Update on Drilling Campaign

RNS Number : 1216C
Savannah Petroleum PLC
11 April 2017
 

11 April 2017

Savannah Petroleum PLC

("Savannah" or the "Company")

 

Update on Drilling Campaign

 

Savannah Petroleum PLC ("Savannah") is pleased to provide an update on its upcoming drilling campaign in Niger.

 

Focus of Initial Campaign on R3

 

The Company can confirm that the focus of its initial three well drilling campaign is intended to be on the R3 PSC (the "R3 PSC Area").  The R3 PSC Area sits within a proven petroleum "sweet spot" in the basin, with some of the largest discoveries located in adjacent areas to the north and south, including the currently producing fields.  It is also located in close proximity to existing and planned infrastructure in the basin.  Initial indications from the recently completed R3 East seismic survey confirm the existence of multiple fault blocks, which have similar configurations to these fields and discoveries.  An R3-focused programme also allows for a more efficient and cost effective drilling campaign, by avoiding lengthier rig moves between blocks.

 

Further details in relation to the prospectivity of the R3 East seismic survey and the Company's chosen exploration targets will be announced in due course. The preferred initial drilling candidates are expected to offer the opportunity for the Company to evaluate multiple stacked objectives with simple well trajectories that have low operational risk. 

 

Drilling Rig

 

Further to the previously announced signature of the Letter of Award with Great Wall Drilling Company Niger SARL, Savannah has now been offered the opportunity to use rig GW215 instead of GW89.  GW215 is already in Niger and is coming off contract from another operator, where it has been operating effectively with an experienced crew.  The Company expects that using a "warm" rig, as opposed to GW89 which was stacked and subject to an element of recommissioning, will lead to greater operational efficiency during the campaign. 

 

Drilling Operations

 

Savannah is also pleased to announce that construction of a logistics camp and pipe yard (the "Camp") to be used throughout its drilling operations has commenced.  The Camp is located on Savannah's R3 PSC area, in close vicinity to the Jaouro airstrip. 

 

The Company continues to expect drilling operations to commence during the first half of this year and will provide further updates as and when appropriate.

 

 

For further information contact:

 

 

Savannah Petroleum  

+44 (0) 20 3817 9844

Andrew Knott, CEO

 

Jessica Hostage, Corporate Communications

 

 

 

Strand Hanson (Nominated Adviser)

+44 (0) 20 7409 3494

Rory Murphy     

 

James Spinney

 

Ritchie Balmer

 

 

 

Mirabaud (Joint Broker)

+44 (0) 20 7878 3362

Peter Krens

 

Rory Scott

 

 

 

Stifel Nicolaus Europe Limited (Joint Broker)

+44 (0) 20 7710 7600

Callum Stewart

Nicholas Rhodes

 

Ashton Clanfield

 

 

 

Celicourt Communications      

+44 (0) 20 7520 9266

Mark Antelme

 

Jimmy Lea

 

 

The information contained within this announcement is considered to be inside information prior to its release, as defined in Article 7 of the Market Abuse Regulation No. 596/2014, and is disclosed in accordance with the Company's obligations under Article 17 of those Regulations.


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLQBLFFDZFZBBF
Investor Meets Company
UK 100