Q1 10
|
|
vs Q1 09
|
|
vs Q4 09
|
|
Hamersley
|
29,989
|
|
+31%
|
|
-12%
|
|
|
Hope Downs
|
4,054
|
|
+137%
|
|
+43%
|
|
|
Robe River
|
7,448
|
|
+58%
|
|
-7%
|
|
|
IOC (pellets and concentrate)
|
1,870
|
|
+1%
|
|
-23%
|
|
|
|
Q1 10
|
|
vs Q1 09
|
|
vs Q4 09
|
|
Kennecott Utah Copper
|
|
|
|
|
|
|
|
Mined copper (000 tonnes)
|
61.3
|
|
-18%
|
|
-8%
|
|
|
Refined copper (000 tonnes)
|
70.1
|
|
+2%
|
|
-4%
|
|
|
Molybdenum (000 tonnes)
|
3.2
|
|
+58%
|
|
-7%
|
|
|
Mined gold (000 ozs)
|
157
|
|
+24%
|
|
-1%
|
|
|
Refined gold (000 ozs)
|
174
|
|
+62%
|
|
+18%
|
|
|
Escondida
|
|
|
|
|
|
|
|
Mined copper (000 tonnes)
|
72.7
|
|
-7%
|
|
-15%
|
|
|
Refined copper (000 tonnes)
|
18.9
|
|
-20%
|
|
-21%
|
|
|
Grasberg JV
|
|
|
|
|
|
|
|
Mined copper (000 tonnes)
|
13.4
|
|
-46%
|
|
-59%
|
|
|
Mined gold (000 ozs)
|
38
|
|
-25%
|
|
-80%
|
|
|
|
Q1 10
|
|
vs Q1 09
|
|
vs Q4 09
|
|
Bauxite
|
8,246
|
|
+18%
|
|
-9%
|
|
|
Alumina
|
2,211
|
|
+1%
|
|
-3%
|
|
|
Aluminium
|
937
|
|
-1%
|
|
-2%
|
|
|
|
Q1 10
|
|
vs Q1 09
|
|
vs Q4 09
|
|
Rio Tinto Coal Australia
|
|
|
|
|
|
|
|
Hard coking coal
|
1,858
|
|
+35%
|
|
-12%
|
|
|
Other coal
|
4,864
|
|
-8%
|
|
-19%
|
|
|
|
Q1 10
|
|
vs Q1 09
|
|
vs Q4 09
|
|
US Coal
|
10,073
|
|
-53%
|
|
-41%
|
|
|
|
Q1 10
|
|
vs Q1 09
|
|
vs Q4 09
|
|
Energy Resources of Australia
|
1,361
|
|
-28%
|
|
-18%
|
|
|
Rössing
|
1,336
|
|
-10%
|
|
-21%
|
|
Diamonds (000 carats)
|
Q1 10
|
|
vs Q1 09
|
|
vs Q4 09
|
|
Argyle
|
2,531
|
|
-43%
|
|
-28%
|
|
Diavik
|
938
|
|
-12%
|
|
+2%
|
|
|
|
|
|
|
|
|
Minerals (000 tonnes)
|
|
|
|
|
|
|
Borates
|
111
|
|
-0%
|
|
+2%
|
|
Titanium dioxide feedstock
|
329
|
|
+1%
|
|
+1%
|
|
Project
|
Approved
capital cost
(100%)
|
Status/Milestones
|
Completed in 2010
|
|
|
|
|
|
Iron ore – construction of the new Mesa A / Warramboo mine (Rio Tinto 53%) in the Robe Valley of Western Australia
|
$901m
|
First ore was produced in February 2010. The mine will have an initial production of 20 Mtpa, increasing to 25Mtpa by 2011.
|
Diamonds – Diavik (Rio Tinto 60%) underground development.
|
$787m
|
The underground mine produced its first ore at the end of March 2010.
|
|
|
|
Ongoing
|
|
|
Iron ore – construction of the new 22mtpa Brockman 4 mine in the Pilbara region of Western Australia. Design considerations allowing for an increase in output by 14mtpa, to 36mtpa, are included in the Phase I scope, which will facilitate a cost effective ramp up as additional port capacity is brought on line.
|
$1,521m
|
On track to commence production in mid 2010 with a potential for further expansion. Full capacity is expected to be reached by 2012.
|
Iron ore – investment in next generation of driverless trains in the Pilbara
|
$371m
|
Approved in June 2008, the project was suspended at the end of 2008 and remains on hold.
|
Iron ore – investment in cleaner, more sustainable power generation to support expansion of mining capacity in Western Australia.
|
$503m
|
Approved in July 2008, the four gas turbines are being commissioned and are expected to come on line progressively during the second half of 2010.
|
Alumina – Expansion of Yarwun Alumina Refinery from 1.4 to 3.4 million tonnes per annum.
|
$1.9bn
|
Approved in July 2007, the project has been slowed in response to market demand. The change to the construction schedule will result in an expected completion date in the fourth quarter of 2012.
|
Aluminium - construction of a new 225MW turbine at the Shipshaw power station in Saguenay, Quebec, Canada
|
$228m
|
Approved in October 2008, the project remains on track and is expected to be completed in December 2012
|
Aluminium – modernisation of the Kitimat smelter in British Columbia, Canada
|
$0.5bn
|
The project timing has been slowed.
|
Aluminium – AP50 project
|
$0.4bn
|
The project timing has been slowed.
|
Thermal coal - Clermont(Rio Tinto 50.1%) will produce 12.2 million tonnes per annum, replacing Blair Athol.
|
$750m
|
Approved in January 2007, first shipments are expected in the second quarter of 2010 with full capacity being reached in 2013.
|
Coking coal – extension and expansion of Kestrel mine (Rio Tinto share 80%).
|
$991m
|
Approved in December 2007, the investment will extend the life of the mine to 2031 and increase production to an average of 5.7mtpa.
|
Diamonds – Argyle (Rio Tinto 100%) development of underground mine and open pit cutback, extending the life of the mine to 2018.
|
< $1.5bn
|
Approved in December 2005, the project has been slowed to critical development activities.
|
Recently approved / restarted
|
|
|
Copper – Northparkes (Rio Tinto 80%) E48 block cave project extending mine life to 2016.
|
$160m
|
Approved in November 2006, the project was put on hold in 2008 but restarted in September 2009. First production from E48 is expected in the second half of 2010.
|
Molybdenum – investment in phases 1 and 2 ofMoly autoclave project (MAP) to enable lower-grade concentrate to be processed more efficiently than conventional roasters and allow improved recoveries
|
$340m
|
First approved in June 2008, the project was put on hold. Approval was given in April 2010 to restart the project. First production from phase 1 is anticipated in the fourth quarter of 2012 and full capacity of 30mlbs is scheduled for fourth quarter 2013. The phase 2 expansion to 60mlbs per annum is anticipated to be completed in the first quarter of 2015.
