Argentina Exploration Update
ECR Minerals plc
ECR MINERALS plc
(“ECR Minerals”, “ECR” or the “Company”)
AIM: ECR
US OTC: MTGDY
Argentina Exploration Update
ECR Minerals plc is pleased to provide the following update on exploration within its Sierra de las Minas gold project area in La Rioja Province, Argentina.
ECR commenced the second phase of its 2011 sampling programme for the Sierra de las Minas gold project area, in which the Company holds a 100% interest, in late July. The objective of this phase has been to evaluate known prospects within the project area and prioritise them for further exploration. The first phase of the programme was completed earlier in the year at the El Abra prospect, yielding numerous high grade results. For more information please refer to the Company’s announcement dated 15 May 2011.
Assay results for 58 samples taken during July and August have now been received, with the best results given in the table below. Assay results are awaited for a further 25 samples. Historic results reportedly obtained from the same prospects by La Plata Gold, a Canadian company which conducted exploration in the Sierra de las Minas area during the 1990s and early 2000s, are also included in the table for comparison purposes. The Company considers the divergence between its sampling results and those of La Plata Gold for the same prospects to be within expected bounds. It was not the Company’s objective to resample the precise locations sampled by La Plata Gold.
All samples specified in the table below were prepared for fire assay and ICP elemental analysis by ACME Analytical Laboratories in Mendoza, Argentina. ACME Analytical Laboratories is certified to ISO 9001 and ISO/IEC 17025 standards.
Sample ID & Prospect |
Au g/t |
La Plata Gold Sample ID |
Au g/t | |||||||||
Maestro Agüero | ||||||||||||
J11SLM246 | 2.00 | 4000 | 88.37 | |||||||||
J11SLM247 | 13.20 | 4001 | 33.20 | |||||||||
J11SLM248 | 21.90 | 4002 | 27.52 | |||||||||
J11SLM251 | 6.00 | 4003 | 10.20 | |||||||||
J11SLM252 | 4.30 | 4004 | 2.08 | |||||||||
J11SLM254 | 6.50 | |||||||||||
J11SLM257 | 4.70 | |||||||||||
J11SLM258 | 11.80 | |||||||||||
Mina San Antonio | ||||||||||||
J11SLM208 | 1.10 | 3961 | 4.99 | |||||||||
J11SLM210 | 14.60 | 3962 | 0.01 | |||||||||
J11SLM211 | 13.50 | |||||||||||
Casas Viejas | ||||||||||||
J11SLM221 | 0.08 | 3925 | 3.54 | |||||||||
J11SLM218 | 32.50 | 3926 | 36.00 | |||||||||
J11SLM221 | 14.50 | |||||||||||
Mina Azul | ||||||||||||
J11SLM204 | 15.30 | |||||||||||
Casa Viejas Body | ||||||||||||
J11SLM225 | 0.33 | |||||||||||
Agua de las Burras | ||||||||||||
J11SLM285 | 4.70 | |||||||||||
J11SLM286 | 0.20 | |||||||||||
J11SLM288 | 0.70 | |||||||||||
Burro Blanco | ||||||||||||
J11SLM280 | 11.90 | |||||||||||
J11SLM281 | 1.50 | |||||||||||
Veta Oculta | ||||||||||||
J11SLM270 | 1.50 | |||||||||||
Suturas | ||||||||||||
J11SLM282 | 6.80 | |||||||||||
The majority of the 13 prospects sampled by the Company during July and August present as mineralised outcropping “pod” systems integrated into localised and regional shear structures. On the surface mineralisation occurs as discontinuous quartz veins embedded in shear belts.
Of these 13 prospects, four (Maestro Agüero, Mina San Antonio, Casa Viejas and Mina Azul, representing a combined potential strike length of approximately 800m) are judged to be priority targets for further work. Anomalous base metal values, including high grade copper, were returned at a number of the prospects, and further exploration will proceed with a view to ascertaining whether these base metal values are of economic significance.
Maestro Agüero is at present considered to be the Company’s highest priority target at Sierra de las Minas, aside from the El Abra prospect. Preliminary investigation indicates that Maestro Agüero is a shear hosted vein system with a strike length demonstrated by outcropping of some 350m and inferred continuity exceeding 550m. The outcropping quartz veins within the shear show abundant haematite, copper oxide and visible gold mineralisation.
More detailed sampling of Maestro Agüero, Mina San Antonio, Casa Viejas and Mina Azul is planned. The Company will also proceed to evaluate and prioritise additional prospects through preliminary mapping and sampling. Only around 30 per cent of the prospects known to exist within the Sierra de las Minas project area have been sampled by the Company so far.
A ground based pole-dipole geophysical survey is scheduled to commence at the El Abra prospect later this month. This survey will aid detailed planning of the 1-2,000m drilling programme proposed to take place at El Abra later this year. The drilling programme will commence at the El Abra prospect but could potentially be extended to encompass other prospects within the Sierra de las Minas project area.
Patrick Harford, Managing Director of ECR Minerals plc, comments:
“The achievement of consistent high grade assays from sampling in the Sierras Las Minas complex continues to generate excitement within ECR, and further work will now begin to focus on developing our knowledge of zones that may be economic to mine.
The Company has sampled approximately 2km of vein length at Sierra de las Minas so far, and with mineralised widths at surface frequently exceeding one metre and samples obtained to date from sections identified as potentially suitable for selective mining returning an average grade greater than 8 g/t gold, the possibility of mining and transporting high grade ores to an existing plant elsewhere may now be considered. This may provide an inexpensive and relatively rapid route to cashflow from the Sierra de las Minas project.
The geophysical programme due to commence at El Abra this month is expected to enhance our geological understanding of the prospect enormously and is intended to allow ECR to derive maximum value from the proposed drilling programme, which will have the objective of confirming the grade and extent of mineralisation at depth.
It should be noted that in the Sierras de las Minas region only 10 historic drill holes are known to have been completed. Six of these holes targeted the Las Callanas vein set, which lies to the southwest of El Abra outside the ECR project area. The best Las Callanas intersection reported was 24.3 g/t gold from 143.9-144.5m down hole, demonstrating not only continuity of vein thickness but also the presence of high grade mineralisation at depth. The Company considers this to be encouraging from the point of view of its proposed drilling at El Abra.”
About ECR Minerals
ECR is a mineral development company with interests in the USA, Argentina, Indonesia, Thailand and Australia.
ECR Minerals plc
Michael Silver, Chairman
Patrick
Harford, Managing Director
Stephen Clayson, Director & Chief
Financial Officer
Luca Tenuta, Non-Executive Director
+44
(0)20 7929 1010
info@ecrminerals.com
www.ecrminerals.com
or
Daniel
Stewart & Company plc
Oliver Rigby/Tessa Smith, +44 (0)20
7776 6550
or
Old Park Lane Capital plc
Michael
Parnes, +44 (0)20 7493 8188
or
Blythe Weigh Communications
Ana
Ribeiro, +44 (0)20 7138 3204
or
Barry Kaplan Associates
Larry
Kaplan, +1 732 747 0702
Mr Howard Coates MSc., P.Geo, Vice President and Partner of MPH Consulting Ltd, who has more than 40 years of experience in the mining and exploration industry, is acting as a geological consultant to ECR with respect to its activities in Argentina. Mr Coates has reviewed the contents of this announcement.
Historic exploration results have not been verified by the Company or by MPH Consulting Ltd.
Glossary
Au: chemical symbol for gold
g/t: grams per tonne
m: metre