Quarterly Activities Report June 2024

GreenX Metals Limited
31 July 2024
 

Shape Description automatically generated with medium confidence

 

NEWS RELEASE  31 JULy 2024

Quarterly Activities Report June 2024

 

HIGHLIGHTS

 

·     In July 2024, following renegotiation with Greenfields Exploration Pty Ltd (Greenfields) GreenX Metals Ltd (GreenX or the Company) entered into a revised agreement to acquire 100% of the Eleonore North Gold Project (Eleonore North or Project) in eastern Greenland.

These revised terms provide GreenX with the opportunity to retain the Project and to conduct further exploration work before making a decision to continue with the Project by 31 December 2025.

Eleonore North has the potential to host a "reduced intrusion-related gold system" (RIRGS), analogous to large bulk-tonnage deposit types found in Canada.

Field work to date at Eleonore North has been focused on determining the depth of an intrusion within the project area by deployment of an array of seismic nodes.

The results from seismic nodes have significantly reduced the exploration search space at Eleonore North.

Future fieldwork will now target these sites where plutons approach the surface. Within a RIRGS setting, 1-2 km-wide elongated plutons rising from a deeper batholith are very favourable exploration targets.

GreenX will now collaborate with Geological Survey of Denmark and Greenland in Copenhagen (GEUS) to possibly commission a fast-tracked production of an updated geological map at Eleonore North based on helicopter photography collected in 2023.

Samples collected by GEUS are also available in Copenhagen for inspection and analysis. These samples may provide a new regional perspective on the gold systems present in northeastern Greenland

·     In November 2022, the hearing for the claim against the Republic of Poland under both the Energy Charter Treaty and the Australia-Poland Bilateral Investment Treaty was concluded (Claim).

Combined arbitration hearing took place in front of the Tribunal in London under the UNCITRAL Arbitration Rules.

With completion of the hearing, the Tribunal will render an Award (decision) in due course.

Damages of up to £737 million (A$1.3 billion / PLN4.0 billion) have been claimed including the assessed value of GreenX's lost profits and damages related to both the Jan Karski and Debiensko projects, and accrued interest related to any damages.

·      Cash balance as at 30 June 2024 was A$7.1 million and no debt.

 

GreenX Metals Limited (ASX:GRX, LSE:GRX) (GreenX or the Company) is pleased to present its Quarterly Activities Report for the period during and subsequent to 30 June 2024.

 

eleonore north gold project

The Eleonore North gold project comprises of two exploration licences covering an area of 1,221 km2 in an arid part of north-eastern Greenland, approximately 1,000 km south of the Company's ARC project (Figure 1).

The two exploration licences are located on Ymer Island in the south and the Strindberg Land peninsula in the north (Figure 2). The 300 m deep fjords in this area are around 6 km wide, sailed annually by large container ships, and aircraft frequent the area. The Company had identified no significant environmental, archaeological, or social challenges in the area.

A map of the north pole Description automatically generated

Figure 1: Map of Greenland showing GreenX's ARC and Eleonore North license areas

Figure 2: Map showing prospects and geological features within the Eleonore North license areas

 

Subsequent to the end of the quarter and following renegotiation with Greenfields, GreenX will acquire a 100% interest in the Eleonore North project through a revised Option Agreement.  Having spent the required amount on an agreed work exploration program for the Project; GreenX will now acquire the Project and conduct further exploration work before making a decision to continue with the Project by 31 December 2025.

 

Results from Seismic Survey

The Company commissioned a passive seismic survey over the Noa Pluton target at Eleonore North licence for the 2023 field season. Passive seismic surveys use ambient noises generated by nature instead of active noise sources. Natural noise sources include waves crashing in the ocean or creaking glaciers whereas active noise sources include vibration trucks or explosives. Passive seismic surveys with ambient noise are therefore much less impactful on the environment.

Fieldwork was completed by Greenfields in conjunction with the Institute of Mine Seismology (IMS). Eleonore North is prospective for RIRGS similar to the Fort Knox and Dublin Gulch/Eagle Gold deposits. The RIRGS deposit style hosts structurally-controlled gold in plutons as well as in the surrounding hornfels aureole. The purpose at of the survey at Eleonore North was to identify plutons that are blind to the surface in the target area.

Data collected from the array of passive seismic nodes was processed by IMS. As shown in the conceptual 3D velocity model below, multiple blind plutons may be situated in the target area (Figure 3). Hornfels have been mapped at Noa Dal, but the causative plutons have not yet been identified. Noa Dal has only been mapped at 1:250,000 scale by GEUS, so it is possible that detailed mapping could identify the currently unknown plutons. More likely however, the causative plutons are blind to the surface (as shown in the cross-section in Figure 3).

