Annual Financial Report

RNS Number : 9442Q
Great Portland Estates PLC
24 June 2020
 

24 June 2020

 

 

 

Great Portland Estates plc

 

Annual Report and Notice of Annual General Meeting 2020

 

Great Portland Estates plc (the "Company") announces that the following documents have today been posted or otherwise made available to shareholders:

 

· Annual Report and Accounts for the year ended 31 March 2020;

· Notice of 2020 Annual General Meeting (the "AGM"); and

· Form of Proxy. 

 

The above documents have been uploaded to the National Storage Mechanism and will shortly be available for inspection at https://data.fca.org.uk/#/nsm/nationalstoragemechanism .

 

The 2020 Annual Report and Accounts and Notice of 2020 Annual General Meeting can also be viewed on the Company's website at  www.gpe.co.uk/investors/shareholder-information/agmgm .

 

The 2020 AGM will be held at Kent House, 14/17 Market Place, London, W1W 8AJ on Friday, 24 July 2020 at 1pm.  In light of the COVID-19 pandemic and current compulsory government measures restricting public gatherings, we are planning for the AGM to be run as a closed meeting.  Regretfully, this means that shareholders must not attend the AGM in person and, in the interests of protecting the health and safety of our shareholders and our people, anyone seeking to attend in person will be refused entry.  The Company will make arrangements for a quorum to be present to transact the formal business of the meeting as set out in the AGM Notice.

 

We will continue to monitor the impact of COVID-19 and how any changes to government guidelines or legislation may affect the arrangements for the AGM.  Any changes to the current arrangements will be communicated to shareholders via the Company's website at www.gpe.co.uk/investors/shareholder-information/agmgm .  

 

In accordance with Disclosure Guidance and Transparency Rule (DTR) 6.3.5R   and the requirements it imposes on issuers regarding regulated information,  we set out below:

 

·in Appendix A, the principal risks and uncertainties facing the Company; and

·in Appendix B, the Directors' responsibility statement.

 

The Company's preliminary consolidated financial information and information on important events that have occurred during the year, and their impact on the financial statements were included in the Company's preliminary results announcement on 20 May 2020. That information together with the Appendices below, which have been extracted from the 2020 Annual Report and Accounts, constitute the material required by DTR 6.3.5R to be communicated to the media in unedited full text through a Regulatory Information Service. This material is not a substitute for reading the full 2020 Annual Report and Accounts.  To view the preliminary results announcement, please visit the Company's website www.gpe.co.uk .

 

 

For further information contact:

 

Darren Lennark

Company Secretary

Great Portland Estates plc  

020 7647 3000

LEI Number: 213800JMEDD2Q4N1MC42

 

APPENDIX A

 

Principal risks and uncertainties

 

A description of the Group's principal risks and uncertainties, together with a summary of steps taken to mitigate those risks, is shown below.

 

How we manage principal risks and uncertainties

 

Principal risk

 

How we monitor and manage risk

Commentary

Structural retail changes

 

A continued structural shift in the retail industry could force changes to leasing requirements (e.g. turnover rents) and/or reduce the demand for, or profitability of retail space in central London. This could reduce rents, asset values and returns from retail space.

 

Link to strategic priorities

Deliver and lease committed schemes; Prepare the pipeline

 

Directional travel of net risk movement over the last 12 months

Increasing

 

Strategic financial forecasts updated prior to each Board meeting including scenario planning for different economic cycles.

 

Quarterly review of asset-by-asset business plans to assess potential exposures and inform hold/sell strategies.

 

Regular reporting to Executive Committee and Board on negotiations and marketing campaigns.

 

Regular updates received from central London retail agencies to understand current market trends and anticipating future changes to deal structures.

 

The Group's in-house portfolio management teams have proactive engagement with occupiers to understand their occupational needs and requirements with a focus on retaining income.

 

Design Review Panel reviews building design and specification to ensure the scheme can accommodate flexibility of unit sizes appropriate for future retail occupier demand.

 

In-house Leasing and Marketing teams liaise with external advisors on a regular basis, creating marketing campaigns, agreed budgets and timelines in accordance with the leasing/marketing objectives.