|
Product Group
|
Advanced projects
|
Greenfield programmes
|
Aluminium
|
Amargosa, Brazil
|
Australia, Brazil, Guyana, Laos
|
Copper
|
Copper: Bingham Orbit, US
Nickel: Tamarack, US
|
Copper: Chile, US, Peru, Russia, Kazakhstan
Nickel: Mozambique, South Africa, Canada
|
Diamonds & Minerals
|
|
Diamonds: India, Canada, Democratic Republic of Congo
|
Energy
|
Coal: Altai Nuurs, Mongolia, Bowen Basin, Australia
Uranium: Rössing, Namibia
|
Coal: Tanzania, Mozambique, Bangladesh
Uranium: Jordan
|
Iron Ore
|
Pilbara, Australia
|
Democratic Republic of Congo
|
Media Relations, London
Nick Cobban
Office: +44 (0) 20 7781 1138
Mobile: +44 (0) 7920 041 003
Christina Mills
Office: +44 (0) 20 7781 1154
Mobile: +44 (0) 7825 275 605
|
Media Relations, Australia
David Luff
Office: +61 (0) 3 9283 3620
Mobile: +61 (0) 419 850 205 Tony Shaffer
Office: +61 (0) 3 9283 3612 Mobile: +1 202 256 3667 |
Media Relations, Americas
Tony Shaffer
Office: +61 (0) 3 9283 3612 Mobile: +1 202 256 3667 |
Media Relations, Canada
Stefano Bertolli
Office:: +1 (0) 514 848 8151
Mobile: +1 (0) 514 945 1800
|
Investor Relations, London
Mark Shannon
Office: +44 (0) 20 7781 1178
Mobile: +44 (0) 7917 576 597
David Ovington
Office: +44 (0) 20 7781 2051
Mobile: +44 (0) 7920 010 978
Investor Relations, North America
Jason Combes
Office: +1 (0) 801 204 2919
Mobile: +1 (0) 801 558 2645
|
Investor Relations, Australia
Dave Skinner
Office: +61 (0) 3 9283 3628
Simon Ellinor
Office: +61 (0) 7 3361 4365
Mobile: +61 (0) 439 102 811
|
Rio Tinto production summary
|
|
Quarter
|
|
Full Year
|
|
% change
|
|||
|
|
2009
|
2009
|
2010
|
|
|
|
Q1 10
|
Q1 10
|
|
|
Q1
|
Q4
|
Q1
|
|
2009
|
|
vs
|
vs
|
|
|
|
|
|
|
|
|
Q1 09
|
Q4 09
|
Principal Commodities
|
|
|
|
|
|
|
|
|
|
Alumina
|
('000 t)
|
2,186
|
2,282
|
2,211
|
|
8,815
|
|
1%
|
-3%
|
Aluminium
|
('000 t)
|
948
|
957
|
937
|
|
3,803
|
|
-1%
|
-2%
|
Bauxite
|
('000 t)
|
6,964
|
9,072
|
8,246
|
|
30,696
|
|
18%
|
-9%
|
Borates
|
('000 t)
|
111
|
109
|
111
|
|
424
|
|
0%
|
2%
|
Coal - hard coking coal
|
('000 t)
|
1,372
|
2,119
|
1,858
|
|
7,467
|
|
35%
|
-12%
|
Coal - other Australian
|
('000 t)
|
5,315
|
6,022
|
4,864
|
|
23,103
|
|
-8%
|
-19%
|
Coal - US
|
('000 t)
|
21,494
|
17,095
|
10,073
|
|
82,983
|
|
-53%
|
-41%
|
Copper - mined
|
('000 t)
|
196.0
|
203.3
|
165.3
|
|
804.7
|
|
-16%
|
-19%
|
Copper - refined
|
('000 t)
|
104.3
|
105.5
|
95.9
|
|
412.4
|
|
-8%
|
-9%
|
Diamonds
|
('000 cts)
|
5,506
|
4,451
|
3,497
|
|
14,026
|
|
-36%
|
-21%
|
Iron ore
|
('000 t)
|
31,244
|
47,228
|
43,361
|
|
170,038
|
|
39%
|
-8%
|
Titanium dioxide feedstock
|
('000 t)
|
324
|
325
|
329
|
|
1,147
|
|
1%
|
1%
|
Uranium
|
('000 lbs)
|
3,360
|
3,360
|
2,697
|
|
14,140
|
|
-20%
|
-20%
|
Other Metals & Minerals
|
|
|
|
|
|
|
|
|
|
Gold - mined
|
('000 ozs)
|
201
|
374
|
225
|
|
1,111
|
|
12%
|
-40%
|
Gold - refined
|
('000 ozs)
|
108
|
147
|
174
|
|
479
|
|
62%
|
18%
|
Molybdenum
|
('000 t)
|
2.0
|
3.4
|
3.2
|
|
11.3
|
|
58%
|
-7%
|
Salt
|
('000 t)
|
1,405
|
1,192
|
1,187
|
|
5,848
|
|
-16%
|
0%
|
Silver - mined
|
('000 ozs)
|
1,803
|
2,375
|
1,784
|
|
8,569
|
|
-1%
|
-25%
|
Silver - refined
|
('000 ozs)
|
1,085
|
1,148
|
1,320
|
|
4,050
|
|
22%
|
15%
|
Talc
|
('000 t)
|
202
|
222
|
240
|
|
888
|
|
19%
|
8%
|
Throughout this report, figures in italics indicate adjustments made since the figure was previously quoted on the equivalent page. Production figures are sometimes more precise than the rounded numbers shown, hence small differences may result between the total of the quarter figures and the full year figures.
