Drilling Update

RNS Number : 9893W
Petroneft Resources PLC
07 August 2018
 

PetroNeft Resources plc ('PetroNeft' or 'the Company')

 

Drilling Update

 

PetroNeft (AIM: PTR) an oil and gas exploration and production company operating in the Tomsk Oblast, Russian Federation, and 50% owner and operator of Licences 61 and 67 is pleased to announce that it has commenced drilling of the C-4 well at Cheremshanskoye.

 

Licence 67

Drilling of the Cheremshanskoye No. 4 (C-4) well has commenced in recent days. The C-4 well is designed to further delineate and de-risk the Cheremshanskoye field in advance of field development.  Three prior wells have been drilled on the field, most recently in 2011 by PetroNeft and oil has been identified and tested in 4 different intervals in the field: the Lower Jurassic J-14 and J-13 intervals and the Upper Jurassic J1-1 and J1-3 intervals.

 

The initial Cheremshanskoye wells were drilled without the benefit of modern 3D seismic data which was acquired in 2014. The C-4 well is designed to test a large portion of the field which is structurally higher than the previous wells based on this recently acquired 3D seismic data and thus has the potential to significantly increase the potential recoverable reserves.

 

The primary reservoir target is the J1-3 interval which is approximately 10 m in thickness throughout the region and is the primary reservoir at the adjacent producing Lomovoye field operated by TomskNeft.  The J1-3 interval tested 240 bopd of light oil (40°API) on natural flow in the adjacent Lomovoye No. 208 well. 

 

The secondary reservoir target is the J14 interval which had a natural flow of 33 bopd of light oil (49°API) from 6.5 m of net pay in the 2011 Cheremshanskoye No. 3 well. 

 

With a number of horizons targeted by this well, Cheremshanskoye has the potential to be larger than the Sibkraeyevskoye oil field at Licence 61 and therefore add significant value.

 

The well is being drilled under the joint venture agreement with our partner for Licence 67, Arawak Energy on a 50:50 basis. It is expected to be completed in about two months.

 



 

 

Dennis Francis, Chief Executive Officer of PetroNeft Resources plc, commented: 

"We are pleased to have commenced drilling the C-4 well which we feel has great potential as it will test multiple targets up-dip from nearby wells that have already tested oil in the same intervals.  This is the first well to be drilled by the Company based on the modern 3D seismic data acquired in 2014."

 

 

For further information, contact:

Dennis Francis, CEO, PetroNeft Resources plc   

+1 713 988 2500

Paul Dowling, CFO, PetroNeft Resources plc     

+353 1 647 0280

John Frain/Brian Garrahy, Davy (NOMAD and Joint Broker)         

+353 1 679 6363

Henry Fitzgerald-O'Connor, Canaccord Genuity Limited (Joint Broker)

+44 207 523 8000

Joe Heron / Douglas Keatinge, Murray Consultants

+353 1 498 0300

 

The information contained in this announcement has been reviewed and verified by Mr. Dennis Francis, Director and Chief Executive Officer of PetroNeft, for the purposes of the Guidance Note for Mining and Oil & Gas Companies issued by the London Stock Exchange in June 2009. Mr. Francis holds a B.S. Degree in Geophysical Engineering and a M.S. Degree in Geology from the Colorado School of Mines. He has also graduated from the Harvard University Program for Management Development. He is a member of the American Association of Petroleum Geologists and the Society of Exploration Geophysicists. He has over 40 years' experience in oil and gas exploration and development.

End

 

 

 


This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
DRLLFFVFTTIRIIT
UK 100

Latest directors dealings