Sugarloaf Project Block B Upd

RNS Number : 6419J
Empyrean Energy PLC
01 April 2010
 

 

Empyrean Energy PLC

('Empyrean' or the 'Company', (EME))

 

Sugarloaf Project, Block B, onshore Texas, USA.

 

 

Empyrean Energy Plc is pleased to provide the market with the following update of operations on Block B at the Sugarloaf Project:

 

Morgan -1H

 

Operations on this well are now complete and the rig has demobilised from the location. The well was drilled to a total depth of 17,015 ft and production casing has now been run and cemented across approximately 5,000 ft of reservoir section. This well is now ready for fracture stimulation.

 

Rancho Grande -1H

 

This well was spudded on 25 March 2010 and the most recent operation has been to run and cement the surface casing string at a depth of 6,005 ft. Thereafter the well will be drilled vertically to the top of the reservoir before the trajectory is built to horizontal through the reservoir section.

 

Easley -1H

 

As previously reported this well has had a production casing string run and cemented in place and is waiting on the commencement of fracture stimulation operations. It will then be flowed to sales.

 

The information contained in this announcement was completed and reviewed by the Technical Director of Empyrean Energy Plc, Mr Frank Brophy BSc (Hons) who has over 40 years experience as a petroleum geologist.

 

           

Contact:

 

Tom Kelly                    Empyrean Energy Plc                Tel: +618 93216988

 

Nominated Adviser and Broker:

 

Jerry Keen                    Astaire Securities Plc                Tel: +44 (0) 20 7448 4400

Shane Gallwey              Astaire Securities Plc                Tel: +44 (0) 20 7448 4400

 

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCUARURRRASRAR
UK 100