Mambare drilling program

RNS Number : 1434R
Regency Mines PLC
31 October 2011
 



Regency Mines PLC

('Regency' or the 'Company')

 

Mambare Drilling Program

 

31 October 2011

 

Regency Mines plc is pleased to announce encouraging drill intercepts from the exploration program being undertaken on the Mambare nickel laterite project in Papua New Guinea.  The program is being undertaken by the 50:50 Joint Venture with Sydney based Direct Nickel Pty Ltd.

 

Assay results for the first 17 holes of a 200-hole program have been received from the Intertek laboratory in Jakarta and the joint venture partners are encouraged by the early results.  The first 17 holes were drilled in the North Ridge Extension zone (see Figure 1).   A further 8 holes have been completed in the Plateau and North Ridge Extension zones.

 

Drilling has accelerated in the last two weeks from one rig to four rigs while a fifth will become operational when parts arrive from overseas and the joint venture looks forward to releasing more drill results in the coming months.

 

The 200-hole program shown in Figure 1 is designed to test three areas:

·    infill drilling of the North Ridge area identified by Regency's 2008 drilling;

·    to test for extensions to the north, the North Ridge Extension; and

·    the Plateau to test for mineralization on prospective ground on the plateau identified by prior tenement holders in the 1950's and 1960's.

 

Earlier in 2011 the joint venture completed a number of test pits and a ground penetrating radar (GPR) survey over the drill area covering approximately 27 line kms with encouraging indications of laterite profile thickness.

 

Key results from the drilling are summarized below: 

 

Mambare Area 2


Location

Intersection (m)

Grade

Hole ID

Easting

Northing

From

To

Interval

%Ni

%Co

MAM-KK-0001

582321

9026762

9.0

13.7

4.7

1.29

0.119

MAM-KK-0002

582314

9026555

18.3

22.5

4.2

1.46

0.042

MAM-KK-0004

582113

9026564

18.5

22.5

4.0

1.18

0.022

MAM-KK-0014

581415

9026965

22.6

26.6

4.0

1.47

0.044

MAM-KK-0017

582010

9026967

12.5

16.3

3.8

1.24

0.102

 

The assay results relate to just one and a half drill lines across the deposit but in summary:

 

·    As anticipated better grades are appearing on the crest of the ridge line and these extend north of the 2008 program where it had been previously open

 

·    Current drilling is penetrating the full laterite profile which wasn't consistently achieved in 2008 and is supported by the GPR survey undertaken

 

·    Of the 305 assays from the 17 holes completed the highest single grade, in hole MAM-KK-0002 was 1m @ 2.06% Ni and 0.062% Co from 20.3m

 

As work has just commenced on the Plateau drill area, considered to have a large tonnage potential, further reports on progress can be expected as results come to hand.

 

There is at this stage insufficient data to be able to calculate or deliver any JORC compliant resource figures, as this will require further drilling and also detailed geological assessment both along and across drill lines in each of the three target areas.

 

Figure 1  Mambare 2011 Drill Program

 

http://www.rns-pdf.londonstockexchange.com/rns/1434R_-2011-10-31.pdf 

 

 

The information in this announcement that relates to Exploration Results is based on information reviewed and audited by Mr M Elias who is a Fellow of the Australasian Institute of Mining and Metallurgy.  Mr Elias is employed by CSA Global Pty Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposits under consideration to qualify as a Competent Person as defined in the 2004 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves" and as a qualified person within the meaning of AIM's Note for Mining and Oil & Gas Companies of June 2009 . Mr Elias has consented to the inclusion of the information in the form and context in which it appears.

 

For further information contact:

 

 

Andrew Bell

0207 402 4580 or

07766 474849 

Regency Mines plc

Chairman

 





Sandra Spencer

0207 402 4580 or

07757 660 798 

Regency Mines plc

Public and Investor Relations





Peter Trevelyan-Clark/ Ben Jeynes 

020 7444 0800

Religare Capital Markets

Nominated Adviser





Nick Emerson

01483 413500

Simple Investments Ltd

Broker

 

 

Updates on the Company's activities are regularly posted on its website, www.regency-mines.com.

 

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLUAVRRARAROAA

Companies

Corcel (CRCL)
UK 100

Latest directors dealings