Q3 2017 Production Report

RNS Number : 8783T
Hochschild Mining PLC
18 October 2017
 

   

__________________________________________________________________________________

 

18 October 2017  

 

Production Report for the 9 months ended 30 September 2017

 

Please click on the link below to open a PDF version of this announcement:

http://www.rns-pdf.londonstockexchange.com/rns/8783T_1-2017-10-17.pdf 

Ignacio Bustamante, Chief Executive Officer said:

"Hochschild achieved record production levels in Q3 2017 driven by a strong performance from Inmaculada and we are firmly on track to hit our 37 million silver equivalent ounce target for the year. Costs remain under control and we can look forward to our financial position improving in the near future with good cashflow generation and a planned debt re-financing in the first quarter of next year.

 

The Pablo permitting process continues as expected with no major issues encountered so far. We are currently in the final stages and we expect to receive the environmental permit by the end of the month.

 

We are now in the middle of our brownfield exploration campaign and have seen some encouraging results from Arcata, San Jose and also at Inmaculada where underground drilling has already revealed a number of new veins close to the original Angela vein. Furthermore, with the permit recently received from the Peruvian government, we can now begin the surface drilling campaign at the deposit."

 

Operational highlights

§ Record quarterly attributable production[1]

5.3 million ounces of silver

67,234 ounces of gold

10.3 million silver equivalent ounces

139,388 gold equivalent ounces

§ Q3 YTD 2017 attributable production in line with expectations

14.3 million ounces of silver

188,664 ounces of gold

28.2 million silver equivalent ounces (Q3 YTD 2016: 26.9 million silver equivalent ounces)

381,596 gold equivalent ounces (Q3 YTD 2016: 363,001 gold equivalent ounces)

§ On track to deliver overall 2017 production target of 37 million silver equivalent ounces

§ 2017 all-in sustaining costs per silver equivalent ounce expected to meet $12.2-12.7 guidance

Exploration highlights

§ Inmaculada surface drilling permit received for all planned exploration campaigns in 2017/2018

§ All drilling permits secured for Arcata's 2017/2018 brownfield exploration programme

§ Encouraging results year-to-date from brownfield exploration programme at all operations

Strengthening financial position

§ Total cash of approximately $156 million as at 30 September 2017 ($140 million as at 31 December 2016)

§ Net debt of approximately $147 million as at 30 September 2017 ($187 million as at 31 December 2016)

§ Current Net Debt/LTM EBITDA of approximately 0.54x as of 30 September 2017

__________________________________________________________________________________

A conference call will be held at 2.30pm (London time) on Wednesday 18 October 2017 for analysts and investors. 

Dial in details as follows:

International Dial in: +44 333 300 0804

UK Toll-Free Number: 0800 358 9473

Pin: 57446849#

A recording of the conference call will be available for one week following its conclusion, accessible from the following telephone number:

International: +44 333 300 0819

UK Toll Free: 0800 358 2049

Pin: 301205236#

__________________________________________________________________________________

 

Overview

In Q3 2017, the Company delivered record attributable production of 10.3 million silver equivalent ounces (139,388 gold equivalent ounces) with Pallancata continuing to deliver tonnage and grades above expectations whilst Inmaculada recorded its second strongest quarter to date. Overall year-to-date production is a record 28.2 million silver equivalent ounces (381,596 gold equivalent ounces), placing the Company firmly on course to reach its 37 million ounce target for the year.

 

The Company reiterates that its all-in sustaining cost per silver equivalent ounce for 2017 is on track to be between $12.2 and $12.7.

 

TOTAL GROUP PRODUCTION

 

Q3 2017

Q2 2017

Q3 2016

YTD 2017

YTD 2016

Silver production (koz)

6,087

5,599

5,908

16,516

15,652

Gold production (koz)

79.10

73.29

78.91

223.37

218.34

Total silver equivalent (koz)

11,940

11,022

11,747

33,046

31,810

Total gold equivalent (koz)

161.36

148.95

158.75

446.56

429.86

Silver sold (koz)

5,726

5,908

6,011

16,234

16,095

Gold sold (koz)

73.99

75.70

77.85

217.41

223.95

Total production includes 100% of all production, including production attributable to Hochschild's joint venture partner at San Jose.

