3Q 2004 operations review
Rio Tinto PLC
20 October 2004
Third quarter 2004 operations review
Overview
• Third quarter production was strong across all the major products. New
projects in iron ore (Eastern Range), coking coal (Hail Creek), and
diamonds (Diavik) all increased volumes.
• There were no significant operational developments in the quarter.
• Hamersley produced record volumes of iron ore in what is traditionally the
strongest quarter of the year. August shipments through Dampier and Cape
Lambert were also at record levels.
• The first bauxite was fed into the Comalco Alumina Refinery in the third
quarter and continuous alumina production is expected in the fourth quarter
of 2004.
All figures in this report are US dollars unless otherwise stated
IRON ORE
Rio Tinto share of production (000 tonnes)
_______________________________________________________________________________________________________
Q3 04 vs Q3 03 vs Q2 04 9 Mths 04 vs 9 Mths 03
Hamersley 19,813 +12% +7% 54,060 +7%
Robe River 6,828 +22% -4% 19,384 +12%
IOC 315 -86% -86% 4,483 -27%
_______________________________________________________________________________________________________
Demand remained strong across the full product range, with most markets showing
continued strength.
New long-term agreements were finalised with Sumitomo Metal Industries securing
ten million tonnes per annum of iron ore sales from Hamersley and Robe over a
ten year period, commencing in 2005. This, together with other long term
arrangements announced in the first half of the year, further underpins the
current expansion programme due for completion at the end of 2005.
Australian operations achieved record production this quarter. Although less
than anticipated, this was consistent with the traditional strength of third
quarter performance. Shipments also reached record levels at both Dampier and
Cape Lambert in August.
Hamersley
Hamersley's production in the third quarter reflects the commissioning of the
Eastern Range mine and the completion of the first stage of expansion work at
Yandicoogina.
Robe River
Increased production and sales from West Angelas were in line with the expansion
programme.
Production from Pannawonica was affected by planned maintenance, but strong
sales volumes underlined the recovery from the effects of tropical cyclone
Monty.
Iron Ore Company of Canada
Output was severely curtailed at IOC due to industrial action for most of the
third quarter. Operations recommenced on a staged basis late in September, with
ramp up to normal levels expected early in the fourth quarter.
ENERGY
US Thermal Coal
Rio Tinto share of production (000 tonnes)
___________________________________________________________________________________________________________
Q3 04 vs Q3 03 vs Q2 04 9 Mths 04 vs 9 Mths 03
Kennecott Energy 30,398 +11% +5% 86,662 +9%
___________________________________________________________________________________________________________
Volume increases largely reflect higher output from the Jacob's Ranch mine and
strong demand for the higher energy coals of Colowyo and Spring Creek.
Australian Coal
Rio Tinto share of production (000 tonnes)
_______________________________________________________________________________________________________
Q3 04 vs Q3 03 vs Q2 04 9 Mths 04 vs 9 Mths 03
Rio Tinto Coal Australia
Hard coking coal 2,070 +287% -1% 5,371 +295%
Other coal 4,230 -6% +2% 12,346 0%
_______________________________________________________________________________________________________
Coal & Allied
Other coal 4,573 +28% +3% 12,342 +9%
_______________________________________________________________________________________________________
Other coal includes thermal, semi-soft and semi-hard coking coal
Rio Tinto Coal Australia
Production from the new Hail Creek coking coal mine continued to ramp-up. Third
quarter shipments were above the initial capacity rate of 5.5 million tonnes per
year and a capacity expansion to eight million tonnes per year by 2006 was
approved by the joint venture in July 2004. The proportion of hard coking coal
from the Kestrel mine has increased in 2004, since mining has commenced in the
new 300 series area.
Blair Athol production was in line with the previous three quarters.
Coal & Allied
Third quarter production from all mines was above both the second quarter of
2004 and the corresponding period of 2003.
INDUSTRIAL MINERALS
Rio Tinto share of production (000 tonnes)
_______________________________________________________________________________________________________
Q3 04 vs Q3 03 vs Q2 04 9 Mths 04 vs 9 Mths 03
Borates 153 +8% +9% 428 +1%
Titanium dioxide feedstock 296 +2% +2% 873 -3%
_______________________________________________________________________________________________________
Production of borates reflects some improvement in end use markets. Demand for
boric acid remains strong. Although production at Richards Bay Minerals was
interrupted in September due to a furnace run-out, titanium dioxide feedstock
sales volumes will not be affected. Demand for Rio Tinto Iron & Titanium's
iron, steel, rutile and zircon co-products remained strong.
ALUMINIUM
Rio Tinto share of production (000 tonnes)
_______________________________________________________________________________________________________
Q3 04 vs Q3 03 vs Q2 04 9 Mths 04 vs 9 Mths 03
Rio Tinto Aluminium
Bauxite 3,157 +5% -5% 9,496 +3%
Alumina 530 +6% +2% 1,560 +5%
Aluminium 210.4 +3% +2% 627.4 +4%
_______________________________________________________________________________________________________
Production was strong at all smelters and refineries. Eurallumina refinery
production was a quarterly record while production at Queensland Alumina Limited
refinery was also above the second quarter of 2004 and the corresponding period
of 2003. Bauxite production has increased in 2004, in anticipation of the
commissioning of the Comalco Alumina Refinery. The new refinery remains on
track for continuous production in the fourth quarter of 2004.
COPPER
Rio Tinto share of production
_______________________________________________________________________________________________________
Q3 04 vs Q3 03 vs Q2 04 9 Mths 04 vs 9 Mths 03
Kennecott Utah Copper
Mined copper (000 tonnes) 63.3 -18% -1% 189.8 -10%
Refined copper (000 tonnes) 63.1 -3% +2% 185.2 +8%
Mined gold (000 ozs) 77 -13% +23% 216 -11%
Refined gold (000 ozs) 74 +12% -4% 232 +2%
_______________________________________________________________________________________________________
Escondida
Mined copper (000 tonnes) 87.5 +19% -12% 270.3 +19%
_______________________________________________________________________________________________________
Grasberg JV
Mined copper (000 tonnes) 9.2 -68% -1% 24.0 -75%
Mined gold (000 ozs) 22 -90% +17% 48 -92%
_______________________________________________________________________________________________________
Kennecott Utah Copper
Third quarter and year to date mined copper production at Kennecott Utah Copper
was below the corresponding periods of 2003, reflecting lower copper grades.
By-product production volumes have been affected by poor mineralogy for about
two years, but gold and molybdenum grades improved in the third quarter.
Escondida
Third quarter copper production from Escondida reflected lower copper grades due
to mine sequencing. Production in the first nine months reflects the return to
the normal mine plan from the beginning of the year and the ramp up of the
Laguna Seca throughput.
Grasberg
Production from the Grasberg mine continued to ramp-up. Mining rates are
gradually improving as bench development in the higher grade areas enables more
efficient ore access.
Rio Tinto's share of production is based on a preliminary allocation of volumes
between the joint venture partners, Rio Tinto and Freeport McMoRan.
Other copper operations
Copper production from the Palabora underground mine has improved, due to higher
volumes hoisted and improved grades, but remains below design capacity.
Production from the new Lift 2 at Northparkes commenced in the quarter.
DIAMONDS
Rio Tinto share of production (000 carats)
_______________________________________________________________________________________________________
Q3 04 vs Q3 03 vs Q2 04 9 Mths 04 vs 9 Mths 03
Argyle 5,328 -45% +100% 11,610 -49%
Diavik 1,358 +54% 0% 3,644 +122%
_______________________________________________________________________________________________________
Argyle
Although still affected by tight mining conditions, output from the Argyle open
pit began to improve in the third quarter. Ore processed continued to consist
of lower grade ore from the open pit supplemented by ore from stockpiles.
