22 October 2020
Resolute Mining Limited
(Resolute or the Company)
Quarterly Activities Report
for the period ended 30 September 2020
· Consistent safety performance with Total Recordable Injury Frequency Rate (TRIFR) of 1.12
· Total gold production of 87,303 ounces (oz), a 19% reduction compared to the June quarter principally due to the impact of industrial action at Syama, as previously announced
· Realised gold price for the quarter averaged US$1,694/oz compared to the average spot price of US$1,913/oz
· All-In Sustaining Cost (AISC) of US$1,284/oz for the quarter bringing year to date AISC to US$1,095/oz
· Syama Sulphide recovery rate of 79.5%, similar to the prior quarter
· Tabakoroni Pre-Feasibility Study released with a 22% increase in Mineral Resource to 1.04 million ounces (Moz)
· Syama conciliation agreement reached with Union confirms cancellation of further planned strike action
· Mali interim government established and ECOWAS sanctions lifted
· Cash and bullion of US$106 million with net debt of US$234 million at 30 September 2020
· CY20 production is expected at the lower end of the guidance of 400,000oz to 430,000oz and costs are expected at the higher end of guidance of US$980/oz and US$1,080/oz
Resolute Mining Limited (Resolute or the Company) (ASX/LSE: RSG) presents its Quarterly Activities Report for the period ended 30 September 2020.
Resolute's performance during the September quarter reflects the consistent performance of the Mako Gold Mine (Mako) in Senegal and the impact of industrial action at the Syama Gold Mine (Syama) in Mali during the quarter. Extensive negotiations with Resolute site-based employees, the Union and Government Officials has resulted in a conciliation agreement and the cancellation of further planned strike action, as announced on 28 September 2020. This provides a solid basis for Syama operations to progress in line with expectations during the December quarter.
An interim government has now been established in Mali following the Coup on 18 August 2020. This government has the support of ECOWAS which has lifted all previously imposed sanctions on Mali. As a result, supply links into Mali have re-opened and transportation of key consumables to Syama has been re-established.
Resolute's safety performance has remained at consistently commendable levels during this period of COVID-19, industrial and political disruption.
Operations at Mako and Syama are currently performing well and have achieved throughput and recovery at forecast levels during October. In addition, higher grade oxide material from the development of the Cashew open pit will be the primary source of Syama oxide ore in the December quarter. Full year results are therefore expected to meet the Company's guidance, with gold production at the lower end and costs at the upper end of the revised guidance range.
The consolidation of Resolute's key operational performance measures compared to the previous quarter and prior comparable quarter are set out in the table below:
Group Level Summary |
Units |
September 2020 Quarter |
June |
Change |
September |
Mining |
|||||
Ore Mined |
t |
1,169,921 |
1,548,640 |
(24%) |
1,258,581 |
Mined Grade |
g/t Au |
2.32 |
2.44 |
(5%) |
2.29 |
Processing |
|||||
Ore Processed |
t |
1,320,046 |
1,439,599 |
(8%) |
1,727,638 |
Processed Grade |
g/t Au |
2.24 |
2.61 |
(14%) |
1.85 |
Recovery |
% |
87.4 |
88.6 |
(1%) |
87.3 |
Gold Recovered |
oz |
83,206 |
107,070 |
(22%) |
90,681 |
Gold Poured |
oz |
87,303 |
107,183 |
(19%) |
103,201 |
Sales |
|||||
Gold Sold |
oz |
90,900 |
110,660 |
(18%) |
127,265 |
Average Realised Price |
US$/oz |
1,694 |
1,446 |
17% |
1,362 |
Cost |
|||||
Operating Cost |
US$/oz |
1,065 |
849 |
(25%) |
984 |
All-In Sustaining Cost (AISC) |
US$/oz |
1,284 |
1,033 |
(24%) |
1,202 |
Table 1 : Resolute Group Operational Performance Summary
Refer to the Appendix for a full summary of Resolute's production and costs in the September quarter and year to date (9 months ended 30 September 2020).
