SIGNIFICANT MINERAL RESERVES INCREASE AT KAZZINC

RNS Number : 6434Y
Glencore International PLC
05 March 2012
 



 

 

BAAR, SWITZERLAND                                                                                                                                                           5 March 2012

 

 

GLENCORE ANNOUNCES SIGNIFICANT MINERAL RESERVES INCREASE AT KAZZINC

 

Glencore International plc today announces significant increases in the total mineral reserves at the Vasilkovskoye, Maleevsky and Ridder-Sokolny deposits operated by Kazzinc as a result of further exploration drilling and technical studies with contained Gold up 50%, contained Copper up 136% and contained Zinc up 67%.

 

The new mineral statement estimates Kazzinc's reserves of total contained gold at 14,448ktoz, total contained silver at 76,197ktoz, total contained copper at 745.3kt, total contained lead at 738.9kt and total contained zinc at 3,374.4kt.

 

Key summary:

 

Vasilkovskoye:

 

·      Vasilkovskoye contained gold reserves increased by 29% to 9,462ktoz compared to the previous report, including the effects of depletion.

 

Maleevsky:

 

·      Maleevsky reserves increased by 88% compared to the previous report, including the effects of depletion. Reserves of all five metals were increased. Contained gold increased by 214% to 300ktoz, silver by 93% to 37,658ktoz, copper by 100% to 354.5kt, lead by 77% to 179.1kt and zinc by 71% to 1,078.5kt.

 

Ridder-Sokolny:

 

·      Ridder-Sokolny reserves increased by 94% compared to the previous report, including the effects of depletion. Reserves of all five metals were increased. Contained gold increased by 283% to 2,291ktoz, silver by 55% to 9,757ktoz, copper by 245% to 203.1kt, lead by 39% to 92.3kt and zinc by 48% to 199.4kt.

 

Commenting on the upgrade, Nick Popovic, Chairman of the Management Board of Kazzinc, said:

 

"This drilling and technical studies campaign has confirmed our evaluation of the high quality deposits we have at Kazzinc. We believe these reserves will create substantial value for our shareholders in the years ahead."

 

Detailed reserves breakdown below:

 

 

 

 

 





Reserves




Resources


Operating Mines1, 2

Proved

Probable

Total


Measured

Indicated

Inferred

Total

Vasilkovskoye


Ore

'000 MT

131 080

31 350

162 430


171 000

104 310

40 880

316 190


Gold

Content, g/t

1.89

1.49

1.81


1.79

1.33

1.72

1.63


Gold

Amount, '000 toz

7 960

1 502

9 462


9 841

4 460

2 261

16 562

Maleevsky


Ore

'000 MT

13 280

5 380

18 660


16 820

5 240

5 170

27 220


Gold

Content, g/t

0.54

0.40

0.50


0.64

0.56

0.25

0.55


Silver

Content, g/t

69.08

47.20

62.77


81.91

65.13

50.11

72.64


Copper

Content, %

2.13

1.36

1.90


2.49

1.79

1.16

2.10


Lead

Content, %

0.98

0.91

0.96


1.17

1.23

1.79

1.30


Zinc

Content, %

5.95

5.35

5.78


6.92

7.08

5.82

6.74

Ridder-Sokolniy3


Ore

'000 MT

9 070

27 850

36 920


24 450

67 780

32 940

125 170


Gold

Content, g/t

1.25

2.15

1.93


1.58

2.16

1.56

1.89


Silver

Content, g/t

5.96

8.80

8.22


10.23

9.27

9.26

9.45


Copper

Content, %

0.64

0.52

0.55


0.72

0.64

0.47

0.61


Lead

Content, %

0.24

0.25

0.25


0.37

0.33

0.32

0.34


Zinc

Content, %

0.60

0.52

0.54


0.87

0.68

0.72

0.73

Tishinsky


Ore

'000 MT

18 200

4 900

23 100


25 360

7 960

5 020

38 340


Gold

Content, g/t

0.53

0.47

0.52


0.55

0.42

0.27

0.48


Silver

Content, g/t

7.99

9.36

8.28


8.04

6.94

8.44

7.86


Copper

Content, %

0.52

0.40

0.49


0.53

0.40

0.50

0.50


Lead

Content, %

0.91

0.88

0.91


0.85

0.72

1.41

0.90


Zinc

Content, %

4.19

4.13

4.18


4.09

3.69

3.77

3.96

Staroye Tailings Dam 4


Ore

'000 MT

-

3 580

3 580


-

4 420

2 790

7 210


Gold

Content, g/t

-

1.13

1.13


-

1.14

0.96

1.07


Silver

Content, g/t

-

11.83

11.83


-

12.36

10.96

11.82


Copper

Content, %

-

0.04

0.04


-

0.04

0.04

0.04


Lead

Content, %

-

0.34

0.34


-

0.34

0.29

0.32


Zinc

Content, %

-

0.74

0.74


-

0.74

0.62

0.69

Shaimerden Stockpiles


Ore

'000 MT

-

2 390

2 390


-

2 480

-

2 480


Zinc

Content, %

-

21.60

21.60


-

21.71

-

21.71

 





