Results of Operational Review and Clarifications

RNS Number : 2041R
Metals Exploration PLC
27 February 2019
 

27 February 2019

 

METALS EXPLORATION PLC

 

 

Metals Exploration plc (AIM: MTL) ("Metals Exploration" or the "Company"), the natural resources exploration and development Company with assets in the Pacific Rim region announces that management, together with an independent third party BiOX specialist consultant, has completed the previously announced operational review of the historical Runruno performance data and provides clarification on mine performance in relation to previously market released data.

 

 

Results of Operational Review and Clarifications

 

On 30 January 2019, Metals Exploration announced that its new management team would be conducting a full review of its historical operational performance versus design and production data previously announced. Following the review, management have identified several material discrepancies in the operational data released versus the mine's actual performance and wish to make the following clarifications with regards to the processing plant's performance.  This review does not impact gold poured or gold sales during the period.

 

2018 achieved BIOX® throughput

The historic statements referred to the BIOX circuit having achieved and maintaining 100% of design throughput rate for extended periods of 2018.  It is the view of the new management and an independent 3rd party review completed by a BiOX specialist, that the BIOX® circuit has yet to reach 100% of nameplate design throughput and on average, for 2018, operated at 31% of design capacity.  Changes implemented in December saw 66 sulfur tonnes fed for a single day into the BIOX® circuit, versus the design rate of 69 sulfur tonnes with the overall month, reaching 65% of design capacity on average.

The independent review completed provides the following statement and data:

"The data in the table below, generated from management's review of the Metallurgical Accounting data, confirms the data in the Internal Review Report and shows additional data that demonstrates that the design throughput was not achieved." 

 

 

Period

Concentrate Feed (T)

S2- in Feed (%)

Total S2- in Feed (T)

Average S2- in Feed (TPD)

Design S2- in Feed (TPD)

Percent Variance

Actual S2- in Feed vs Design

April, 2018

7,219

13.44

970

32.34

69.0

-53.1

May, 2018

6,937

11.16

774

24.97

-63.8

December, 2018

9,197

15.18

1,396

45.03

-34.7

Apr to Dec, 2018

55,791

13.26

7,403

26.92

-61.0

Year, 2018

60,812

13.27

8,069

22.10

-69.4

 

Based on the results of the operational review therefore, management believe the following previously released statements regarding BIOX® plant throughput require clarification:

 

Date of Release

Statement

Clarification

(All %'s provided are of BiOX Design Circuit Throughput)

20 April 2018 Quarterly Update to 31 March 2018

The BIOX® circuit had achieved a throughput of 45% in ramp-up at the end of the quarter; subsequent to the end of the quarter, the BIOX® circuit reached a milestone event achieving and maintaining 100% of the design throughput rate.

Average throughput for the quarter to Mar 2018 was 10.7%.

20 June 2018 AGM presentation

BIOX throughput is increasing steadily and has proven it capability of achieving 100% of design - having achieved 6 weeks at 100% in 2018

100% not achieved, the best 6 week period having an average throughput of 47.2%.

5 July 2018 operational update

After having achieved 100% of design throughput early in Q2 2018, the BIOX circuit operated resiliently at and about these levels, demonstrating the capacity of the circuit.

After previously announced disruptions, the BIOX® circuit has recently recommenced ramp-up and is progressing strongly with throughput having achieved 88% of design throughput.

1st Jan 2018 to 30th June 2018 average throughput was 21.8% with the best month being April 2018 where average throughput was 46.9%.

23 July 2018 Operations Update to 30 June 2018

After previously announced disruptions, the BIOX® circuit has recently recommenced ramp-up and is progressing strongly with throughput having achieved 88% of design throughput

From 1st of July to 22nd of July the average throughput was 14.5%   with a one week period during the month achieving a throughput of 38.5%.

10 Oct 2018 Company's Quarterly Operations Update to 30 September 2018

BIOX® operations have been stable throughout Q3 and design criteria has been demonstrated.

Average throughput for the quarter Q3 was 39.1%. 

Best month was August 2018 with a throughput of 47.6%.

 

Gold recoveries

Management have undertaken a full review and analysis of the recoveries achieved to date at Runruno. There has been a material overstatement of all gold recoveries announced to date. This is evidenced by the material difference reported in the mine head grade and mill feed grade which was calculated incorrectly. Management can further confirm that the reconciliation of mine ore tonnes to ounces provides for a strong and accurate representation of the ounces that were mined during the period ending December 2018 however the dilution is significantly higher than those analysed in the BFS leading to a lower mill feed head grade.   

The stated recoveries, as a result, have been consistently overstated due to the incorrectly calculated mill feed grades to the processing plant.  In 2017, while same level of detailed analysis undergone for 2018 cannot be undertaken due to lack of available information, by using the mine delivered records, it can be shown to have been overstated by 5% - recoveries were 42.8% versus the 47.9% announced in the Company's full year 2017 results.  A table with the updated results is provided below.  

 

 

 

 

 

 

 

 

Key Metric

Unit of measure

Period to 31 Dec 2017 Previously Reported

Period to 31 Dec 2017 Updated

 

 

 

 

 

 

 

 

Mining activities

 

 

 

 

 

Ore mined

tonnes

1,815,669

1,815,669

 

 

Waste mined

tonnes

7,644,821

7,644,821

 

 

 

 

 

 

 

 

Total material movements

 

9,460,490

9,460,490

 

 

 

 

 

 

 

 

Strip ratio

waste/ore

4.05

4.05

 

 

Au grade mined

grams/tonne

1.62

1.62

 

 

Ctd. ounces gold mined¹

ounces

92,363

92,363.45

 

 

S grade

%

0.82

0.82

 

 

 

 

 

 

 

 

Processing activities

 

 

 

 

 

Tonnes milled

tonnes

1,688,254

1,687,811

 

 

S feed grade²

%

0.82

0.76

 

 

Au feed grade

grams/tonne

1.38

1.55

 

 

Gold recovery

%

47.9%

42.8%

 

 

Gold poured

ounces

36,006

36,006

 

 

Gold sold

ounces

35,697

35,697

 

 

 

 

 

 

 

 

In 2018, by using sampled and assayed mill feed values and removing the return of scats, rather than calculated values, the plant feed data aligns to the mine reconciliation within 3% and provided confidence to the accuracy of the reconciliation. The corrected metallurgical recovery for the first 3 quarters is 55.6% against a previously reported recovery of 66.6%. This represents a reduction in gold recovery of 11%.  The corrections for the first 3 quarters are provided in the following table.

