2 new iron ore mines Pilbara
Rio Tinto PLC
26 November 2007
Date: 26 November 2007
Ref: PR580g
Rio Tinto invests US$2.4 billion in two new iron ore mines in the Pilbara
Rio Tinto has announced a further significant investment in its iron ore export
capacity in the Pilbara region of Western Australia, with the approval of the
new Mesa A/Warramboo mine in the Robe Valley and Brockman 4 mine near Tom Price.
The combined investment of US$2.42 billion (nominal terms, 100 per cent basis)
in the two mines will ensure that Rio Tinto's leadership of the Pilbara matches
its unparalleled global position in the iron ore industry. The mines will begin
production in 2010.
Sam Walsh, Chief Executive Rio Tinto Iron Ore, said the new mines were integral
to the Pilbara production platform underpinning Rio Tinto's rapid expansion of
its global network of assets.
'Mesa A/Warramboo and Brockman 4 demonstrate our strategy of substantial
investment in high-quality, long-life, low-cost assets. They are outstanding
deposits, close to existing infrastructure, and each promises excellent
commercial returns,' he said.
'Brockman 4 will bring on a new, high-volume long-life source of Brockman ore, a
key component of the Pilbara Blend product successfully introduced to the market
in July this year. Likewise, our Robe Valley pisolite product has consistently
proved to be competitively attractive for our customers.'
Mesa A/Warramboo
The Mesa A/Warramboo mine, about 50 kilometres from Pannawonica, will have an
initial production of 20 Mtpa, increasing to 25Mtpa by 2011.
The mine will sustain production of Robe Valley pisolite ore at 32Mtpa over the
next decade. Current production from the Mesa J deposit, now nearing the end of
its mine life, will reduce to 7Mtpa with Mesa A providing the balance. A
49-kilometre rail extension will connect the new mine to the Rio Tinto rail
network.
The project capital cost is estimated at US$901 million (Rio Tinto share US$478
million).
Total high-grade reserves across the Mesa A / Warramboo deposits are estimated
at 249Mt, with a total mine life of 11 years.
Brockman 4
The first phase of the Brockman 4 development, about 60 kilometres northwest of
Tom Price, will have an annual output of 22 Mtpa with a potential for further
expansion. Brockman 4 is well positioned to serve as a hub for the future
development of nearby deposits. The project has an estimated total capital cost
of US$1,521 million. Design considerations allowing for an increase in output by
14Mtpa, to 36Mtpa, are included in the Phase I scope, which will facilitate a
cost effective ramp up as additional port capacity is brought on line.
Phase I will take two years to construct and commission with production ramp-up
planned to begin in early 2010, and full capacity to be reached by 2012. The
mine will be connected to the Pilbara Iron Rail network by a 35 kilometre rail
spur to the Brockman 2/Nammuldi operations.
The Brockman 4 orebody contains 573Mt of high-grade reserves (> 60 percent
iron). A further 597 Mt of blending and lower-grade (50-60 percent Fe) resource
will be stockpiled for future processing.
Both expansions are subject to Government approvals.
For further information, please contact:
Media Relations, London Media Relations, Australia
Christina Mills Ian Head
Office: +44 (0) 20 8080 1306 Office: +61 (0) 3 9283 3620
Mobile: +44 (0) 7825 275 605 Mobile: +61 (0) 408 360 101
Nick Cobban Amanda Buckley
Office: +44 (0) 20 8080 1305 Office: +61 (0) 3 9283 3627
Mobile: +44 (0) 7920 041 003 Mobile: +61 (0) 419 801 349
Media Relations, US Media Relations, Canada
Nancy Ives Bryan Tucker
Mobile: +1 619 540 3751 Office: +1 514 848 8511
Investor Relations, London Investor Relations, Australia
Nigel Jones Dave Skinner
Office: +44 (0) 20 7753 2401 Office: +61 (0) 3 9283 3628
Mobile: +44 (0) 7917 227 365 Mobile: +61 (0) 408 335 309
Investor Relations, North America
David Ovington
Office: +44 (0) 20 7753 2326 Jason Combes
Mobile: +44 (0) 7920 010 978 Office: +1 (0) 801 685 4535
Mobile: +1 (0) 801 558 2645
Email: questions@riotinto.com
Website: www.riotinto.com
High resolution photographs available at: www.newscast.co.uk
Forward looking statements
This announcement includes 'forward-looking statements' within the meaning of
Section 27A of the Securities Act of 1933, as amended, and Section 21E of the
Securities Exchange Act of 1934, as amended. All statements other than
statements of historical facts included in this announcement, including, without
limitation, those regarding Rio Tinto's financial position, business strategy,
plans and objectives of management for future operations (including development
plans and objectives relating to Rio Tinto's products, production forecasts and
reserve and resource positions), are forward-looking statements. Such
forward-looking statements involve known and unknown risks, uncertainties and
other factors which may cause the actual results, performance or achievements of
Rio Tinto, or industry results, to be materially different from any future
results, performance or achievements expressed or implied by such
forward-looking statements.
Such forward-looking statements are based on numerous assumptions regarding Rio
Tinto's present and future business strategies and the environment in which Rio
Tinto will operate in the future. Among the important factors that could cause
Rio Tinto's actual results, performance or achievements to differ materially
from those in the forward-looking statements include, among others, levels of
demand and market prices, the ability to produce and transport products
profitably, the impact of foreign currency exchange rates on market prices and
operating costs, operational problems, political uncertainty and economic
conditions in relevant areas of the world, the actions of competitors,
activities by governmental authorities such as changes in taxation or regulation
and such other risk factors identified in Rio Tinto's most recent Annual Report
on Form 20-F filed with the United States Securities and Exchange Commission
(the 'SEC') or Form 6-Ks furnished to the SEC. Forward-looking statements
should, therefore, be construed in light of such risk factors and undue reliance
should not be placed on forward-looking statements. These forward-looking
statements speak only as of the date of this announcement. Rio Tinto expressly
disclaims any obligation or undertaking (except as required by applicable law,
the City Code on Takeovers and Mergers (the 'Takeover Code'), the UK Listing
Rules, the Disclosure and Transparency Rules of the Financial Services Authority
and the Listing Rules of the Australian Securities Exchange) to release publicly
any updates or revisions to any forward-looking statement contained herein to
reflect any change in Rio Tinto's expectations with regard thereto or any change
in events, conditions or circumstances on which any such statement is based.
Nothing in this announcement should be interpreted to mean that future earnings
per share of Rio Tinto plc or Rio Tinto Limited will necessarily match or exceed
its historical published earnings per share.
This information is provided by RNS
The company news service from the London Stock Exchange