Q3 2018 Preliminary Production Results

RNS Number : 0969D
Centamin PLC
05 October 2018
 

For immediate release

 

5 October 2018

 

 

 

Centamin plc ("Centamin" or "the Company")

(LSE:CEY, TSX:CEE)

 

Q3 2018 Preliminary Production Results

 

Centamin announces preliminary production results for the third quarter ended 30 September 2018 ("Q3") from its Sukari Gold Mine ("Sukari") in Egypt.

 

 

 

 

Quarter on quarter comparative

 

Year on year comparative

 

 

units

Q3 2018

Q2 2018

% change

Q3 2018

Q3 2017

% change

Safety

 

 

 

 

 

 

 

Sukari LTIFR

200,000 hours

0.14

0

 

0.14

0

 

Open pit mining

 

 

 

 

 

 

 

Total material mined

kt

19,891

18,415

8%

19,891

18,602

7%

Ore mined(1)

kt

6,562

5,532

19%

6,562

4,825

36%

Ore grade mined

g/t Au

0.64

0.51

25%

0.64

0.76

-16%

Ore grade milled

g/t Au

0.81

0.59

37%

0.81

1.11

-27%

Strip ratio

waste/ore

2.03

2.33

-13%

2.03

2.86

-29%

Underground mining

 

 

 

 

 

 

 

Ore mined stoping

kt

199

180

11%

199

189

5%

Ore mined developmentt

kt

128

109

17%

128

113

13%

Ore grade mined

g/t Au

5.18

4.62

12%

5.18

7.98

-35%

Processing

 

 

 

 

 

 

 

Ore processed

kt

3,129

3,172

-1%

3,129

2,996

4%

Head grade

g/t Au

1.29

0.99

30%

1.29

1.82

-29%

Gold recovery

%

88.7

87.3

2%

88.7

88.3

0%

Gold produced - dump leach

oz

3,894

3,028

29%

3,894

1,692

130%

Total gold production(2)

oz

      117,720

92,803

27%

       117,720

156,533

-25%

(1)   Gold produced is gold poured and does not include gold-in-circuit at period end.

 

OVERVIEW

·     Gold production for Q3 was 117,720 ounces, a 27% improvement on the second quarter ("QoQ"), resulting from month on month operational improvements in the open pit and underground;

·     September was a strong month with production of 48,511 ounces. However operational improvements have taken longer than planned to materialise;

·      In Q4, we expect improvements to be sustained and production in the region of 145,000 ounces, resulting in a total 2018 annual production of approximately 480,000 ounces.

 

Open Pit

·      Mining of the Stage 4 transitional zone was completed in Q3 and mining is now in the higher-grade fresh sulphide material, which will be the source of ore for at least the next three years;

·      The open pit is performing slightly ahead of expectations, achieving another record quarter for ore mined and material moved (6.6Mt and 19.9Mt, respectively);

·      Open pit ore grade mined has improved month on month, exiting at 0.74 g/t for September and averaging 0.64g/t in Q3; and

·      Open pit average milled grade was 0.81g/t.

 

Underground

·     Total underground ore mining of 327kt, a 13% increase QoQ, at an average mined grade of 5.18 g/t, a 12% increase QoQ due to the successful ongoing implementation of changes initiated in Q2:

Ore mined from stoping was 199kt at 6.16 g/t

Ore mined from development was 128kt at 3.65 g/t

Stope to development ore split 60:40;

·     Cleopatra decline development progressed 864.4 metres, delivering 70,897 tonnes of material at an average development grade of 1.56g/t:

Produced 3,223 ounces in Q3

Cleopatra exploration drilling continues to test the contact zones and at depth

Assay results will be released as part of the detailed Results, to be published 1 November 2018.  

 

Processing

·      Total ore processed through the plant was 3.1Mt, at a head grade of 1.29g/t, a 31% increase QoQ; and

·      Metallurgical plant recoveries for the quarter were 88.7% a 1% increase QoQ.

 

The Company will publish full Q3 Results on 1 November 2018. The results will be accompanied by a conference call for institutional investors and analysts at 09:00 BST (UK) on the same day.

 

Andrew Pardey, CEO commented:

"These results are a demonstrable operational improvement on Q2. We are extremely pleased with the operational performance from the open pit. We are through the transitional ore, grades are improving in line with the mine plan and will continue to through the fourth quarter. The underground improvements have been very encouraging and are continuing. Our focus remains on achieving optimal and consistent performance."

 

 

Conference call

A conference call will be hosted by the Company at 09.00 BST (UK) today to discuss the results and answer any questions. Where possible, please dial in 10 minutes before the start time using the details below:

 

Participant code:     78774386#

 

UK Toll:                   02034281542
UK Toll Free:           08082370040

 

A replay will be made available on the Company website from 13.00 BST (UK) today.

 

 

For further information, please visit www.centamin.com or contact:

 

Centamin plc

Andrew Pardey, Chief Executive Officer

Ross Jerrard, Chief Financial Officer

Alexandra Carse, Investor Relations

+44 (0) 7700 713 738

alexandra.carse@centamin.je

 

Buchanan Communications

Bobby Morse

Chris Judd

+ 44 (0) 20 7466 5000

centamin@buchanan.uk.com

 

 

This announcement contains inside information for the purposes of Article 7 of the Market Abuse Regulation (EU) 596/2014.

 


This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLUVOVRWSARRRA
UK 100

Latest directors dealings