Drilling Report

RNS Number : 3897I
Landore Resources Limited
25 July 2012
 



LANDORE RESOURCES LIMITED

(AIM Ticker: LND.L)

 

 

                  25th  July 2012

 

DRILLING UPDATE

JUNIOR LAKE NICKEL PROJECT

 B4-7 DEPOSIT

 

Highlights: 

 

·     Assay results from the recently-completed drilling campaign on the eastern section of the B4-7 deposit indicate massive sulphide mineralisation with grades of > 1% nickel plus notable credits of copper, cobalt and platinum group metals.

 

·     The results of the campaign are highly encouraging having significantly increased the potential tonnage amenable to open pit development.  The B4-7 remains open down dip and along strike to the east and west.

 

·     Work has commenced on an upgraded resource estimate for the B4-7 Deposit, scheduled for completion early Q4 2012.

 

Assay results have now been received for all drilling covering the eastern portion of the B4-7 deposit. This section spans from line 0 to line 5+00E, and encompasses drill-holes 0412-367 to 0412-420, 0412-426 to 0412-438, and re-entered holes 0409-202, 0409-237/238 and 0411-359, for 10,992 metres of drilling.

 

B4-7 mineralised intersections , not previously reported , include:   

Drill-hole

From

Width*

Ni

Cu

Co

Pd

Pt

Au

No

Metres

Metres

%

%

%

ppb

ppb

ppb

0412-420

316.65

2.80

0.96

0.62

0.08

718

218

24

including

318.00

1.45

1.02

0.47

0.08

680

133

24

0412-423

298.43

6.87

0.98

0.52

0.08

665

157

18

including

301.05

2.95

1.07

0.52

0.07

632

158

19

0412-427

30.07

4.68

0.97

0.62

0.05

858

146

18

including

33.00

1.00

1.41

1.16

0.05

1090

242

16

and

41.18

2.47

1.03

0.66

0.06

503

21

20

0412-428

17.22

3.98

0.77

0.45

0.07

618

99

13

0412-429

23.00

2.06

0.93

0.28

0.10

676

88

21

0412-430

60.49

3.75

0.77

0.59

0.07

581

95

57

including

61.50

0.75

0.62

1.23

0.13

696

62

142

0412-432

79.38

10.04

0.85

0.47

0.06

1008

370

30

*The actual true thickness of mineralisation is estimated to represent between 75-80% of the intervals shown in the above table.

 

Additionally, drill-hole 0412-437 revealed encouraging zinc results with 1.32 metres at 5.87% Zn, 0.22% Ni, 0.50% Cu, and 0.04% Co.

 

These significant drill results have successfully increased the potential tonnage of the B4-7 deposit, most notably within the upper 150-metre portion of the deposit along the eastern 500 metres of strike length. Drilling consistently intersected the B4-7 massive sulphide main zone through this 500 metre section. (Drill testing has shown that the mineralisation in this section extends to the surface.

Encouraged by these results, Landore reviewed all assays from drill-holes 0412-367 to 0412-424 and re-entered holes 0409-202, 0409-237/238 and 0411-359. Samples from these drill holes had initially been submitted to Landore's primary laboratory for exploration-grade analysis with ore grade analysis triggered at a threshold metal level.

 

Significant mineralised intersections from these drill-holes were re-submitted to the laboratory for full ore grade analysis. Results from this testing have indicated average grade increases of approximately 8.1% nickel, 1.6% copper, and 4.4% cobalt within these intersections.

 

Re-evaluated mineralised B4-7 intersections include:

Drill-hole

From

Width*

Ni

Cu

Co

Pd

Pt

Au

No

Metres

Metres

%

%

%

ppb

ppb

ppb

0409-238

116.00

19.83

0.64

0.61

0.05

579

117

34

including

129.30

5.75

0.99

0.54

0.08

791

110

21

0412-374

96.60

13.96

0.79

0.62

0.07

618

101

31

including

99.00

8.50

0.98

0.68

0.08

770

120

23

0412-375

191.00

13.72

0.73

0.45

0.05

527

113

17

0412-378

46.90

23.97

0.87

0.59

0.07

782

123

27

including

61.50

7.50

0.99

0.70

0.06

1132

221

16

0412-376

285.00

8.80

0.92

0.75

0.06

502

191

92

0412-381

256.51

13.17

0.91

0.59

0.06

695

185

20

0412-382

145.11

7.90

1.01

0.59

0.08

568

83

23

0412-385

139.00

30.08

0.82

0.46

0.07

597

162

29

including

164.58

4.50

1.03

0.44

0.08

189

145

28

0412-386

20.48

20.17

0.74

0.63

0.07

689

173

40

including

23.20

12.90

1.02

0.58

0.06

893

214

33

0412-388

44.90

8.41

0.99

0.49

0.07

494

165

19

0412-394

33.00

3.39

0.60

0.88

0.27

304

124

55

0412-396

79.36

11.34

0.68

0.41

0.05

356

167

44

*The actual true thickness of mineralisation is estimated to represent between 75-80% of the intervals shown in the above table.