The Company's Total Recordable Injury Frequency Rate (TRIFR) as at 30 September 2020 was 1.12 relative to 2.09 at 31 December 2019. Resolute continues to maintain effective infection control measures to protect employees and contractors at our sites and offices from the COVID-19 pandemic. Critical Hazard Management Standards have been developed to drive improved mitigation of critical health and safety risks across the Group.
A comprehensive response plan is in place to manage the COVID-19 pandemic at all company locations which includes, in addition to hygiene, PPE, and social distancing measures, testing and mandatory isolation procedures for positive cases amongst the workforce. The implemented protocols prioritise the health and safety of the workforce and have enabled operational continuity with currently no negative impacts on gold production. Further information pertaining to the Company's response is available at https://www.rml.com.au/covid-19/covid-19-update/.
Gold production at Syama during the quarter totalled 46,622oz at an AISC of US$1,628/oz. The operational performance for Syama is set out in Table 2 below.
Period |
Ore Mined |
Head Grade |
Ore Milled |
Head Grade |
Recovery |
Total Gold Production |
Cash Cost |
AISC |
|
(t) |
(g/t) |
(t) |
(g/t) |
(%) |
(oz) |
(US$/oz) |
(US$/oz) |
Mar Quarter |
1,218,949 |
2.55 |
829,176 |
2.89 |
82.7 |
57,532 |
938 |
1,076 |
June Quarter |
863,612 |
2.47 |
920,458 |
2.57 |
86.2 |
63,705 |
950 |
1,113 |
Sept Quarter |
506,702 |
2.37 |
835,487 |
2.00 |
83.3 |
46,622 |
1,446 |
1,628 |
CY20 |
2,589,263 |
2.49 |
2,585,121 |
2.49 |
84.1 |
167,859 |
1,084 |
1,243 |
Table 2: Syama Operational Performance
Period |
Mining |
Processing |
Cost |
|||||
Ore |
Grade |
Ore (t) |
Grade |
Recovery |
Gold Poured (oz) |
Operating |
AISC |
|
Mar 20 Quarter |
519,898 |
2.61 |
441,542 |
2.62 |
75.2 |
21,430 |
1,475 |
1,629 |
Jun 20 Quarter |
492,863 |
2.84 |
536,791 |
2.67 |
80.0 |
35,249 |
1,106 |
1,333 |
Sept 20 Quarter |
506,702 |
2.37 |
495,947 |
2.38 |
79.5 |
31,074 |
1,545 |
1,766 |
YTD |
1,519,463 |
2.55 |
1,474,280 |
2.55 |
78.3 |
87,753 |
1,351 |
1,559 |
Table 3: Sulphide Production and Cost Summary
Underground mining tonnages increased by 3% compared to the June quarter despite disruptions from industrial action.
Syama sulphide processing and production performance for the quarter was impacted by the industrial action in September, which resulted in lower mill throughput while head grades were lower as the underground mine encountered lower grade ore zones in establishing the cave on the hangingwall of 1055mRL level, the fourth operating level within the mining sequence.
Plant recovery was stable averaging 79.5%. This reflected a consolidation of improvements made in the June quarter but was also impacted by disruption from the industrial action. Further improvement is expected in the December quarter as higher-grade ore is processed.
Underground sulphide ore stocks at Syama increased from 491,000t to 501,000t at an average grade of 2.36 grams per tonne of gold (g/t Au). The large quantity of run-of-mine stockpiled underground ore at Syama provides significant operational flexibility in managing the mining and processing rates.
