Corporate Presentation

RNS Number : 8272N
Blencowe Resources PLC
04 October 2021
 

4 October 2021   

Blencowe Resources Plc

("Blencowe" or the "Company")

 

 

Corporate Presentation

 

Blencowe Resources (LSE:BRES) is pleased to announce a new Corporate Presentation has been uploaded on the 'Investors' section of the Company's website (www.blencoweresourcesplc.com), incorporating information on the recently announced and highly positive Preliminary Economic Assessment.

 

For further information please contact:

 

  Blencowe Resources Plc

Sam Quinn

 

 

Investor Relations

Sasha Sethi

 

www.blencoweresourcesplc.com

Tel: +44 (0)1624 681 250

info@blencoweresourcesplc.com

 

Tel: +44 (0)7891  677 441

sasha@flowscomm.com

 

Brandon Hill Capital Limited

Jonathan Evans

Tel: +44 (0)20 3463 5000

jonathan.evans@brandonhillcapital.com

 

  First Equity Limited     Tel: +44(0)20 7330 1883

 Jason Robertson    jasonrobertson@firstequitylimited.com

 

 

Twitter  https://twitter.com/BlencoweRes

LinkedIn  https://www.linkedin.com/company/72382491/admin/

 

 

Background

Orom-Cross is a potential world class graphite project both by size and end-product quality, with a high component of more valuable larger flakes within the deposit. A 21-year Mining Licence for the project was issued by the Ugandan Government in 2019 following extensive historical work on the deposit and following delivery of exceptional metallurgy test results (July 2021 and an outstanding Preliminary Economic Assessment (September 2021) Blencowe is moving into the Pre-Feasibility Study (PFS) stage as it drives towards first production.

Orom-Cross is a large, shallow open pitable deposit, with an estimated overall resource between 2-3 billion tonnes of graphite with 16.3Mt already drilled to JORC Resource standard, covering an initial 13-year life of mine. Development of the resource is expected to benefit from a low strip ratio and free dig operations thereby ensuring lower operating and capital costs. 

Blencowe's Preliminary Economic Assessment (PEA) for Orom-Cross presents the project as low-cost with robust financials and the Company is confident that Project economics can improve further, notably by extending the life of mine and/or increasing the levels of production. The September 2021 PEA delivered an NPV8 of US$317M and IRR 49% with an average nameplate production of 75,000tpa graphite sold as concentrate, with ability to extend this after further drilling.

 

 

 

 

This information is provided by Reach, the non-regulatory press release distribution service of RNS, part of the London Stock Exchange. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

Reach is a non-regulatory news service. By using this service an issuer is confirming that the information contained within this announcement is of a non-regulatory nature. Reach announcements are identified with an orange label and the word “Reach” in the source column of the News Explorer pages of London Stock Exchange’s website so that they are distinguished from the RNS UK regulatory service. Other vendors subscribing for Reach press releases may use a different method to distinguish Reach announcements from UK regulatory news.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 
NRAMJBLTMTMMBPB
UK 100

Latest directors dealings