Overview and Highlights
Operational and Corporate
· Conclusion of legal agreements and commencement of site construction at Springs Road where the operator IGas has advised it expects to commence drilling around mid-2018
· Following rejection by the Planning Inspectorate of Egdon's appeals against the two planning refusals in respect of the development of the Wressle oil discovery, Egdon announced its intention to submit a new planning application to address in detail all matters highlighted by the Inspector in his Decision Notice and to also make an application to extend the existing planning for the wellsite
· Acquisition of 100% interest in Promote Licence P2304 from Arenite Petroleum Limited and Europa Oil & Gas Limited resulting in an expanded core area to the south of the Resolution offshore gas discovery
· Completion of the acquisition of the producing Fiskerton Airfield oil field in Lincolnshire licence EXL294 and subsequent sale of 20% interest to Union Jack Oil plc to balance financial exposure
· Production of 17,962 barrels of oil equivalent ("boe") (98 barrels of oil equivalent per day "boepd") (H1 2017: 16,882 boe; 94 boepd)
Financial Performance
· Oil and gas revenues during the period £0.51 million (H1 2017: £0.51 million)
· Loss for the period of £0.85 million (H1 2017: loss of £0.73 million)
· Cash at bank of £4.10 million (H1 2017: £6.80 million)
· Net current assets as at 31 January 2018 of £5.08 million (H1 2017: £8.00 million)
· The Company has no debt (H1 2017: Nil)
Post-Period Events
· Farm-out of interests in PEDL253 (Biscathorpe) to Union Jack Oil plc and Humber Oil & Gas Limited
· Workovers completed of two wells at Fiskerton Airfield with production increased to approaching 30 barrels of oil per day ("bopd"), ahead of further optimisation, an increase of 14 bopd from pre workover levels
· Planning application submitted on 13 April 2018 to extend existing planning consent at the Wressle wellsite for a period of 12 months from the decision date
· Additional site investigation boreholes and two deeper cored boreholes completed to support a new planning application for Wressle field development due for submission within the next month
· Submission of planning applications to extend existing consents for a further 3 years at both North Kelsey and Biscathorpe
· Encouraging Results from third party activity includes the drilling of UK's first horizontal shale gas well at Preston New Road in Lancashire by Cuadrilla
Commenting on the results, Philip Stephens, Chairman of Egdon said
" After a busy and productive six months, we are confident that we will make further progress in the second half of the year, especially on two important fronts. Firstly, after many setbacks, we hope to be successful in gaining planning permission in order to allow us to develop our conventional oil discovery at Wressle. Secondly, we await the drilling of the first well at Springs Road where we have a carried interest in this significant unconventional prospect in the Gainsborough Trough. Success in these prospects will significantly enhance our future.
Whilst challenges no doubt remain, the UK shale business is gaining considerable traction with the completion recently of the first horizontal shale gas well in Lancashire. With an increased level of industry activity due to take place over the coming months, we believe the spotlight will shine more brightly on this exciting space, and Egdon's sizeable acreage position ensures we represent a compelling vehicle for investors to benefit from the eventual uptick in much needed onshore activity."
An audiocast of the Results Presentation is available to view via the following link with immediate effect: http://vm.buchanan.uk.com/2018/egdon170418/registration.htm
For further information please contact:
Egdon Resources plc Mark Abbott
|
01256 702 292 |
Buchanan Ben Romney, Anna Michniewicz
|
020 7466 5000 |
Nominated Adviser and Broker - Cantor Fitzgerald Europe David Porter / Nick Tulloch (Corporate Finance) Caspar Shand Kydd / Alex Pollen (Sales)
|
020 7894 7000 |
Joint Broker - VSA Capital Limited Andrew Monk (Corporate Broking) Andrew Raca (Corporate Finance) |
020 3005 5000 |
Egdon Resources plc (LSE: EDR) is an established UK-based exploration and production company focused on onshore exploration and production in the hydrocarbon-producing basins of the UK.
Egdon holds interests in 43 licences in the UK and has an active programme of exploration, appraisal and development within its portfolio of oil and gas assets. Egdon is an approved operator in the UK. Egdon was formed in 1997 and listed on AIM in December 2004.
Qualified Person Review
In accordance with the AIM Rules - Note for Mining and Oil and Gas Companies, this release has been reviewed by Mark Abbott, Managing Director of Egdon, who is a geoscientist with over 30 years' experience and is a member of the Petroleum Exploration Society of Great Britain and a Fellow of the Geological Society. Mr Abbott has consented to the inclusion of the technical information in this release in the form and context in which it appears.