Period |
Mining |
Processing |
Cost |
|||||
Ore |
Grade |
Ore (t) |
Grade |
Recovery |
Gold Poured (oz) |
Operating |
AISC |
|
Mar 20 Quarter |
699,053 |
2.50 |
387,633 |
3.21 |
91.2 |
36,101 |
620 |
747 |
Jun 20 Quarter |
370,748 |
1.98 |
383,667 |
2.44 |
95.0 |
28,457 |
757 |
840 |
Sept 20 Quarter |
- |
- |
339,540 |
1.44 |
89.0 |
15,548 |
1,250 |
1,354 |
YTD |
1,069,800 |
2.32 |
1,110,841 |
2.41 |
91.8 |
80,106 |
791 |
899 |
Table 4: Oxide Production and Cost Summary
Syama oxide operations reflect the processing of low grade stock-piles following the completion of open pit mining activities at Tabakoroni in the June quarter, Syama industrial action and seasonal material handling issues associated with sticky ore.
A new satellite open pit operation at the Cashew prospect commenced late in the September quarter, which will provide higher grade oxide material for processing in the December quarter. Exploration continues to identify opportunities for further satellite open pit operations to augment the existing stockpiles.
Significant stockpiles of 3.0 million tonnes (Mt) of oxide ore at an average grade of 1.29g/t Au have been built and will be processed over 2021 and 2022.
Please see image in the full version of the announcement at www.rml.com.au
Figure 1: Establishment works at the Cashew mining operation
Mako |
Mining |
Processing |
Cost |
|||||
Ore |
Grade |
Ore (t) |
Grade |
Recovery |
Gold Poured (oz) |
Operating |
AISC |
|
Mar 20 Quarter |
719,097 |
2.28 |
558,839 |
2.67 |
92.8 |
42,185 |
562 |
694 |
Jun 20 Quarter |
685,028 |
2.37 |
519,141 |
2.69 |
92.8 |
43,478 |
699 |
821 |
Sept 20 Quarter |
663,219 |
2.27 |
484,559 |
2.65 |
94.5 |
40,681 |
627 |
810 |
YTD |
2,067,343 |
2.31 |
1,562,539 |
2.67 |
93.3 |
126,344 |
630 |
775 |
Table 5: Mako Production and Cost Summary
Mako continues to perform reliably, with an increase in mining volumes reflecting the arrival of a new mining fleet to accelerate waste stripping and the easing of shortages of operating personnel in the initial stages of the COVID-19 pandemic.
Throughput was slightly lower than the June quarter following a planned shut down for a SAG mill reline in August.
Stockpiles in excess of 2.3Mt of ore at an average grade of 1.2g/t Au are available for processing at Mako.
Please see image in the full version of the announcement at www.rml.com.au
Figure 2: Open pit operations at Mako
Strategic update
Resolute continues to progress the strategic review of the Bibiani Gold Mine (Bibiani) in Ghana. The Company continues to evaluate plans to recommission the mine, assess capital requirements, evaluate funding alternatives, and engage with third parties interested in acquiring the project.
The Company's exploration and drilling programs continued throughout the September quarter at Syama and recommenced in Senegal and Guinea. Resolute's exploration field programs in Senegal, Côte d'Ivoire and Guinea were paused during the June quarter due to logistical impacts of the COVID-19 pandemic, with border closures and travel restrictions imposed by respective governments. These programs restarted after restrictions eased in August.
Drill programs using reverse circulation (RC) and diamond rigs continued in multiple locations along the Syama greenstone belt, focusing on increasing the oxide resources to extend the life of the Syama oxide operation. Diamond drilling continues at Tabakoroni to extend the sulphide mineralisation down dip and along strike.
Resolute announced the results of the ongoing exploration program and an updated Mineral Resource at Tabakoroni subsequent to quarter end, on 14 October 2020 (see ASX Announcement dated 14 October 2020). The Tabakoroni Mineral Resource was upgraded to 7.4Mt at 4.4g/t Au at a 1.5g/t Au cut off for a total of 1.04Moz, an increase of 22% over the previous estimate (see ASX Announcement dated 29 April 2019).