 

Retail space comprises 28% of our portfolio by value. Whilst wider UK retailing has suffered from a combination of lower retail sales and a structural shift, as increasing volumes of sales move online, central London retail has to date demonstrated greater resilience, underpinned by tourism (both domestic and international), flagship stores, a deep cultural offering and its growing population.

 

Moreover, we focus on delivering high quality, modern retail units into locations with enduring appeal with the bulk of our activities centred on the prime shopping streets of Oxford Street, Regent Street, Bond Street and Piccadilly. Our current development activity at Oxford House, at the eastern end of Oxford Street, and Hanover Square, at the northern end of Bond Street, aim to deliver new retail experiences into locations that will benefit from the expected opening of Crossrail in 2021. Early interest in the schemes has been encouraging and during the year we completed our first retail letting in our Hanover Square scheme.

 

However, the outbreak of COVID-19 and associated lockdown has made the position more challenging and rental values across our retail units fell 4.3% during the year

Climate change and decarbonisation

 

The need to decarbonise our business increases the cost of our activities through the need to retro-fit buildings to improve their sustainability credentials and reduces our ability to redevelop due to planning restrictions, increased regulation and stakeholder expectations, the increased cost of low carbon technology and potentially the pricing of carbon. Failure to meet the climate challenge could impact our ability to deliver new buildings, reduce the demand for the buildings we own, cause significant reputational damage and result in exposure to environmental activism and potentially stranded assets.

 

Link to strategic priorities

Prepare the pipeline; Progress sustainability agenda

 

Directional travel of net risk movement over the last 12 months

Increasing

Regular Board and Executive review of Sustainability policy and climate change commitments.

 

Sustainability Committee meets quarterly to consider strategy in respect of climate change and Environmental and Social strategy and risks.

 

Dedicated Director of Sustainability and Community and Sustainability Manager.

 

Design Review Panel reviews design brief for all buildings to ensure that forthcoming sustainability risks are considered.

 

Sustainable Development Brief and Sustainability strategy in place.

 

ESG-linked RCF and the introduction of ESG strategic bonus measures for Executive Committee members to support delivery of decarbonisation within the business.

 

The creation of a baseline carbon position for existing near-term development schemes is currently underway.

With the built environment contributing approximately 40% of the UK's carbon footprint and the climate change debate moving from the periphery to now being both a moral and economic imperative, particularly for our occupiers and other stakeholders, we have been further expanding our sustainability commitments and activities. Having announced in 2019 targets to reduce energy intensity in our existing buildings by 40% (from a 2016 baseline) by 2030 and to delivering net zero carbon new build developments from 2030, we have more recently articulated our approach to sustainability in our Statement of Intent 'The Time is Now', which includes a commitment to decarbonize our business to become net zero by 2030. We are also committing to design climate change resilient and adaptable

spaces, create a lasting positive social impact in our communities and put health and wellbeing front and centre.

 

Moreover, with sustainability touching everything that we do, in early 2020 we incorporated our energy intensity target into our ESG-linked revolving credit facility, along with targets to reduce embodied carbon of our new developments and major refurbishments by 40% by 2030 and to improve biodiversity net gain across our portfolio by 25% by 2030. As a result, the rate of interest we pay on this facility will depend on our performance against these targets. Furthermore, these targets have been included within the objectives of many of our senior management team and will be used to assess levels of future remuneration.

 

We also continue to work to improve the number of our buildings rated for their sustainability credentials. In line with current legislative requirements and Government proposals on the future trajectory for minimum energy efficiency standards, we are actively managing ratings, seeking to improve EPC ratings by at least one grade following refurbishment.

 

Pandemic

 

Ongoing pandemic (lasting longer than three months) could lead to a significant decrease in demand in our markets, adversely impact our rental income, reduce the availability of our workforce and disrupt our supply chains resulting in a decreased ability to maintain the consistency of our operations.

 

Link to strategic priorities

COVID-19 response; Deliver and lease committed schemes; Prepare the pipeline; Progress sustainability agenda; Further embed values; Continue to grow flex offer

 

Directional travel of net risk movement over the last 12 months

Increasing

 

Business Continuity Plans and IT Business Continuity Plans in place.

 

Response Committee established and led by the Finance and Operations Director to identify risks and concerns to help manage GPE's response to COVID-19 crisis. Daily and weekly reporting to the Executive Committee.