                                     

ATTRIBUTABLE GROUP PRODUCTION

 

Q3 2017

Q2 2017

Q3 2016

YTD 2017

YTD 2016

Silver production (koz)

5,339

4,824

4,999

14,277

13,209

Gold production (koz)

67.23

60.81

66.38

188.66

184.50

Silver equivalent (koz)

10,315

9,324

9,911

28,238

26,862

Gold equivalent (koz)

139.39

126.01

133.94

381.60

363.00

Attributable production includes 100% of all production from Arcata, Inmaculada, Pallancata and 51% from San Jose.

 

 

Production

Inmaculada

Product

Q3 2017

Q2 2017

Q3 2016

YTD 2017

YTD 2016

Ore production (tonnes treated)

343,990

330,393

343,247

958,343

962,407

Average grade silver (g/t)

149

148

132

145

132

Average grade gold (g/t)

4.19

3.80

4.09

4.10

4.19

Silver produced (koz)

       1,499

1,405

       1,318

4,143

3,688

Gold produced (koz)

       43.72

38.03

       42.48

 123.54

           121.68

Silver equivalent (koz)

4,735

4,219

       4,461

13,285

12,692

Gold equivalent (koz)

63.98

57.01

60.29

179.53

171.52

Silver sold (koz)

1,410

1,448

1,270

4,052

3,738

Gold sold (koz)

40.52

38.35

40.66

118.84

122.83

 

Inmaculada's third quarter production was 43,722 ounces of gold and 1.5 million ounces of silver which amounts to gold equivalent production of 63,981 ounces and was principally driven by higher than expected extracted grades. Year-to-date, Inmaculada has delivered gold equivalent production of 179,528 ounces, which represents a 5% improvement on the same period of 2016 (Q3 YTD 2016: 171,520 ounces). Inmaculada is on track to meet its full year forecast of approximately 230,000 gold equivalent ounces (17 million silver equivalent ounces).

 

 

 

Arcata

Product

Q3 2017

Q2 2017

Q3 2016

YTD 2017

YTD 2016

Ore production (tonnes treated)

117,358

129,215

173,784

379,001

507,181

Average grade silver (g/t)

300

308

348

306

334

Average grade gold (g/t)

1.05

1.06

1.30

1.08

1.25

Silver produced (koz)

       1,003

1,138

       1,705

3,306

4,675

Gold produced (koz)

3.52

3.90

6.33

11.56

16.69

Silver equivalent (koz)

       1,264

1,427

       2,174

4,162

5,910

Gold equivalent (koz)

17.08

19.28

29.37

56.24

79.87

Silver sold (koz)

990

1,139

1,751

3,250

4,672

Gold sold (koz)

3.41

3.71

6.26

11.35

16.39

 

At Arcata, silver production in the third quarter was 1.0 million ounces with gold production of 3,516 ounces which resulted in silver equivalent production of 1.3 million ounces. Production for the first nine months of 2017 was 4.2 million silver equivalent ounces (Q3 YTD 2016: 5.9 million ounces) which reflected reduced tonnage and silver grades following a revision of the mine plan to accommodate a lower number of stopes and narrower veins.