Rio Tinto share of production
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
ALUMINA |
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
Gardanne (a) |
100% |
- |
- |
- |
- |
- |
- |
Gove |
100% |
609 |
613 |
641 |
656 |
595 |
2,519 |
Jonquière (Vaudreuil) |
100% |
327 |
248 |
261 |
288 |
316 |
1,125 |
Queensland Alumina |
80% |
770 |
781 |
803 |
813 |
762 |
3,167 |
São Luis (Alumar) |
10% |
38 |
37 |
37 |
53 |
59 |
166 |
Yarwun |
100% |
313 |
347 |
345 |
341 |
336 |
1,347 |
Speciality alumina plants |
100% |
129 |
113 |
121 |
129 |
143 |
492 |
Rio Tinto total alumina production |
|
2,186 |
2,139 |
2,208 |
2,282 |
2,211 |
8,815 |
ALUMINIUM |
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
Australia - Bell Bay |
100% |
44 |
45 |
44 |
44 |
43 |
177 |
Australia - Boyne Island |
59% |
81 |
83 |
84 |
84 |
82 |
331 |
Australia - Tomago |
52% |
67 |
68 |
69 |
68 |
67 |
272 |
Cameroon - Alucam (Edéa) |
47% |
8 |
8 |
9 |
10 |
8 |
34 |
Canada - six wholly owned (b) |
100% |
354 |
348 |
343 |
345 |
337 |
1,390 |
Canada - Alouette (Sept-Îles) |
40% |
56 |
57 |
58 |
58 |
57 |
229 |
Canada - Bécancour |
25% |
27 |
25 |
26 |
27 |
26 |
105 |
France - two wholly owned |
100% |
84 |
82 |
89 |
90 |
88 |
345 |
Iceland - ISAL (Reykjavik) |
100% |
46 |
47 |
48 |
48 |
47 |
190 |
New Zealand - Tiwai Point |
79% |
46 |
48 |
57 |
64 |
65 |
215 |
Norway - SORAL (Husnes) |
50% |
16 |
11 |
11 |
11 |
11 |
49 |
Oman - Sohar |
20% |
16 |
18 |
18 |
19 |
18 |
70 |
UK - two wholly owned |
100% |
36 |
35 |
36 |
40 |
41 |
147 |
UK - Anglesey (c) |
51% |
18 |
18 |
18 |
- |
- |
54 |
USA - Sebree |
100% |
48 |
48 |
48 |
49 |
48 |
193 |
Rio Tinto total aluminium production |
|
948 |
942 |
956 |
957 |
937 |
3,803 |
BAUXITE |
|
|
|
|
|
|
|
Production ('000 tonnes) (d) |
|
|
|
|
|
|
|
Awaso (e) |
0% |
174 |
109 |
22 |
47 |
34 |
352 |
Gove |
100% |
1,551 |
1,816 |
1,822 |
1,996 |
1,849 |
7,185 |
Porto Trombetas |
12% |
451 |
425 |
480 |
521 |
457 |
1,877 |
Sangaredi |
(f) |
1,374 |
937 |
1,171 |
1,565 |
1,356 |
5,047 |
Weipa |
100% |
3,415 |
3,929 |
3,949 |
4,942 |
4,550 |
16,235 |
Rio Tinto total bauxite production |
|
6,964 |
7,217 |
7,443 |
9,072 |
8,246 |
30,696 |
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
BORATES |
|
|
|
|
|
|
|
Production ('000 tonnes B2O3 content) |
|
|
|
|
|
|
|
Rio Tinto Minerals - borates |
100% |
111 |
79 |
124 |
109 |
111 |
424 |
COAL - HARD COKING |
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
Hail Creek Coal |
82% |
872 |
1,292 |
1,496 |
1,513 |
1,006 |
5,173 |
Kestrel Coal |
80% |
501 |
606 |
581 |
607 |
852 |
2,294 |
Rio Tinto total hard coking coal production |
|
1,372 |
1,898 |
2,077 |
2,119 |
1,858 |
7,467 |
COAL - OTHER (g) |
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
Bengalla |
30% |
341 |
435 |
445 |
434 |
372 |
1,655 |
Blair Athol Coal |
71% |
1,818 |
2,250 |
2,142 |
1,858 |
1,525 |
8,068 |
Hunter Valley Operations |
76% |
2,047 |
2,066 |
2,085 |
2,305 |
1,955 |
8,504 |
Kestrel Coal |
80% |
285 |
121 |
111 |
163 |
143 |
679 |
Mount Thorley Operations |
61% |
345 |
385 |
583 |
711 |
300 |
2,024 |
Warkworth |
42% |
479 |
478 |
665 |
549 |
569 |
2,172 |
Total Australian other coal |
|
5,315 |
5,734 |
6,031 |
6,022 |
4,864 |
23,103 |
|
|
|
|
|
|
|
|
US Coal ('000 tonnes) |
|
|
|
|
|
|
|
Antelope (h) |
48% |
7,277 |
7,799 |
8,057 |
5,898 |
3,708 |
29,031 |
Colowyo |
100% |
869 |
783 |
845 |
717 |
582 |
3,214 |
Cordero Rojo (h) |
48% |
8,897 |
7,588 |
9,586 |
7,289 |
3,906 |
33,361 |
Decker (h) |
24% |
536 |
505 |
588 |
387 |
103 |
2,017 |
Spring Creek (h) |
48% |
3,915 |
4,392 |
4,251 |
2,803 |
1,774 |
15,360 |
Total US coal |
|
21,494 |
21,067 |
23,327 |
17,095 |
10,073 |
82,983 |
Rio Tinto total other coal production |
|
26,810 |
26,801 |
29,358 |
23,117 |
14,937 |
106,086 |
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
COPPER |
|
|
|
|
|
|
|
Mine production ('000 tonnes) (d) |
|
|
|
|
|
|
|
Bingham Canyon |
100% |
74.7 |
86.2 |
75.8 |
66.8 |
61.3 |
303.5 |
Escondida |
30% |
78.1 |
76.2 |
78.2 |
85.9 |
72.7 |
318.3 |
Grasberg - Joint Venture (i) |
40% |
24.7 |
25.3 |
25.2 |
32.5 |
13.4 |
107.7 |
Northparkes |
80% |
6.6 |
7.4 |
6.9 |
6.5 |
7.3 |
27.4 |
Palabora |
58% |
11.8 |
13.1 |
11.1 |
11.6 |
10.6 |
47.6 |
Rio Tinto total mine production |
|
196.0 |
208.2 |
197.2 |
203.3 |
165.3 |
804.7 |
Refined production ('000 tonnes) |
|
|
|
|
|
|
|
Escondida |
30% |
23.5 |
25.7 |
25.0 |
24.0 |
18.9 |
98.2 |
Kennecott Utah Copper |
100% |
68.7 |
65.1 |
67.6 |
72.9 |
70.1 |
274.2 |
Palabora |
58% |
12.1 |
11.2 |
8.0 |
8.7 |
6.9 |
40.0 |
Rio Tinto total refined production |
|
104.3 |
102.0 |
100.6 |
105.5 |
95.9 |
412.4 |
DIAMONDS |
|
|
|
|
|
|
|
Production ('000 carats) |
|
|
|
|
|
|
|
Argyle |
100% |
4,404 |
408 |
2,274 |
3,504 |
2,531 |
10,591 |
Diavik |
60% |
1,071 |
853 |
497 |
918 |
938 |
3,339 |
Murowa |
78% |
31 |
20 |
17 |
29 |
29 |
97 |
Rio Tinto total diamond production |
|
5,506 |
1,281 |
2,787 |
4,451 |
3,497 |
14,026 |
GOLD |
|
|
|
|
|
|
|
Mine production ('000 ounces) (d) |
|
|
|
|
|
|
|
Barneys Canyon |
100% |
1 |
1 |
0 |
0 |
1 |
2 |
Bingham Canyon |
100% |
126 |
159 |
138 |
158 |
157 |
582 |
Escondida |
30% |
11 |
11 |
9 |
13 |
12 |
43 |
Grasberg - Joint Venture (i) |
40% |
51 |
73 |
118 |
187 |
38 |
429 |
Northparkes |
80% |
6 |
6 |
7 |
9 |
11 |
27 |
Rawhide |
100% |
4 |
5 |
5 |
5 |
4 |
19 |
Others |
- |
3 |
2 |
2 |
1 |
2 |
8 |
Rio Tinto total mine production |
|
201 |
258 |
278 |
374 |
225 |
1,111 |
Refined production ('000 ounces) |
|
|
|
|
|
|
|
Kennecott Utah Copper |
100% |
108 |
112 |
112 |
147 |
174 |
479 |
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
