Q3 2013 PRODUCTION REPORT

RNS Number : 7914R
Antofagasta PLC
31 October 2013
 



 

NEWS RELEASE, 31 OCTOBER, 2013

Q3 2013 PRODUCTION REPORT

HIGHLIGHTS

The Group remains on-track to achieve production and net cash costs for the full year 2013

PRODUCTION

·     Group copper production was in line with expectations at 174,200 tonnes in Q3 2013, a 3.4% decrease versus the previous quarter primarily due to forecast lower grades across the operations

·     For the year to date, copper production was 538,300 tonnes, a 4.4% increase versus the same period in 2012 primarily reflecting the improved operational performance at Esperanza

·     Group gold production was 67,700 ounces in Q3 2013, an 11.7% decrease on Q2 as a result of lower grades at Esperanza

·     For the year to date, gold production was 230,600 ounces, 8.0% higher than the same period in the previous year

·     Forecast group production for 2013 remains unchanged at 700,000 tonnes of copper, 280,000 ounces of gold and 8,000 tonnes of molybdenum

 

CASH COSTS

·     Cash costs before by-product credits were in line with expectations at $1.84/lb in Q3 2013, 2.2% higher than the previous quarter, primarily due to higher costs at Esperanza

·     Net cash costs were $1.48/lb in Q3 2013, 8.0% higher than Q2, mainly reflecting the lower gold production at Esperanza

·     In line with expectations, net cash costs were $1.33/lb in the first nine months of 2013, a 34.3% increase against the comparable period of 2012, principally due to lower molybdenum production, lower by-product commodity prices, an increase in the energy price at Los Pelambres and increased costs at Esperanza

·     The Group remains on track to achieve cash costs before by-product credits of approximately $1.85/lb and net cash costs of approximately $1.40/lb

 

 

GROUP PRODUCTION AND CASH COSTS

 

2013

YTD

 

 

Q3

Q2

%

2013

2012

%

Copper production

kt

174.2

180.3

(3.4)

538.3

515.8

4.4

Gold production

koz

67.7

76.7

(11.7)

230.6

213.5

8.0

Molybdenum production

kt

2.0

2.0

-

6.7

9.5

(29.5)

Cash costs before by-product credits

$/lb

1.84

1.80

2.2

1.79

1.60

11.9

Net cash costs

$/lb

1.48

1.37

8.0

1.33

0.99

34.3

 



 

MINING OPERATIONS

Los Pelambres

Los Pelambres produced 99,700 tonnes of copper in Q3 2012 compared with 102,500 tonnes in Q2 as plant throughput decreased by 3.2% to 172,700.  This decrease was as a result of harder ore, which reduced throughput, and the expected decrease in ore grades from 0.73% in Q2 to 0.71% in Q3, which was partly offset by higher recoveries.

 

Copper production in the first nine months of 2013 was 303,400 tonnes compared with 296,000 tonnes in the comparable period in 2012, primarily due to higher ore grades. 

 

Molybdenum production remained stable between Q3 and Q2 2013 at 2,000 tonnes despite lower plant throughput and grade as recoveries improved. Molybdenum production decreased by 29.5% to 6,700 tonnes in the first nine months of 2013 compared with the first nine months of 2012 mainly reflecting the decrease in grades from 0.023% to 0.015%, in line with expectations and guidance.

 

Cash costs before by-product credits decreased by $0.17/lb between Q3 and Q2 2013, primarily due to a fall in the energy price as a greater proportion of power was generated in the SIC (the central grid) by lower cost hydroelectric producers. Net cash costs were $0.13/lb lower at $1.17/lb in Q3 2013 compared with the previous quarter. This reduction reflects the decrease in the cash costs before by-product credits partly offset by a $0.04/lb decrease in by-product credits due to a lower molybdenum price in Q3 compared to Q2, despite higher gold production.

 

Net cash costs for the first nine months of 2013 were $1.18/lb compared to $0.81/lb in the first nine months of 2012 principally due to lower molybdenum production, lower molybdenum and gold prices, and the higher energy costs resulting from the movement to spot prices following expiry of the long-term energy supply contract at the end of 2012.

 

LOS PELAMBRES

 

2013

YTD

 

 

Q3

Q2

%

2013

2012

%

Daily ore throughput

kt

172.7

178.4

(3.2)

175.8

177.0

(0.7)

Copper grade

%

0.71

0.73

(2.7)

0.73

0.70

4.3

Copper recovery

%

91.5

89.7

2.0

89.9

90.5

(0.7)

Copper production

kt

99.7

102.5

(2.7)

303.4

296.0

2.5

Copper sales

kt

110.7

92.2

20.1

305.7

288.2

6.1

Molybdenum grade

%

0.014

0.016

(12.5)

0.015

0.023

(34.8)

Molybdenum recovery

%

85.1

79.8

6.6

81.5

82.8

(1.6)

Molybdenum production

kt

2.0

2.0

-

6.7

9.5

(29.5)