Evaluation of hydrocarbon volumes has been assessed in accordance with 2007 Petroleum Resources Management System prepared by the Oil and Gas Reserves Committee of the Society of Petroleum Engineers (SPE) and reviewed and jointly sponsored by the World Petroleum Council (WPC), the American Association of Petroleum Geologists (AAPG) and the Society of Petroleum Evaluation Engineers (SPEE).
The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 ("MAR"). Upon the publication of this announcement via Regulatory Information Service ("RIS"), this inside information is now considered to be in the public domain.
Chairman's Statement
In the six months ended 31st January 2018, we have made important progress in some areas which have been somewhat tempered by unexpected planning setbacks, which have delayed the development of our conventional oil production. Our share price has been adversely impacted by these uncertainties, but we are confident that we will make good progress in the next six months as outlined below.
On a more general note we have recently experienced unusually adverse weather conditions in the UK and this has highlighted the potential vulnerability of energy supply to this country. In this context, the development of indigenous onshore UK oil and gas production seems to us to have an ever more vital role to play alongside development of renewable sources of energy.
Developments during the period have included:
Springs Road (Egdon 14.5%)
Licence operator IGas has concluded all legal agreements with Nottinghamshire County Council and commenced civil works at the Springs Road site in Nottinghamshire, where planning consent has been granted for the drilling of two wells. Site construction is now largely completed and IGas has advised that drilling operations in the East Midlands will begin around mid-2018. In the coming months, Egdon looks forward to participating in Springs Road-1, a potentially play-opening well in our core area for unconventional resources exploration, the Gainsborough Trough. Egdon's costs are carried in Springs Road.
Fiskerton Airfield (Egdon 80%)
In October, Egdon completed the acquisition of the producing Fiskerton Airfield oil field in Lincolnshire licence EXL294 and in November a 20% interest was sold to Union Jack Oil plc ("UJO") to balance Egdon's financial and risk exposure to the asset. Despite challenging weather conditions, workovers of the two producing wells were successfully completed in the period January to March 2018. Production operations have resumed at Fiskerton with field production approaching 30 barrels of oil per day ("bopd"), a significant increase on the pre-workover rates of 16 bopd, prior to further optimisation including increasing pumping rates.
Wressle Oil Field Development (Egdon 25%):
In early January 2018, The Planning Inspectorate rejected Egdon's appeals against the planning refusals by North Lincolnshire County Council's Planning Committee in respect of the development of the Wressle oil discovery in licences PEDL180 and PEDL182. In mid-January, Egdon announced its intention to submit a new planning application for the development of the Wressle oil discovery. Since then, Egdon has drilled a number of site investigation boreholes and two deeper cored boreholes. The data from these operations will be used to support a new planning application containing a revised site design and hydrogeological risk assessment for the Wressle Field Development. Once Egdon has received and integrated the results of the hydraulic conductivity tests carried out on the core samples, the new planning application for the Wressle Field Development will be submitted. This is expected to occur in four to five weeks' time. An application to extend the existing consent for the Wressle wellsite for a further year was submitted on 13 April 2018.
Endeavour Gas Discovery (P2304) (Egdon 100%)
In December 2017, Egdon announced the acquisition of a 100% interest in offshore Promote Licence P2304, adjacent to our Resolution gas discovery (Licence P1929, Egdon 100%), from Arenite Petroleum Limited and Europa Oil & Gas Limited for a nominal cash consideration, plus further contingent payments related to future activity. The licence contains a mapped extension of Resolution and an additional proven gas discovery made by well 41/24a-1, named Endeavour by Egdon, and has flow tested at rates of up to 34 million cubic feet of gas per day from well 41/24a-3. Egdon has independently mapped the Endeavour structure and attributes a mean prospective resource volume of 27 billion cubic feet of gas ("bcf") to the discovery.
Financial and Statutory Information
Net production for the period ending 31 January 2018 was 17,962 boe (H1 2017: 16,882 boe). Revenue from oil and gas production during the period was £0.51 million (H1 2017: £0.51 million). Cost of sales from production operations (including shut-in assets) for the period was £0.56 million (H1 2017: £0.41 million). Depreciation for the period was £0.20 million (H1 2017: £0.23 million).
The Group recorded a loss of £0.85 million for the six months ended 31 January 2018 (H1 2017: loss of £0.73 million).