IRON ORE & IRON |
|
|
|
|
|
|
|
Production ('000 tonnes) (d) |
|
|
|
|
|
|
|
Hamersley - six wholly owned mines |
100% |
19,571 |
26,834 |
30,353 |
30,050 |
25,510 |
106,808 |
Hamersley - Channar |
60% |
1,437 |
1,819 |
1,851 |
1,517 |
2,006 |
6,625 |
Hamersley - Eastern Range |
(k) |
1,958 |
2,374 |
2,636 |
2,349 |
2,473 |
9,318 |
Hope Downs |
50% |
1,707 |
2,748 |
3,019 |
2,843 |
4,054 |
10,317 |
Iron Ore Company of Canada |
59% |
1,853 |
2,515 |
1,329 |
2,432 |
1,870 |
8,129 |
Robe River |
53% |
4,717 |
8,298 |
7,789 |
8,037 |
7,448 |
28,841 |
Rio Tinto total mine production |
|
31,244 |
44,589 |
46,977 |
47,228 |
43,361 |
170,038 |
Pig iron production ('000 tonnes) |
|
|
|
|
|
|
|
HIsmelt® (j) |
60% |
- |
- |
- |
- |
- |
- |
MOLYBDENUM |
|
|
|
|
|
|
|
Mine production ('000 tonnes) (d) |
|
|
|
|
|
|
|
Bingham Canyon |
100% |
2.0 |
2.5 |
3.4 |
3.4 |
3.2 |
11.3 |
SALT |
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
Dampier Salt |
68% |
1,405 |
1,520 |
1,731 |
1,192 |
1,187 |
5,848 |
SILVER |
|
|
|
|
|
|
|
Mine production ('000 ounces) (d) |
|
|
|
|
|
|
|
Bingham Canyon |
100% |
1,106 |
1,389 |
1,189 |
1,187 |
1,146 |
4,871 |
Escondida |
30% |
403 |
416 |
316 |
492 |
471 |
1,627 |
Grasberg - Joint Venture (i) |
40% |
154 |
303 |
460 |
557 |
16 |
1,474 |
Others |
- |
141 |
159 |
158 |
138 |
151 |
596 |
Rio Tinto total mine production |
|
1,803 |
2,268 |
2,122 |
2,375 |
1,784 |
8,569 |
Refined production ('000 ounces) |
|
|
|
|
|
|
|
Kennecott Utah Copper |
100% |
1,085 |
931 |
886 |
1,148 |
1,320 |
4,050 |
TALC |
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
Rio Tinto Minerals - talc |
100% |
202 |
224 |
240 |
222 |
240 |
888 |
TITANIUM DIOXIDE FEEDSTOCK |
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
Rio Tinto Iron & Titanium |
100% |
324 |
332 |
165 |
325 |
329 |
1,147 |
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
URANIUM |
|
|
|
|
|
|
|
Production ('000 lbs U3O8) |
|
|
|
|
|
|
|
Energy Resources of Australia |
68% |
1,883 |
2,180 |
2,138 |
1,663 |
1,361 |
7,865 |
Rössing |
69% |
1,477 |
1,461 |
1,640 |
1,697 |
1,336 |
6,275 |
Rio Tinto total uranium production |
|
3,360 |
3,641 |
3,778 |
3,360 |
2,697 |
14,140 |
(a) Production of smelter grade alumina at Gardanne ceased at the end of 2008. Production continues from the Gardanne specialty alumina plant.
(b) Includes data for the Beauharnois smelter which ceased smelting operations in the second quarter of 2009.
(c) The Anglesey smelter ceased smelting operations at the end of the third quarter of 2009.
(d) Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus pellets.
(e) Rio Tinto Alcan had an 80% interest in the Awaso mine but purchased the additional 20% of production. Rio Tinto Alcan sold its interest in Ghana Bauxite Company, owner of the Awaso mine, with an effective date of 1 February 2010. Production data are shown up to that date.
(f) Rio Tinto has a 22.95% shareholding in the Sangaredi mine but receives 45.0% of production under the partnership agreement.
(g) Coal - other includes thermal coal and semi-soft coking coal.
(h) As a result of the initial public offering of Cloud Peak Energy Inc. on 20 November 2009, Rio Tinto now holds a 48.3% interest in the Antelope, Cordero Rojo and Spring Creek mines and a 24.1% interest in the Decker mine. These interests were formerly reported under Rio Tinto Energy America but are now managed by Cloud Peak Energy.
(i) Through a joint venture agreement with Freeport-McMoRan Copper & Gold (FCX), Rio Tinto is entitled to 40% of additional material mined as a consequence of expansions and developments of the Grasberg facilities since 1998. Rio Tinto's share of production reflects actual production for the periods shown.
(j) In March 2009, Rio Tinto announced that HIsmelt would be placed on an extended care and maintenance programme.
(k) Rio Tinto's share of production includes 100% of the production from the Eastern Range mine. Under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture.
The Rio Tinto percentage interest shown above is at 31 March 2010.
Where Rio Tinto's beneficial interest in an operation has changed, as footnoted above, the share of production has been calculated using the weighted average interest over the relevant periods. Rio Tinto's interests in the Ningxia aluminium smelter, Corumbá and Jacobs Ranch mines were sold in 2009. No data for these operations are included in the Share of Production table.
Rio Tinto operational data
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
ALUMINIUM |
|
|
|
|
|
|
|
Rio Tinto Alcan |
|
|
|
|
|
|
|
Bauxite Mines |
|
|
|
|
|
|
|
Bauxite production ('000 tonnes) |
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
Gove mine - Northern Territory |
100.0% |
1,551 |
1,816 |
1,822 |
1,996 |
1,849 |
7,185 |
Weipa mine - Queensland |
100.0% |
3,415 |
3,929 |
3,949 |
4,942 |
4,550 |
16,235 |
Brazil |
|
|
|
|
|
|
|
Porto Trombetas (MRN) mine |
12.0% |
3,756 |
3,544 |
4,000 |
4,345 |
3,809 |
15,645 |
Ghana |
|
|
|
|
|
|
|
Awaso mine (a) |
80.0% |
217 |
136 |
28 |
59 |
42 |
440 |
Guinea |
|
|
|
|
|
|
|
Sangaredi mine (b) |
23.0% |
3,053 |
2,083 |
2,602 |
3,478 |
3,013 |
11,216 |
|
|
|
|
|
|
|
|
Rio Tinto Alcan share of bauxite shipments |
|
|
|
|
|
||
Share of bauxite shipments ('000 tonnes) |
7,291 |
7,337 |
7,803 |
9,140 |
7,671 |
31,571 |
(a) Rio Tinto Alcan had an 80% interest in the Awaso mine but purchased the additional 20% of production. Rio Tinto Alcan sold its interest in Ghana Bauxite Company, owner of the Awaso mine, with an effective date of 1 February 2010. Production data are shown up to that date.