The diamond drilling program at Tabakoroni has moved focus to explore for extensions of mineralisation down dip and along strike to build on the already 1Moz resource. Results to date from this drilling confirm extensions to the mineralisation, with encouraging high-grade gold intersections including excellent grades of 5m @ 116.3g/t Au in hole TARD773W located deep underneath the Tabakoroni South open pit (Figure 3). Notable intersections include:
TADD730 9m @ 9.6g/t Au from 185m
TADD732 4m @ 6.4g/t Au from 188m
TADD734 4m @ 72.8g/t Au from 209m
TADD778 17m @ 3.1g/t Au from 250m
TADD780 7m @ 10.5g/t Au from 405m
7m @ 4.8g/t Au from 356m
TADD781 9m @ 5.2g/t Au from 443m
TARD773W 5m @ 116.3g/t Au from 222m
These drill results prove the down dip extensions of the mineralisation at Tabakoroni is sufficient to support underground mining operations. Diamond drilling will continue to expand the mineral resources at Tabakoroni.
Please see image in the full version of the announcement at www.rml.com.au
Figure 3: Tabakoroni Longitudinal Section with Resource Model and drilling pierce points
RC drilling programs undertaken in the first quarter of 2020 identified zones of shallow oxide mineralisation to the east of the Tabakoroni pit and adjacent to the Tabakoroni "Porphyry Splay" pit. These encouraging results have been followed up with programs of infill RC drilling to provide sufficient hole density for resource estimation.
Recent drilling has continued the positive results in the area between the Tabakoroni pit and the "Porphyry Splay" pit (Figure 4). Better results include:
TARC767 8m @ 5g/t Au from 61m
TARC772 7m @ 6.7g/t Au from 33m
TARC788 17m @ 1.9g/t Au from 84m
TARC791 4m @ 52.5g/t Au from 49m
TARC795 5m @ 6.5g/t Au from 64m
TARC799 14m @ 2.5g/t Au from 21m
TARC803 4m @ 7.1g/t Au from 31m
TARC805 10m @ 4.2g/t Au from 104m
Mining during 2020 at the "Porphyry Splay" pit extracted over 40,000oz from a small shallow open pit which was in excess of expectations. The mineralisation which was high-grade but discontinuous in resource drilling, proved to be more coherent after grade control drilling was completed. This led to the overperformance of the pit in both tonnes and grade.
The overperformance of the open pit mining at the "Porphyry Splay" pit encouraged the exploration team to re-evaluate the mineralisation interpretation of the Tabakoroni area and focus on resource remodelling. This work is in progress and the team is confident that the mineralisation footprint will be expanded sufficiently to support a restart to open pit mining activities.
It is expected that the small pit at "Porphyry Splay" will be deepened and expanded laterally to access newly modelled gold mineralisation. The ongoing drilling program continues to expand the mineralisation footprint around the current pits at Tabakoroni.
Please see image in the full version of the announcement at www.rml.com.au
Figure 4: Tabakoroni North Pit and "Porphyry Splay" pit, drillhole locations on geology and drone imagery
Diamond drilling commenced in August 2020 with a program targeting the down dip extensions of the mineralisation in the main Petowal orebody. Drilling is progressing well and results are expected in the coming months.
Resolute is earning into a Joint Venture with Toya Gold on the Kourouba project located west of Kankan in Guinea. The Kourouba JV permits cover a portion of the Keniero Greenstone Belt which lies on the western margin of the Siguiri Basin.
The Kourouba project has had limited surface exploration to date and is untested by drilling. A surface geochemistry program has outlined a gold in soil anomaly greater than 4km in strike, which is currently host to widespread artisanal mining activity.
First pass air core drilling commenced in August at Kourouba Hill to test the geochemical soil anomaly and active artisanal workings. Drilling to date has intersected ultramafic komatiites and sediments with quartz veining and sulphides in some holes, with results expected in the next quarter.
Syama Power Upgrade Project
Construction of the new solar hybrid modular power station at Syama continued during the September quarter in partnership with Aggreko plc (Aggreko). Key milestones achieved this quarter include continuation of civil/construction works, shipment of generating engines to the port of Abidjan in Côte d'Ivoire, completion of fuel treatment and storage at the Syama power plant along with commencing the commissioning of the battery storage system. In addition, civil works and construction of the storage tank are well advanced for the heavy fuel oil (HFO) storage. Progress of construction is shown in Figure 5 below.