The loss per share for the period was 0.33p (H1 2017: loss of 0.31p).
Net current assets as at 31 January 2018 of £5.08 million (H1 2017: £8.00 million) including cash at bank of £4.10 million (H1 2017: £6.80 million).
The Group remains debt free (H1 2017: Nil).
Strategy
Our strategy focuses on three key near-term objectives to deliver shareholder value:
· UK Unconventional Resources - growing the value of exploration opportunities in Northern England
· Conventional Resources Exploration and Appraisal - adding additional reserves and revenues through an active drilling programme whilst managing risk and financial exposure through farm-out transactions
· Production - a continued focus on maximising production rates, revenues and profitability from existing producing assets through targeted investment
Operations
Our website (www.egdon-resources.com) provides further details of all our assets and operations.
UK Unconventional Resources
Egdon has delivered against its strategic objective by building a significant unconventional resources acreage position in Northern England (c. 205,800 acres net (833km² net)) through a series of targeted acquisitions, farm-ins and licence round applications. Egdon now holds a material interest in a number of key prospective geological basins and has reported an independently assessed mean volume of undiscovered Gas Initially in Place ("GIIP") of 50.9 TCF. Springs Road will be a key test of our Gainsborough Trough core area for shale exploration during the coming months.
In addition to the carried Springs Road well, 2018 should see a number of important wells and tests by other operators. IGas is planning to drill at Tinker Lane on the southern margin of the Gainsborough Trough and has also announced that its mid-term focus will be to move to pilot development in the Gainsborough Trough. Cuadrilla has reported encouraging results from the Upper and Lower Bowland Shale in two vertical wells at its Preston New Road site in Lancashire and has recently announced the completion of the first horizontal well. Hydraulic fracturing and flow testing by Cuadrilla of two horizontal wells at Preston New Road in Lancashire is planned to start later in 2018. Third Energy is planning to hydraulically fracture and test at Kirby Misperton in North Yorkshire once it has concluded financial resilience tests. Elsewhere INEOS Shale has completed its large 3D acquisition programme in the East Midlands adjacent to and over some of Egdon's licences and expects planning inquiries for several proposed shale exploration wells starting from mid-2018.
In November 2017, INEOS Shale acquired the majority of Total's interests in the Gainsborough Trough, becoming the funding partner for the forthcoming Springs Road wells (EDR14.5% carried) and acquiring the option to farm-in to Egdon's PEDL209 licence.
Conventional Resources Exploration and Appraisal
Post period-end we announced the farm-out of interests in PEDL253 to UJO and Humber Oil & Gas Limited. The funded Biscathorpe well targets a prospect that has the potential to be one of the larger UK onshore oil fields (Egdon 35.8% interest: Gross Mean Prospective Resources of 14 million barrels of oil ("mmbo")). We continue to look to introduce further partners at North Kelsey (Egdon 80% interest: Gross Mean Prospective Resources of 6.5 mmbo). Egdon has submitted applications to extend existing planning for a further three years at both the Biscathorpe and North Kelsey exploration sites. A decision on the extension at North Kelsey was deferred for a site visit at a planning meeting held on 9 April 2018.
The Company's interest in Holmwood (PEDL143) is largely carried. Operator Europa has advised that the well could be drilled in H2 2018 subject to agreement of the Construction Transport Management Plan, the last unfulfilled planning condition and issue of the Environmental Permit where a "minded to award" decision has been issued by the Environment Agency. Holmwood is a conventional prospect with potential for oil trapped in Jurassic sandstone and limestone reservoirs which have been proven locally at the Brockham and Horse Hill discoveries. Holmwood has a Gross Mean Prospective Resource volume of 5.6mmbo (1.14mmbo net to Egdon).
In Egdon's offshore Yorkshire licences, P1929 and the newly acquired P2304, Egdon plans to progress appraisal of the prospective gas resources (Egdon 100% interest: mean cases: Resolution - 337 bcf and Endeavour - 27 bcf) in the enlarged area via the acquisition of 3D seismic and appraisal drilling during 2019, subject to securing a suitable funding partner.
Production and Development
Production during the period was 98 boepd (H1 2017: 94 boepd) from Ceres, Keddington, Avington and Fiskerton
Airfield. This is slightly below our guidance of 100 - 110 boepd due to pump failure at Fiskerton Airfield and weather-related delays in completion of the workovers, plus a decision to shut-in production at Avington from January 2018 until a revised forward plan is agreed.