Diavik
Diavik continued to perform well. The process plant comfortably exceeded design
capacity on a consistent basis.
Murowa
First diamonds were recovered from the small scale operation at Murowa.
EXPLORATION AND EVALUATION
Total pre-tax expenditure on exploration charged to the profit and loss account
up to the end of the third quarter of 2004 was $126 million compared with $97
million in 2003.
Exploration drilling continued on copper targets in Peru, Chile, Mexico, and
Alaska. Diamond exploration continued in India, Canada, Botswana, South Africa
and Brazil. Iron ore exploration continued in the Hamersley Basin (Western
Australia) and the order of magnitude study for Simandou (iron ore, Guinea) was
completed and the project handed over to Rio Tinto Iron Ore. Bauxite, coking
coal, and nickel exploration was carried out in a number of regions.
Evaluation work continued at Eagle (nickel/copper, US), Sari Gunay (gold, Iran),
Resolution (copper/gold, US) and at Potasio Rio Colorado (potash, Argentina)
where pilot solution mining began in the third quarter. An agreement for the
sale of a copper resource at Marcona in Peru to Chariot Resources was signed on
6 August 2004. The sale is expected to be completed by early 2005.
ASSET DISPOSALS
The restructuring of Rio Tinto Zimbabwe, as a result of which Rio Tinto will
hold its interest in the Murowa diamond project directly but cease to be an
ordinary shareholder of Rio Tinto Zimbabwe, was completed on 8 July 2004.
For further information, please contact:
LONDON AUSTRALIA
Media Relations Media Relations
Lisa Cullimore Ian Head
Office: +44 (0) 20 7753 2305 Office: +61 (0) 3 9283 3620
Mobile: +44 (0) 7730 418 385 Mobile: +61 (0) 408 360 101
Investor Relations Investor Relations
Peter Cunningham Dave Skinner
Office: +44 (0) 20 7753 2401 Office: +61 (0) 3 9283 3628
Mobile: +44 (0) 7711 596 570 Mobile: +61 (0) 408 335 309
Richard Brimelow Susie Creswell
Office: +44 (0) 20 7753 2326 Office: +61 (0) 3 9283 3639
Mobile: +44 (0) 7753 783 825 Mobile: +61 (0) 418 933 792
Website: www.riotinto.com
RIO TINTO PRODUCTION SUMMARY
RIO TINTO SHARE OF PRODUCTION
____________________________ _________________ __________________________
QUARTER NINE MONTHS % CHANGE
____________________________ _________________ __________________________
2003 2004 2004 2003 2004 Q3 04 Q3 04 9 Mths 04
Q3 Q2 Q3 vs vs vs
Principal Commodities Q2 04 Q3 03 9 Mths 03
____________________________ _________________ __________________________
Alumina ('000 t) 500 517 530 1,488 1,560 2% 6% 5%
Aluminium ('000 t) 204.9 207.0 210.4 606.2 627.4 2% 3% 4%
Borates ('000 t) 142 141 153 425 428 9% 8% 1%
Coal - hard coking coal ('000 t) 535 2,101 2,070 1,361 5,371 -1% 287% 295%
Coal - other Australian/ ('000 t) 9,784 8,597 8,803 29,883 24,688 2% -10% -17%
Indonesian
Coal - US ('000 t) 27,391 28,861 30,398 79,759 86,662 5% 11% 9%
Copper - mined ('000 t) 221.4 193.4 174.7 684.1 548.2 -10% -21% -20%
Copper - refined ('000 t) 93.7 81.6 82.5 258.9 251.5 1% -12% -3%
Diamonds ('000 cts) 10,588 4,033 6,688 24,304 15,255 66% -37% -37%
Gold - mined ('000 ozs) 691 376 366 2,221 1,123 -3% -47% -49%
Gold - refined ('000 ozs) 66 77 74 227 232 -4% 12% 2%
Iron ore ('000 t) 25,826 28,048 27,307 74,616 78,854 -3% 6% 6%
Titanium dioxide feedstock ('000 t) 291 291 296 899 873 2% 2% -3%
____________________________ _________________ __________________________
Other Metals & Minerals
____________________________ _________________ __________________________
Bauxite ('000 t) 3,018 3,331 3,157 9,213 9,496 -5% 5% 3%
Lead - mined ('000 t) 12.0 8.1 3.4 33.4 21.8 -58% -72% -35%
Molybdenum ('000 t) 1.2 0.9 1.5 3.5 4.0 57% 21% 14%
Nickel - refined (tonnes) 1,029 648 - 2,463 1,619 - - -34%
Salt ('000 t) 1,420 1,257 1,271 3,513 3,661 1% -10% 4%
Silver - mined ('000 ozs) 4,983 3,465 3,569 13,353 10,799 3% -28% -19%
Silver - refined ('000 ozs) 691 768 854 2,310 2,400 11% 24% 4%
Talc ('000 t) 350 361 371 1,036 1,088 3% 6% 5%
Tin (tonnes) 16 38 - 39 59 - - 49%
Uranium (tonnes) 1,395 1,357 1,610 3,752 4,399 19% 15% 17%
Zinc - mined ('000 t) 26.8 21.5 10.7 82.6 62.1 -50% -60% -25%
____________________________ _________________ __________________________
Throughout this report, figures in italics indicate adjustments made since the
figure was previously quoted on the equivalent page.
Production figures are sometimes more precise than the rounded numbers shown,
hence small differences may result between the total of the quarter figures and
the nine month figures.
RIO TINTO SHARE OF PRODUCTION
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
__________________________________________________________________________________________________________________
ALUMINA
Production ('000 tonnes)
Eurallumina 56% 150 148 145 144 155 426 444
Queensland Alumina 39% 350 378 368 373 375 1,062 1,116
______________________________________________________________
Rio Tinto total alumina production 500 526 514 517 530 1,488 1,560
__________________________________________________________________________________________________________________
ALUMINIUM
Refined production ('000 tonnes)
Anglesey 51% 18.3 19.0 18.3 18.2 18.9 54.9 55.4
Bell Bay 100% 42.3 41.9 41.8 40.8 38.2 124.8 120.9
Boyne Island 59% 76.9 80.9 80.5 79.7 82.0 230.2 242.2
Tiwai Point 79% 67.5 70.2 69.5 68.3 71.2 196.3 209.0
______________________________________________________________
Rio Tinto total aluminium production 204.9 211.9 210.1 207.0 210.4 606.2 627.4
__________________________________________________________________________________________________________________
BAUXITE
Production ('000 tonnes)
Boke (a) 0% 123 58 121 58 - 360 179
Weipa 100% 2,895 3,045 2,887 3,273 3,157 8,853 9,317
______________________________________________________________
Rio Tinto total bauxite production 3,018 3,103 3,008 3,331 3,157 9,213 9,496
__________________________________________________________________________________________________________________
BORATES
Borates ('000 tonnes B2O3 content)
Rio Tinto total borate production 100% 142 134 134 141 153 425 428
__________________________________________________________________________________________________________________
COAL - HARD COKING
Rio Tinto Coal Australia (b) ('000
tonnes)
Hail Creek Coal 92% 204 608 831 1,325 1,376 204 3,532
Kestrel Coal 80% 332 342 369 776 693 1,157 1,838
______________________________________________________________
Rio Tinto total hard coking coal production 535 950 1,200 2,101 2,070 1,361 5,371
__________________________________________________________________________________________________________________
COAL - OTHER *
Australian coal operations ('000
tonnes)
Coal & Allied Industries
Bengalla 30% 340 608 325 462 526 1,271 1,313
Hunter Valley Operations 76% 2,198 2,272 1,988 2,625 2,671 6,819 7,284
Mount Thorley Operations 61% 475 491 407 576 593 1,419 1,576
Warkworth 42% 563 616 612 774 783 1,853 2,169
Rio Tinto Coal Australia (b)
Blair Athol Coal 71% 2,599 2,197 2,180 2,206 2,169 6,693 6,555
Kestrel Coal 80% 263 292 98 167 173 867 438
Tarong Coal 100% 1,635 1,713 1,678 1,787 1,888 4,825 5,352
______________________________________________________________
Total Australian other coal 8,073 8,189 7,287 8,597 8,803 23,746 24,688
______________________________________________________________
Indonesian coal operations ('000 tonnes)
Kaltim Prima Coal (c) 0% 1,711 191 - - - 6,137 -
US coal operations ('000 tonnes)
Kennecott Energy
Antelope 100% 7,130 6,795 5,919 6,628 7,152 20,011 19,699
Colowyo (d) 1,093 1,138 1,467 1,415 1,494 3,396 4,376
Cordero Rojo 100% 7,448 8,501 8,589 8,263 9,023 24,170 25,874
Decker 50% 1,068 1,203 514 1,062 1,104 2,476 2,680
Jacobs Ranch 100% 8,767 8,706 8,649 8,705 8,833 23,712 26,187
Spring Creek 100% 1,887 2,074 2,265 2,789 2,791 5,995 7,845
______________________________________________________________
Total US coal 27,391 28,417 27,403 28,861 30,398 79,759 86,662
______________________________________________________________
Rio Tinto total other coal production 37,175 36,797 34,690 37,459 39,201 109,642 111,350
__________________________________________________________________________________________________________________
Mine production figures for metals refer to the total quantity of metal produced
in concentrates or dore bullion irrespective of whether these products are then
refined on-site.
