Additional Listing

RNS Number : 7093J
Zenergy Power PLC
08 December 2008
 





Zenergy Power plc

('the Company')


Additional Listing



The Company announces that an application has been made for the admission of 287,082 ordinary shares of 1 pence to AIM. This application relates to an issue of shares which the Company is contractually required to make to Bain & Company, Inc. ('Bain') in satisfaction and extinguishment of fees for professional services to be rendered in accordance with the terms and conditions of a consulting agreement made between the Company and Bain, dated 31st October 2008.


Dealings are expected to commence on 11th December 2008. These additional shares will, on Admission, rank pari passu with the existing ordinary shares of 1 pence each in the capital of the Company.



-Ends-


Further information


Andrew Tan

Zenergy Power Plc

+ 49 2226 9060 668




Vikki Krause

Hansard Group

+ 44 207 245 1100




Andrew Godber

Panmure Gordon & Co

+ 44 207 459 5742



About Zenergy Power plc


Zenergy Power plc is a global specialist manufacturer and developer of commercial applications for superconductive materials. Comprising three operating subsidiaries located in GermanyUSA and Australia, Zenergy is highly focussed on the commercialisation of a number of energy efficient applications to be adopted in energy intensive industrial processes, power distribution and renewable power generation. Zenergy achieved the world's first sale of an industrial scale HTS induction heater which is now in operation.


About superconductivity 


Superconductive materials are capable of conducting electricity without any resistance and were first discovered in 1911 in what was to prove to be one of the most significant scientific breakthroughs of the 20th century. 


Superconductors enable:


(a)     Induction Heaters to be twice as efficient for the metals industry 

(b)     Fault Current Limiters to protect power grids from blackouts 

(c)     Direct-drive wind generators to be significantly reduced in size and weight allowing the operation of wind generators in 
         excess of 8 MW
(d)     Existing hydro-power sites to upgrade to energy efficient Hydro-generators 





This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
LISFVLFBVLBXFBK
UK 100

Latest directors dealings