At Fiskerton Airfield, production has increased from pre-workover levels of 16 bopd to approaching 30 bopd and further optimisation will continue over the coming period.
Our production guidance for the financial year ending 31 July 2018 remains c. 100 - 110 boepd.
Production from the Ceres field during the period is via recovery of back-out gas whilst the well remains shut-in. From mid-2018 onwards, Egdon's production will see a boost of 145 boepd from the restoration of production from the Ceres well once a replacement gas meter has been installed during the summer maintenance shut-down. In addition, a successful outcome for the new Wressle field development planning application could see Egdon's net production from the field reach 125 bopd.
We continue to undertake detailed technical evaluation work to inform our plans for further development drilling at Keddington and Waddock Cross and are also looking at innovative ways of restarting production elsewhere within our portfolio (e.g. Dukes Wood, Kirklington and Kirkleatham).
Outlook
As we look to enter a more active operational phase, our main focus during the coming period will be:
· The carried drilling of the potentially play-opening well at Springs Road in the Gainsborough Trough, our core area for unconventional resources exploration
· Progressing the new Wressle planning application with a view to gaining consent to develop the field
· Drilling of the funded Biscathorpe well in mid-2018
· Drilling of the largely carried Holmwood well later in 2018
· Introducing a funding partner and acquiring a marine 3D survey early in 2019 over the Resolution and Endeavour gas discoveries, prior to finalising a drilling location
As highlighted above, operational activity by IGas, Cuadrilla, Third Energy and INEOS Shale will also provide useful information in relation to the potential for UK shale and could lead to a re-rating of Egdon's unconventional resource portfolio.
Despite the non-technical challenges, the fundamentals of the business remain robust as we embark on a period of more active drilling. The Company remains debt free, holds an asset portfolio that offers excellent potential for both conventional and unconventional resources, in a jurisdiction which remains commercially attractive especially with the improved commodity price levels. Furthermore, we are well positioned to benefit from the historic portfolio management as we have successfully mitigated our risk and cost exposure to enable Egdon exposure to significant upside catalysts with limited capex requirements.
Egdon will continue to manage its cash resources and risk exposure through farm-outs and look to dispose of non-core assets as we continue to focus on fewer projects with higher potential.
Finally I would like to thank our shareholders for their patience and the hardworking and professional team at Egdon for the continuing efforts in what remains a challenging operating environment.
Philip Stephens
Chairman
17 April 2018
EGDON RESOURCES PLC
CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME
For the six months ended 31 January 2018
|
Unaudited |
Unaudited |
Audited |
Continuing operations |
|
|
|
Revenue |
513 |
505 |
1,039 |
Cost of sales - exploration costs written off and pre-licence costs |
(87) |
(5) |
(33) |
Cost of sales - impairments and impairment reversals |
- |
- |
(158) |
Cost of sales - other |
(556) |
(414) |
(923) |
Cost of sales - depreciation |
(202) |
(227) |
(462) |
Total cost of sales |
(845) |
(646) |
(1,576) |
Gross loss |
(332) |
(141) |
(537) |
Administrative expenses |
(578) |
(589) |
(1,178) |
Other operating income |
85 |
19 |
58 |
|
(825) |
(711) |
(1,657) |
Finance income |
4 |
1 |
5 |
Finance costs - unwinding of decommissioning discount |
(24) |
(24) |
(47) |
Loss before taxation |
(845) |
(734) |
(1,699) |
Taxation |
- |
- |
- |
Loss for the period |
(845) |
(734) |
(1,699) |
Other comprehensive income for the period |
- |
- |
- |
Total comprehensive income for the period attributable to equity holders of the parent |
(845) |
(734) |
(1,699) |
Loss per share - note 2 |
|
|
|
Basic loss per share |
(0.33)p |
(0.31)p |
(0.68)p |
Diluted loss per share |
(0.33)p |
(0.31)p |
(0.68)p |
EGDON RESOURCES PLC
CONSOLIDATED STATEMENT OF FINANCIAL POSITION
As at 31 January 2018
|
Notes |
Unaudited |
Unaudited |
Audited |
