Drilling Update at Tjate

RNS Number : 0206B
Jubilee Platinum PLC
11 August 2008
 



11 August 2008 


AIM: JLP

JSE: JBL

Registration number: 4459850

ISIN: GB0031852162

JUBILEE PLATINUM PLC

('Jubilee' or 'the Company')


Update on drilling programme at the Tjate project 



Jubilee Platinum, the AIM quoted and JSE Limited listed mining exploration and development Company with a focus on platinum group metals (PGM) in South Africa, is pleased to announce recently received results from six new boreholes on the Tjate project, DT15, DT17, DT18, DT19, DT20 and DT23, These boreholes are part of the Company's accelerated drilling programme at the Tjate Project. 


Highlights 


  • All six boreholes intersected the Merensky Reef (MR) at expected projected depths, with grades and thicknesses generally in line with the variability expected for this reef. 


  • Borehole DT20 targeted the UG2 reef as well as the MR and intersected both reefs at expected target depths


  • Borehole DT23 intersected exceptionally high assays in the motherhole (12.04 g/t 3PGE + Au) (combined platinum, palladium, rhodium and gold) and the two deflections (7.46 g/t 3PGE + Au and 18.03 g/t 3PGE+Au respectively) giving a weighted average assay for the hole of 12.52 g/t 3PGE + Au over 0.98m apparent thickness.  


  • DT15 (mother hole and two deflections) MR plus contiguous footwall assayed a weighted average of 4.04 g/t 3PGE+Au, over combined 1.96m apparent thickness.


  • One deflection in DT15 intersected 3.8m apparent thickness of mineralised MR and contiguous footwall assaying weighted average 5.40 g/t 3PGE+Au including 0.98m MR assaying 6.31 g/t 3PGE+AU and 1.83m of footwall assaying weighted average 7.80g/t 3PGE+Au with associated base metals assaying 0.57% nickel (Ni) and 0.20% copper (Cu).



Detailed results are provided in Tables 1 and 2 below


Preliminary results from an independent structural modelling exercise conducted as part of phase1 of the current feasibility study programme suggest that the Merensky Reef in the area identified occurs as two distinct types:  


  • a wide type MR thicker than 1.84m; and 


  • a thinner type  MR approximately 1.01m thick.


The wide type MR represents more than 70% of the identified MR tonnage and accounts for 77% of the 3PGE+Au content. If the exploration programme proves this assumption to be correct then overall mining costs could be affected very favourably.



Colin Bird, CEO of Jubilee and Tjate Project Manager said: 'These new results continue to confirm the expected consistency of grade and continuity at depth of the Merensky and UG2 reefs. The newly identified thicker areas, if they continue, could have a significant impact on the project economics. The accelerated drilling is rapidly advancing the project towards a definitive resource estimate.' 



Table 1      Summary of Selected Merensky Reef and UG2 results 


Borehole

Reef 

Intersected 

Depth 

m

Weighted averages

Apparent Thickness m

3PGE+Au 

g/t

Copper 

%

Nickel

%

DT15

Merensky

1070

1.01

3.78

0.11

0.15

DT17 

Merensky

770 

1.55 

4.74

0.07

0.14

DT18 

Merensky

1144 

1.05

4.69

0.09

0.09

DT19 

Merensky

 1023

1.00

3.99

0.08

0.14

DT20 

Merensky

 1141

1.02

2.26

0.04

0.90

DT20 

UG2

1518

1.26

4.17

na

na

DT23 

Merensky

993

0.98

12.52

0.13

0.22

na not applicable



Table 2     Detailed drilling results for boreholes in Table 1 



Borehole & deflections

Thickness

m

Au 

g/t

Pt 

g/t

Pd 

g/t

Rh 

g/t

Cu 

%

Ni

%

3PGE + Au

DT15 Motherhole 

1.06

0.49

1.25

0.51

0.06

0.11

0.11

2.31

Deflection 4

0.98

0.37

3.48

2.25

0.21

0.15

0.26

6.31

Deflection 5

1.00

0.37

1.75

0.66

0.07

0.08

0.10

2.85

wtd average

1.01

0.41

2.13

1.12

0.11

0.11

0.15

3.78










DT15  (footwall)