The results from 2023's passive seismic survey have significantly reduced the exploration search space at Eleonore North. Future fieldwork will target these sites where plutons approach the surface. Within a RIRGS setting, 1-2 km-wide elongated plutons rising from a deeper batholith are very favourable exploration targets.    

A map of a geolocation Description automatically generated

Figure 3:  IMS's conceptual 3D velocity model from Noa Dal target area with GreenX's interpretation of target plutons. Inset shows survey location in Noa Dal. Velocity values above 2,900 m/s are considered to be igneous material. The A-A' section shows three potential plutons extending upwards towards the surface.

Planned 2024 Activities

GreenX is again collaborating with the GEUS. For the last two years, GEUS has conducted fieldwork in the region surrounding and within the Eleonore North licence. GEUS has a multi-year project working to update the geological maps to a higher level of detail. This work is primarily being done with traditional field mapping, sample collection, and helicopter-based photography. Based on previous discussions with GEUS, there is the possibility to commission GEUS to fast-track production of an updated geological map at Eleonore North based on helicopter photography collected in 2023. Samples collected by GEUS are also available in Copenhagen for inspection and analysis. These samples may provide a new regional perspective on the gold systems present in northeastern Greenland.

Figure 4: Map showing regional historical samples collected by GUES as publicly available from GUES, a subset of which are available for inspection.

ARCTIC RIFT COPPER PROJECT

The ARC project is an exploration joint venture between GreenX and Greenfields. GreenX can earn-in up to 80% in ARC with the Company awaiting final registration of its initial 51% interest in the project. The project is targeting large scale copper in multiple settings across a 5,774 km2 Special Exploration Licence in eastern North Greenland. The area has been historically underexplored yet is prospective for copper, forming part of the newly identified Kiffaanngissuseq metallogenic province.

The results of work program announced last year have demonstrated the high-grade nature of the known copper sulphide mineralisation and wider copper mineralization in fault hosted Black Earth zones and adjacent sandstone units. The exact position of a native copper fissure at the Neergaard Dal prospect was also identified.

The Company is in the process of analysing further remote-sensing options for ARC, which  would be used to supplement current understanding of the known copper sulphide mineralisation and refine plans for the next exploration program.

DISPUTE WITH POLISH GOVERNMENT

In November 2022, the Company reported the conclusion of the Claim against the Republic of Poland under both the Energy Charter Treaty (ECT) and the Australia-Poland Bilateral Investment Treaty (BIT) (together the Treaties). The hearing took place in London in and lasted two weeks.

Following completion of the hearing, the Tribunal will render an Award (i.e., the legal term used for a 'decision' by the Tribunal) in due course with no specified date available for the Tribunal decision.

As previously advised, the arbitration and hearing proceedings in relation to the Claim are required to be kept confidential.

Details of the Claim

The Company's Claim against the Republic of Poland is being prosecuted through an established and enforceable legal framework, with GreenX and Poland agreeing to apply the United Nations Commission on International Trade Law Rules (UNCITRAL) rules to the proceedings. The arbitration claims are being administered through the Permanent Court of Arbitration in the Hague.

The evidentiary hearing phase of the arbitration proceedings has now been completed in front of the Arbitral Tribunal. With completion of the hearing, the Arbitral Tribunal will render an Award in due course. There is no specified date for an Award to be rendered. The Company's claims for damages against Poland are in the amount of up to £737 million (A$1.3 billion/PLN4.0 billion), which includes a revised assessment of the value of GreenX's lost profits and damages related to both the Jan Karski and Debiensko projects, and accrued interest related to any damages. The Claim for damages has been assessed by independent external quantum experts appointed by GreenX specifically for the purposes of the Claim.

In February 2019, GreenX formally notified the Polish Government that there exists an investment dispute between GreenX and the Polish Government. GreenX's notification called for prompt negotiations with the Government to amicably resolve the dispute and indicated GreenX's right to submit the dispute to international arbitration in the event of the dispute not being resolved amicably.

In July 2020, the Company announced it had executed the LFA for US$12.3 million with LCM. US$10.7 million of the facility has been drawn down to cover legal, tribunal and external expert costs as well as defined operating expenses associated with the Claim. The Company does not anticipate further material drawdowns in relation to the ongoing BIT and ECT Tribunal proceedings. The LFA is a limited recourse loan with LCM that is on a "no win - no fee" basis.