 

Regular Board calls held during COVID-19 crisis to review GPE's response and mitigations with key updates provided between meetings. Reviews of Government guidelines and emerging practice with risk assessments undertaken as control measures change.

 

Enhanced stakeholder engagement, particularly with occupiers, contractors, shareholders and employees.

 

Selection of contractors and suppliers based on creditworthiness.

 

The current COVID-19 pandemic is already having profound social and economic consequences. However, the resilience of our business, finances and people are already in strong evidence. We are engaging extensively with all our stakeholders, including offering assistance to our occupiers on a case by case basis, extending our community activities, including through the creation of a new community fund, and working hard to ensure the safety and wellbeing of our employees who have all been working from home since late March 2020.

 

All our properties have remained open and operating to Government guidelines, including our development sites. We have also issued to all our occupiers a 'return to the office' playbook.

 

None of our employees have been furloughed and the Group has no current plans to access any UK Government COVID-19 funding.

 

London attractiveness

 

The appeal of London to occupiers and investors may diminish due to macro-economic conditions (e.g. Brexit), the rise of alternative destinations for international trade, the impact of civil unrest and terrorism, the impact of long-term climate change (e.g. risk of flooding) and the relative expense of operating in London. This could result in a lack of investment and occupier demand leading to decreasing income and asset values.

 

Link to strategic priorities

Deliver and lease committed schemes; Prepare the pipeline; Continue to grow flex offer

 

Directional travel of net risk movement over the last 12 months

Increasing

 

Board annual strategy review with regular economic and market updates received from third parties.

Strategic financial forecasts are updated prior to each Board meeting including scenario planning for different economic cycles and eventualities, including to reflect potential impacts regarding the UK's exit from the EU and, more recently, broader economic recovery from the COVID-19 crisis.

 

Regular review of strategic priorities and transactions in light of the Group's dashboard of lead indicators and operational parameters.

 

Detailed planning regarding the UK's exit from the EU, with regular updates to the Board on GPE's preparations and potential impacts.

 

The Group aims to maintain a consistent policy of low financial leverage.

London generates around 22% of UK GDP, with the largest economy of any city in Europe, and is one of the world's leading commercial, creative and financial centres, with a deep pool of talent.

 

Despite the uncertainty created by the UK's exit from the EU and the more recent economic disruption as a result

of COVID-19, London has been growing and is forecast to grow further. By 2030, London's population is expected to have increased to around ten million, up from around nine million today, and improving infrastructure, including extensions of the tube network and the expected opening of Crossrail in 2021, will bring more people within its reach. Its combination of a strong legal system, time zone advantages, international connectivity and a welcoming attitude to businesses from around the world has resulted in London retaining its position leading the Global Power City Index 2019, as measured by the Mori Memorial Foundation.

 

Central London also offers one of the world's largest commercial real estate markets, with around 440 million sq ft of office and retail property attracting a deep and diverse mix of occupiers and property investors, many from overseas. London's markets are also highly liquid and remain one of the leading global destinations for real estate investment.

 

Property market dislocation and impact on financial leverage

 

Assets may reduce in value due to capital markets disruption and/or a macro-economic shock which could increase GPE's financial leverage and potentially result in our breaching banking covenants.

 

Link to strategic priorities

Deliver and lease committed schemes; Prepare the pipeline; Continue to grow flex offer

 

Directional travel of net risk movement over the last 12 months

No change

 

Quarterly review of capital structure, including gearing levels, by Finance and Operations Director and Executive Committee.

 

Board annual strategy review with regular economic and market updates received from third parties.

 

Regular review of strategic priorities and transactions in light of the Group's dashboard of lead indicators and operational parameters.

 

Quarterly review of current and forecast debt, hedging levels and financing ratios under various market scenarios.

 

The Group aims to maintain a consistent policy of low financial leverage.

 

The Group's funding measures are diversified across a range of bank and bond markets.

 

Regular review of financing by Finance and Operations Director and Executive Committee with reporting at each Board meeting.

 

Over the long term, real estate markets have historically been cyclical and London has been no exception to this. As a result, we have consistently adopted a conservative approach to financial leverage.

As at 31 March 2020, our property LTV was 14.2%, net gearing was 16.2% and interest cover not measurable. As a result, we have substantial headroom above our Group debt covenants. We estimate property values could fall around 70% before Group debt covenants could be endangered, even before factoring in mitigating management actions.