* Coal - other includes thermal coal, semi-soft coking coal and semi-hard coking
coal.
See footnotes on page 11.
RIO TINTO SHARE OF PRODUCTION (continued)
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
_______________________________________________________________________________________________________________
COPPER
Mine production ('000 tonnes)
Alumbrera (e) 0% - - - - - 8.7 -
Bingham Canyon 100% 77.6 71.6 62.5 64.0 63.3 210.2 189.8
Escondida 30% 73.4 70.1 83.8 99.1 87.5 227.7 270.3
Grasberg - FCX (f) 0% 21.5 7.7 5.5 - - 76.8 5.5
Grasberg - Joint Venture (f) 40% 28.9 11.5 5.5 9.3 9.2 97.2 24.0
Neves Corvo (g) 0% 7.5 9.6 11.6 11.4 - 28.4 23.0
Northparkes 80% 5.4 5.2 5.8 4.7 6.0 16.5 16.6
Palabora 49% 7.0 7.1 5.2 4.9 8.7 18.7 18.9
___________________________________________________________
Rio Tinto total mine production 221.4 182.9 180.0 193.4 174.7 684.1 548.2
___________________________________________________________
Refined production ('000 tonnes)
Atlantic Copper (f) 0% 9.2 8.6 7.0 - - 29.6 7.0
Escondida 30% 11.2 11.4 11.3 11.4 11.4 32.9 34.1
Kennecott Utah Copper 100% 64.8 59.9 60.3 61.7 63.1 170.7 185.2
Palabora 49% 8.5 10.3 8.8 8.5 8.0 25.8 25.3
___________________________________________________________
Rio Tinto total refined production 93.7 90.2 87.4 81.6 82.5 258.9 251.5
_______________________________________________________________________________________________________________
DIAMONDS
Production ('000 carats)
Argyle 100% 9,690 8,307 3,612 2,669 5,328 22,603 11,610
Diavik 60% 880 661 922 1,364 1,358 1,639 3,644
Merlin 100% 18 - - - - 62 -
Murowa (h) 78% - - - - 2 - 2
___________________________________________________________
Rio Tinto total diamond production 10,588 8,968 4,534 4,033 6,688 24,304 15,255
_______________________________________________________________________________________________________________
GOLD
Mine production ('000 ounces)
Alumbrera (e) 0% - - - - - 31 -
Barneys Canyon 100% 10 6 7 4 5 29 16
Bingham Canyon 100% 79 92 69 59 72 213 200
Cortez/Pipeline 40% 100 106 113 115 105 329 334
Escondida 30% 16 16 18 16 16 40 50
Grasberg - FCX (f) 0% 107 26 14 - - 327 14
Grasberg - Joint Venture (f) 40% 223 96 6 19 22 626 48
Greens Creek 70% 17 17 16 16 15 53 46
Kelian 90% 71 74 69 73 64 349 205
Lihir (i) 14% 21 25 16 24 E 22 64 E 62
Morro do Ouro 51% 24 26 25 23 24 77 73
Northparkes 80% 9 15 17 15 14 24 45
Peak (e) 0% - - - - - 20 -
Rawhide 51% 9 8 7 7 6 25 19
Rio Tinto Zimbabwe (j) 0% 3 3 3 3 - 11 6
Others - 2 2 2 2 1 5 5
___________________________________________________________
Rio Tinto total mine production 691 511 381 376 366 2,221 1,123
___________________________________________________________
Refined production ('000 ounces)
Kennecott Utah Copper 100% 66 81 81 77 74 227 232
_______________________________________________________________________________________________________________
IRON ORE
Production ('000 tonnes)
Channar 60% 1,628 1,417 1,404 1,516 1,623 4,792 4,543
Corumba 100% 292 279 268 306 352 795 926
Eastern Range (k) - - 3 645 1,050 - 1,698
Hamersley 100% 16,079 17,462 14,407 16,273 17,140 45,595 47,819
Iron Ore Company of Canada (l) 59% 2,220 2,191 1,969 2,199 315 6,161 4,483
Robe River 53% 5,607 6,649 5,447 7,110 6,828 17,273 19,384
___________________________________________________________
Rio Tinto total mine production 25,826 27,997 23,499 28,048 27,307 74,616 78,854
_______________________________________________________________________________________________________________
Mine production figures for metals refer to the total quantity of metal produced
in concentrates or dore bullion irrespective of whether these products are then
refined on-site, except for the data for iron ore which represent production of
saleable quantities of ore plus pellets.
See footnotes on page 11. E = Estimated number.