 

Pallancata

Product

Q3 2017

Q2 2017

Q3 2016

YTD 2017

YTD 2016

Ore production (tonnes treated)

152,087

121,282

82,147

345,031

217,884

Average grade silver (g/t)

          471

424

          438

454

377

Average grade gold (g/t)

1.80

1.75

1.98

1.81

1.85

Silver produced (koz)

2,058

1,475

1,030

4,497

2,303

Gold produced (koz)

7.65

5.90

4.54

17.44

10.91

Silver equivalent (koz)

       2,624

1,912

       1,365

5,788

3,110

Gold equivalent (koz)

35.46

25.83

18.45

78.21

42.03

Silver sold (koz)

1,838

1,558

1,023

4,275

2,338

Gold sold (koz)

6.85

6.23

4.46

16.57

10.96

 

The Pallancata operation produced 2.1 million ounces of silver and 7,650 ounces of gold bringing the silver equivalent total to 2.6 million ounces.  For the first nine months this has led to a better-than-expected 5.8 million silver equivalent ounces (Q3 YTD 2016: 3.1 million ounces) driven by better than forecast tonnage and grades.

 

San Jose (the Company has a 51% interest in San Jose)

Product

Q3 2017

Q2 2017

Q3 2016

YTD 2017

YTD 2016

Ore production (tonnes treated)

137,548

135,439

140,366

387,943

389,132

Average grade silver (g/t)

406

418

469

425

454

Average grade gold (g/t)

6.35

6.68

6.44

6.51

6.26

Silver produced (koz)

1,526

1,581

1,855

4,570

4,987

Gold produced (koz)

24.21

25.46

25.57

70.83

69.06

Silver equivalent (koz)

       3,318

3,465

       3,747

9,811

10,097

Gold equivalent (koz)

44.84

46.82

50.64

132.59

136.45

Silver sold (koz)

1,489

1,763

1,967

4,657

5,347

Gold sold (koz)

23.22

27.41

26.47

70.65

73.77

 

The San Jose mine in Argentina has continued to be a solid performer with consistent tonnage offsetting slightly lower gold grades and resulting in production of 1.5 million ounces of silver and 24,208 ounces of gold (3.3 million silver equivalent ounces). The first nine months' overall production was 4.6 million ounces of silver and 70,825 ounces of gold which is 9.8 million silver equivalent ounces, broadly in line with the same of 2016.

 

Average realisable prices and sales

Average realisable precious metal prices in Q3 2017 (which are reported before the deduction of commercial discounts) were $1,293/ounce for gold and $16.9/ounce for silver (Q3 2016: $1,254/ounce for gold and $18.6/ounce for silver). For the first nine months of 2017, average realisable precious metal prices were $1,265/ounce for gold and $17.1/ounce for silver (Q3 YTD 2016: $1,205/ounce for gold and $16.4/ounce for silver).

 

 

Brownfield exploration

At Arcata, in the third quarter over 5,000m of resource drilling has been carried out at the Ramal Marion and Paralelas veins whilst 6,200m of potential drilling has been executed in the Tunel 3, Tunel 4, Pamela and Veta Paralelas veins. The outcome of drilling year-to-date is promising with selected results below:

 