Molybdenum sales

kt

1.9

2.1

(9.5)

6.2

9.8

(36.7)

Gold production and sales

koz

16.6

12.5

32.8

40.9

38.8

5.4

Cash costs before by-product credits*

$/lb

1.48

1.65

(10.3)

1.55

1.37

13.1

Net cash costs

$/lb

1.17

1.30

(10.0)

1.18

0.81

45.7

 

* Includes tolling charges of $0.18/lb in Q3 2013 and $0.17/lb in 2013 YTD

 

Esperanza

Esperanza produced 41,000 tonnes of copper in Q3 2013, a 2.8% decrease compared with the previous quarter. This was primarily due to a 22.9% decrease in the copper grade to 0.54% and a 7.1% decrease in copper recovery to 83.6%, which was partially offset by a 7.7% increase in daily throughput. The decrease in copper grade was mainly due to mining a lower grade phase of the pit throughout the quarter as well as due to localised geotechnical issues, which resulted in the temporary processing of lower grade stockpiles. The decrease in recoveries was primarily a result of this decline in grade.

Copper production in the first nine months of 2013 was 131,100 tonnes compared with 113,700 tonnes in the comparable period in 2012 reflecting the improved performance of the operation as throughput increased 11.2% to an average of 87,300 tonnes per day.

Gold production was 51,000 ounces in Q3, 20.6% lower than in the previous quarter mainly as a result of lower grades from the processing of lower grade stockpiles as well as lower recoveries. The production in the first nine months of 2013 was 189,600 ounces compared with 174,600 ounces in the comparable period of 2012, which was principally due to the higher daily throughput, marginally offset by a decline in grades.

Cash costs before by-product credits were $2.73/lb in Q3 compared with $2.14/lb in the previous quarter. This increase was primarily due to the lower copper grade and the use of higher cost stockpiles, partly as a result of the temporary mine issues outlined above. By-product credits fell by $0.21/lb in the quarter due to the lower gold production. This resulted in net cash costs of $1.94/lb in Q3 compared with $1.14/lb in the previous quarter.

 

Net cash costs for the first nine months of 2013 were $1.29/lb compared with $0.54/lb in the comparable period in 2012. This increase was mainly due to the consumption of higher cost stockpiles and higher mine movement costs in 2013. The lower gold grades and price contributed a $0.27/lb increase in the net cash cost.

 

ESPERANZA

 

2013

YTD

 

 

Q3

Q2

%

2013

2012

%

Daily ore throughput

kt

88.4

82.1

7.7

87.3

78.5

11.2

Copper grade

%

0.54

0.70

(22.9)

0.65

0.66

(1.5)

Copper recovery

%

83.6

90.0

(7.1)

87.7

87.1

0.7

Copper production

kt

41.0

42.2

(2.8)

131.1

113.7

15.3

Copper sales

kt

47.0

37.2

26.3

125.2

104.8

19.5

Gold grade

%

0.26

0.35

(25.7)

0.32

0.36

(11.1)

Gold recovery

%

68.9

85.6

(19.5)

80.4

76.1

5.7

Gold production

koz

51.0

64.2

(20.6)

189.6

174.6

8.6

Gold sales

koz

60.6

53.1

14.1

176.7

163.8

7.9

Cash costs before by-product credits*

$/lb

2.73

2.14

27.6

2.31

1.83

26.2

Net cash costs

$/lb

1.94

1.14

70.2

1.29

0.54

138.9

 

*  Includes tolling charges of $0.21/lb in Q3 2013 and $0.20/lb in 2013 YTD

 

El Tesoro

El Tesoro produced 24,800 tonnes of copper in Q3 compared to 26,400 tonnes in Q2 as a result of a decrease in ore grade, which was a lower than expected decline as mining stopped at the higher grade Mirador pit in September, some three months later than had originally been planned.  Production was 76,500 tonnes in the first nine months of 2013 compared with production of 78,200 tonnes in the same period of 2012 principally due to the slightly lower grade this year, marginally offset by higher copper recoveries.

 

Cash costs increased in Q3 to $1.33/lb compared with $1.26/lb in Q2 principally reflecting the lower copper grade in the period.  Cash costs for the first nine months of 2013 were $1.28/lb, a 17.4% decrease on the comparable period primarily reflecting lower consumption of acid and favourable inventory movements.

 

EL TESORO

 

2013

YTD

 

 

Q3

Q2

%

2013

2012

%

Daily ore throughput

kt

20.4

20.5

(0.5)

19.4

20.1

(3.5)

Copper grade

%

1.43

1.63

(12.3)

1.63

1.68

(3.0)

Copper recovery

%

80.5

77.2

4.4

78.8

75.0

5.1

Copper production - heap leach

kt

22.6

24.3

(7.0)

70.2

69.9

0.4

Copper production - total *

kt

24.8

26.4

(6.1)

76.5

78.2

(2.2)

Copper sales

kt

25.4

29.9

(15.1)

74.8

74.5

(0.4)

Cash costs

$/lb

1.33

1.26

5.6

1.28

1.55

(17.4)

 

* Includes production from ROM material

 

 

Michilla

 

Michilla produced 8,700 tonnes of copper in Q3 compared to 9,300 tonnes in Q2 primarily as a result of lower throughput despite marginally higher grade and recoveries. Production from the primary heap leach was 22,600 tonnes in the first nine months of 2013 compared to 24,900 tonnes in the same period of 2012 principally reflecting the 16.4% decline in the combined grade of the mine's own operations and third-party ore, marginally offset by higher throughput and recoveries.