 

The Group also has significant financial capacity with liquidity of £411 million, comprising cash of £111 million and undrawn committed facilities of £300 million. In addition, the Group's weighted average interest rate remains low at only 2.2% (falling to 1.9% on a fully drawn basis), with an attractive debt maturity ladder and diverse funding sources, predominantly borrowing on an unsecured basis.

 

Failure to maximise returns from prevailing market conditions

 

We fail to adequately read market conditions and respond accordingly. This could result in making leasing decisions or buying, selling or developing buildings at the incorrect time leading to insufficient returns on our investment. Additionally, in periods of stable markets we may fail to effectively adjust our business model to maximise returns from prevailing market conditions.

 

Link to strategic priorities

Deliver and lease committed schemes; Prepare the pipeline; Progress sustainability agenda; Continue to grow flex offer

 

Directional travel of net risk movement over the last 12 months

No change

 

Strategic financial forecasts are updated prior to each Board meeting including scenario planning for different economic cycles and eventualities.

 

Regular review of property cycle by reference to dashboard of lead indicators.

 

Board annual strategy review including regular economic and market updates received from third parties.

 

Dedicated in-house team with remit to research sub-markets in central London seeking the right balance between investment and development opportunities for current and prospective market conditions.

 

Detailed due diligence undertaken for all prospective acquisitions prior to purchase to ensure appropriate returns.

 

Quarterly review of asset-by-asset business plans to assess future performance and to inform hold/sell decision making.

 

The Group has this year again continued to take advantage of supportive market conditions through developing 414,600 sq ft of prime Grade A space for delivery in the next 18 months into a supply-constrained market, whilst also profitably recycling capital with £73 million of sales at a 10% premium to book values.

 

Failure to profitably deliver the development programme

 

We fail to translate the development pipeline and current committed schemes into profitable developments through poor development management, inappropriate level of development undertaken as a percentage of the portfolio, poor timing of activity and/or inappropriate products for the local market resulting in weak leasing performance, reputational damage, reducing asset values and lowering Group earnings.

 

Link to strategic priorities

Deliver and lease committed schemes; Prepare the pipeline; Progress sustainability agenda

 

Directional travel of net risk movement over the last 12 months

No change

Updated strategic financial forecasts reviewed at each scheduled Board meeting including scenario planning for different economic cycles.

Development management quarterly updates to Executive Committee with reporting to each scheduled Board meeting.

 

Regular review of portfolio mix and asset concentration. Adjustment of the portfolio as appropriate through undertaking acquisitions and/or development projects in joint venture or forward funding.

 

Prior to committing to a development, the Group conducts a detailed financial and operational appraisal process which evaluates the expected returns from a development in light of likely risks. During the course of a development, the actual costs and estimated returns are regularly monitored to signpost prompt decisions on project management, leasing and ownership.

 

Working with agents, potential occupiers and purchasers to identify their needs and aspirations including sustainability, wellbeing and technological advances during the planning application and design stages.

Regular pipeline review meetings between Development and Portfolio Management teams and quarterly asset review sessions.

 

Selection of contractors and suppliers based on track record of delivery and creditworthiness.

 

In-house Project Management team closely monitor construction and manage contractors to ensure adequate resourcing to meet programme.

 

Post-completion reviews undertaken through Final Appraisal process on all developments to identify best practice and areas for improvement.

 

Regular review of the prospective performance of individual assets and their business plans with joint venture partners.

 

We currently have three committed schemes on-site, set to deliver 414,600 sq ft of high quality space, all near Crossrail stations and all targeting BREEAM 'Excellent'. These schemes are already 48% pre-let or under-offer, with two of the schemes due for completion this year, and are expected to generate a profit on cost of 14.7%.

 

Beyond this, the Group is preparing a further ten schemes set to deliver more than 1.4 million sq ft across the coming decade.

Challenging planning environment

 

The increasingly stringent planning environment limits our ability to create new spaces, increases costs, and results in our failure to obtain viable planning consents.

 

Link to strategic priorities

Prepare the pipeline; Progress sustainability agenda

 

Directional travel of net risk movement over the last 12 months

Increasing

 

Prior to committing to a development, the Group conducts a detailed financial and operational appraisal process which evaluates the expected returns from a development in light of likely risks.