Vein

Results

Ramal Marion

DDH-018-GE-17: 1.0m @ 1.0g/t Au & 326g/t Ag

DDH-023-GE-17: 0.8m @ 0.6g/t Au & 154g/t Ag

DDH-049-EX-17: 0.8m @ 0.6g/t Au & 146g/t Ag

DDH-054-EX-17: 0.8m @ 0.4g/t Au & 201g/t Ag

DDH-023-GE-17: 0.8m @ 0.9g/t Au & 246g/t Ag

DDH-043-EX-17: 1.2m @ 0.3g/t Au & 159g/t Ag

DDH-058-EX-17: 1.0m @ 2.1g/t Au & 712g/t Ag

DDH-066-EX-17: 1.3m @ 0.4g/t Au & 167g/t Ag

DDH-018-GE-17: 1.2m @ 2.6g/t Au & 1,229g/t Ag

DDH-023-GE-17: 0.8m @ 1.0g/t Au & 227g/t Ag

DDH-043-EX-17: 0.8m @ 0.2g/t Au & 477g/t Ag

DDH-058-EX-17: 0.9m @ 0.5g/t Au & 309/t Ag

DDH-043-EX-17: 0.8m @ 0.2g/t Au & 132g/t Ag

DDH-052-EX-17: 0.8m @ 0.4g/t Au & 106g/t Ag

DDH-066-EX-17: 1.2m @ 1.1g/t Au & 408g/t Ag

DDH-018-GE-17: 0.8m @ 0.9g/t Au & 303g/t Ag

DDH-023-GE-17: 1.1m @ 3.8g/t Au & 1,025g/t Ag

Paralela

DDH-036-GE-17: 0.8m @ 4.9g/t Au & 605g/t Ag

DDH-038-GE-17: 0.8m @ 1.5g/t Au & 198g/t Ag

DDH-048-DI-17: 0.4m @ 3.9g/t Au & 389g/t Ag

DDH-074-DI-17: 1.2m @ 1.8g/t Au & 176g/t Ag

DDH-056-DI-17: 0.8m @ 1.5g/t Au & 177g/t Ag

Paralela 1

DDH-036-GE-17: 0.8m @ 5.2g/t Au & 692g/t Ag

DDH-038-GE-17: 0.8m @ 1.4g/t Au & 240g/t Ag

DDH-048-DI-17: 0.8m @ 6.6g/t Au & 765g/t Ag

Paralela 2

DDH-057-DI-17: 1.1m @ 3.0g/t Au & 244g/t Ag

DDH-028-GE-17: 0.9m @ 2.6g/t Au & 226g/t Ag

Paralela 3

DDH-056-DI-17: 1.1m @ 2.1g/t Au & 331g/t Ag

DDH-074-DI-17: 1.8m @ 12.2g/t Au & 1,339g/t Ag

DDH-041-DI-17: 1.3m @ 1.4g/t Au & 173g/t Ag

DDH-038-GE-17: 0.8m @ 1.7g/t Au & 117g/t Ag

Socorro+800

DDH-074-DI-17: 2.5m @ 12.2g/t Au & 399g/t Ag

Tunel 4

DDH-087-GE-17: 0.8m @ 1.6g/t Au & 850g/t Ag

DDH-097-DI-17: 1.8m @ 0.9g/t Au & 397g/t Ag

DDH-103-DI-17: 0.8m @ 0.8g/t Au & 126g/t Ag

DDH-109-DI-17: 1.3m @ 4.2g/t Au & 636g/t Ag

DDH-555-S-17: 0.4m @ 1.6g/t Au & 516g/t Ag

DDH-557-S-17: 1.9m @ 1.5g/t Au & 205g/t Ag

 

In addition, long horizontal drilling for potential resources has continued during the quarter having started in the Pamela and Paralelas vein systems in the second quarter with results still pending. During the fourth quarter drilling, will be carried out at the Michele, Soledad, Baja and Ramal 4 veins.

 

At Inmaculada, following the recent receipt from the Peruvian government of the exploration permit, the 3,600m surface drilling programme at the Millet vein will commence shortly. In addition, the permit also encompasses resource drilling that is expected to start by the end of the first quarter of 2018 at the Millet and Olinda structures. In addition, mine development during the third quarter has allowed a reinterpretation of the geological model at the deposit and has so far identified a further 9.7 million silver equivalent ounces of resources. Exploratory underground drilling has also already confirmed the presence of the Millet vein as well as discovering new structures, Barbara, Thalia and Alessandra. Supporting intercepts and diagram are provided below.

 