(b) Rio Tinto has a 22.95% shareholding in the Sangaredi mine but receives 45.0% of production under the partnership agreement.
|
|
|
|
|
|
|
|
Alumina production ('000 tonnes) |
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
Gove refinery - Northern Territory |
100.0% |
609 |
613 |
641 |
656 |
595 |
2,519 |
Queensland Alumina Refinery - Queensland |
80.0% |
962 |
977 |
1,003 |
1,017 |
953 |
3,959 |
Yarwun refinery - Queensland |
100.0% |
313 |
347 |
345 |
341 |
336 |
1,347 |
Brazil |
|
|
|
|
|
|
|
São Luis (Alumar) refinery |
10.0% |
382 |
370 |
373 |
532 |
588 |
1,657 |
Canada |
|
|
|
|
|
|
|
Jonquière (Vaudreuil) refinery - Quebec |
100.0% |
327 |
248 |
261 |
288 |
316 |
1,125 |
France |
|
|
|
|
|
|
|
Gardanne refinery (a) |
100.0% |
- |
- |
- |
- |
- |
- |
(a) Production of smelter grade alumina at Gardanne ceased at the end of 2008. Production continues from the Gardanne specialty alumina plant.
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
ALUMINIUM (continued) |
|
|
|
|
|
|
|
Specialty Alumina Plants |
|
|
|
|
|
|
|
Specialty alumina production ('000 tonnes) |
|
|
|
|
|
|
|
Canada |
|
|
|
|
|
|
|
Brockville plant - Quebec |
100.0% |
4 |
4 |
3 |
4 |
4 |
16 |
Jonquière (Vaudreuil) plant - Quebec |
100.0% |
26 |
29 |
27 |
26 |
24 |
109 |
France |
|
|
|
|
|
|
|
Beyrede |
100.0% |
3 |
2 |
4 |
6 |
4 |
15 |
Gardanne plant |
100.0% |
88 |
70 |
76 |
83 |
99 |
317 |
La Bathie plant |
100.0% |
4 |
3 |
4 |
5 |
7 |
16 |
Germany |
|
|
|
|
|
|
|
Teutschenthal plant |
100.0% |
4 |
4 |
6 |
5 |
5 |
19 |
Aluminium Smelters |
|
|
|
|
|
|
|
Primary aluminium production ('000 tonnes) |
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
Bell Bay smelter - Tasmania |
100.0% |
44 |
45 |
44 |
44 |
43 |
177 |
Boyne Island smelter - Queensland |
59.4% |
136 |
139 |
141 |
141 |
137 |
556 |
Tomago smelter - New South Wales |
51.6% |
130 |
132 |
133 |
133 |
129 |
528 |
Cameroon |
|
|
|
|
|
|
|
Alucam (Edéa) smelter |
46.7% |
17 |
16 |
18 |
22 |
17 |
73 |
Canada |
|
|
|
|
|
|
|
Alma smelter - Quebec |
100.0% |
108 |
108 |
109 |
110 |
107 |
435 |
Alouette (Sept-Îles) smelter - Quebec |
40.0% |
140 |
143 |
145 |
145 |
141 |
573 |
Arvida smelter - Quebec |
100.0% |
41 |
43 |
43 |
44 |
43 |
171 |
Beauharnois, smelter - Quebec (a) |
100.0% |
9 |
2 |
- |
- |
- |
11 |
Bécancour smelter - Quebec |
25.1% |
107 |
101 |
103 |
109 |
103 |
420 |
Grande-Baie smelter - Quebec |
100.0% |
53 |
53 |
54 |
54 |
54 |
215 |
Kitimat smelter - British Colombia |
100.0% |
60 |
59 |
53 |
52 |
50 |
224 |
Laterrière smelter - Quebec |
100.0% |
58 |
59 |
59 |
59 |
58 |
235 |
Shawinigan smelter - Quebec |
100.0% |
25 |
25 |
25 |
25 |
25 |
99 |
China |
|
|
|
|
|
|
|
Ningxia (Qingtongxia) smelter (b) |
0.0% |
10 |
- |
- |
- |
- |
10 |
France |
|
|
|
|
|
|
|
Dunkerque smelter |
100.0% |
57 |
57 |
64 |
66 |
64 |
244 |
Saint-Jean-de-Maurienne smelter |
100.0% |
28 |
25 |
25 |
24 |
24 |
101 |
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
ALUMINIUM (continued) |
|
|
|
|
|
|
|
Iceland |
|
|
|
|
|
|
|
ISAL (Reykjavik) smelter |
100.0% |
46 |
47 |
48 |
48 |
47 |
190 |
New Zealand |
|
|
|
|
|
|
|
Tiwai Point smelter |
79.4% |
58 |
61 |
71 |
81 |
82 |
271 |
Norway |
|
|
|
|
|
|
|
SORAL (Husnes) smelter |
50.0% |
32 |
21 |
22 |
22 |
22 |
98 |
Oman |
|
|
|
|
|
|
|
Sohar smelter |
20.0% |
79 |
90 |
89 |
93 |
89 |
351 |
United Kingdom |
|
|
|
|
|
|
|
Anglesey Aluminium smelter (c) |
51.0% |
35 |
35 |
36 |
- |
- |
106 |
Lochaber smelter |
100.0% |
9 |
9 |
9 |
10 |
10 |
38 |
Lynemouth smelter |
100.0% |
26 |
26 |
27 |
30 |
31 |
109 |
United States |
|
|
|
|
|
|
|
Sebree smelter - Kentucky |
100.0% |
48 |
48 |
48 |
49 |
48 |
193 |
Rio Tinto Alcan share of metal sales |
|
|
|
|
|
|
|
Share of primary aluminium sales |
|
1,167 |
1,243 |
1,244 |
1,254 |
1,232 |
4,909 |
(a) The Beauharnois smelter ceased smelting operations in the second quarter of 2009.
(b) Rio Tinto sold its 50% interest in the Ningxia aluminium smelter with an effective date of 26 January 2009
(c) The Anglesey smelter ceased smelting operations at the end of the third quarter of 2009.
(d) Primary aluminium sales include sales made through Rio Tinto Alcan's Engineered Products division.
BORATES |
|
|
|
|
|
|
|
Rio Tinto Minerals - borates |
100.0% |
|
|
|
|
|
|
California, US and Argentina |
|
|
|
|
|
|
|
Borates ('000 tonnes) (a) |
|
111 |
79 |
124 |
109 |
111 |
424 |
(a) Production is expressed as B2O3 content.