Active engagement with planning authorities.

 

Early engagement with local residents and community groups, adjoining owners and freeholders.

Third-party expertise used to support in-house teams, where appropriate.

 

Regular updates to the Executive Committee and Board on regulatory and planning policy developments.

 

Sustainable building design, including climate change mitigation and adaption, considered at an early design stage. All our major developments are subject to a minimum BREEAM rating requirement of 'Very Good' for major refurbishments and 'Excellent' for new build developments.

 

To successfully deliver our developments, we work closely with both the local authorities and communities to secure planning consents to create great new spaces, helping London to thrive. The emerging London Plan is now being adopted as policy and includes a number of further challenging requirements. Moreover, our substantial and flexible pipeline of ten uncommitted schemes totals 1.4 million sq ft across four London boroughs, all of which will likely be subject to planning approval requirements.

 

We aim to engage with local authorities in an open, transparent and non-adversarial manner to enable us to secure planning consents that are both beneficial to us and the local communities in which they are built. In line with our social value guidelines, as a matter of course, we liaise with community stakeholders to understand their needs and, where possible, we will adjust our proposals to take account of comments received. We use planning performance agreements with the local planning authority to ensure that our planning applications are determined in a timely manner.

 

During the year we have continued to work with community groups in the London Bridge area, supporting air quality and urban greening projects, apprenticeship opportunities and local schools. Over the coming months we will continue to support these initiatives, focusing on ensuring that our proposals for New City Court, SE1 enhance the excellent work already being undertaken by community groups in the area. This process is implemented at each development scheme, with urban greening and biodiversity projects currently being supported in Islington as part of early engagement for our 50 Finsbury Square, EC2 and our social value guidelines are in the process of being implemented in full for Oxford House, W1.

 

Moreover, sustainability is becoming ever more important in the planning process with many of our key local authorities declaring climate emergencies. We will look to work with them to support their principles of 'good growth'.

 

People

 

Failure to attract, develop and retain high quality, suitably experienced individuals means we may not have the necessary capability or resource levels resulting in the failure to deliver our business plan.

 

Link to strategic priorities

COVID-19 response; Deliver and lease committed schemes; Prepare the pipeline; Progress sustainability agenda; Further embed values; Continue to grow flex offer

 

Directional travel of net risk movement over the last 12 months

No change

Regular review is undertaken of the Group's resource requirements and succession planning.

 

The Group has a remuneration system that is strongly linked to performance and a formal six monthly appraisal system to provide regular assessment of individual performance.

 

Benchmarking of remuneration packages of all employees is undertaken annually to ensure competitive financial and non financial packages in line with market rates.

 

Annual personal development planning and ongoing training support for all employees together with focused initiatives to nurture potential successors, including introduction of mentoring programme .

 

Clear articulation of GPE values so all existing and prospective employees understand our core beliefs and behaviours . Launch of new Inclusion and Diversity strategy in October 2019.

 

Health and wellbeing programme implemented following earlier roll-out of mental health training programme .

 

Focus on people engagement with regular two-way communication and responsive employee-focused activities, e.g. Board engagement sessions, employee engagement surveys and flexible working.

 

The motivation of our people and maintaining our strong collaborative culture remains fundamental to the delivery of our strategic priorities. During the year, the strength of our values and appeal of our culture was highlighted with our most recent employee engagement survey showing 94% of our people would "recommend GPE as a great place to work" and we were delighted to make several internal senior management team promotions as we develop our talent from within. We also successfully launched our Inclusion and Diversity strategy at an all-staff event, with valuable participation from our Non-Executive Directors, and we are pleased to have now achieved the National Equality Standard accreditation.

 

We also broadened our health and wellbeing programme for our employees, held another Community Day, working with our charity partners Centrepoint and Groundwork London, and launched our Board engagement programme. Our employee retention remains high at 87% and we continue to focus on growing the breadth and depth of our talent, providing focused development support where needed.

 

Meeting occupier needs and competition

 

We fail to understand and provide spaces that meet quickly evolving occupier needs, including an inappropriate mix of flex versus traditional space and/or we fail to identify and react effectively to shifting patterns of work space use. This could lead to GPE failing to deliver space that occupiers want resulting in poor investment returns, potentially stranded assets and losing occupiers to competitors.

