Q3 Production Report
Antofagasta PLC
31 October 2006
31 October 2006
Antofagasta plc
Quarterly Production Report - Q3 2006
Highlights
• Group copper production in Q3 was 126,400 tonnes compared with 100,900
tonnes in Q2, reflecting higher production at all three mines.
• Molybdenum production at Los Pelambres in Q3 increased to 2,900 tonnes
compared with 2,100 tonnes in Q2.
• Group cash costs for Q3 fell 12.5 cents to 31.4 cents per pound, mainly
due to improved by-product credits.
Group Total Q1 Q2 Q3 Q4 Acc Acc Full Year
2006 2006 2006 2006 2006 2005 2005
Total production of 107.0 100.9 126.4 334.3 343.4 467.3
payable copper ('000 tonnes)
Total production of 2.0 2.1 2.9 7.0 6.7 8.7
payable moly ('000 tonnes)
Weighted average cash 49.7 43.9 31.4 41.0 4.8 13.9
costs (cents per pound)
Los Pelambres
Los Pelambres produced 88,800 tonnes of payable copper in Q3, an increase of
31.5% over the previous quarter. This was mainly due to the release of
unfiltered copper concentrate from the concentrator plant to the port which
built-up in Q2 when repairs to the slurry pipeline took place. The increased
production also resulted from higher daily ore throughput at the concentrator
plant as Los Pelambres started to benefit from the 140,000 tonnes per day
expansion project currently in progress, as well as higher recoveries. These
factors were partly offset by the effect of the ore grade which as expected was
lower this quarter.
Molybdenum production in Q3 increased to 2,900 tonnes compared with 2,100 tonnes
in Q2. This reflected the higher ore throughput level and changes in the level
of partly-processed molybdenum concentrate and, to a lesser extent, the higher
molybdenum ore grade and improved recoveries.
Cash costs in Q3 were 5.7 cents per pound, compared with 18.5 cents per pound in
Q2. This mainly resulted from improved by-product credits (which increased by
9.0 cents) and lower treatment and refining charges (which decreased by 3.5
cents). Improved by-product credits resulted mainly from the higher molybdenum
production and, to a lesser extent, higher molybdenum market prices (which
averaged US$26.3 per pound compared with US$24.4 per pound in Q2). Onsite and
shipping costs for Q3 were marginally below Q2.
El Tesoro
Cathode production at El Tesoro in Q3 was 25,900 tonnes, an 18.9% increase over
the previous quarter. This was mainly due to higher than expected recoveries
mainly as a result of lower carbonates. Cathode production also benefited from
the improved ore grade which rose in Q3 in line with budget.
Cash costs in Q3 were 76.1 cents per pound, 2.7 cents below the previous
quarter. This resulted principally from the higher production level this
quarter.
Michilla
Michilla produced 11,700 tonnes of copper cathodes in Q3, marginally above Q2.
The expected decrease in the ore grade and lower processing level were offset by
higher recoveries. The improved recoveries were due to the higher proportion of
sulphide ores (which yield higher recoveries than oxide ores) processed in the
period.
Cash costs in Q3 were 127.8 cents per pound, 3.9 cents per pound above Q2. This
was mainly due to higher transport costs as a result of increased costs of tyres
and fuel.
Transport
Rail tonnages in Q3 were 1,104,000 tons, recovering from the temporary decrease
experienced the previous quarter. Road tonnages of 361,000 remained in line with
previous quarters.
Water
The water division continued to perform strongly, with year-to-date volumes
increasing 13.6% over the previous year. Volumes in Q3, usually the weakest
seasonal quarter, exceeded the previous two quarters mainly due to increased
sales to the mining sector.
Los Pelambres Q1 Q2 Q3 Q4 Acc Acc Full Year
2006 2006 2006 2006 2006 2005 2005
Production statistics
Daily average ore treated 120.9 119.5 130.0 123.5 128.3 128.1
('000 tonnes)
Average ore grade 0.81 0.84 0.78 0.81 0.79 0.80
(%)
Average recovery 88.1 88.2 89.3 88.6 89.8 89.2
(%)
Concentrate produced 194.8 200.2 207.4 602.4 645.4 865.1
('000 tonnes)
Average concentrate grade 39.6 40.0 40.2 40.0 38.4 38.5
(%)
Fine copper in 76.6 69.8 91.8 238.2 244.0 333.8
concentrate
('000 tonnes)
Payable copper in 74.1 67.5 88.8 230.4 235.9 322.8
concentrate
('000 tonnes)
Average moly ore grade 0.026 0.027 0.028 0.027 0.023 0.022
(%)
Average moly recovery 74.4 76.0 77.8 76.2 80.0 79.9
(%)
Payable moly 2.0 2.1 2.9 7.0 6.7 8.7
('000 tonnes)
Cash costs statistics
On-site and shipment 54.5 56.8 56.5 55.9 44.6 47.1
costs
(cents per pound)
Tolling charges for 34.8 45.4 41.9 40.6 27.2 27.6
concentrates
(cents per pound)
By - product credits (59.5) (83.7) (92.7) (79.4) (101.5) (91.8)
(cents per pound) *
Cash costs 29.8 18.5 5.7 17.2 (29.7) (17.1)
(cents per pound)
(*) Note: By-products credits do not include any costs attributable to the
production of molybdenum concentrate. By-product calculations also do not take
into account unrealised mark-to-market gains at the beginning or end of each
period.
El Tesoro Q1 Q2 Q3 Q4 Acc Acc Full Year
2006 2006 2006 2006 2006 2005 2005
Daily average ore treated 29.7 28.6 27.9 28.7 26.1 27.2
('000 tonnes)
Average ore grade 0.99 1.18 1.25 1.14 1.28 1.23
(%)
Average recovery 77.9 73.9 80.4 77.4 79.7 80.2
(%)
Copper cathodes 20.8 21.8 25.9 68.4 73.8 98.1
('000 tonnes)
Cash costs 79.6 79.8 76.1 78.3 63.5 66.1
(cents per pound)
Michilla Q1 Q2 Q3 Q4 Acc Acc Full Year
2006 2006 2006 2006 2006 2005 2005
Daily average ore treated 14.6 15.4 15.0 15.0 14.9 14.9
('000 tonnes)
Average ore grade 1.13 1.07 1.03 1.07 1.07 1.10
(%)
Average recovery 76.2 76.4 80.9 77.8 75.5 75.4
(%)
Copper cathodes 12.1 11.6 11.7 35.4 33.7 46.4
('000 tonnes)
Cash costs 120.2 123.9 127.8 123.9 117.3 118.8
(cents per pound)
Transport Q1 Q2 Q3 Q4 Acc Acc Full Year
2006 2006 2006 2006 2006 2005 2005
Rail tonnage transported 1,122 1,011 1,104 3,237 3,301 4,336
('000 tons)
Road tonnage transported 383 367 361 1,111 1,122 1,522
('000 tons)
Water Q1 Q2 Q3 Q4 Acc Acc Full Year
2006 2006 2006 2006 2006 2005 2005
Water volume sold - 9,304 9,231 9,328 27,864 24,526 33,074
potable and untreated
('000 m3) **
(**) Note: Water volumes include water transportation of 270,000 m3 in Q1,
740,000 m3 in Q2 and 254,000 m3 in Q3.
For further enquiries:
Alejandro Rivera
arivera@aminerals.cl Santiago: (56-2) 377 5145
Desmond O'Conor
doconor@antofagasta.co.uk London: (44) 20 7808 0988
Hussein Barma London: (44) 20 7808 0988
hbarma@antofagasta.co.uk
Issued by:
Keith Irons, Bankside Consultants (44) 20 7367 8873
keith@bankside.com
Oliver Winters, Bankside Consultants (44) 20 7367 8874
oliver.winters@bankside.com
This information is provided by RNS
The company news service from the London Stock Exchange