Adriatic Metals PLC
('Adriatic Metals' or the 'Company')
Total Voting Rights
In accordance with the FCA's Disclosure and Transparency Rule 5.6.1(R), Adriatic Metals plc (ASX:ADT, LON:ADT1) confirms that as at 30 August 2020, the Company's issued share capital comprises 182,940,987 ordinary shares of £0.013355 par value per share, with each share carrying the right to one vote. The Company does not hold any ordinary shares in treasury.
The above figure of 182,940,987 may be used by shareholders as the denominator for the calculations by which they will determine if they are required to notify their interest in, or of a change to their interest in the Company under the FCA's Disclosure and Transparency Rules.
** ENDS **
Market Abuse Regulation Disclosure
The information contained within this announcement is deemed by Adriatic (LEI: 549300OHAH2GL1DP0L61) to constitute inside information as stipulated under the Market Abuse Regulations (EU) No. 596/2014. The person responsible for arranging and authorising the release of this announcement on behalf of Adriatic is Paul Cronin, Managing Director and CEO.
For further information please visit
www.adriaticmetals.com
;
@AdriaticMetals
on Twitter; or contact:
Adriatic Metals PLC |
|
Paul Cronin / Emma Chetwynd Stapylton |
Tel: +44 (0) 203 950 9138 |
|
|
Tavistock Communications Limited |
|
Charles Vivian |
Tel: +44 (0) 7977 297903 |
Edward Lee |
Tel: +44 (0) 7736 220565 |
Gareth Tredway |
Tel: +44 (0) 7785 974264 |
|
|
The Capital Network |
|
Julia Maguire/Lelde Smits |
Tel: +61 2 8999 3699 |
About Adriatic Metals
Adriatic Metals Plc (ASX:ADT, LON:ADT1) is a precious and base metals explorer and developer that owns the world-class advanced Vares silver project in Bosnia & Herzegovina.
The Vares silver project consists of two high-grade polymetallic deposits, located at Rupice and Veovaca. Bosnia & Herzegovina is well-positioned in central Europe and boasts a strong mining history, pro-mining environment, highly-skilled workforce as well as extensive existing infrastructure and logistics.
The Vares project's captivating economics and impressive resource inventory have attracted Adriatic's highly experienced team, which is expediting exploration efforts to expand the current JORC resource. Results of a recent scoping study announced on 19 November 2019 indicate an NPV 8 of US$917 million and IRR of 107%. Leveraging its first-mover advantage, Adriatic is rapidly advancing the project into the development phase and through to production. There have been no material changes to the assumptions underpinning the forecast financial information derived from the production target in the 19 November 2019 announcement and these assumptions continue to apply. There have been no material changes to the assumptions and technical parameters on the updated Mineral Resource Estimate announced on 1 September 2020 and these assumptions continue to apply.