 

Cash costs were $3.32/lb in Q3 compared with $3.43/lb in the previous quarter due to fewer waste tonnes being moved at the Lince pit.  Cash costs for the first nine months of 2013 were $3.35/lb, a 6.3% increase on the comparable period primarily reflecting the additional stripping activities to the mine site that will support mining activities in 2014.

 

MICHILLA

 

2013

YTD

 

 

Q3

Q2

%

2013

2012

%

Daily ore throughput

kt

11.1

12.1

(8.3)

11.5

11.0

4.5

Copper grade

%

0.93

0.91

1.1

0.92

1.10

(16.4)

Copper recovery

%

78.5

77.3

1.6

77.3

73.7

4.9

Copper production - heap leach

kt

7.2

7.8

(7.7)

22.6

24.9

(9.2)

Copper production - total *

kt

8.7

9.3

(6.5)

27.3

27.8

(1.8)

Copper sales

kt

7.8

11.8

(33.9)

26.3

27.5

(4.4)

Cash costs

$/lb

3.32

3.43

(3.2)

3.35

3.15

6.3

 

* Includes production from secondary leaching

 

Project update

 

The construction of Antucoya remains on time and on budget with 44% total progress (design, procurement and physical progress) and 14% construction progress as at 30 September 2013.

 

 

Commodity prices and exchange rates

 

 

 

2013

YTD

 

 

Q3

Q2

%

2013

2012

%

Copper

 

 

 

 

 

 

 

Market price

$/lb

3.21

3.24

(0.9)

3.35

3.50

(7.3)

Realised price

$/lb

3.45

2.90

19.0

3.26

3.74

(12.8)

Gold

 

 

 

 

 

 

 

Market price

$/oz

1,326

1,415

(6.3)

1,456

11.9

(11.9)

Realised price

$/oz

1,319

1,287

2.5

1,402

12.3

(16.0)

Molybdenum

 

 

 

 

 

 

 

Market price

$/lb

9.4

10.8

(13.0)

10.5

1,651

(21.1)

Realised price

$/lb

8.4

10.6

(20.8)

10.0

1,668

(18.7)

Exchange rates

 

 

 

 

 

 

 

Chilean peso

per $

507

484

4.8

488

490

(0.3)

 

The spot commodity price for copper, gold and molybdenum as at 30 September 2013 were $3.31/lb, $1,331/oz and $9.2/lb respectively compared with $3.06/lb, $1,198/oz and $10.3/lb at the end of the previous quarter. 

The provisional pricing adjustments and hedging effects in the period for copper, gold and molybdenum were negative $123.5m, negative $24.1m and negative $14.7m respectively.  

Transport and water

 

Total volumes transported by the transport division were 1.9 million tonnes in Q3 2013, in line with the previous quarter.  Total volumes in the first nine months of 2013 were 5.5 million tonnes, a 3.2% decrease versus the comparable period in 2012.

 

The water division sold 12.6 million cubic metres in Q3 2013, marginally less than in the previous quarter. Total volumes in the first nine months of 2013 were 38.3 million cubic metres, slightly ahead versus the comparable period of 2012.

 

 

 

2013

YTD

 

 

Q3

Q2

%

2013

2012

%

Total tonnage transported

kt

1,851

1,875

(1.3)

5,542

5,728

(3.2)

Water volumes sold

million m³

12.6

12.7

(0.8)

38.3

38.0

0.8

 

Interim Management Statement

This report represents the Interim Management Statement for the purposes of the UK Listing Authority's Disclosure and Transparency Rules. Other than as set out above, there have been no material events or transactions, or significant changes to the financial position and performance of the Group, since 30 June 2013.

                                                                                                                                                                                                               

Investors - London                                                                                                   Media (Brunswick)

Andrew Lindsay                    alindsay@antofagasta.co.uk                            Carole Cable         antofagasta@brunswickgroup.com

Clare wood                            cwood@antofagasta.co.uk                                Robin Wrench       antofagasta@brunswickgroup.com

Telephone                               +44 20 7808 0988                                                    Telephone               +44 20 7404 5959

Investors - Santiago                                                                

Alejandro Rivera                  arivera@aminerals.cl

Telephone                               +56 2 2798 7000

                                                                                                                                                                                                               


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
MSCMMBATMBMJBIJ

Companies

Antofagasta (ANTO)
UK 100

Latest directors dealings