Non-current assets |
|
|
|
|
Intangible assets |
|
19,856 |
18,923 |
19,231 |
Property, plant and equipment |
|
9,130 |
8,536 |
9,264 |
Total non-current assets |
|
28,986 |
27,459 |
28,495 |
|
|
|
|
|
Current assets |
|
|
|
|
Trade and other receivables |
|
1,808 |
1,795 |
1,506 |
Available for sale financial assets |
|
50 |
50 |
50 |
Cash and cash equivalents |
3 |
4,095 |
6,796 |
6,057 |
Total current assets |
|
5,953 |
8,641 |
7,613 |
|
|
|
|
|
Current liabilities |
|
|
|
|
Trade and other payables |
|
(878) |
(642) |
(1,216) |
Total current liabilities |
|
(878) |
(642) |
(1,216) |
Net current assets |
|
5,075 |
7,999 |
6,397 |
|
|
|
|
|
Total assets less current liabilities |
|
34,061 |
35,458 |
34,892 |
|
|
|
|
|
Non-current liabilities |
|
|
|
|
Provisions |
|
(2,201) |
(1,842) |
(2,187) |
Net assets |
|
31,860 |
33,616 |
32,705 |
|
|
|
|
|
Equity |
|
|
|
|
Share capital |
|
14,551 |
14,545 |
14,551 |
Share premium |
|
25,202 |
25,154 |
25,202 |
Share based payment reserve |
|
225 |
224 |
225 |
Retained deficit |
|
(8,118) |
(6,307) |
(7,273) |
|
|
31,860 |
33,616 |
32,705 |
EGDON RESOURCES PLC
CONSOLIDATED STATEMENT OF CASH FLOWS
For the six months ended 31 January 2018
|
Unaudited |
Unaudited |
Audited |
Cash flows from operating activities |
|
|
|
Loss before tax |
(845) |
(734) |
(1,699) |
Adjustments for: |
|
|
|
Depreciation and impairment of fixed assets |
202 |
227 |
464 |
Exploration costs written off |
- |
11 |
177 |
Foreign exchange loss |
3 |
- |
16 |
(Increase)/decrease in trade and other receivables |
(302) |
745 |
1,034 |
Decrease in trade and other payables |
(401) |
(435) |
(456) |
Finance costs |
24 |
24 |
47 |
Finance income |
(4) |
(1) |
(5) |
Cash flow used in operations |
(1,323) |
(163) |
(422) |
Finance costs |
- |
- |
- |
Net cash flow used in operating activities |
(1,323) |
(163) |
(422) |
Investing activities |
|
|
|
Finance income |
4 |
1 |
5 |
Purchase of exploration and evaluation assets |
(561) |
(509) |
(908) |
Purchase of property, plant and equipment |
(216) |
(77) |
(146) |
Partial disposal of licence interest - property, plant and equipment |
137 |
- |
- |
Net cash flow used in capital expenditure and financial investment |
(636) |
(585) |
(1,049) |
Financing activities |
|
|
|
Issue of shares |
- |
5,075 |
5,075 |
Costs associated with issue of shares |
- |
(210) |
(210) |
Net cash flow generated from financing |
- |
4,865 |
4,865 |
Net (decrease)/increase in cash and cash equivalents |
(1,959) |
4,117 |
3,394 |
Cash and cash equivalents at the start of the period |
6,057 |
2,679 |
2,679 |
Effects of exchange rate changes on the balance of cash held in foreign currencies |
(3) |
- |
(16) |
Cash and cash equivalents at the end of the period |
4,095 |
6,796 |
6,057 |
In the period to 31 January 2017, significant non-cash transactions comprised the issue of equity share capital with a market value of £50,000 as consideration for the acquisition of an interest in PEDL201.
EGDON RESOURCES PLC
CONSOLIDATED STATEMENT OF CHANGES IN EQUITY
For the six months ended 31 January 2018
|
Share capital |
Share premium |
Share based payment reserve |
Retained earnings |
Equity |
|
£'000 |
£'000 |
£'000 |
£'000 |
£'000 |
Balance as at 1 August 2016 |
14,164 |
20,620 |
226 |
(5,575) |
29,435 |
Total comprehensive income for the period |
- |
- |
- |
(734) |
(734) |
Transfer |
- |
- |
(2) |
2 |
- |
Issues of ordinary shares: |
379 |
4,728 |
|
|
5,107 |
Costs associated with share issues |
- |
(210) |
- |
- |
(210) |
Share options exercised |
2 |
16 |
- |
- |
18 |
Total issue of ordinary shares |
381 |
4,534 |
- |
- |
4,915 |
Balance as at 31 January 2017 |
14,545 |
25,154 |
224 |
(6,307) |
33,616 |
Total comprehensive income for the period |
- |
- |
- |
(965) |
(965) |
Issue of shares |
6 |
48 |
- |
- |
54 |
Transfer |
- |
- |
1 |
(1) |
- |
Balance as at 31 July 2017 |
14,551 |
25,202 |
225 |
(7,273) |
32,705 |
Total comprehensive income for the period |
- |
- |
- |
(845) |
(845) |
Balance as at 31 January 2018 |
14,551 |
25,202 |
225 |
(8,118) |
31,860 |
1. General information
Egdon Resources plc ('the Company' and ultimate parent of the Group) is a public limited company listed on the AIM market of the London Stock Exchange plc (AIM) and incorporated in England. The registered office is The Wheat House, 98 High Street, Odiham, Hampshire, RG29 1LP.