Vein

Results

Thalia

MIL-17-001: 1.1m @ 3.0g/t Au & 125g/t Ag

BAR17-017: 1.5m @ 11.0g/t Au & 67g/t Ag

Alessandra

MIL-17-001: 1.2m @ 2.9g/t Au & 227g/t Ag

MIL-17-001: 1.5m @ 1.5g/t Au & 82g/t Ag

Millet

MIL-17-001: 3.0m @ 0.7g/t Au & 35g/t Ag

Barbara

BAR17-001: 3.9m @ 1.6g/t Au & 235g/t Ag

BAR17-003: 1.3m @ 2.4g/t Au & 419g/t Ag

BAR17-004: 3.0m @ 2.6g/t Au & 175g/t Ag

BAR17-008: 4.3m @ 10.0g/t Au & 751g/t Ag

BAR17-009: 3.6m @ 1.9g/t Au & 348g/t Ag

BAR17-010: 6.0m @ 15.2g/t Au & 3,049g/t Ag

BAR17-011: 2.7m @ 6.6g/t Au & 780g/t Ag

BAR17-012: 3.8m @ 6.5g/t Au & 692g/t Ag

BAR17-013: 4.1m @ 11.1g/t Au & 1,449g/t Ag

BAR17-014: 3.5m @ 16.2g/t Au & 1,227g/t Ag

BAR17-017: 2.4m @ 1.2g/t Au & 70g/t Ag

BAR17-018: 3.6m @ 3.5g/t Au & 132g/t Ag

BAR 17-019: 1.9m @ 3.9g/t Au & 259g/t Ag

Ramal Barbara

BAR 17-019: 1.0m @ 1.7g/t Au & 314g/t Ag

 

View of underground drill holes showing newly discovered structures close to the Angela vein - please see PDF at top of announcement

  

At San Jose, a further 1,846m of drilling for potential resources was carried out in the third quarter at the Aguas Vivas zone with the results pending whilst resource drilling has been carried out close to the San Jose operation with results from the Molle vein shown below.

 

Vein

Results

Molle

SJD-1651: 0.8m @ 8.4g/t Au & 141g/t Ag

SJM-320: 2.5m @ 5.2g/t Au & 427g/t Ag

SJM-320: 1.2m @ 46.7g/t Au & 2,256g/t Ag

 

Financial position

Total cash was approximately $156 million as at 30 September 2017 following interest and equity dividend payments in the third quarter resulting in net debt of approximately $147 million. The Company's cash balance is expected to rise in the fourth quarter.

 

Outlook

The Company remains on track to deliver its overall production target for 2017 of 37.0 million silver equivalent ounces or 500 thousand gold equivalent ounces and also reaffirms its all-in sustaining cost per silver equivalent ounce forecast of between $12.2 and $12.7.

 

__________________________________________________________________________________

 

Enquiries:

 

Hochschild Mining plc

Charles Gordon                                                                                                                                               +44 (0)20 3709 3264

Head of Investor Relations

 

Hudson Sandler

Charlie Jack                                                                                                                                                      +44 (0)207 796 4133

Public Relations

__________________________________________________________________________________

 

 

 

About Hochschild Mining plc

Hochschild Mining plc is a leading precious metals company listed on the London Stock Exchange (HOCM.L / HOC LN) with a primary focus on the exploration, mining, processing and sale of silver and gold. Hochschild has over fifty years' experience in the mining of precious metal epithermal vein deposits and currently operates four underground epithermal vein mines, three located in southern Peru and one in southern Argentina. Hochschild also has numerous long-term projects throughout the Americas.

__________________________________________________________________________________

 

Forward looking statements

This announcement may contain forward looking statements. By their nature, forward looking statements involve risks and uncertainties because they relate to events and depend on circumstances that will or may occur in the future. Actual results, performance or achievements of Hochschild Mining plc may, for various reasons, be materially different from any future results, performance or achievements expressed or implied by such forward looking statements.

 

The forward looking statements reflect knowledge and information available at the date of preparation of this announcement. Except as required by the Listing Rules and applicable law, the Board of Hochschild Mining plc does not undertake any obligation to update or change any forward looking statements to reflect events occurring after the date of this announcement. Nothing in this announcement should be construed as a profit forecast.

 

This announcement contains information which prior to its release could be considered inside information.

 

Note

The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (Regulation (EU) No.596/2014). Upon the publication of this announcement via a Regulatory Information Service, this inside information is now considered to be in the public domain.

 

LEI: 549300JK10TVQ3CCJQ89

 

 

- ends -

 

[1] All equivalent figures assume a gold/silver ratio of 74x.


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLDDLFFDBFZFBF