Handelsbanken Capital Markets Day Presentation

RNS Number : 2323H
Beowulf Mining PLC
27 November 2015
 

 

 

27 November 2015

 

Beowulf Mining plc

("Beowulf" or the "Company")

Handelsbanken Capital Markets Day Presentation

 

Beowulf (AIM: BEM; Aktietorget: BEO), the mineral exploration and development company focused on the Kallak iron ore project in northern Sweden and its Swedish exploration portfolio, announces that Kurt Budge, Chief Executive Officer ("CEO"), presented at a Handelsbanken Capital Markets Day in Stockholm on 25 November 2015. The presentation and transcript can be found on the Company's website: www.beowulfmining.com.

Enquiries:

 

Beowulf Mining plc


Kurt Budge, Chief Executive Officer

Tel: +44 (0) 20 3771 6993

Cantor Fitzgerald Europe

(Nominated Advisor & Joint Broker)


Stewart Dickson / Jeremy Stephenson / Phil Davies / Carrie Drummond

Tel: +44 (0) 20 7894 7000

Beaufort Securities Limited

(Joint Broker)


Jon Belliss

Tel: +44 (0) 20 7382 8300

Blytheweigh 


Tim Blythe / Megan Ray 

Tel: +44 (0) 20 7138 3204

 

 

Cautionary Statement

 

Statements and assumptions made in this document with respect to the Company's current plans, estimates, strategies and beliefs, and other statements that are not historical facts, are forward-looking statements about the future performance of Beowulf. Forward-looking statements include, but are not limited to, those using words such as "may", "might", "seeks", "expects", "anticipates", "estimates", "believes", "projects", "plans", strategy", "forecast" and similar expressions. These statements reflect management's expectations and assumptions in light of currently available information. They are subject to a number of risks and uncertainties, including, but not limited to, (i) changes in the economic, regulatory and political environments in the countries where Beowulf operates; (ii) changes relating to the geological information available in respect of the various projects undertaken; (iii) Beowulf's continued ability to secure enough financing to carry on its operations as a going concern; (iv) the success of its potential joint ventures and alliances, if any; (v) metal prices, particularly as regards iron ore. In the light of the many risks and uncertainties surrounding any mineral project at an early stage of its development, the actual results could differ materially from those presented and forecast in this document. Beowulf assumes no unconditional obligation to immediately update any such statements and/or forecasts.

 

About Us

 

The Kallak North iron ore project is located about 40km west of the Jokkmokk municipality centre in the County of Norrbotten in Northern Sweden.

Local infrastructure is excellent with all-weather gravel roads passing through the project area and all parts are easily reached by well used forestry tracks. A major hydroelectric power station with associated electric power-lines is located only a few kilometres to the south east. The nearest railway (the 'Inland Railway Line') passes approximately 40km to the east. This railway line is connected at Gällivare with the 'Ore Railway Line', which is used by LKAB for delivery of their iron ore material to the Atlantic harbour at Narvik (Norway) or to the Botnian Sea harbour at Luleå (Sweden).

The total Kallak project area is approximately 80km2, and includes the Parkijaure licence granted in 2010 and the Ågåsjiegge nr2 licence granted in 2014.

The Kallak North and Kallak South orebodies are centrally located and cover an area approximately 3,700m in length and 350m in width, as defined by drilling.  The mineral resource estimate for Kallak North and South is based on drilling conducted between 2010-2014, a total 27,895m drilled, including 131 drillholes. 

The latest resource statement for the Kallak project was finalised on 28 November 2014, following the guidelines of the JORC Code 2012 edition, summary as follows:


Category

Tonnage

Mt

Fe

%

P

%

S

%

Kallak North

Indicated

105.9

27.9

0.035

0.001


Inferred

17.0

28.1

0.037

0.001







Kallak South

Indicated

12.5

24.3

0.041

0.003


Inferred

16.8

24.3

0.044

0.005







Global

Indicated

118.5

27.5

0.036

0.001


Inferred

33.8

26.2

0.040

0.003

The Ballek Joint Venture project comprises two exploration permits over a total area of approximately 8.7km2, located in the Norrbotten County in Northern Sweden. In September 2008 Beowulf reported a maiden JORC Code compliant Inferred Resource estimate for the Lulepotten copper-gold deposit of 5.4Mt, grading 0.8% Cu and 0.3g/t Au.

Other portfolio assets include the Nautijaure licence with potential for copper and Grundträsk gold project.


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
NRALLFEFLDLDFIE
UK 100

Latest directors dealings