FOR: RAMBLER METALS & MINING PLC
TSX VENTURE SYMBOL: RAB
AIM SYMBOL: RMM
January 16, 2008
Rambler Drills 5.2m of 6.7 g/T Gold With 2.96% Copper
Underground Drilling Confirms Significant Gold Mineralization
LONDON, ENGLAND and BAIE VERTE, NEWFOUNDLAND AND LABRADOR--(Marketwire - Jan. 16, 2008) - Rambler Metals and
Mining plc (TSX VENTURE:RAB)(AIM:RMM) is pleased to announce the first intersections from its underground
diamond drilling exploration program.
/T/
- RMUG07-01 returns 34.4 m of 1.8 g/T gold with 0.61% copper
- Including 5.2 m of 6.7 g/T gold with 2.96% copper
- RMUG07-05 returns 5.5 m of 3.2 g/T gold with 1.15% copper
- Including 2.6 m of 5.9 g/T gold with 2.30% copper
- RMUG07-07a returns 27.2 m of 1.2 g/T gold with 0.05% copper
- Including 4.9 m of 3.0 g/T gold with 0.03% copper
/T/
New Gold Zone
The first Rambler exploration drill holes for the underground drill program were designed to confirm an
historically reported drill intersection that returned 28 g/T (0.9 oz/tonne) gold (not NI43-101 compliant) over
2.7 m (9 feet). All of the new holes were collared from the 740 Level and were planned to test the historical
mineralized intersection which had returned significant gold and copper assays. The gold mineralization appears
to be located in a zone at or near the stratigraphic contact between the hangingwall and footwall rock sequence
which also hosts the Ming Massive Sulphide Zone.
Historically gold had been recovered from concentrate during mining and milling of the copper rich deposits in
the Rambler Camp. However, copper had been the mineral of choice and little effort appears to have been made to
evaluate the gold potential of the mineralized horizons in the immediate vicinity of the Massive Sulphide
deposits, no doubt due to the price of gold at the time of production. The significant gold intersections in
recent holes completed by Rambler Metals and Mining indicates the possible potential for a standalone gold
resource that may be realized in the Rambler Camp.
It is important to note that this potential gold resource is located in close proximity to the already
developed ramp access and easily accessible with virtually no development cost. Additional holes have been
planned to determine the orientation and extent of mineralization. The table below summarizes the widths and
grades of the recent holes.
/T/
---------------------------------------------------------------------------
Hole From To Length Length Cu Au
(m) (m) (m) (feet) (%) (g/T)
---------------------------------------------------------------------------
RMUG07-01 0.00 34.40 34.40 112.86 0.61 1.8
including 19.5 34.00 14.90 48.88 1.27 3.3
including 29.20 34.40 5.20 17.06 2.96 6.7
RMUG07-02 78.70 81.70 3.00 9.84 0.37 1.9
RMUG07-03 7.10 9.10 2.00 6.56 0.09 0.9
RMUG07-04 9.40 13.00 3.60 11.81 1.06 0.8
including 10.40 12.10 1.70 5.58 2.24 1.6
RMUG07-05 13.00 18.50 5.50 18.04 1.15 3.2
including 14.90 17.50 2.60 8.53 2.30 5.9
RMUG07-07a 11.80 39.00 27.20 89.24 0.05 1.2
including 18.80 33.60 14.80 48.56 0.05 1.9
including 18.80 23.70 4.90 16.08 0.03 3.0
RMUG07-08 0 34.50 34.5 113.19 0.3 1.3
including 29.30 34.00 4.70 15.42 0.7 3.6
/T/
For more information and a complete listing of all RMM drill intersections, corresponding maps, figures and
NI43-101 compliance information please visit our website at www.ramblermines.com.
Larry Pilgrim, P.Geo. is the Qualified Person responsible for the technical content of this release and has
reviewed and approved it accordingly. Mr. Pilgrim is an independent consultant contracted by Rambler Metals and
Mining plc.
All tonnes are dry metric tonnes.
Drill intercepts quoted are core lengths; true widths for the gold zone are estimated to be in excess of 60% of
the intersected core lengths. Analytical results for Rambler core in this press release were determined at
Eastern Analytical, Springdale, NL. Samples are then shipped by courier to Activation Laboratories Ltd.,
Ancaster Ontario, where a 34 element ICP analysis and gold fire assay are performed.
National Instrument 43-101 compliance information regarding sampling and analytical protocols pertaining to the
Rambler Project can be accessed via the following link: http://www.ramblermines.com.
-30-
FOR FURTHER INFORMATION PLEASE CONTACT:
Rambler Metals and Mining Canada Limited
George Ogilvie, P.Eng.
VP & COO
(709) 532-4990
OR
Rambler Metals & Mining Plc
Leslie Little
Company Secretary
+44 (0) 20-7661-8104
Website: www.ramblermines.com
OR
Seymour Pierce Limited
David Newton
+44 (0) 20-7107 8000
OR
Pelham Public Relations
Chelsea Hayes
+44 (0) 20-7743-6675
-0-
Rambler Metals & Mining Plc
*A Private Investor is a recipient of the information who meets all of the conditions set out below, the recipient:
Obtains access to the information in a personal capacity;
Is not required to be regulated or supervised by a body concerned with the regulation or supervision of investment or financial services;
Is not currently registered or qualified as a professional securities trader or investment adviser with any national or state exchange, regulatory authority, professional association or recognised professional body;
Does not currently act in any capacity as an investment adviser, whether or not they have at some time been qualified to do so;
Uses the information solely in relation to the management of their personal funds and not as a trader to the public or for the investment of corporate funds;
Does not distribute, republish or otherwise provide any information or derived works to any third party in any manner or use or process information or derived works for any commercial purposes.
Please note, this site uses cookies. Some of the cookies are essential for parts of the site to operate and have already been set. You may delete and block all cookies from this site, but if you do, parts of the site may not work. To find out more about the cookies used on Investegate and how you can manage them, see our Privacy and Cookie Policy
To continue using Investegate, please confirm that you are a private investor as well as agreeing to our Privacy and Cookie Policy & Terms.