Please see image in the full version of the announcement at www.rml.com.au
Figure 5: Earthworks continues at the new Syama Solar-Hybrid Power Station and HFO fuel Farm
Over the next quarter, commissioning of the battery storage system and first engine is expected to be completed. At current fuel oil prices, the projected cost of energy remains below US$0.15 per kilowatt hour (kWh). The current cost of energy at Syama ranges from US$0.23/kWh to US$0.26/kWh based on prevailing diesel prices. The new power station will deliver cost effective, environmentally friendly, capital efficient power and long-term electricity cost savings of up to 40% while reducing carbon emissions by approximately 20% (see ASX Announcement dated 18 December 2019). The new power plant is being funded and operated by Aggreko with limited capital contribution from Resolute.
Tabakoroni Sulphide Pre-Feasibility Study
On 14 October 2020 Resolute announced an updated Mineral Resource Estimate at Tabakoroni which had enabled completion of a Pre-Feasibility Study (PFS) to assess the potential for a new underground gold mine at Tabakoroni (see ASX announcement dated 14 October 2020).
The Tabakoroni Mineral Resource has been upgraded to 7.4Mt at 4.4g/t Au at a 1.5g/t Au cut off for a total of 1.04Moz, an increase of 22% over the previous estimate (see ASX Announcement dated 29 April 2019). The PFS has established a mining schedule, consisting of Indicated and Inferred Resources, of 2.4Mt at 4.9g/t containing 387koz. Gold production is expected to average approximately 80,000oz per annum over an initial four-year mine life. The AISC is estimated to be US$974/oz. The underground operation will require a capital investment of US$86 million and total project capital of US$118 million. It is planned to modified the Syama oxide processing infrastructure and commence following completion of Syama oxide operations.
The Tabakoroni underground deposit remains open, both along strike and at depth with ongoing exploration success expected to expand Mineral Resources and extend mine life.
Cash, Bullion and Listed Investments
Description |
September 2020 Quarter (US$m) |
June 2020 Quarter (US$m) |
Cash |
85.8 |
62.3 |
Bullion |
20.6 |
25.2 |
Cash and Bullion |
106.4 |
87.5 |
Liquid Assets |
|
|
Promissory Note |
36.2 |
34.9 |
Listed Investments |
44.8 |
35.3 |
Total Cash, Bullion and Liquid Assets |
187.4 |
157.7 |
Table 6: Total Cash, Bullion and Liquid Assets |
The key movements in cash and market value of bullion balances during the quarter are summarised in Figure 6.
Please see image in the full version of the announcement at www.rml.com.au
Figure 6: Quarterly Cash and Bullion Movements in US dollars
Total borrowings at 30 September 2020 were US$340.8 million comprising US$300.0 million drawn on the Company's US$300.0 million senior debt facility and revolving credit facility, overdraft facilities with the Bank of Mali of US$32.7 million and asset finance facilities of US$8.1 million.
Net debt after taking into account cash and bullion balances of US$106.4 million was US$234.4 million at 30 September 2020 (30 June 2020: US$220.0 million). The increase in net debt primarily reflects the reduced production at Syama in the September quarter due to the industrial action impacting on the Company's operating cash flows.
Tax
During the quarter Resolute's Mali subsidiary Société des Mines de Finkolo S.A. (SOMIFI) paid XOF10 Billion (US$17m) to the Mali Tax Authorities as the final payment of SOMIFI's 2019 Income Tax amount of XOF12 Billion (US$20m).