This interim report was authorised for issue by the Directors on the 16 April 2018.
Basis of preparation
The financial information set out in this interim report has been prepared using accounting policies consistent with International Financial Reporting Standards as adopted for use in the European Union. IFRS is subject to amendment and interpretation by the International Accounting Standards Board (IASB) and the IFRS Interpretations Committee and there is an ongoing process of review and endorsement by the European Union. The financial information has been prepared on the basis of IFRS that the Directors expect to be adopted by the European Union and applicable as at 31 July 2018.
Non-statutory accounts
The financial information set out in this interim report does not constitute the Group's statutory accounts for that period within the meaning of Section 434 of the Companies Act 2006. The statutory accounts for the year ended 31 July 2017 have been delivered to the Registrar of Companies. The auditors reported on those accounts; their report was unqualified and did not contain a statement under either Section 498 (2) or Section 498 (3) of the Companies Act 2006.
The financial information for the six months ended 31 January 2018 and 31 January 2017 is unaudited.
Accounting policies
The condensed financial statements have been prepared under the historical cost convention, except for the inclusion of certain financial instruments at fair value.
The same accounting policies, presentation and methods of computation are followed in these condensed financial statements as were applied in preparation of the Group's financial statements for the year ended 31 July 2017.
2. Loss per share
|
Unaudited |
Unaudited |
Audited |
|
|
|
|
Basic |
(0.33) |
(0.31) |
(0.68) |
Diluted |
(0.33) |
(0.31) |
(0.68) |
The basic loss per share has been calculated on the loss on ordinary activities after taxation of £0.85m (January 2017 £0.73m; July 2017: £1.70m) divided by the weighted average number of ordinary shares in issue of 259,984,822 (January 2017: 237,882,631, July 2017: 248,740,775). The diluted loss per share has been calculated on the loss on ordinary activities after taxation of £0.85m (January 2017: £0.73m; July 2017: £1.70m) divided by the diluted weighted average number of ordinary shares in issue of 259,984,822 (January 2017: 237,882,631, July 2017: 248,740,775). In all of the reported periods, all share options in issue were excluded as their inclusion would have been anti-dilutive.
3. Cash and Cash Equivalents
|
Unaudited 31-Jan-18 £'000
|
Unaudited 31-Jan-17 £'000 |
Audited 31-Jul-17 £'000 |
Cash at bank at floating interest rates |
3,554 |
5,825 |
5,353 |
Restricted cash at bank |
206 |
206 |
206 |
Non-interest bearing cash at bank |
335 |
765 |
498 |
|
|
|
|
|
4,095 |
6,796 |
6,057 |
Cash at bank at floating interest rates consisted of money market deposits which earn interest at rates set in advance for periods up to three months by reference to Sterling LIBOR. Restricted cash at bank represents amounts lodged in support of guarantee commitments, earning interest at short term rates based on Sterling LIBOR.
4. Post balance sheet events
In March 2018 Egdon announced that it had farmed-out of interests in PEDL253 to Union Jack Oil plc ("UJO") and Humber Oil & Gas Limited ("Humber"). Under the agreed terms, UJO and Humber will each acquire 6% of Egdon's interest in PEDL253 by paying their pro-rata share of the Biscathorpe-2 well cost plus an additional £10,000 per percentage point interest acquired.
On 3 April 2018, Egdon announced that it had signed a Farm-out Agreement in respect of a further 5% interest in PEDL253 with Humber under the same terms as the farm-out previously announced on 5 March and 20 March.
In this release we announced that workovers were completed of two wells at Fiskerton Airfield in April 2018 with production having increased to approaching 30 barrels of oil per day from 16 barrels of oil per day and further optimisation, including increasing pumping rates, will continue over the coming period.
5. Dividend