Reserves




Resources


Development Projects 1, 2

Proved

Probable

Total


Measured

Indicated

Inferred

Total

Dolinnoye


Ore

'000 MT

3 660

960

4 620


4 010

3 040

3 830

10 880


Gold

Content, g/t

3.93

2.38

3.61


4.47

2.51

2.11

3.09


Silver

Content, g/t

53.76

29.82

48.77


61.83

34.03

29.54

42.70


Copper

Content, %

0.20

0.14

0.19


0.24

0.14

0.20

0.20


Lead

Content, %

0.75

0.50

0.70


0.92

0.51

0.68

0.72


Zinc

Content, %

1.41

1.02

1.33


1.76

1.01

1.26

1.37

Obruchevskoye


Ore

'000 MT

890

3 250

4 140


2 710

5 510

5 240

13 460


Gold

Content, g/t

1.73

0.90

1.08


1.76

0.51

0.51

0.76


Silver

Content, g/t

42.80

33.21

35.26


65.37

22.15

36.42

36.41


Copper

Content, %

0.81

0.83

0.82


1.51

1.05

0.95

1.24


Lead

Content, %

4.27

2.66

3.01


0.42

0.37

0.36

0.39


Zinc

Content, %

8.98

6.50

7.03


2.46

2.06

1.77

2.16

Chashinskoye Tailings Dam


Ore

'000 MT

-

55 500

55 500


-

57 800

30 000

87 800


Gold

Content, g/t

-

0.67

0.67


-

0.67

0.50

0.61


Silver

Content, g/t

-

5.13

5.13


-

5.16

4.57

4.96


Copper

Content, %

-

0.05

0.05


-

0.05

0.06

0.05


Lead

Content, %

-

0.15

0.15


-

0.15

0.19

0.16


Zinc

Content, %

-

0.38

0.38


-

0.38

0.45

0.40

Tishinsky Tailings Dam


Ore

'000 MT

-

1 100

1 100


-

1 150

-

1 150


Gold

Content, g/t

-

0.38

0.38


-

0.38

-

0.38


Silver

Content, g/t

-

5.10

5.10


-

5.13

-

5.13


Copper

Content, %

-

0.23

0.23


-

0.23

-

0.23


Lead

Content, %

-

0.44

0.44


-

0.44

-

0.44


Zinc

Content, %

-

2.25

2.25


-

2.26

-

2.26

 

¹ The information in the tables above, in relation to mineral resources and ore reserves, have been estimated in accordance with the guidelines of the JORC Code (2004) and are dated as of 1 January 2012.

² Remaining mine life: different for each mine, ranging from eight to 21 years. Expiry date of relevant mining/concession licences: different for each mine, ranging from 19 May 2013 to 7 November 2030.

3 Mineral resources and ore reserves for Ridder-Sokolniy have been completed for a significant part of the deposit, however there are still some outstanding results.

4 The grades of copper and zinc for the depletion of the Staroye Tailings have been estimated from assumptions based upon the known proportion of other metals within the tailings due to a lack of grade data.

Note: rounding errors may occur

 

Competent Persons: the mineral resource and ore reserve estimates set out above were reviewed and approved by Phil Newall of WAI. The mineral resource and ore reserve estimates have been prepared in accordance with the JORC Code. Mr Newall is a Competent Person as defined by JORC and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking.

 

For further information, please contact:

 

Paul Smith (Investors)
Simon Buerk (Media)
Finsbury (Media)
t:  +41 (0)41 709 2487
t:  +41 (0)41 709 2679
Guy Lamming
m: +41 (0)79 947 1348
m: +41 (0)79 955 5384
Dorothy Burwell
e: paul.smith@glencore.com
e: simon.buerk@glencore.com
t: +44 (0)20 7251 3801
 
 
 
Elisa Morniroli (Investors)
Charles Watenphul (Media)
 
t:  +41 (0)41 709 2818
t:  +41 (0) 41 709 2462
 
m: +41 (0) 79 833 0508
m: +41 (0) 79 904 33 20
 
e: elisa.morniroli@glencore.com
charles.watenphul@glencore.com
 
 

 

 

 

About Glencore International plc

Glencore is one of the world's leading integrated producers and marketers of commodities, headquartered in Baar, Switzerland, and listed on the London and Hong Kong Stock Exchanges.

Glencore has worldwide activities in the production, sourcing, processing, refining, transporting, storage, financing and supply of Metals and Minerals, Energy Products and Agricultural Products.

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCBKQDQCBKDANK

Companies

Glencore (GLEN)
UK 100