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
COAL |
|
|
|
|
|
|
|
Rio Tinto Coal Australia |
|
|
|
|
|
|
|
Bengalla mine |
30.3% |
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
1,126 |
1,438 |
1,468 |
1,434 |
1,228 |
5,466 |
Blair Athol Coal mine |
71.2% |
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
2,552 |
3,158 |
3,007 |
2,609 |
2,141 |
11,325 |
Hail Creek Coal mine |
82.0% |
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
Hard coking coal production ('000 tonnes) |
1,063 |
1,576 |
1,824 |
1,845 |
1,227 |
6,308 |
|
Hunter Valley Operations |
75.7% |
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
2,212 |
2,383 |
1,610 |
2,400 |
1,892 |
8,606 |
Semi-soft coking coal production ('000 tonnes) |
492 |
346 |
1,144 |
644 |
690 |
2,626 |
|
Kestrel Coal mine (a) |
80.0% |
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
356 |
151 |
138 |
204 |
179 |
849 |
Hard coking coal production ('000 tonnes) |
626 |
758 |
726 |
758 |
1,065 |
2,868 |
|
Mount Thorley Operations |
60.6% |
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
513 |
478 |
882 |
357 |
189 |
2,230 |
Semi-soft coking coal production ('000 tonnes) |
57 |
157 |
81 |
818 |
306 |
1,112 |
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
COAL (continued) |
|
|
|
|
|
|
|
Warkworth mine |
42.1% |
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
1,064 |
918 |
1,378 |
1,272 |
1,115 |
4,632 |
Semi-soft coking coal production ('000 tonnes) |
75 |
217 |
204 |
34 |
236 |
530 |
|
|
|
|
|
|
|
|
|
Total hard coking coal production ('000 tonnes) |
1,689 |
2,334 |
2,550 |
2,603 |
2,292 |
9,176 |
|
Total hard coking coal sales ('000 tonnes) (a) |
2,186 |
2,551 |
2,761 |
2,761 |
1,873 |
10,260 |
|
Total other coal production ('000 tonnes) (b) |
8,447 |
9,246 |
9,912 |
9,772 |
7,977 |
37,377 |
|
Total other coal sales ('000 tonnes) (c) (d) |
7,376 |
9,323 |
9,654 |
10,231 |
7,235 |
36,584 |
|
|
|
|
|
|
|
|
|
Total coal production ('000 tonnes) |
10,136 |
11,580 |
12,462 |
12,375 |
10,269 |
46,554 |
|
Total coal sales ('000 tonnes) |
9,562 |
11,875 |
12,415 |
12,992 |
9,108 |
46,844 |
|
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia share |
|
|
|
|
|
|
|
Share of hard coking coal sales ('000 tonnes) (a) |
1,773 |
2,072 |
2,246 |
2,246 |
1,519 |
8,337 |
|
Share of other coal sales ('000 tonnes) (c) (d) |
4,603 |
5,742 |
5,955 |
6,205 |
4,377 |
22,505 |
(a) Kestrel produces hard-coking coal and thermal coal through its mining operations. These coals may be blended at ports; blended coal sales are included in hard-coking coal sales.
(b) Other coal production includes thermal coal and semi-soft coking coal.
(c) Other coal sales include thermal coal and semi-soft coking coal.
(d) Sales relate only to coal mined by the operations and exclude traded coal.
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
COAL (continued) |
|
|
|
|
|
|
|
US Coal |
|
|
|
|
|
|
|
Antelope mine (a) |
48.3% |
|
|
|
|
|
|
Wyoming, US |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
7,277 |
7,799 |
8,057 |
7,732 |
7,682 |
30,865 |
Colowyo mine |
100.0% |
|
|
|
|
|
|
Colorado, US |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
869 |
783 |
845 |
717 |
582 |
3,214 |
Cordero Rojo mine (a) |
48.3% |
|
|
|
|
|
|
Wyoming, US |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
8,897 |
7,588 |
9,586 |
9,616 |
8,091 |
35,687 |
Decker mine (a) |
24.1% |
|
|
|
|
|
|
Montana, US |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
1,073 |
1,010 |
1,177 |
901 |
429 |
4,161 |
Jacobs Ranch mine (b) |
0.0% |
|
|
|
|
|
|
Wyoming, US |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
9,349 |
8,062 |
9,126 |
- |
- |
26,537 |
Spring Creek mine (a) |
48.3% |
|
|
|
|
|
|
Montana, US |
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
3,915 |
4,392 |
4,251 |
3,478 |
3,674 |
16,035 |
|
|
|
|
|
|
|
|
Total coal production ('000 tonnes) |
|
31,380 |
29,634 |
33,041 |
22,444 |
20,458 |
116,499 |
Total coal sales ('000 tonnes) |
|
32,076 |
29,487 |
32,918 |
22,467 |
22,417 |
116,947 |
(a) As a result of the initial public offering of Cloud Peak Energy Inc. on 20 November 2009, Rio Tinto now holds a 48.3% interest in the Antelope, Cordero Rojo and Spring Creek mines and a 24.1% interest in the Decker mine. These interests were formerly reported under Rio Tinto Energy America but are now managed by Cloud Peak Energy.
(b) Rio Tinto sold its 100% interest in the Jacobs Ranch mine with an effective date of 1 October 2009. Production data are shown up to that date.
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
COPPER & GOLD |
|
|
|
|
|
|
|
Escondida |
30.0% |
|
|
|
|
|
|
Chile |
|
|
|
|
|
|
|
Sulphide ore to concentrator ('000 tonnes) |
21,381 |
19,898 |
16,224 |
20,246 |
17,697 |
77,749 |
|
Average copper grade (%) |
|
0.93 |
1.22 |
1.40 |
1.38 |
1.29 |
1.22 |
Mill production (metals in concentrates): |
|
|
|
|
|
|
|
Contained copper ('000 tonnes) |
|
156.4 |
199.6 |
188.4 |
233.0 |
189.2 |
777.4 |
Contained gold ('000 ounces) |
|
35 |
37 |
29 |
42 |
40 |
144 |
Contained silver ('000 ounces) |
|
1,345 |
1,387 |
1,052 |
1,641 |
1,571 |
5,424 |
Recoverable copper in ore stacked for leaching |
104 |
54 |
72 |
53 |
53 |
284 |
|
Refined production from leach plants: |
|
|
|
|
|
|
|
Copper cathode production ('000 tonnes) |
78 |
86 |
83 |
80 |
63 |
327 |
(a) With effect from the first quarter of 2010, the calculation of copper in material mined for leaching is based on ore stacked at the leach pad.
