, its nature should be reported.

·    If it is not known and only the down hole lengths are reported, there should be a clear statement to this effect (eg 'down hole length, true width not known').

·    Mineralisation down hole intersection width is reported as the geometry of the magnetic anomaly being tested is still uncertain. Therefore, true width cannot yet be estimated.

 

 

 

 

 

Diagrams

·    Appropriate maps and sections (with scales) and tabulations of intercepts should be included for any significant discovery being reported These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views.

·    Diagrams have been incorporated in the body of this release.

Balanced reporting

·    Where comprehensive reporting of all Exploration Results is not practicable, representative reporting of both low and high grades and/or widths should be practiced to avoid misleading reporting of Exploration Results.

·      The assay results reported in the release are from 4 composite samples from a specific zone of geological  interest and were fast tracked through the laboratory. The remaining 1 metre samples are to be assayed.

 

Other substantive exploration data

·    Other exploration data, if meaningful and material, should be reported including (but not limited to): geological observations; geophysical survey results; geochemical survey results; bulk samples - size and method of treatment; metallurgical test results; bulk density, groundwater, geotechnical and rock characteristics; potential deleterious or contaminating substances.

·    No other substantive exploration data to be reported.

Further work

·    The nature and scale of planned further work (eg tests for lateral extensions or depth extensions or large-scale step-out drilling).

·    Diagrams clearly highlighting the areas of possible extensions, including the main geological interpretations and future drilling areas, provided this information is not commercially sensitive.

·    A decision on any further work will be made once the bulk of the individual 1m intervals selected for further sampling have been analysed.

 



 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 

Companies

Corcel (CRCL)
UK 100

Latest directors dealings