Further to the CY19 Full Year and CY20 Half Year Financial Report disclosure on the Mali Tax Authorities Income Tax and Value Added Tax (VAT) demand on Resolute's Mali subsidiary Société des Mines de Syama S.A. (SOMISY), in country tax and legal advice has been sought with a formal response submitted to the Mali Tax Authorities on 19 June 2020. The formal response outlined SOMISY's objections to the income tax demands and the calculations on the VAT withholding demand. However, the formal response from the Mali Tax Authorities that was expected by the end of August 2020 has been delayed due to the political situation. Resolute continues to work with its in-country tax and legal advisors in engaging with the Mali Tax Authorities on their formal response.
Hedging
Resolute maintains a policy of undertaking discretionary hedging in compliance with funding obligations, which require a minimum of 30% of the next 18 months of forecast production to be hedged.
A quarterly summary of forward sales commitments is set out in the table below:
|
US Dollar Forward Sales |
|
Quarter |
Forward Price (US$/oz) |
Delivery (oz) |
December 2020 |
1,647 |
60,000 |
March 2021 |
1,576 |
30,000 |
June 2021 |
1,577 |
30,000 |
September 2021 |
1,667 |
18,000 |
December 2021 |
1,670 |
15,000 |
Total |
1,624 |
153,000 |
Table 7: Committed Hedging Forward Sales in US dollars
The Company has also placed 20,000oz of zero cash flow collars in 2021 comprising put options at US$1,600/oz and call options at US$2,300/oz .
Guidance
As announced on 28 September 2020, CY20 guidance was reinstated of between 400,000oz and 430,000oz at an AISC between US$980 and US$1,080/oz. The reinstated guidance reflects the negative impact of the industrial relations dispute in the September quarter and other uncertainties relating to the potential impacts of the coronavirus pandemic and ECOWAS sanctions. Resolute continues to maintain its reinstated guidance, with production expected to be at the lower end of the range and costs expected at the upper end of the range.
CY20 capital expenditure guidance has been allocated between non-sustaining of US$15 million, exploration and other development of US$25 million and sustaining of US$30 million (also included in AISC).
Resolute will host two conference calls for investors, analysts and media today, Thursday, 22 October 2020, to discuss the Company's Quarterly Activities Report for the period ending 30 September 2020. Both calls will conclude with a question and answer session.
Pre-Registration: The Company has arranged for participants to pre-register for each call. Pre-registering for the conference calls gives you immediate access on the day with no need to wait for an operator. A calendar invite with dial-in details will be received once participants complete the pre-registration process.
Conference Call Details
Date:
Thursday, 22 October 2020
Time: 09:00 (AWST, Perth) / 12:00 (AEDT, Sydney)
Pre-Registration Link:https://s1.c-conf.com/diamondpass/10010321-mf7hs3.html
Conference Call 1 will also be streamed live online at http://www.openbriefing.com/OB/3994.aspx
Date:
Thursday, 22 October 2020
Time: 09:00 (BST, London) / 16:00 (AWST, Perth)