 

Link to strategic priorities

Deliver and lease committed schemes; Prepare the pipeline; Progress sustainability agenda; Continue to grow flex offer

 

Directional travel of net risk movement over the last 12 months

Increasing

 

Quarterly review of individual property business plans and the market more generally, including review of property IRRs.

 

Portfolio Management quarterly updates to Executive Committee with reporting at each scheduled Board meeting.

 

Board and management reviews of GPE flexible space offer across the portfolio, including broadening our product offering.

 

The Group's in-house Portfolio Management teams have proactive engagement with occupiers to understand their occupational needs and requirements with a focus on retaining income, including through our annual occupier survey.

 

Our Director of Workplace and Innovation is responsible for keeping the Board up to date on market developments and incorporating innovation in the GPE portfolio.

 

We have had another strong year of leasing, completing 46 new lettings and securing £14.4 million of rent at an 8.8% premium to March 2019 ERV's, whilst continuing the successful roll-out of our flexible space offering. We have also continued to capture reversion across the portfolio and, coupled with the leasing activity, this has helped drive like-for-like Group rent roll up by 3%.

 

Over the past twelve months, our flexible office space has increased from 87,600 sq ft to 219,600 sq ft, or 11% of our office portfolio, and we are also currently appraising a further 152,200 sq ft of flexible space across the portfolio. After the success of our co-working arrangement with Runway East at New City Court, SE1, we expanded our co-working arrangement with a new flexible office partnership arrangement with Knotel for 82,300 sq ft at City Place House, EC2. In addition, we have committed 16,300 sq ft to our new Flex+ space at Dufours Place, W1, which will provide occupiers with added service provision as well as communal facilities such as a courtyard and ground floor café.

 

During the year, we created our Occupier Services and Property Services teams to reflect our focus on customer service delivery and the changing nature of the occupier environment, whilst also ensuring the structure meets the needs of our growing portfolio, in particular given our upcoming development completions. We also commissioned an independent customer satisfaction survey to update our understanding of how our occupiers view their buildings and the services we provide. Encouragingly, our Net Promoter Score increased from +17.5 in 2017 to +25.3 in 2019, materially ahead of our peer group which scored +12.9.

 

Poor capital allocation decisions

 

We make poor decisions regarding the allocation of capital such that we buy, sell, hold or develop the incorrect buildings resulting in inadequate investment returns.

 

Link to strategic priorities

Prepare the pipeline; Progress sustainability agenda; Continue to grow flex offer

 

Directional travel of net risk movement over the last 12 months

No change

 

Regular reviews conducted of individual property IRRs, including quarterly review of individual property dashboards, and market generally.

 

Weekly investment meetings held and regular dialogue maintained with key intermediaries.

 

Portfolio Management, Development and Leasing quarterly updates to Executive Committee with reporting at each scheduled Board meeting.

 

Strategic Review forecast on an asset-by-asset basis provides a business plan for each individual property which is reviewed against the performance of the business as a whole.

 

Detailed due diligence processes in place to help ensure appropriate returns.

 

With limited availability of attractively priced acquisition opportunities and the depth of opportunity in our existing portfolio, we made no acquisitions in the year. However, taking advantage of strong investor demand for well let, attractively located properties, we made sales of £73 million in the year.

 

We also successfully completed our £200 million share buyback, meaning that we have now returned more than £615 million of surplus equity to shareholders since 2017, whilst retaining the lowest loan to value ratio in the UK REIT sector.

 

Health and safety

 

A serious health and safety incident (including by our contractors) could result in loss of life or serious injury and financial and reputational damage to GPE. Furthermore, significant changes in health and safety regulations driven by government intervention following events such as the Grenfell Tower fire may increase costs of compliance and/or risks of non-compliance.

 

Link to strategic priorities

COVID-19 response; Deliver and lease committed schemes; Prepare the pipeline; Progress sustainability agenda; Further embed values

 

Directional travel of net risk movement over the last 12 months

No change

 

Formal quarterly reporting on health and safety to the Executive Committee and regular reporting to the Board, including on progress against new Health and Safety strategy.

 

Regular site health and safety checks undertaken by Executive Committee members, Development and Project Management team members and third parties.

 

Pre-qualification and competency checks undertaken for all contractors and consultants appointed.

Formal reporting on near misses/significant incidents and accidents.