In September 2020, GreenX announced that it had formally commenced with the Claim by serving the Notices of Arbitration against the Republic of Poland. In June 2021, GreenX announced that it had formally lodged its Statement of Claim in the BIT arbitration, including the first assessed claim for compensation. The Company's Statement of Reply, the last material filing to be made by the Company for the BIT arbitration proceedings, was submitted in July 2021. The Statement of Reply addresses various points raised by the Republic of Poland in their Statement of Defence. The Statement of Reply also contains a re-evaluation of the claim for damages based on responses to Poland's Statement of Defence.

GreenX's dispute alleges that the Republic of Poland has breached its obligations under the applicable Treaties through its actions to block the development of the Company's Jan Karski and Debiensko projects in Poland which effectively deprived GreenX of the entire value of its investments in Poland.

GreenX's investment dispute with the Republic of Poland is not unique, with international media widely reporting that the political environment and investment climate in Poland has deteriorated since the change in Government in 2015. As a result, there are a significant number of International Arbitration claims being bought against Poland.

CORPORATE

At 30 June 2024, GreenX had cash of A$7.1m placing it in a strong financial position to progress with exploration activities in Greenland and to pursue additional business development opportunities in the resource sector to complement its current projects.

ENQUIRIES

Ben Stoikovich
Chief Executive Officer

+44 207 478 3900

Sapan Ghai
Business Development

+44 207 478 3900

 

 

-ENDS-

Forward Looking Statements

This release may include forward-looking statements. These forward-looking statements are based on GreenX's expectations and beliefs concerning future events. Forward looking statements are necessarily subject to risks, uncertainties and other factors, many of which are outside the control of GreenX, which could cause actual results to differ materially from such statements. GreenX makes no undertaking to subsequently update or revise the forward-looking statements made in this release, to reflect the circumstances or events after the date of that release.

Competent Persons Statement

The information in this report that relates to exploration results were extracted from the ASX announcement dated 15 July 2024 which is available to view at www.greenxmetals.com.

GreenX confirms that (a) it is not aware of any new information or data that materially affects the information included in the original announcement; (b) all material assumptions and technical parameters underpinning the content in the relevant announcement continue to apply and have not materially changed; and (c) the form and context in which the Competent Person's findings are presented have not been materially modified from the original announcement

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014 as it forms part of UK domestic law by virtue of the European Union (Withdrawal) Act 2018 ('MAR'). Upon the publication of this announcement via Regulatory Information Service ('RIS'), this inside information is now considered to be in the public domain.

APPENDIX 1: TENEMENT INFORMATION

 

As at 30 June 2024, the Company has an interest in the following tenements:

Location

Tenement

Percentage
Interest

Status

Tenement Type

Greenland

Arctic Rift Copper project (Licence No. 2021-07 MEL-S)

511

Granted

Exploration Licence

Greenland

Eleonore North gold project
(Licence No's 2018-19 and 2023-39)

-2

Granted

Exploration Licence

Jan Karski, Poland

Jan Karski Mine Plan Area (K-4-5, K6-7, K-8 and K-9)2

-3

In dispute3

Exclusive Right to apply for a mining concession3

Debiensko, Poland

Debiensko 1

-3

In dispute3

Mining3

Notes:

1     In October 2021, the Company announced that it had entered into an Earn-In Agreement (EIA) with Greenfields to acquire an interest of up to 80% in ARC. Having met the spend requirement to earn its initial 51% interest, the Company is awaiting final registration of its interest in the project.

2   In July 2024, the Company announced that it had entered into a revised Option Agreement with Greenfields to acquire 100% of the Eleonore North project. As at the date of this announcement, the transfer of the licence into GreenX's name is pending.

3   GreenX formally commenced international arbitration claims against the Republic of Poland under both the ECT and the BIT in 2021. GreenX alleges that the Republic of Poland has breached its obligations under the Treaties through its actions to block the development of the Company's Jan Karski and Debiensko projects in Poland. Refer to discussion of the Claim above. The Company has received notice from the relevant Polish authority that the Debiensko mining licence has been extinguished.

 

Appendix 2: Related Party Payments

 

During the quarter ended 30 June 2024, the Company made payments of A$256,000 to related parties and their associates. These payments relate to existing remuneration arrangements (director fees, consulting fees and superannuation of A$181,000 and the provision of a serviced office and company secretarial and administration services of A$75,000).