RIO TINTO SHARE OF PRODUCTION (continued)
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
________________________________________________________________________________________________________________
LEAD
Mine production ('000 tonnes)
Greens Creek 70% 4.0 4.1 3.3 3.9 3.4 11.7 10.6
Zinkgruvan (m) 0% 8.0 10.1 7.0 4.2 - 21.7 11.2
___________________________________________________________
Rio Tinto total mine production 12.0 14.2 10.3 8.1 3.4 33.4 21.8
________________________________________________________________________________________________________________
MOLYBDENUM
Mine production ('000 tonnes)
Bingham Canyon 100% 1.2 1.1 1.6 0.9 1.5 3.5 4.0
________________________________________________________________________________________________________________
NICKEL
Nickel in matte (tonnes)
Fortaleza (n) 0% 1,284 1,524 - - - 4,426 -
Toll refined metal production (tonnes)
Rio Tinto Zimbabwe - Empress (j) 0% 1,029 1,011 971 648 - 2,463 1,619
________________________________________________________________________________________________________________
SALT
Production ('000 tonnes)
Dampier Salt 65% 1,420 1,120 1,133 1,257 1,271 3,513 3,661
________________________________________________________________________________________________________________
SILVER
Mine production ('000 ounces)
Bingham Canyon 100% 873 1,105 730 785 947 2,443 2,462
Escondida 30% 375 368 411 482 404 1,050 1,297
Grasberg - FCX (f) 0% 207 46 79 - - 698 79
Grasberg - Joint Venture (f) 40% 320 466 13 53 135 660 201
Greens Creek 70% 2,472 2,035 1,761 1,584 1,813 6,191 5,157
Zinkgruvan (m) 0% 460 571 426 225 - 1,270 651
Others - 275 366 346 336 270 1,041 952
____________________________________________________________
Rio Tinto total mine production 4,983 4,959 3,766 3,465 3,569 13,353 10,799
____________________________________________________________
Refined production ('000 ounces)
Kennecott Utah Copper 100% 691 653 778 768 854 2,310 2,400
________________________________________________________________________________________________________________
TALC
Production ('000 tonnes)
Luzenac Group 99.9% 350 321 356 361 371 1,036 1,088
________________________________________________________________________________________________________________
TIN
Mine production (tonnes)
Neves Corvo (g) 0% 16 60 21 38 - 39 59
________________________________________________________________________________________________________________
TITANIUM DIOXIDE FEEDSTOCK
Production ('000 tonnes)
Rio Tinto Iron & Titanium 100% 291 293 287 291 296 899 873
________________________________________________________________________________________________________________
URANIUM
Production (tonnes U3O8)
Energy Resources of Australia 68% 775 858 809 751 931 2,653 2,492
Rossing 69% 620 548 622 607 679 1,099 1,907
____________________________________________________________
Rio Tinto total uranium production 1,395 1,406 1,431 1,357 1,610 3,752 4,399
________________________________________________________________________________________________________________
ZINC
Mine production ('000 tonnes)
Greens Creek 70% 11.7 11.3 10.7 11.0 10.7 37.2 32.4
Zinkgruvan (m) 0% 15.1 19.1 19.2 10.5 - 45.4 29.7
____________________________________________________________
Rio Tinto total mine production 26.8 30.4 29.9 21.5 10.7 82.6 62.1
________________________________________________________________________________________________________________
Mine production figures for metals refer to the total quantity of metal produced
in concentrates or dore bullion irrespective of whether these products are then
refined on-site. The nickel in matte production reflects the contained tonnage
of nickel.
See footnotes on page 11.
RIO TINTO SHARE OF PRODUCTION (continued)
Production data notes
(a) Rio Tinto completed the sale of its 4.0% interest in the Boke mine on 25
June 2004. Production data are shown up to the date of sale.
(b) Rio Tinto Coal Australia was previously known as Pacific Coal.
(c) Rio Tinto had a 50% share in Kaltim Prima and, under the terms of its
Coal Agreement, the Indonesian Government was entitled to a 13.5% share of
Kaltim Prima's production. Rio Tinto's share of production shown is before
deduction of the Government share. Rio Tinto completed the sale of its
interest in PT Kaltim Prima Coal on 10 October 2003. Production data are
shown up to the date of sale.
(d) Kennecott Energy has a partnership interest in the Colowyo mine but, as
it is responsible under a management agreement for the operation of the
mine, all of Colowyo's output is included in Rio Tinto's share of
production.
(e) Rio Tinto completed the sale of its 25% interest in Minera Alumbrera
together with its wholly owned Peak Gold Mine on 17 March 2003. Production
data are shown up to the date of sale.
(f) From mid 1995 until 30 March 2004, Rio Tinto held 23.93 million shares
of Freeport-McMoRan-Copper & Gold (FCX) common stock from which it derived
a share of production. This interest was sold to FCX on 30 March 2004.
Also, through a joint venture agreement with FCX, Rio Tinto is entitled, as
shown separately in the above tables, to 40% of additional material mined
as a consequence of expansions and developments of the Grasberg facilities
since 1998.
(g) Rio Tinto completed the sale of its 49% interest in Somincor on 18 June
2004. Production data are shown up to the date of sale.
(h) Ore mining and processing commenced during the third quarter of 2004.
(i) Following a placement of shares on 13 November 2003, and a subsequent
allotment of shares under a Share Purchase Plan on 23 January 2004,
Rio Tinto's interest in Lihir changed from 16.3% to 14.4%. Rio
Tinto's share of gold production includes an estimate of the
production from the Lihir gold mine for the third quarter of 2004. The
actual third quarter production, which may be different from the
figure in this report, will be announced by Lihir Gold Ltd on 25
October 2004. The estimate in this report is based on one quarter of
the indicative full year 2004 production of 600,000 oz previously
disclosed in the Managing Director's report to the Lihir Gold Ltd AGM
(27 April 2004).
(j) As a result of the corporate restructuring completed on 8 July 2004,
Rio Tinto has ceased to be an ordinary shareholder in the renamed
RioZim but will retain a reduced cash participation in its gold and
nickel assets for a period of ten years.
(k) Rio Tinto's share of production includes 100% of the production from
the Eastern Range mine, which commenced production in March 2004.
Under the terms of the joint venture agreement, Hamersley Iron manages
the operation and is obliged to purchase all mine production from the
joint venture.
(l) Rio Tinto owns 19% of the Labrador Iron Ore Royalty Income Fund. The
Fund has a shareholding in Iron Ore Company of Canada but this has not
been included in the calculation of tonnage attributable to Rio Tinto.
(m) Rio Tinto completed the sale of its 100% interest in the Zinkgruvan
mine on 2 June 2004. Production data are shown up to the date of sale.
(n) Rio Tinto completed the sale of its 100% interest in the Fortaleza
nickel mine on 16 January 2004. The sale was effective from 1 January
2004.
Where Rio Tinto's beneficial interest in an operation has changed, as indicated
above, the share of production has been calculated using the weighted average
interest over the relevant periods. Rio Tinto percentage interest shown above is
at 30 September 2004.
RIO TINTO OPERATIONAL DATA
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
_____________________________________________________________________________________________________________________
ALUMINIUM
Rio Tinto Aluminium
Weipa mine 100.0%
Queensland, Australia
Beneficiated bauxite production ('000 2,895 3,045 2,887 3,273 3,157 8,853 9,317
tonnes)
Metal grade bauxite shipments ('000 tonnes) 2,709 3,160 2,981 2,861 3,213 8,255 9,056
Calcined bauxite production ('000 tonnes) 42 29 44 36 45 132 125
Boke mine (a) 0.0%
Guinea
Bauxite production ('000 tonnes) 2,970 3,648 2,812 2,961 - 8,412 5,773
Eurallumina refinery 56.2%
Sardinia, Italy
Alumina production ('000 tonnes) 267 263 258 256 275 758 790
Queensland Alumina refinery 38.6%
Queensland, Australia
Alumina production ('000 tonnes) 906 980 954 966 971 2,750 2,891
Anglesey Aluminium smelter 51.0%
United Kingdom
Primary aluminium production ('000 tonnes) 35.9 37.2 35.9 35.6 37.2 107.6 108.6
Bell Bay smelter 100.0%
Tasmania, Australia
Primary aluminium production ('000 tonnes) 42.3 41.9 41.8 40.8 38.2 124.8 120.9
Boyne Island smelter 59.4%
Queensland, Australia
Primary aluminium production ('000 tonnes) 128.5 133.8 134.7 134.3 135.8 387.1 404.8
Tiwai Point smelter 79.4%
New Zealand
Primary aluminium production ('000 tonnes) 85.0 87.9 87.1 86.0 88.7 246.6 261.7
Rio Tinto Aluminium share
Share of primary aluminium sales ('000 205.1 213.1 203.5 218.5 208.5 606.9 630.5
tonnes)
(a) Rio Tinto completed the sale of its 4.0% interest in the Boke mine on 25
June 2004. Production data are shown up to the date of sale.
BORATES
Rio Tinto Borax 100.0%
California, US and Argentina
Borates ('000 tonnes) (a) 142 134 134 141 153 425 428
(a) Production is expressed as B2O3 content.
_____________________________________________________________________________________________________________________
Rio Tinto percentage interest shown above is at 30 September 2004. The data
represent full production and sales on a 100% basis unless otherwise stated.
RIO TINTO OPERATIONAL DATA
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
_____________________________________________________________________________________________________________________
COAL
Coal & Allied Industries Limited
Bengalla mine 30.3%
New South Wales, Australia
Thermal coal production ('000 tonnes) 1,122 2,008 1,075 1,525 1,737 4,196 4,337
Hunter Valley Operations 75.7%
New South Wales, Australia
Thermal coal production ('000 tonnes) 2,028 2,620 2,255 2,738 2,838 6,526 7,831
Semi-soft coking coal production ('000 875 381 371 729 689 2,480 1,790
tonnes)
Mount Thorley Operations 60.6%
New South Wales, Australia
Thermal coal production ('000 tonnes) 416 433 514 710 722 1,287 1,946
Semi-soft coking coal production ('000 369 377 158 240 258 1,055 656
tonnes)
Warkworth mine 42.1%
New South Wales, Australia
Thermal coal production ('000 tonnes) 1,212 1,371 1,217 1,394 1,381 3,997 3,992
Semi-soft coking coal production ('000 127 93 237 447 479 406 1,163
tonnes)
______________________________________________________________
Total coal production ('000 tonnes) 6,147 7,284 5,826 7,784 8,105 19,948 21,715
______________________________________________________________
Total coal sales ('000 tonnes) (a) 6,802 7,278 6,424 7,486 7,931 20,609 21,841
Coal & Allied Industries share ______________________________________________________________
Share of coal production ('000 tonnes) 4,723 5,266 4,401 5,861 6,040 15,006 16,302
______________________________________________________________
Share of coal sales ('000 tonnes) (a) 5,178 5,456 4,776 5,669 6,002 15,629 16,446
______________________________________________________________
(a) Sales relate only to coal mined by the operations and exclude traded coal.
_____________________________________________________________________________________________________________________
Kaltim Prima Coal (a)
Indonesia 0.0%
Thermal coal:
Production ('000 tonnes) 3,422 381 - - - 12,274 -
Shipments ('000 tonnes) 4,042 309 - - - 12,501 -
(a) Rio Tinto completed the sale of its 50% interest in PT Kaltim Prima Coal on
10 October 2003. Production data are shown up to the date of sale.
_____________________________________________________________________________________________________________________
Kennecott Energy and Coal Company
Antelope mine 100.0%
Wyoming, US
Thermal coal production ('000 tonnes) 7,130 6,795 5,919 6,628 7,152 20,011 19,699
Colowyo mine (a)
Colorado, US
Thermal coal production ('000 tonnes) 1,093 1,138 1,467 1,415 1,494 3,396 4,376
Cordero Rojo mine 100.0%
Wyoming, US
Thermal coal production ('000 tonnes) 7,448 8,501 8,589 8,263 9,023 24,170 25,874
Decker mine 50.0%
Montana, US
Thermal coal production ('000 tonnes) 2,135 2,406 1,028 2,123 2,209 4,952 5,360
Jacobs Ranch mine 100.0%
Wyoming, US
Thermal coal production ('000 tonnes) 8,767 8,706 8,649 8,705 8,833 23,712 26,187
Spring Creek mine 100.0%
Montana, US
Thermal coal production ('000 tonnes) 1,887 2,074 2,265 2,789 2,791 5,995 7,845
Total coal production ('000 tonnes) 28,459 29,620 27,917 29,923 31,503 82,236 89,342
______________________________________________________________
Total coal sales ('000 tonnes) 28,459 29,620 27,917 29,923 31,503 82,236 89,342
______________________________________________________________
(a) Kennecott Energy has a partnership interest in the Colowyo mine but, as it
is responsible under a management agreement for the operation of the mine,
all of Colowyo's output is included in Rio Tinto's share of production.
_____________________________________________________________________________________________________________________
Rio Tinto percentage interest shown above is at 30 September 2004. The data
represent full production and sales on a 100% basis unless otherwise stated.
RIO TINTO OPERATIONAL DATA
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
_____________________________________________________________________________________________________________________
COAL (continued)
Rio Tinto Coal Australia (a)
Blair Athol Coal mine 71.2%
Queensland, Australia
Thermal coal:
Production ('000 tonnes) 3,649 3,084 3,060 3,097 3,045 9,396 9,202
Sales ('000 tonnes) 3,179 3,473 2,867 3,218 3,198 9,105 9,283
Hail Creek Coal mine 92.0%
Queensland, Australia
Coking coal:
Production ('000 tonnes) 221 661 903 1,441 1,496 221 3,840
Sales ('000 tonnes) 114 622 890 1,069 1,389 114 3,348
Kestrel Coal mine 80.0%
Queensland, Australia
Thermal coal:
Production ('000 tonnes) 328 365 122 209 216 1,084 548
Sales ('000 tonnes) 145 177 - - - 712 -
Coking coal:
Production ('000 tonnes) 415 427 462 970 867 1,446 2,298
Sales ('000 tonnes) 331 357 409 536 837 727 1,782
Semi-hard coking coal:(b)
Sales ('000 tonnes) 353 461 225 258 300 1,277 784
Tarong Coal mine 100.0%
Queensland, Australia
Thermal coal:
Production ('000 tonnes) 1,635 1,713 1,678 1,787 1,888 4,825 5,352
Sales ('000 tonnes) 1,623 1,749 1,744 1,781 1,819 4,871 5,345
Total coal production ('000 tonnes) 6,248 6,250 6,225 7,503 7,512 16,972 21,240
______________________________________________________________
Total coal sales ('000 tonnes) 5,746 6,839 6,135 6,863 7,544 16,807 20,543
Rio Tinto Coal Australia share ______________________________________________________________
Share of coal production ('000 tonnes) 5,033 5,152 5,156 6,261 6,300 13,746 17,717
______________________________________________________________
Share of coal sales ('000 tonnes) 4,656 5,591 5,113 5,693 6,286 13,636 17,092
______________________________________________________________
(a) Rio Tinto Coal Australia was previously known as Pacific Coal.
(b) Semi-hard coking coal is a mixture of thermal coal and coking coal. The
product mix is customer dependent.
_____________________________________________________________________________________________________________________
COPPER & GOLD
Alumbrera (a) 0.0%
Argentina
Ore treated ('000 tonnes) - - - - - 7,053 -
Average ore grades:
Copper (%) - - - - - 0.54 -
Gold (g/t) - - - - - 0.69 -
Concentrates produced ('000 tonnes) - - - - - 130.9 -
Copper in concentrates:
Production ('000 tonnes) - - - - - 34.9 -
Sales ('000 tonnes) - - - - - 37.0 -
Production of gold in concentrates ('000 - - - - - 108 -
ounces)
Production of gold in dore ('000 ounces) - - - - - 16 -
Total gold sales ('000 ounces) - - - - - 132 -
(a) Rio Tinto completed the sale of its 25% holding in Minera Alumbrera on 17
March 2003.
_____________________________________________________________________________________________________________________
Rio Tinto percentage interest shown above is at 30 September 2004. The data
represent full production and sales on a 100% basis unless otherwise stated.
RIO TINTO OPERATIONAL DATA
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
____________________________________________________________________________________________________________________
COPPER & GOLD (continued)
Escondida 30.0%
Chile
Sulphide ore treated ('000 tonnes) 18,888 18,299 19,619 21,197 20,637 52,048 61,453
Average copper grade (%) 1.33 1.31 1.48 1.61 1.47 1.47 1.52
Mill production (metals in concentrates):
Contained copper ('000 tonnes) 208.2 197.1 239.6 284.2 256.8 649.9 780.5
Contained gold ('000 ounces) 52 52 58 55 53 132 166
Contained silver ('000 ounces) 1,251 1,227 1,370 1,606 1,347 3,501 4,323
Oxide ore treated ('000 tonnes) 3,569 3,537 3,179 4,186 3,996 10,165 11,361
Average copper grade (%) 1.02 1.03 1.25 1.10 0.87 1.07 1.06
Contained copper in leachate/mined material ('000 37 37 40 46 35 109 121
tonnes)
Refined production:
Oxide plant production ('000 tonnes) 37.3 38.0 37.7 37.9 38.0 109.6 113.6
____________________________________________________________________________________________________________________
Freeport-McMoRan Copper & Gold (a)
Grasberg mine 0.0% (40.0% of the expansion)
Papua, Indonesia
Ore treated ('000 tonnes) 19,453 13,071 13,817 14,946 17,845 61,032 46,608
Average mill head grades:
Copper (%) 1.08 0.77 0.50 0.82 0.83 1.16 0.73
Gold (g/t) 1.79 1.00 0.41 0.95 0.79 1.66 0.73
Silver (g/t) 3.90 4.26 3.09 4.01 3.74 3.98 3.63
Production of metals in concentrates:
Copper in concentrates ('000 tonnes) 189.3 86.9 55.9 107.7 129.7 628.9 293.2
Gold in concentrates ('000 ounces) 1,007 369 135 395 370 2,893 901
Silver in concentrates ('000 ounces) 1,857 981 740 1,143 1,199 5,493 3,081
Sales of payable metals in concentrates:
(b)
Copper in concentrates ('000 tonnes) 184.7 85.5 53.0 101.7 127.9 607.5 282.5
Gold in concentrates ('000 ounces) 980 369 130 370 372 2,803 872
Silver in concentrates ('000 ounces) 1,431 763 563 862 943 4,231 2,367
(a) See note (f) on page 11 concerning Rio Tinto's previous direct interest
in Freeport-McMoRan Copper & Gold and its continuing 40% interest in the
expansion of Grasberg.
(b) Net of smelter deductions.
Atlantic Copper smelter 0.0%
Spain
Concentrates and scrap smelted ('000 tonnes) 253.0 224.7 187.1 - - 739.7 187.1
Copper anodes produced ('000 tonnes) (c) 78.6 65.0 57.5 - - 225.3 57.5
Copper cathodes produced ('000 tonnes) 61.4 62.0 58.4 - - 185.1 58.4
Copper cathode sales ('000 tonnes) (d) 57.7 63.8 50.8 - - 184.2 50.8
(c) New metal excluding recycled material.
(d) Refers to copper cathode and wire rod sales.
____________________________________________________________________________________________________________________
Kelian Equatorial Mining 90.0%
East Kalimantan, Indonesia
Ore treated ('000 tonnes) 1,995 2,180 2,119 2,134 2,057 5,673 6,310
Average ore grades:
Gold (g/t) 1.76 1.66 1.57 1.84 1.56 2.64 1.66
Silver (g/t) 4.39 4.40 3.94 4.12 3.90 5.09 3.99
Production:
Gold ('000 ounces) 79 82 76 81 71 387 228
Silver ('000 ounces) 66 73 64 52 93 274 209
Sales:
Gold ('000 ounces) 93 47 113 70 76 390 259
Silver ('000 ounces) 145 - 148 - - 299 148
____________________________________________________________________________________________________________________
Rio Tinto percentage interest shown above is at 30 September 2004. The data
represent full production and sales on a 100% basis unless otherwise stated.
RIO TINTO OPERATIONAL DATA
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
_____________________________________________________________________________________________________________________
COPPER & GOLD (continued)
Kennecott Minerals Company
Cortez/Pipeline mine 40.0%
Nevada, US
Ore treated
Milled ('000 tonnes) 865 878 781 760 794 2,575 2,334
Leached ('000 tonnes) 5,507 6,161 9,246 7,110 9,673 11,306 26,030
Sold for roasting ('000 tonnes) 111 62 96 111 107 402 314
Average ore grade: gold
Milled (g/t) 5.55 5.61 6.14 6.43 5.31 6.84 5.95
Leached (g/t) 0.85 0.78 0.77 0.73 0.50 0.96 0.66
Sold for roasting (g/t) 5.87 5.86 5.90 6.21 6.90 6.84 6.35
Gold produced ('000 ounces) 249 264 283 288 264 821 835
Greens Creek mine 70.3%
Alaska, US
Ore treated ('000 tonnes) 185 177 182 177 182 532 541
Average ore grades:
Gold (g/t) 6.20 6.19 5.86 6.21 5.43 6.49 5.83
Silver (g/t) 764 671 572 560 619 677 584
Zinc (%) 11.1 11.8 10.7 11.9 11.1 12.5 11.2
Lead (%) 4.3 4.7 3.9 4.6 3.9 4.5 4.1
Metals produced in concentrates:
Gold ('000 ounces) 25 24 23 23 21 75 66
Silver ('000 ounces) 3,518 2,897 2,506 2,254 2,580 8,810 7,339
Zinc ('000 tonnes) 16.6 16.1 15.3 15.6 15.3 52.9 46.2
Lead ('000 tonnes) 5.6 5.9 4.6 5.6 4.8 16.7 15.0
Rawhide mine (a) 51.0%
Nevada, US
Ore treated ('000 tonnes) - - - - - 1,614 -
Average ore grades:
Gold (g/t) - - - - - 0.51 -
Silver (g/t) - - - - - 9.4 -
Metals produced in dore:
Gold ('000 ounces) 17 15 13 13 11 49 38
Silver ('000 ounces) 131 114 108 122 111 416 341
(a) Mining operations were completed in October 2002 and processing of
stockpiled ores was completed in May 2003. Residual gold and silver
production continues from the leach pads.
_____________________________________________________________________________________________________________________
Rio Tinto percentage interest shown above is at 30 September 2004. The data
represent full production and sales on a 100% basis unless otherwise stated.
RIO TINTO OPERATIONAL DATA
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
_____________________________________________________________________________________________________________________
COPPER & GOLD (continued)
Kennecott Utah Copper
Barneys Canyon mine (a) 100.0%
Utah, US
Gold produced ('000 ounces) 10 6 7 4 5 29 16
(a) Mining operations ceased in the first quarter of 2002. Gold continues to be
recovered from leach pads.
Bingham Canyon mine 100.0%
Utah, US
Ore treated ('000 tonnes) 11,904 11,988 10,497 11,054 11,943 34,117 33,493
Average ore grade:
Copper (%) 0.72 0.64 0.64 0.62 0.58 0.69 0.61
Gold (g/t) 0.31 0.31 0.28 0.23 0.26 0.28 0.26
Silver (g/t) 2.88 3.53 2.74 2.81 2.95 2.84 2.84
Molybdenum (%) 0.028 0.038 0.027 0.019 0.028 0.024 0.025
Copper concentrates produced ('000 tonnes) 298 280 262 277 276 867 815
Average concentrate grade (% Cu) 25.9 25.5 23.9 23.1 22.8 24.2 23.3
Production of metals in copper
concentrates:
Copper ('000 tonnes) (b) 77.6 71.6 62.5 64.0 63.3 210.2 189.8
Gold ('000 ounces) 79 92 69 59 72 213 200
Silver ('000 ounces) 873 1,105 730 785 947 2,443 2,462
Molybdenum concentrates produced ('000 tonnes): 2.1 2.2 3.0 1.8 2.8 6.6 7.6
Molybdenum in concentrates ('000 tonnes) 1.2 1.1 1.6 0.9 1.5 3.5 4.0
Kennecott smelter & refinery 100.0%
Copper concentrates smelted ('000 tonnes) 282 286 279 301 288 774 869
Copper anodes produced ('000 tonnes) (c) 69.9 66.3 54.4 64.3 66.1 176.8 184.7
Production of refined metal:
Copper ('000 tonnes) 64.8 59.9 60.3 61.7 63.1 170.7 185.2
Gold ('000 ounces) (d) 66 81 81 77 74 227 232
Silver ('000 ounces) (d) 691 653 778 768 854 2,310 2,400
(b) Includes a small amount of copper in precipitates.
(c) New metal excluding recycled material.
(d) Includes gold and silver in intermediate products.
_____________________________________________________________________________________________________________________
Northparkes Joint Venture 80.0%
New South Wales, Australia
Ore treated ('000 tonnes) 1,284 1,263 1,275 1,157 1,270 3,905 3,702
Average ore grades:
Copper (%) 0.70 0.71 0.78 0.71 0.75 0.66 0.75
Gold (g/t) 0.45 0.70 0.73 0.68 0.66 0.36 0.69
Copper concentrates produced ('000 tonnes) 18.3 17.9 19.3 16.6 21.7 57.2 57.5
Contained copper in concentrates:
Saleable production ('000 tonnes) 6.7 6.5 7.3 5.9 7.5 20.6 20.8
Sales ('000 tonnes) (a) 4.5 6.2 2.8 7.2 3.1 16.3 13.1
Contained gold in concentrates:
Saleable production ('000 ounces) 11.4 18.7 21.0 18.7 17.2 29.9 56.9
Sales ('000 ounces) (a) 6.4 12.4 8.7 21.7 11.4 25.8 41.8
(a) Rio Tinto's 80% share of material from the Joint Venture.
_____________________________________________________________________________________________________________________
Rio Tinto percentage interest shown above is at 30 September 2004. The data
represent full production and sales on a 100% basis unless otherwise stated.
RIO TINTO OPERATIONAL DATA
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
_____________________________________________________________________________________________________________________
COPPER & GOLD (continued)
Palabora 49.2%
Palabora mine
South Africa
Ore treated ('000 tonnes) 3,398 2,838 2,101 1,897 2,345 8,577 6,343
Average ore grade: copper (%) 0.53 0.63 0.76 0.74 0.75 0.57 0.75
Copper concentrates produced ('000 tonnes) 43.5 46.3 35.9 35.4 64.2 117.0 135.5
Average concentrate grade: copper (%) 32.9 31.3 29.7 28.3 27.7 32.4 28.4
Copper in concentrates ('000 tonnes) 14.3 14.5 10.7 10.0 17.8 37.9 38.4
Palabora smelter/refinery
New concentrate smelted on site ('000 64.0 72.5 59.4 68.0 59.0 195.2 186.5
tonnes)
New copper anodes produced ('000 tonnes) 19.4 21.3 15.8 19.7 14.4 55.3 49.9
Refined new copper produced ('000 tonnes) 17.4 20.9 17.9 17.2 16.2 52.5 51.3
By-products:
Magnetite concentrate ('000 tonnes) 53 68 105 160 144 148 409
Refined nickel sulphate (tonnes) 26 38 53 37 36 114 126
Vermiculite plant
Vermiculite produced ('000 tonnes) 32.5 35.6 38.4 51.5 52.7 137.6 142.6
_____________________________________________________________________________________________________________________
Peak Gold Mine (a) 0.0%
New South Wales, Australia
Ore treated ('000 tonnes) - - - - - 144 -
Average ore grades:
Gold (g/t) - - - - - 5.23 -
Silver (g/t) - - - - - 3.16 -
Copper (%) - - - - - 0.13 -
Lead (%) - - - - - 0.11 -
Zinc (%) - - - - - 0.00 -
Bullion produced ('000 ounces) - - - - - 23 -
Containing:
Gold ('000 ounces) - - - - - 20 -
Silver ('000 ounces) - - - - - 3 -
Gold recovered in concentrates ('000 ounces) - - - - - - -
______________________________________________________________
Total gold production ('000 ounces) - - - - - 20 -
______________________________________________________________
Bullion sales (fine gold) ('000 ounces) - - - - - 20 -
(a) Rio Tinto completed the sale of its wholly owned Peak Gold Mine on 17 March
2003.
____________________________________________________________________________________________________________________
Rio Tinto Brasil Limitada
Morro do Ouro mine 51.0%
Minas Gerais, Brazil
Ore treated ('000 tonnes) 4,655 4,640 4,499 4,271 4,409 13,771 13,179
Average ore grade: gold (g/t) 0.45 0.43 0.45 0.46 0.44 0.45 0.45
Refined gold produced ('000 ounces) 48 51 50 45 48 150 142
____________________________________________________________________________________________________________________
Rio Tinto percentage interest shown above is at 30 September 2004. The data
represent full production and sales on a 100% basis unless otherwise stated.
RIO TINTO OPERATIONAL DATA
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
_____________________________________________________________________________________________________________________
COPPER & GOLD (continued)
Rio Tinto Zimbabwe (a)
Patchway mine (b) 0.0%
Zimbabwe
Ore treated ('000 tonnes) - - - - - 38 -
Average ore grade: gold (g/t) - - - - - 2.13 -
Total gold produced ('000 ounces) - - - - - 2 -
Renco mine 0.0%
Zimbabwe
Ore treated ('000 tonnes) 64 61 61 85 - 173 146
Average ore grade: gold (g/t) 3.48 3.56 3.13 3.43 - 3.60 3.30
Total gold produced ('000 ounces) 6 6 5 6 - 17 11
Total Rio Tinto Zimbabwe
______________________________________________________________
Total gold produced ('000 ounces) 6 6 5 6 - 19 11
______________________________________________________________
(a) As a result of the corporate restructuring completed on 8 July 2004, Rio
Tinto has ceased to be an ordinary shareholder in the renamed RioZim but
will retain a reduced cash participation in its gold and nickel assets for
a period of ten years. (b) Rio Tinto Zimbabwe completed the sale of the
Patchway mine in July 2003.
Somincor (a)
Neves Corvo mine 0.0%
Portugal
Total ore treated ('000 tonnes) (b) 354 447 448 430 - 1,253 878
of which, treated to extract tin ('000 4 10 5 8 - 12 13
tonnes)
Average ore grades:
Copper (%) 5.13 5.15 6.02 6.07 - 5.40 6.04
Tin (%) 2.26 2.46 2.15 1.80 - 1.91 1.93
Copper production:
Copper concentrates produced ('000 66.2 84.0 100.1 98.3 - 245.6 198.3
tonnes)
Copper concentrate grade: copper (%) 23.2 23.4 23.7 23.6 - 23.6 23.7
Copper in concentrates produced ('000 15.4 19.6 23.7 23.2 - 57.9 46.9
tonnes)
Tin production:
Tin concentrates produced ('000 tonnes) 0.1 0.2 0.1 0.1 - 0.1 0.2
Tin concentrate grade: tin (%) 60.7 64.3 63.9 67.1 - 56.7 65.9
Tin in concentrates produced ('000 0.0 0.1 0.0 0.1 - 0.1 0.1
tonnes)
(a) Rio Tinto completed the sale of its 49% interest in Somincor on 18 June
2004. Production data are shown up to the date of sale.
(b) Total ore treated for both copper and tin production.
_____________________________________________________________________________________________________________________
DIAMONDS
Argyle Diamonds 100.0%
Western Australia
AK1 ore processed ('000 tonnes) 2,601 2,372 2,066 2,424 2,468 7,415 6,958
AK1 Diamonds produced ('000 carats) 9,690 8,307 3,612 2,669 5,328 22,603 11,610
_____________________________________________________________________________________________________________________
Diavik Diamonds 60.0%
Northwest Territories, Canada
Ore processed ('000 tonnes) 388 300 394 541 560 894 1,495
Diamonds recovered ('000 carats) 1,466 1,101 1,537 2,273 2,263 2,731 6,073
_____________________________________________________________________________________________________________________
Merlin (a) 100.0%
Northern Territory, Australia
Ore processed ('000 tonnes) - - - - - 237 -
Diamonds recovered ('000 carats) 18 - - - - 62 -
(a) Ore mining and processing ceased during the second quarter of 2003.
_____________________________________________________________________________________________________________________
Murowa Diamonds (a) 77.8%
Zimbabwe
Ore processed ('000 tonnes) - - - - 4 - 4
Diamonds recovered ('000 carats) - - - - 3 - 3
(a) Ore mining and processing commenced during the third quarter of 2004.
_____________________________________________________________________________________________________________________
Rio Tinto percentage interest shown above is at 30 September 2004. The data
represent full production and sales on a 100% basis unless otherwise stated.
RIO TINTO OPERATIONAL DATA
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
_____________________________________________________________________________________________________________________
IRON ORE
Hamersley Iron
Western Australia
Saleable iron ore production ('000 tonnes):
Paraburdoo, Mount Tom Price, 100.0%
Marandoo, Yandicoogina and Brockman 16,079 17,462 14,407 16,273 17,140 45,595 47,819
Channar 60.0% 2,713 2,361 2,341 2,526 2,705 7,986 7,572
Eastern Range (a) 54.0% - - 3 645 1,050 - 1,698
______________________________________________________________
Total production ('000 tonnes) 18,792 19,823 16,751 19,443 20,895 53,581 57,089
______________________________________________________________
Total sales ('000 tonnes) (b) 18,636 19,987 17,664 18,112 19,822 54,346 55,598
______________________________________________________________
(a) The Eastern Range mine commenced production in March 2004.
(b) Sales represent iron ore exported from Western Australian ports (previously
reported as Total shipments).
_____________________________________________________________________________________________________________________
Iron Ore Company of Canada
Newfoundland & Labrador and Quebec in Canada
Carol Lake operations 58.7%
Saleable iron ore production:
Concentrates ('000 tonnes) 958 706 462 608 0 1,942 1,070
Pellets ('000 tonnes) 2,823 3,026 2,892 3,137 536 8,551 6,565
Sales:
Concentrate ('000 tonnes) 664 1,093 431 537 238 1,524 1,206
Pellets ('000 tonnes) 2,820 3,767 2,072 3,408 1,844 8,544 7,324
_____________________________________________________________________________________________________________________
Rio Tinto Brasil
Corumba mine 100.0%
Mato Grosso do Sul, Brazil
Saleable iron ore production ('000 tonnes) 292 279 268 306 352 795 926
(a)
(a) Production includes by-product fines.
_____________________________________________________________________________________________________________________
Robe River Iron Associates
Pannawonica mine 53.0%
Western Australia
Saleable iron ore production ('000 tonnes) 7,583 8,035 6,281 8,437 7,643 23,999 22,360
Sales ('000 tonnes) 8,413 7,470 7,325 7,014 7,602 23,604 21,942
West Angelas mine 53.0%
Western Australia
Saleable iron ore production ('000 tonnes) 2,996 4,510 3,997 4,978 5,240 8,592 14,214
Sales ('000 tonnes) 2,585 4,350 4,742 3,937 5,784 8,436 14,462
_____________________________________________________________________________________________________________________
NICKEL
Rio Tinto Brasil
Fortaleza mine 0.0%
Brazil
Production (tonnes) 1,284 1,524 - - - 4,426 -
(a) Rio Tinto completed the sale of its 100% interest in the Fortaleza nickel
mine on 16 January 2004. The sale was effective from 1 January 2004.
_____________________________________________________________________________________________________________________
Rio Tinto Zimbabwe (a)
Empress Nickel refinery 0.0%
Zimbabwe
Production (tonnes) 1,836 1,804 1,733 1,156 - 4,395 2,889
(a) As a result of the corporate restructuring completed on 8 July 2004, Rio
Tinto has ceased to be an ordinary shareholder in the renamed RioZim but
will retain a reduced cash participation in its gold and nickel assets for
a period of ten years.
_____________________________________________________________________________________________________________________
SALT
Dampier Salt 64.9%
Western Australia
Salt production ('000 tonnes) 2,186 1,725 1,745 1,936 1,957 5,410 5,638
_____________________________________________________________________________________________________________________
Rio Tinto percentage interest shown above is at 30 September 2004. The data
represent full production and sales on a 100% basis unless otherwise stated.
RIO TINTO OPERATIONAL DATA
Rio Tinto 3Q 4Q 1Q 2Q 3Q 9 MTHS 9 MTHS
interest 2003 2003 2004 2004 2004 2003 2004
_____________________________________________________________________________________________________________________
TALC
The Luzenac Group 99.9%
Australia, Europe, and North America
Talc production ('000 tonnes) 350 321 356 361 371 1,037 1,089
_____________________________________________________________________________________________________________________
TITANIUM DIOXIDE FEEDSTOCK
Rio Tinto Iron & Titanium 100.0%
Canada and South Africa
(Rio Tinto share)
Titanium dioxide feedstock production ('000 291 293 287 291 296 899 873
tonnes)
_____________________________________________________________________________________________________________________
URANIUM
Energy Resources of Australia Ltd
Ranger mine 68.4%
Northern Territory, Australia
Production (tonnes U3O8) 1,133 1,255 1,183 1,098 1,362 3,879 3,643
_____________________________________________________________________________________________________________________
Rossing Uranium Ltd 68.6%
Namibia
Production (tonnes U3O8) 904 799 907 885 990 1,602 2,781
_____________________________________________________________________________________________________________________
ZINC
Zinkgruvan Mining AB 0.0%
Sweden
Ore treated ('000 tonnes) 191 227 196 139 - 547 335
Average ore grades:
Zinc (%) 8.8 9.3 10.6 8.1 - 9.1 9.6
Lead (%) 4.8 5.3 4.2 3.6 - 4.5 3.9
Silver (g/t) 102 105 95 77 - 101 86
Production of zinc concentrate ('000 tonnes) 27.5 35.0 34.8 18.7 - 82.0 53.5
Production of lead concentrate ('000 tonnes) 11.3 14.4 9.9 5.9 - 31.4 15.8
Production of metal in concentrates:
Zinc ('000 tonnes) 15.1 19.1 19.2 10.5 - 45.4 29.7
Lead ('000 tonnes) 8.0 10.1 7.0 4.2 - 21.7 11.2
Silver ('000 ounces) 460 571 426 225 - 1,270 651
(a) Rio Tinto completed the sale of its 100% interest in the Zinkgruvan mine on
2 June 2004. Production data are shown up to the date of sale.
_____________________________________________________________________________________________________________________
Rio Tinto percentage interest shown above is at 30 September 2004. The data
represent full production and sales on a 100% basis unless otherwise stated.
This information is provided by RNS
The company news service from the London Stock Exchange