Highlight

 

·     Project remains on track for float plant to be completed at the end of August 2012 and commissioned in September

 

This will be the 7th dump operations plant to be commissioned

 

·     Board approves expansion of run of mine capacity from 20,000 t/mth to 31,000 t/mth

 

Construction of New Processing Plant at Tweefontein

 

The Tweefontein project, located in the Steelpoort area, commenced construction just over six months ago and remains on track to produce its first ounces in September 2012 following completion of the float plant at the end of August, as per original plan. This will bring the number of operating plants to seven, including the recently commissioned second plant at Mooinooi, and allow continued Company production growth into 2013.

 

Expansion of Plant Capacity

 

During the plant planning period, a design option was considered which would allow for the processing of the planned expanded production from the host mine. This option has now been approved by the board of Sylvania and this design is now incorporated into the Tweefontein plant construction plan. The expanded plant will be able to process additional run of mine ("ROM") material from the host mine's Tweefontein MG2 adit once phase 2 is approved, erected and commissioned. The impact of the change in design has not changed the commissioning date of the floatation plant but will cause the chrome spiral plant expansion to be commissioned at the end of November, a little later than originally planned. The projected total plant cost for Phase 1 is now expected to be R109.5m.

 

The new Tweefontein plant is being constructed around the existing small chrome washing and spiral plant and when complete the float plant will be similar in size to Sylvania's Doornbosch plant.

 

Commenting today, Terry McConnachie, CEO, said: "We are very encouraged that the commissioning of our seventh plant is very near completion. We have experienced very challenging operating conditions including unusual tropical storms and strike action at host mines which has impeded work at the site. However, it is testament to the hard work of our team that the construction remains on track for completion in August, with first production expected in September. Once in production, the Tweefontein plant will allow the Company's continued growth plans to be realised."

 

Background

 

On 1 June 2011, Sylvania announced the completion of the planning for the Tweefontein plant at an estimated cost of R90m for phase 1 and also indicated the possibility of a phase 2 which would allow the treatment of ROM ore from underground.

 

Following the presentation to the board of these plans, the project team was instructed to review the plant design and look to incorporate phase 2 into the overall strategy to optimise design and costs. The original plant design of 20,000 t/mth of ROM feed was consequentially updated to 31,000 t/mth and is now aligned with the host mine's MG2 adit planned production volumes.

 

On 27 January 2012, Sylvania announced it had commenced the construction of phase 1 of the updated Tweefontein plant design and had completed the concept design for the phase 2 of the project which would allow for the treatment of ROM material from the new adit at the host mine.

 

The detailed design of phase 2 of the project which is the classification section for the ROM tons from the MG2 adit will be presented to the board for approval in September 2012.

 

 

CORPORATE INFORMATION

 

Registered office:     Sylvania Platinum Limited

                                    Clarendon House

                                    2 Church Street

                                    Hamilton HM 11

                                    Bermuda

                                   

Postal address:         PO Box 524

                                    Wembley WA 6913

                                    Australia

 

Sylvania Website:     www.sylvaniaplatinum.com

 

 

CONTACT DETAILS

 

South Africa:              Terry McConnachie                             Nigel Trevarthen

(CEO)                                                  (Deputy CEO)

                                    Sylvania Platinum Limited                    Sylvania Platinum Limited

                                    +27 (11) 673 1171                               +27 (11) 673 1171

 

                                    Louis Carroll

                                    (Director/Assistant Company Secretary)

                                    Sylvania Platinum

                                    +44 (0) 7969 170 622

 

Australia:                    Richard Rossiter                                  Grant Button

(Chairman)                                          (Director/Assistant Company Secretary)

Sylvania Platinum Limited                    Sylvania Platinum Limited

+61 (8) 9226 4777                               +61 (8) 9226 4777

 

United Kingdom:       Samantha Harrison                              Martin Eales/James Kelly

                                    RFC Ambrian Limited                           RBC Capital Markets  

Nominated Advisor                               Joint Broker

                                    +44 (0) 20 3440 6800                          +44 (0) 20 7653 4000

 

Graham Herring/Beth Harris

                                    Newgate Threadneedle

                                    +44 (0) 20 7653 9850

                                            

 


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCSEISDIFESEDW
UK 100