 

Appendix 3: Exploration and Mining Expenditure

 

During the quarter ended 30 June 2024, the Company made the following payments in relation to exploration activities:

 

Activity

A$000

Greenland (ARC and Eleonore North)


Project Management

190

Transport costs (including equipment and fuel)

42

Other (field supplies, satellite imagery, etc)

10

Total as reported in the Appendix 5B (item 1.2(a) and 2.1(d))

242

 

There were no mining or production activities and expenses incurred during the quarter ended 30 June 2024.

 

Appendix 5B

Mining exploration entity or oil and gas exploration entity
quarterly cash flow report

Name of entity

GreenX Metals Limited

ABN


Quarter ended ("current quarter")

23 008 677 852


30 June 2024

 

Consolidated statement of cash flows

Current quarter
$A'000

Year to date
(12 months)
$A'000

1.

Cash flows from operating activities

-

-

1.1

Receipts from customers

1.2

Payments for

(41)

(81)


(a)   exploration & evaluation


(b)   development

-

-


(c)   production

-

-


(d)   staff costs

(395)

(1,641)


(e)   administration and corporate costs

(53)

(1,157)

1.3

Dividends received (see note 3)

-

-

1.4

Interest received

94

454

1.5

Interest and other costs of finance paid

-

-

1.6

Income taxes paid

-

-

1.7

Government grants and tax incentives

-

-

1.8

Other (provide details if material)

(a)    Business Development

(b)    Property rental and gas sales

(c)    Arbitration related expenses

(d)    Occupancy

 

(84)

-

-

(225)

 

(395)

10

(182)

(845)

1.9

Net cash from / (used in) operating activities

(704)

(3,837)


2.

Cash flows from investing activities

-

-

2.1

Payments to acquire or for:


(a)   Entities


(b)   Tenements

-

-


(c)   property, plant and equipment

(2)

(4)


(d)   exploration & evaluation

(201)

(1,639)


(e)   investments

-

-


(f)    other non-current assets

-

-

2.2

Proceeds from the disposal of:

-

-


(a)   entities


(b)   tenements

-

-


(c)   property, plant and equipment

-

-


(d)   investments

-

-


(e)   other non-current assets

-

-

2.3

Cash flows from loans to other entities

-

-

2.4

Dividends received (see note 3)

-

-

2.5

Other (provide details if material)

-

-

2.6

Net cash from / (used in) investing activities

(203)

(1,643)


3.

Cash flows from financing activities

-

4,164

3.1

Proceeds from issues of equity securities (excluding convertible debt securities)

3.2

Proceeds from issue of convertible debt securities

-

-

3.3

Proceeds from exercise of options

-

-

3.4

Transaction costs related to issues of equity securities or convertible debt securities

(12)

(189)

3.5

Proceeds from borrowings

-

-

3.6

Repayment of borrowings

-

-

3.7

Transaction costs related to loans and borrowings

-

-

3.8

Dividends paid

-

-

3.9

Other (provide details if material)

-

-

3.10

Net cash from / (used in) financing activities

(12)

3,975


4.

Net increase / (decrease) in cash and cash equivalents for the period



4.1

Cash and cash equivalents at beginning of period

8,087

8,674

4.2

Net cash from / (used in) operating activities (item 1.9 above)

(704)

(3,837)

4.3

Net cash from / (used in) investing activities (item 2.6 above)

(203)

(1,643)

4.4

Net cash from / (used in) financing activities (item 3.10 above)

(12)

3,975

4.5

Effect of movement in exchange rates on cash held

(5)

(6)

4.6

Cash and cash equivalents at end of period

7,163

7,163

 

5.

Reconciliation of cash and cash equivalents
at the end of the quarter (as shown in the consolidated statement of cash flows) to the related items in the accounts

Current quarter
$A'000

Previous quarter
$A'000

5.1

Bank balances

3,163

2,087

5.2

Call deposits

4,000

6,000

5.3

Bank overdrafts

-

-

5.4

Other (provide details)

-

-

5.5

Cash and cash equivalents at end of quarter (should equal item 4.6 above)

7,163

8,087

 

6.

Payments to related parties of the entity and their associates

Current quarter
$A'000

6.1

Aggregate amount of payments to related parties and their associates included in item 1

(256)

6.2

Aggregate amount of payments to related parties and their associates included in item 2

-

Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an explanation for, such payments.

 

7.

Financing facilities
Note: the term "facility' includes all forms of financing arrangements available to the entity.

Add notes as necessary for an understanding of the sources of finance available to the entity.

Total facility amount at quarter end
$A'000


Amount drawn at quarter end
$A'000

7.1

Loan facilities

18,437*

16,038

7.2

Credit standby arrangements

-

-

7.3

Other (please specify)

-

-

7.4

Total financing facilities

18,437*

16,038


 


7.5

Unused financing facilities available at quarter end

2,399

7.6

Include in the box below a description of each facility above, including the lender, interest rate, maturity date and whether it is secured or unsecured. If any additional financing facilities have been entered into or are proposed to be entered into after quarter end, include a note providing details of those facilities as well.

On 30 June 2020, the Company executed a Litigation Funding Agreement (LFA) for US$12.3 million (*now worth A$18.4 million with the movement of the A$ compared to the $US) with LCM Funding UK Limited a subsidiary of Litigation Capital Management Limited (LCM), to pursue damages claims in relation to the investment dispute between GreenX and the Polish Government that has arisen out of certain measures taken by Poland in breach of the Energy Charter Treaty and the Australia - Poland Bilateral Investment Treaty (BIT). LCM will provide up to US$12.3million (~A$18.4 million), denominated in US$, in limited recourse financing which is repayable to LCM in the event of a successful Claim or settlement of the Dispute that results in the recovery of any monies. If there is no settlement or award, then LCM is not entitled to any repayment of the financing facility. In return for providing the financing facility, LCM shall be entitled to receive repayment of any funds drawn plus an amount equal to between two and five times the total of any funds drawn from the funding facility during the first five years, depending on the time frame over which funds have remained drawn, and then a 30% interest rate after the fifth year until receipt of damages payments.

 

8.

Estimated cash available for future operating activities

$A'000

8.1

Net cash from / (used in) operating activities (item 1.9)

(704)

8.2

(Payments for exploration & evaluation classified as investing activities) (item 2.1(d))

(201)

8.3

Total relevant outgoings (item 8.1 + item 8.2)

(905)

8.4

Cash and cash equivalents at quarter end (item 4.6)

7,163

8.5

Unused finance facilities available at quarter end (item 7.5)

2,399

8.6

Total available funding (item 8.4 + item 8.5)

9,562




8.7

Estimated quarters of funding available (item 8.6 divided by item 8.3)

>10

Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as "N/A". Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.

8.8

If item 8.7 is less than 2 quarters, please provide answers to the following questions:


8.8.1     Does the entity expect that it will continue to have the current level of net operating cash flows for the time being and, if not, why not?


Answer: Not applicable


8.8.2     Has the entity taken any steps, or does it propose to take any steps, to raise further cash to fund its operations and, if so, what are those steps and how likely does it believe that they will be successful?


Answer: Not applicable


8.8.3     Does the entity expect to be able to continue its operations and to meet its business objectives and, if so, on what basis?


Answer: Not applicable


Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.

 

Compliance statement

1        This statement has been prepared in accordance with accounting standards and policies which comply with Listing Rule 19.11A.

2        This statement gives a true and fair view of the matters disclosed.

 

Date:                31 July 2024

Authorised by:  Company Secretary

(Name of body or officer authorising release - see note 4)

Notes

1.          This quarterly cash flow report and the accompanying activity report provide a basis for informing the market about the entity's activities for the past quarter, how they have been financed and the effect this has had on its cash position. An entity that wishes to disclose additional information over and above the minimum required under the Listing Rules is encouraged to do so.

2.          If this quarterly cash flow report has been prepared in accordance with Australian Accounting Standards, the definitions in, and provisions of, AASB 6: Exploration for and Evaluation of Mineral Resources and AASB 107: Statement of Cash Flows apply to this report. If this quarterly cash flow report has been prepared in accordance with other accounting standards agreed by ASX pursuant to Listing Rule 19.11A, the corresponding equivalent standards apply to this report.

3.          Dividends received may be classified either as cash flows from operating activities or cash flows from investing activities, depending on the accounting policy of the entity.

4.          If this report has been authorised for release to the market by your board of directors, you can insert here: "By the board". If it has been authorised for release to the market by a committee of your board of directors, you can insert here: "By the [name of board committee - eg Audit and Risk Committee]". If it has been authorised for release to the market by a disclosure committee, you can insert here: "By the Disclosure Committee".

5.          If this report has been authorised for release to the market by your board of directors and you wish to hold yourself out as complying with recommendation 4.2 of the ASX Corporate Governance Council's Corporate Governance Principles and Recommendations, the board should have received a declaration from its CEO and CFO that, in their opinion, the financial records of the entity have been properly maintained, that this report complies with the appropriate accounting standards and gives a true and fair view of the cash flows of the entity, and that their opinion has been formed on the basis of a sound system of risk management and internal control which is operating effectively.

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UK 100