Motherhole

0.40

0.01

1.93

0.41

0.19

0.01

0.02

2.53

Deflection 4

1.83

0.11

4.25

3.09

0.35

0.20

0.57

7.80

Deflection 5

0.87

0.33

1.12

1.07

0.09

0.01

0.04

2.62

wtd average

1.03

0.16

3.07

2.18

0.26

0.12

0.35

5.66

DT17 Motherhole

1.63

0.38

4.40

2.11

0.16

0.05

0.10

7.05

Deflection 1

1.61

0.26

2.65

1.17

0.14

0.08

0.16

4.21

Including 

1.42

0.23

1.65

0.71

0.10

0.07

0.15

2.70

wtd average

1.55

0.29

2.96

1.36

0.13

0.07

0.14

4.74










DT18 Motherhole

0.96

0.15

1.39

0.54

0.07

0.04

0.06

2.16

Deflection 3

1.75

0.45

3.17

1.78

0.13

0.12

0.23

5.53

Including 

1.12

0.52

3.37

2.00

0.12

0.12

0.26

6.01

Deflection 5

1.79

0.34

2.99

1.34

0.16

0.08

0.14

4.83

Including 

1.06

0.39

3.42

1.65

0.16

0.09

0.16

5.62

wtd average

1.05

0.36

2.78

1.43

0.12

0.09

0.17

4.69










DT19 Motherhole

1.01

0.27

1.75

0.94

0.08

0.06

0.10

3.03

Deflection 1

1.01

0.35

2.02

0.98

0.12

0.08

0.16

3.47

Deflection 2

0.99

0.43

3.22

1.70

0.14

0.10

0.16

5.49

wtd average

1.00

0.35

2.32

1.20

0.11

0.08

0.14

3.99










DT20 Merensky 









Motherhole

1.04

0.07

1.19

0.46

0.07

0.04

0.08

1.79

Deflection 4

1.03

0.11

1.65

0.50

0.12

0.04

0.12

2.39

Deflection 5

0.99

0.08

1.62

0.78

0.14

0.03

0.07

2.62

wtd average

1.02

0.09

1.48

0.58

0.11

0.04

0.09

2.26










DT20 UG2









Motherhole

1.29

0.08

2.35

2.25

0.46

0.02

0.04

5.14

Deflection 1

1.21

0.06

1.39

1.20

0.26

0.02

0.05

2.91

Deflection 2

1.28

0.07

1.98

1.90

0.44

0.02

0.03

4.39

wtd average

1.26

0.07

1.92

1.80

0.39

0.02

0.04

4.17










DT23 Motherhole

0.95

0.82

6.72

4.16

0.35

0.18

0.28

12.04

Deflection 1

1.00

0.40

4.29

2.47

0.31

0.11

0.21

7.46

Deflection 3

1.00

1.00

10.71

5.72

0.60

0.10

0.17

18.03

wtd average

0.98

0.74

7.25

4.11

0.42

0.13

0.22

12.52



Note to Editors


The Tjate Project comprises three contiguous farms, totalling 5,143 hectares in the eastern Bushveld: Dsjate, Fernkloof and Quartz Hill. The farms are downdip of Impala Platinum's operating Marula platinum mine and of Anglo Platinum's developing Twickenham platinum mine. Jubilee, which last year completed a positive scoping study, has announced its decision to advance the Project to feasibility study. The Tjate drilling programme is now being accelerated with eight drill rigs on site.  


SGS Lakefield Research Africa in Johannesburg carried out the analyses of the borehole core samples. This laboratory is SNAS TO169 accredited.


For further information please contact:


Colin Bird                                    Nick Rome/Michael Kinirons

Jubilee Platinum plc                     Bishopsgate Communications Ltd 

Tel: +44 (0) 20 7584 2155            Tel +44 (0) 20 7562 3350


Jan Bosch/Paul Brett

Investec Bank UK Limited

Tel +44 (0)20 7597 5000


This information is provided by RNS
The company news service from the London Stock Exchange
 
END
 
 
DRLILFIDTTITIIT
UK 100

Latest directors dealings