Pre-Registration Link:http://s1.c-conf.com/diamondpass/10010322-712jsa.html
Conference Call 2 will also be streamed live online at http://www.openbriefing.com/OB/3995.aspx
For further information, contact:
Mr Stuart Gale
Interim CEO
Board of Directors |
Contact |
|
Mr Martin Botha, Non-Executive Chairman |
Ms Sabina Shugg, Non-Executive Director |
Stuart Gale, Interim CEO |
Ms Yasmin Broughton, Non-Executive Director |
Mr Peter Sullivan, Non-Executive Director |
|
Mr Mark Potts, Non-Executive Director |
|
Appendix
September 2020 Quarter Production and Costs (unaudited)
September 2020 Quarter |
Units |
Syama Sulphide |
Syama Oxide |
Syama Total |
Mako |
Group |
UG Lateral Development |
m |
1,319 |
- |
1,319 |
- |
1,319 |
UG Vertical Development |
m |
130 |
- |
130 |
- |
130 |
Total UG Development |
m |
1,449 |
- |
1,449 |
- |
1,449 |
UG Ore Mined |
t |
506,702 |
- |
506,702 |
- |
506,702 |
UG Grade Mined |
g/t Au |
2.37 |
- |
2.37 |
- |
2.37 |
OP Operating Waste |
BCM |
- |
59,055 |
59,055 |
1,713,765 |
1,772,820 |
OP Ore Mined |
BCM |
- |
- |
- |
239,744 |
239,744 |
OP Grade Mined |
g/t Au |
- |
- |
- |
2.27 |
2.27 |
Total Ore Mined |
t |
506,702 |
- |
506,702 |
663,219 |
1,169,921 |
Total Tonnes Processed |
t |
495,947 |
339,540 |
835,487 |
484,559 |
1,320,046 |
Grade Processed |
g/t Au |
2.38 |
1.44 |
2.00 |
2.65 |
2.24 |
Recovery |
% |
79.5 |
89.0 |
83.3 |
94.5 |
87.4 |
Gold Recovered |
oz |
30,135 |
14,046 |
44,181 |
39,025 |
83,206 |
Gold in Circuit Drawdown/(Addition) |
oz |
939 |
1,502 |
2,441 |
1,656 |
4,097 |
Gold Produced (Poured) |
oz |
31,074 |
15,548 |
46,622 |
40,681 |
87,303 |
Gold Bullion in Metal Account Movement (Increase)/Decrease* |
oz |
(177) |
(245) |
(422) |
4,019 |
3,597 |
Gold Sold* |
oz |
30,897 |
15,303 |
46,200 |
44,700 |
90,900 |
Achieved Gold Price |
US$/oz |
|
|
|
|
1,694 |
Mining |
US$/oz |
654 |
440 |
582 |
342 |
470 |
Processing |
US$/oz |
407 |
400 |
405 |
231 |
324 |
Site Administration |
US$/oz |
178 |
302 |
219 |
96 |
162 |
Stockpile Adjustments |
US$/oz |
208 |
9 |
142 |
(68) |
44 |
Gold in Circuit Movement |
US$/oz |
98 |
99 |
98 |
26 |
65 |
Operating Cost |
US$/oz |
1,545 |
1,250 |
1,446 |
627 |
1,065 |
Royalties |
US$/oz |
105 |
107 |
106 |
125 |
116 |
By-Product Credits |
US$/oz |
(3) |
(3) |
(3) |
- |
(1) |
Sustaining Capital + Other |
US$/oz |
121 |
- |
81 |
58 |
70 |
Asset Reclamation & Remediation |
US$/oz |
(2) |
- |
(2) |
- |
(1) |
Corporate Overheads |
US$/oz |
- |
- |
- |
- |
35 |
All-In Sustaining Cost (AISC) AISC is calculated on gold produced (poured) |
US$/oz |
1,766 |
1,354 |
1,628 |
810 |
1,284 |
Year-to-date 2020 Production and Costs (unaudited)
Year-to-date 2020 |
Units |
Syama Sulphide |
Syama Oxide |
Syama Total |
Mako |
Ravens-wood |
Group |
UG Lateral Development |
m |
5,510 |
- |
5,510 |
- |
- |
5,510 |
UG Vertical Development |
m |
217 |
- |
217 |
- |
- |
217 |
Total UG Development |
m |
5,727 |
- |
5,727 |
- |
- |
5,727 |
UG Ore Mined |
t |
1,519,463 |
- |
1,519,463 |
- |
- |
1,519,463 |
UG Grade Mined |
g/t Au |
2.60 |
- |
2.60 |
- |
- |
2.60 |
OP Operating Waste |
BCM |
- |
1,846,508 |
1,846,508 |
4,433,761 |
- |
6,280,269 |
OP Ore Mined |
BCM |
- |
503,323 |
503,323 |