Freeport-McMoRan Copper & Gold |
0.0% (40% of the expansion) |
|
|
|
|||
Grasberg mine (a) |
|
|
|
|
|
|
|
Papua, Indonesia |
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
21,364 |
21,632 |
22,191 |
21,786 |
20,177 |
86,973 |
Average mill head grades: |
|
|
|
|
|
|
|
Copper (%) |
|
1.12 |
1.10 |
0.90 |
0.82 |
0.84 |
0.98 |
Gold (g/t) |
|
1.13 |
1.51 |
1.33 |
1.23 |
1.00 |
1.30 |
Silver (g/t) |
|
3.63 |
3.81 |
3.49 |
3.03 |
2.66 |
3.49 |
Production of metals in concentrates: |
|
|
|
|
|
|
|
Copper in concentrates ('000 tonnes) |
|
214.6 |
214.8 |
180.8 |
161.3 |
147.0 |
771.4 |
Gold in concentrates ('000 ounces) |
|
638 |
875 |
823 |
740 |
534 |
3,076 |
Silver in concentrates ('000 ounces) |
|
2,012 |
2,314 |
1,909 |
1,652 |
977 |
7,888 |
Sales of payable metals in concentrates: (b) |
|
|
|
|
|
|
|
Copper in concentrates ('000 tonnes) |
|
189.0 |
222.1 |
174.3 |
152.4 |
144.3 |
737.8 |
Gold in concentrates ('000 ounces) |
|
565 |
885 |
796 |
707 |
535 |
2,953 |
Silver in concentrates ('000 ounces) |
|
1,425 |
1,876 |
1,459 |
1,248 |
795 |
6,008 |
(a) Through a joint venture agreement with Freeport-McMoRan Copper & Gold (FCX), Rio Tinto is entitled to 40% of additional material mined as a consequence of expansions and developments of the Grasberg facilities since 1998. The 1Q 2010 results show the forecast from FCX's most recent five-year plan because FCX is not releasing its actual 100% operating data for 1Q 2010 until the release of its 2010 first-quarter results on 21 April 2010.
(b) Net of smelter deductions.
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
Kennecott Minerals Company |
|
|
|
|
|
|
|
Rawhide mine (a) |
100.0% |
|
|
|
|
|
|
Nevada, US |
|
|
|
|
|
|
|
Metals produced in doré: |
|
|
|
|
|
|
|
Gold ('000 ounces) |
|
4 |
5 |
5 |
5 |
4 |
19 |
Silver ('000 ounces) |
|
35 |
54 |
63 |
58 |
52 |
210 |
(a) Mining operations were completed in October 2002 and processing of stockpiled ores was completed in May 2003. Residual gold and silver production continues from the leach pads.
Kennecott Utah Copper |
|
|
|
|
|
|
|
Barneys Canyon mine (a) |
100.0% |
|
|
|
|
|
|
Utah, US |
|
|
|
|
|
|
|
Gold produced ('000 ounces) |
|
0.8 |
0.8 |
0.4 |
0.4 |
0.8 |
2.3 |
Bingham Canyon mine |
100.0% |
|
|
|
|
|
|
Utah, US |
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
12,281 |
13,749 |
13,880 |
12,946 |
13,303 |
52,856 |
Average ore grade: |
|
|
|
|
|
|
|
Copper (%) |
|
0.69 |
0.69 |
0.60 |
0.57 |
0.52 |
0.64 |
Gold (g/t) |
|
0.44 |
0.52 |
0.43 |
0.53 |
0.51 |
0.48 |
Silver (g/t) |
|
3.37 |
3.96 |
3.35 |
3.45 |
3.28 |
3.54 |
Molybdenum (%) |
|
0.031 |
0.036 |
0.038 |
0.044 |
0.042 |
0.038 |
Copper concentrates produced ('000 tonnes) |
256 |
290 |
258 |
223 |
224 |
1,028 |
|
Average concentrate grade (% Cu) |
29.0 |
29.7 |
29.3 |
29.9 |
27.2 |
29.4 |
|
Production of metals in copper concentrates: |
|
|
|
|
|
|
|
Copper ('000 tonnes) (b) |
|
74.7 |
86.2 |
75.8 |
66.8 |
61.3 |
303.5 |
Gold ('000 ounces) |
|
126 |
159 |
138 |
158 |
157 |
582 |
Silver ('000 ounces) |
|
1,106 |
1,389 |
1,189 |
1,187 |
1,146 |
4,871 |
Molybdenum concentrates produced ('000 tonnes): |
3.8 |
4.7 |
6.5 |
6.5 |
6.2 |
21.6 |
|
Molybdenum in concentrates ('000 tonnes) |
2.0 |
2.5 |
3.4 |
3.4 |
3.2 |
11.3 |
(a) Mining operations ceased in the first quarter of 2002. Gold continues to be recovered from leach pads.
(b) Includes a small amount of copper in precipitates.
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
Kennecott smelter & refinery |
100.0% |
|
|
|
|
|
|
Copper concentrates smelted ('000 tonnes) |
|
288 |
305 |
294 |
288 |
232 |
1,175 |
Copper anodes produced ('000 tonnes) (a) |
|
73.0 |
67.5 |
67.0 |
79.7 |
72.3 |
287.1 |
Production of refined metal: |
|
|
|
|
|
|
|
Copper ('000 tonnes) |
|
68.7 |
65.1 |
67.6 |
72.9 |
70.1 |
274.2 |
Gold ('000 ounces) (b) |
|
108 |
112 |
112 |
147 |
174 |
479 |
Silver ('000 ounces) (b) |
|
1,085 |
931 |
886 |
1,148 |
1,320 |
4,050 |
(a) New metal excluding recycled material.
(b) Includes gold and silver in intermediate products.
Northparkes Joint Venture |
80.0% |
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
1,367 |
1,422 |
1,421 |
1,344 |
1,364 |
5,554 |
|
Average ore grades: |
|
|
|
|
|
|
|
Copper (%) |
|
0.68 |
0.75 |
0.69 |
0.70 |
0.76 |
0.70 |
Gold (g/t) |
|
0.23 |
0.24 |
0.26 |
0.33 |
0.44 |
0.27 |
Copper concentrates produced ('000 tonnes) |
23.5 |
27.0 |
24.3 |
23.7 |
25.9 |
98.5 |
|
Contained copper in concentrates: |
|
|
|
|
|
|
|
Saleable production ('000 tonnes) |
|
8.3 |
9.3 |
8.6 |
8.1 |
9.1 |
34.3 |
Sales ('000 tonnes) (a) |
|
2.9 |
7.8 |
6.6 |
9.7 |
7.5 |
26.9 |
Contained gold in concentrates: |
|
|
|
|
|
|
|
Saleable production ('000 ounces) |
|
7.1 |
7.9 |
8.4 |
11.0 |
14.0 |
34.3 |
Sales ('000 ounces) (a) |
|
2.5 |
5.9 |
6.1 |
9.8 |
11.8 |
24.2 |
(a) Rio Tinto's 80% share of material from the Joint Venture.
