0.9 MWh Sale to U.S. Electrical Workers Union HQ

Invinity Energy Systems PLC
25 May 2023
 

 

25 May 2023

Invinity Energy Systems plc

 

("Invinity" or the "Company")

 

0.9 MWh Sale to U.S. Electrical Workers Union HQ

Invinity flow battery will increase use of onsite solar power and be used to train future electricians on VFB maintenance and installation at IBEW 58 Headquarters in Detroit, Michigan

 

Invinity Energy Systems plc (AIM: IES) (AQSE: IES) (OTCQX: IESVF) a leading global manufacturer of utility-grade energy storage, is pleased to announce a 0.88 MWh sale to the Detroit branch of the International Brotherhood of Electrical Workers ("IBEW") Local 58 for use in a solar plus storage project.

 

The project will see four Invinity VS3 vanadium flow batteries installed at IBEW 58 Headquarters in Detroit, Michigan alongside a 235 kWp solar array. Invinity's batteries will be used to store and dispatch on-demand power generated from the solar array, to achieve carbon neutrality for the building, reduce energy bills and provide enhanced energy security in case of blackouts. IBEW Local 58 will also use the system to train a portion of their 4,800 members in the management and installation of Invinity's VFB technology, an initiative that could enhance Local 58 members' understanding of and ability to support future Invinity installations across North America.

 

The IBEW, one the largest North American workers unions with around 775,000 members in the U.S. and Canada, is a major organiser of apprenticeship programs in the U.S. and Canada for training future electricians, linesmen and wiring installers. It is a vital source of skilled electrical workers for many of the larger electrical companies in North America.

 

Delivery of the Invinity batteries is expected to commence in Q3 2023. The contract was included as part of the Company's Base category in its most recently disclosed commercial pipeline.

 

Paul VanOss, Business Manager at IBEW Local 58 Detroit said:

 

"We are pleased to be installing Invinity's vanadium flow battery technology at the Local 58 Zero Net Energy Center in Detroit, Michigan for use as part of a solar plus energy storage project. IBEW Local 58 is a leader in the energy space and is committed to expanding our Zero Net Energy Center headquarters with the latest technology innovations that diversify energy production and consumption and provide real-time hands-on training labs for our members."

 

Matt Harper, Chief Commercial Officer at Invinity said:

 

"The Invinity team have long been proud of the significant advantages that our vanadium flow batteries offer to the workers who install, operate and maintain them. We are pleased that the IBEW Local 58 appreciates those advantages and are excited to demonstrate the personnel safety and product longevity that are the hallmarks of our products. In addition, we look forward to working together to prove how our future net zero grid infrastructure can be built using domestically manufactured components and delivered by a strong, capable domestic labor force. We thank IBEW and its members for their support and look forward to working alongside them as we deliver and demonstrate the benefits of this pioneering project."

 

 

Stay up to date with news from Invinity. Join the distribution list for the Company's monthly investor newsletter here

 

Enquiries:

 

Invinity Energy Systems plc

+44 (0)20 4551 0361

Jonathan Marren, Chief Development Officer and Interim CFO

Joe Worthington, Director of Communications




Tavistock (Financial PR Advisor)

+44 (0)20 7920 3150

Simon Hudson / Charles Baister

invinity@tavistock.co.uk

 

Notes to Editors

 

Invinity Energy Systems plc (AIM: IES) (AQSE: IES) (OTCQX: IESVF) manufactures vanadium flow batteries for large-scale, high-throughput energy storage requirements of business, industry and electrical networks.

 

Invinity's factory-built flow batteries run continually with no degradation for over 25 years, making them suitable for the most demanding applications in renewable energy production. Energy storage systems based on Invinity's batteries are safe, reliable, and economical, and range in size from less than 250 kilowatt-hours to tens of megawatt-hours.

 

Invinity was created in April 2020 through the merger of two flow battery industry leaders: redT energy plc and Avalon Battery Corporation. With over 65 MWh of systems already deployed or contracted for delivery across over 70 sites in 15 countries, Invinity is active in all major global energy storage markets and has operations in the UK, Canada, USA, China and Australia. Invinity Energy Systems plc is listed in the UK on AIM and AQSE and trades in the USA on OTCQX.

 

To find out more, visit invinity.com, sign up to our monthly Investor Newsletter here or contact Investor Relations on via +44 (0)20 4551 0361 or ir@invinity.com 

 

 

About Reach announcements

 

This is a Reach announcement. Reach is an investor communication service aimed at assisting listed and unlisted (including AIM quoted) companies to distribute media only / non-regulatory news releases into the public domain. Information required to be notified under the AIM Rules for Companies, Market Abuse Regulation or other regulation would be disseminated as an RNS regulatory announcement and not on Reach.

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
UK 100