 

Annual cycle of health and safety audits.

 

Online health and safety management system in place for business.

 

Comprehensive fire safety management procedures in place.

 

We continue to focus on ensuring that we have a best in class and proactive health and safety culture at GPE, which we reinforced during the year with the recruitment of a new Head of Health and Safety. During the year, following Board approval, we launched a new Health and Safety strategy, with the goal of embedding a proactive approach to health and safety across our business and with our supply chain partners which goes beyond legal compliance. The main aim was to create an integrated approach, with each individual in the business having the confidence to take ownership of health and safety. We have also enhanced our health and safety management system, integrating systems between our development, occupier and property services teams to improve communication. All employee-related health and safety information has been updated and incorporated on our intranet, complete with case studies of health and safety leadership in the business. We instigated a programme of senior leadership team health and safety tours of our development sites and managed portfolio with a number of inspections taking place during the year.

 

Our change in approach is also being reflected in how we measure health and safety performance incorporating the use of both reactive measures, such as accident reporting and outcomes from accident investigation, as well as more proactive health and safety indicators such as positive health and safety observations and the implementation of control measures. We are also supporting our occupiers, rolling out occupier fire safety monitoring checks to help provide information on changing expectations on fire safety across the industry.

 

The COVID-19 outbreak has required us to put additional health and safety processes in place for our employees, occupiers and suppliers. We have followed Government guidelines from the start of the outbreak, supported our employees in their transition to home working, worked with our suppliers to ensure that essential building maintenance could be carried out safely and introduced additional cleaning measures and social distancing protocols to reassure our occupiers.

 

The Group had six reportable accidents during the year. Where accidents do occur, we work with our supply chain on accident investigation to understand lessons learned and opportunities for improvement, to consider how the work could have been set up differently and to understand how, as a client, we can better support our suppliers.

 

Cyber security and infrastructure failure

 

A cyber attack or infrastructure failure could lead to business or network disruption within our portfolio or loss of occupier data. This could have a significant impact on flex+ occupiers to which we provide increased infrastructure support and high risk occupiers who may seek to recoup damages from GPE, leading to potential direct regulatory fines and reputational damage.

 

Link to strategic priorities

COVID-19 response; Deliver and lease committed schemes; Prepare the pipeline; Progress sustainability agenda; Further embed values; Continue to grow flex offer

 

Directional travel of net risk movement over the last 12 months

Increasing

 

IT and cyber security updates are regularly reported to the Executive Committee and the Board.

A head office and portfolio IT risk register is maintained.

 

The Group's IT Business Continuity Plan is regularly reviewed and tested and recovery of data at off-site recovery centre is tested during the year.

 

Regular testing of IT security is undertaken including penetration testing of key systems.

The Group's data is regularly backed up and replicated.

 

Employee awareness training on cyber risk is undertaken regularly. Cyber risk insurance is in place.

Each building has a bespoke Emergency Action Plan, maintaining appropriate systems to mitigate any infrastructure failure.

 

 

Given the increased incidence of attempted cyber attacks on UK businesses, we have continued to invest time and resource into our cyber security measures, both in our head office and across our portfolio.

 

APPENDIX B

Directors' responsibility statement

 

The following statement is extracted from the 2020 Annual Report and Accounts and is repeated here for the purposes of compliance with DTR 6.3.5R.  This statement relates solely to the 2020 Annual Report and Accounts and is not connected to the extracted information set out in this announcement.

We confirm that to the best of our knowledge:

· the financial statements, prepared in accordance with the relevant financial reporting framework, give a true and fair view of the assets, liabilities, financial position and profit or loss of the Company and the undertakings included in the consolidation taken as a whole;

· the Strategic Report includes a fair review of the development and performance of the business and the position of the Company and the undertakings included in the consolidation taken as a whole, together with a description of the principal risks and uncertainties that they face; and

· the Annual Report and financial statements, taken as a whole, are fair, balanced and understandable and provide the information necessary for shareholders to assess the Company's position, performance, business model and strategy.

This responsibility statement was approved by the Board of Directors and is signed on its behalf by:

Toby Courtauld Nick Sanderson

Chief Executive   Finance and Operations Director

9 June 2020                             9 June 2020


This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
ACSSEFFSLESSESM
UK 100

Latest directors dealings