 

 

 

 

 

 

 

 

 

 

 

 

Key Metric

Unit of measure

Quarter ended 31 Mar 2018

Quarter ended 31 Mar 2018

Quarter ended 30 Jun 2018

Quarter ended 30 Jun 2018

Quarter ended 30 Sep 2018

Quarter ended 30 Sep 2018

 

 

 

 

Previously Reported

Updated Results

Previously Reported

Updated Results

Previously Reported

Updated Results

 

 

Mining activities

 

 

 

 

 

 

 

 

 

Ore mined

tonnes

353,960

353,960

407,884

407,884

367,385

367,385

 

 

Waste mined

tonnes

1,472,217

1,472,217

1,799,213

1,799,213

2,418,393

2,418,393

 

 

 

 

 

 

 

 

 

 

 

 

Total material movements

 

1,826,177

1,826,177

2,207,097

2,207,097

2,785,778

2,785,778

 

 

 

 

 

 

 

 

 

 

 

 

Strip ratio

waste/ore

4.16

4.16

4.41

4.41

6.58

6.58

 

 

Au grade mined

grams/tonne

1.60

1.60

1.61

1.61

1.55

1.55

 

 

Ctd. ounces gold mined¹

ounces

18,250

18,250

21,113

21,113

18,325

18,325

 

 

S grade

%

0.99

0.99

0.82

0.82

0.62

0.62

 

 

 

 

 

 

 

 

 

 

 

 

Processing activities

 

 

 

 

 

 

 

 

 

Tonnes milled

tonnes

435,775

413,054

424,053

401,943

458,254

437,251

 

 

S feed grade²

%

0.96

0.93

0.93

0.90

0.70

0.67

 

 

Au feed grade

grams/tonne

1.38

1.59

1.43

1.61

1.27

1.45

 

 

Gold recovery

%

54.7%

50.3%

69.6%

59.4%

75.3%

57.3%

 

 

Gold poured

ounces

10,593

10,593

12,359

12,359

11,665

11,665

 

 

Gold sold

ounces

11,334

11,334

13,496

13,496

10,522

10,522

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The final quarter and 2018 results are therefore provided in the table below based on the same reconciliation analysis.

 

 

 

 

 

 

 

Key Metric

Unit of measure

Quarter ended 31 Dec 2018

Year to date 2018

 

 

 

 

 

 

 

 

Mining activities

 

 

 

 

 

Ore mined

tonnes

494,184

1,623,413

 

 

Waste mined

tonnes

2,372,031

8,061,853

 

 

 

 

 

 

 

 

Total material movements

 

2,866,215

9,685,266

 

 

 

 

 

 

 

 

Strip ratio

waste/ore

4.80

4.97

 

 

Au grade mined

grams/tonne

1.53

1.57

 

 

Ctd. ounces gold mined¹

ounces

24,238

81,925

 

 

S grade

%

0.67

0.77

 

 

 

 

 

 

 

 

Processing activities

 

 

 

 

 

Tonnes milled

tonnes

403,121

1,655,368

 

 

S feed grade²

%

0.82

0.83

 

 

Au feed grade

grams/tonne

1.60

1.56

 

 

Gold recovery

%

64.8%

57.9%

 

 

Gold poured

ounces

13,464

48,081

 

 

Gold sold

ounces

11,016

46,369

 

 

 

 

 

 

 

 

It is the view of management that this dilution of approximately 20%, which is not abnormal to operations, is ongoing and is leading to a reduced mill feed head grade and ounces produced. This dilution is expected to continue going forward. The management are currently engaging a 3rd party review of the life of mine plan and are targeting to have an updated plan by end of the second quarter of 2019 with an update to the reserve and resource statement by end of the fourth quarter of 2019. 

It is management's intention to ensure a more accurate and integrated reconciliation is completed for internal and external reporting.  2019 quarter one results will be reported against this new reconciliation analysis ensuring a higher level of reporting accuracy. 

The data in this announcement has been complied in conjunction with a 3rd party independent BiOX specialist consultant and Mr Xiaofeng Zhen (B.Eng., Ph.D., MAusIMM).  Mr Darren Bowden, a director of the Company, who has been involved in the mining industry for more than 25 years, is a member of the Australasian Institute of Mining and Metallurgy, has compiled, read and approved the technical disclosure in this regulatory announcement.

 

 

For further information please visit or contact www.metalsexploration.com

 

 

 

 

 

 

Darren Bowden (Chief Executive Office)

+57 310 230 1620

 

 

 

 

 

 

                                          

 

 

 

 

 

 

 

 

 

 

 

 

Nominated Adviser and Broker:                   CANACCORD GENUITY LIMITED

 

 

Martin Davison, James Asensio

+44 (0) 207 523 4689

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Public Relations:                                               TAVISTOCK

 

 

 

Barnaby Hayward, Jos Simson

+44 (0) 207 920 3150

 

 

 

 

 

 


This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
UPDDGGDDIUDBGCL
UK 100

Latest directors dealings