 

Accordingly, Landore modified its B4-7 analysis protocol to include nickel and copper assaying using strict ore grade methodology, and lowered the trigger limit for cobalt ore grade re-analysis. All drill-holes subsequent to 0412-424 (comprising of 0412-425 to 0412-448 and re-entered holes 0409-222 and 0409-257) have followed this new protocol.

 

The Junior Lake property:

The Junior Lake property, 100% owned by Landore, is located in the province of Ontario, Canada, approximately 235 kilometres north-northeast of Thunder Bay, and is host to; the B4-7 Nickel-Copper-Cobalt-PGMs deposit, the VW Nickel deposit, the B4-8 prospect and numerous other highly prospective mineral occurrences.

 

The combined resources (Canadian National Instrument (NI) 43-101 compliant) of the VW and B4-7 deposits delineated to date, total 48,281 tonnes of nickel equivalent (NiEq), 82 per cent of which is in the Indicated category.  Both deposits remain open down dip and along strike to the east and west.

 

B4-7 Nickel-Copper-Cobalt-PGEs deposit:

The B4-7 deposit is located approximately 3 kilometres to the northwest of the VW deposit. The B4-7 deposit mineralisation is hosted within a sub-vertical massive sulphide vein with stringers, net-textured and disseminated sulphides in the immediate hanging wall. In Q1 2010, a NI 43-101 compliant report and resource estimate upgrade for the B4-7 deposit was completed. The resource reported 26,521 tonnes NiEq, at a 0.25% Nickel cut-off.

 

The drilling campaign started in February 2012, aimed at expanding the B4-7 deposit and providing adequate drill density to bring inferred portions of the deposit to indicated status, is now complete. In total, 81 diamond core NQ size holes and 4 re-entered holes (0412-367 to 0412-448 and 0409-202, 0409-237/238 and 0411-359) for 15,868 metres, have been completed. Assays are outstanding for 10 drill-holes and will be reported as they become available.

 

2012 Planned Works:

The results of the current drilling campaign on the B4-7 deposit are highly encouraging having significantly increased the potential tonnage amenable to open pit development. 

 

Landore has initiated an in-house resource upgrade, including a full review of all quality assurance-quality control (QAQC) data, geological and grade wireframe modelling, internal resource estimate and the updating of all text required for the final NI43-101 report. On completion, Landore will submit all data for an independent audit and external resource upgrade of the B4-7 deposit. The resource upgrade is anticipated for completion in early Q4 2012.

 

Pre-feasibility studies on the combined B4-7 and the VW deposits will be initiated in Q1 2013.

 

A drilling program to extend the B4-7 to the west is currently being planned to commence in Q4 2012.  

 

QAQC

Landore has in place a stringent quality assurance and quality control programme to ensure best practices in sampling and assaying. All samples from the B4-7 project were collected by employees of Landore and shipped directly to ALS Laboratories, Thunder Bay, (ISO 9001 Certified) for preparation and assay in sealed bags. All samples are assayed for gold, platinum and palladium by fire assay, and nickel, copper, cobalt and silver by aqua regia digestion with AA finish, according to ALS's procedures PGM-ICP23, Ni Cu AA46, and Co Ag AA45. Inductively-coupled plasma ("ICP") analyses for a suite of multi-elements (35 elements, including base metals and silver) were performed by procedure ME-ICP41.

 

Michele Tuomi, (P.Geo., BSc. Geology),  Exploration Manager of Landore Resources Canada Inc. and a qualified person as defined in the Canadian National Instrument 43-101, has reviewed and verified all scientific or technical mining disclosure contained in this announcement.

 

- ENDS -

 

About Landore Resources Ltd.

Landore Resources Ltd. is an exploration company that seeks to grow shareholder value through the acquisition, exploration and development of precious and base metal projects in eastern Canada. The Company is primarily focused on the development of the Junior Lake Nickel Project, anticipated to enter into pre-feasibility stage Q1 2013. Landore Resources has mineral rights to 5 properties in eastern Canada.  The Company is headquartered in London, with an exploration office located in Thunder Bay, Ontario, Canada.

 

Landore Resources is listed on the AIM market of the London Stock Exchange under the symbol LND.

 

Cautionary Statement Regarding Forward-Looking Information

This news release includes certain information that may constitute "forward-looking information" under applicable securities legislation. Forward looking information includes, but is not limited to, forecasts as to free-cash flow, strategic plans, mineral resources estimates, future operations, results of exploration, future works programs, capital expenditures and objectives. Forward-looking information is necessarily based on a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties, and other factors which may cause the actual results and future events to differ materially from those expressed or implied by such forward-looking information, including the risks identified in the Company's public disclosure. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. All forward-looking information contained in this press release is given as of the date hereof and is based upon the opinions and estimates of management and information available to management at the date hereof. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by law.

 

For more information please contact:

 

Bill Humphries, Chairman

Richard Prickett, Chief Executive Officer    

Landore Resources Limited      

Tel: 07734 681262

Tel: 07775 651421

www.landore.com



Simon Raggett /Angela Hallett

Strand Hanson Limited

Nominated Adviser/ Broker

Tel: 020 7409 3494

 



David Bick

Tel: 07831 381201

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLXZLFLLDFLBBV
UK 100