745,308 |
- |
1,248,631 |
OP Grade Mined |
g/t Au |
- |
2.32 |
2.32 |
2.31 |
- |
2.31 |
Total Ore Mined |
t |
1,519,463 |
1,069,800 |
2,589,263 |
2,067,343 |
- |
4,656,606 |
Total Tonnes Processed |
t |
1,474,280 |
1,110,841 |
2,585,121 |
1,562,539 |
726,735 |
4,874,395 |
Grade Processed |
g/t Au |
2.55 |
2.41 |
2.49 |
2.67 |
0.50 |
2.25 |
Recovery |
% |
78.3 |
91.8 |
84.1 |
93.3 |
91.8 |
88.2 |
Gold Recovered |
oz |
94,738 |
79,355 |
174,093 |
125,254 |
10,611 |
309,958 |
Gold in Circuit Drawdown/(Addition) |
oz |
(6,985) |
751 |
(6,234) |
1,090 |
435 |
(4,709) |
Gold Produced (Poured) |
oz |
87,753 |
80,106 |
167,859 |
126,344 |
11,046 |
305,249 |
Gold Bullion in Metal Account Movement (Increase)/Decrease |
oz |
(1,398) |
810 |
(588) |
896 |
(1,989) |
(1,681) |
Gold Sold |
oz |
86,355 |
80,916 |
167,271 |
127,240 |
9,057 |
303,568 |
Achieved Gold Price |
US$/oz |
- |
- |
- |
- |
- |
1,507 |
Mining |
US$/oz |
808 |
390 |
608 |
330 |
215 |
479 |
Processing |
US$/oz |
439 |
261 |
354 |
254 |
910 |
333 |
Site Administration |
US$/oz |
184 |
175 |
180 |
88 |
226 |
143 |
Stockpile Adjustments |
US$/oz |
19 |
(38) |
(8) |
(42) |
(18) |
(22) |
Gold in Circuit Movement |
US$/oz |
(99) |
3 |
(50) |
(0) |
37 |
(26) |
Operating Cost |
US$/oz |
1,351 |
791 |
1,084 |
630 |
1,370 |
907 |
Royalties |
US$/oz |
89 |
84 |
86 |
105 |
59 |
94 |
By-Product Credits |
US$/oz |
(2) |
(1) |
(2) |
- |
(9) |
(1) |
Sustaining Capital + Other |
US$/oz |
106 |
- |
55 |
40 |
27 |
48 |
Asset Reclamation & Remediation |
US$/oz |
15 |
25 |
20 |
- |
11 |
11 |
Corporate Overheads |
US$/oz |
- |
- |
- |
- |
- |
36 |
All-In Sustaining Cost (AISC) AISC is calculated on gold produced (poured) |
US$/oz |
1,559 |
899 |
1,243 |
775 |
1,458 |
1,095 |
Contact Information
Resolute Stuart Gale, Interim CEO Telephone: +61 8 9261 6100 Email: contact@rml.com.au Web: www.rml.com.au
|
Berenberg (UK Corporate Broker) Matthew Armitt / Jennifer Wyllie / Detlir Elezi Telephone: +44 20 3207 7800 Tavistock (UK Public Relations) Jos Simson / Emily Moss / Annabel de Morgan / Oliver Lamb Telephone: +44 207 920 3150 / +44 778 855 4035
Email:
resolute@tavistock.co.uk
|
Competent Persons Statement
For the purposes of ASX Listing Rule 5.23, Resolute confirms that it is not aware of any new information or data that materially affects the information included in the original market announcements relating to exploration results or estimates of Mineral Resources or Ore Reserves referred to in this announcement and, in the case of Mineral Resources and Ore Reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. Resolute confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement.
The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (MAR). Upon the publication of this announcement via a Regulatory Information Service (RIS), this inside information is now considered to be in the public domain.
Authorised by Mr Stuart Gale, Interim CEO
Board of Directors |
Contact |
|
Mr Martin Botha, Non-Executive Chairman |
Ms Sabina Shugg, Non-Executive Director |
Stuart Gale, Interim CEO |
Ms Yasmin Broughton, Non-Executive Director |
Mr Peter Sullivan, Non-Executive Director |
|
Mr Mark Potts, Non-Executive Director |
|