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
Palabora |
57.7% |
|
|
|
|
|
|
Palabora mine |
|
|
|
|
|
|
|
South Africa |
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
2,789 |
2,940 |
2,792 |
2,809 |
2,783 |
11,330 |
|
Average ore grade: copper (%) |
0.68 |
0.68 |
0.66 |
0.67 |
0.66 |
0.67 |
|
Copper concentrates produced ('000 tonnes) |
67.1 |
76.1 |
61.8 |
65.8 |
61.8 |
270.8 |
|
Average concentrate grade: copper (%) |
30.5 |
29.9 |
31.1 |
30.5 |
29.8 |
30.5 |
|
Copper in concentrates ('000 tonnes) |
20.5 |
22.7 |
19.3 |
20.1 |
18.4 |
82.6 |
|
Palabora smelter/refinery |
|
|
|
|
|
|
|
New concentrate smelted on site ('000 tonnes) |
72.8 |
68.0 |
58.5 |
67.3 |
57.7 |
266.6 |
|
New copper anodes produced ('000 tonnes) |
20.2 |
18.9 |
12.5 |
14.3 |
12.4 |
65.9 |
|
Refined new copper produced ('000 tonnes) |
21.0 |
19.5 |
13.8 |
15.1 |
12.0 |
69.4 |
|
By-products: |
|
|
|
|
|
|
|
Magnetite concentrate ('000 tonnes) |
772 |
617 |
759 |
697 |
754 |
2,845 |
|
Nickel contained in products (tonnes) |
21 |
33 |
29 |
11 |
18 |
95 |
|
Vermiculite plant |
|
|
|
|
|
|
|
Vermiculite produced ('000 tonnes) |
52 |
46 |
48 |
50 |
54 |
196 |
DIAMONDS |
|
|
|
|
|
|
|
Argyle Diamonds |
100.0% |
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
AK1 ore processed ('000 tonnes) |
|
881 |
315 |
1,465 |
1,972 |
1,726 |
4,634 |
AK1 diamonds produced ('000 carats) |
|
4,404 |
408 |
2,274 |
3,504 |
2,531 |
10,591 |
Diavik Diamonds |
60.0% |
|
|
|
|
|
|
Northwest Territories, Canada |
|
|
|
|
|
|
|
Ore processed ('000 tonnes) |
|
427 |
382 |
186 |
364 |
388 |
1,359 |
Diamonds recovered ('000 carats) |
|
1,785 |
1,421 |
828 |
1,530 |
1,563 |
5,565 |
Murowa Diamonds |
77.8% |
|
|
|
|
|
|
Zimbabwe |
|
|
|
|
|
|
|
Ore processed ('000 tonnes) |
|
84 |
78 |
39 |
66 |
88 |
267 |
Diamonds recovered ('000 carats) |
|
40 |
26 |
21 |
37 |
37 |
124 |
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
IRON ORE & IRON |
|
|
|
|
|
|
|
Rio Tinto Iron Ore |
|
|
|
|
|
|
|
Pilbara Operations |
|
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
Saleable iron ore production ('000 tonnes): |
|
|
|
|
|
|
|
Hamersley - Paraburdoo, Mount Tom Price, Marandoo, Yandicoogina, Brockman and Nammuldi |
100.0% |
19,571 |
26,834 |
30,353 |
30,050 |
25,510 |
106,808 |
Hamersley - Channar |
60.0% |
2,395 |
3,032 |
3,085 |
2,528 |
3,344 |
11,041 |
Hamersley - Eastern Range |
(a) |
1,958 |
2,374 |
2,636 |
2,349 |
2,473 |
9,318 |
Hope Downs |
50.0% |
3,414 |
5,495 |
6,037 |
5,687 |
8,108 |
20,634 |
Robe River - Pannawonica (Mesas J and A) (b) |
53.0% |
3,572 |
7,426 |
7,378 |
6,801 |
6,971 |
25,178 |
Robe River - West Angelas |
53.0% |
5,329 |
8,231 |
7,317 |
8,362 |
7,083 |
29,239 |
Total production ('000 tonnes) |
|
36,240 |
53,393 |
56,808 |
55,778 |
53,488 |
202,218 |
Total sales ('000 tonnes) (c) |
|
39,343 |
52,479 |
55,722 |
56,350 |
52,896 |
203,895 |
(a) Rio Tinto owns 54% of the Eastern Range mine. Under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture and therefore all of the production is included in Rio Tinto's share of production.
(b) Production at the Mesa A mine commenced in the first quarter of 2010.
(c) Sales represent iron ore exported from Western Australian ports.
Iron Ore Company of Canada |
58.7% |
|
|
|
|
|
|
Newfoundland & Labrador and Quebec in Canada |
|
|
|
|
|
|
|
Saleable iron ore production: |
|
|
|
|
|
|
|
Concentrates ('000 tonnes) |
|
1,459 |
2,396 |
835 |
1,034 |
261 |
5,724 |
Pellets ('000 tonnes) |
|
1,697 |
1,887 |
1,429 |
3,107 |
2,923 |
8,120 |
Sales: |
|
|
|
|
|
|
|
Concentrate ('000 tonnes) |
|
919 |
1,832 |
1,167 |
1,317 |
314 |
5,235 |
Pellets ('000 tonnes) |
|
1,210 |
2,407 |
2,086 |
3,307 |
2,676 |
9,010 |
Rio Tinto Brasil |
|
|
|
|
|
|
|
Corumbá mine (a) |
0.0% |
|
|
|
|
|
|
Mato Grosso do Sul, Brazil |
|
|
|
|
|
|
|
Saleable iron ore production ('000 tonnes) |
401 |
574 |
534 |
- |
- |
1,509 |
|
Sales ('000 tonnes) |
|
138 |
140 |
253 |
- |
- |
530 |
(a) Rio Tinto sold its 100% interest in the Corumbá mine with an effective date of 18 September 2009. Production data are shown up to that date.
HIsmelt® |
60.0% |
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
Pig iron production ('000 tonnes) (a) |
|
- |
- |
- |
- |
- |
- |
(a) In March 2009, Rio Tinto announced that HIsmelt would be placed on an extended care and maintenance programme.
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.
|
Rio Tinto |
1Q |
2Q |
3Q |
4Q |
1Q |
Full Year |
|
interest |
2009 |
2009 |
2009 |
2009 |
2010 |
2009 |
SALT |
|
|
|
|
|
|
|
Dampier Salt |
68.4% |
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
Salt production ('000 tonnes) |
|
2,056 |
2,224 |
2,532 |
1,744 |
1,737 |
8,555 |
TALC |
|
|
|
|
|
|
|
Rio Tinto Minerals - talc |
100.0% |
|
|
|
|
|
|
Australia, Europe, and North America |
|
|
|
|
|
|
|
Talc production ('000 tonnes) |
|
202 |
224 |
240 |
222 |
240 |
888 |
TITANIUM DIOXIDE FEEDSTOCK |
|
|
|
|
|
|
|
Rio Tinto Iron & Titanium |
100.0% |
|
|
|
|
|
|
Canada and South Africa (a) (b) |
|
|
|
|
|
|
|
(Rio Tinto share) |
|
|
|
|
|
|
|
Titanium dioxide feedstock production ('000 tonnes) |
|
324 |
332 |
165 |
325 |
329 |
1,147 |
(a) Quantities comprise 100% of Rio Tinto Fer et Titane and 50% of Richards Bay Minerals production until late 2009 when RBM concluded a Broad Based Black Economic Empowerment transaction. RTIT's share of RBM production reflects a decrease from 50% to 37% with effect from 9 December 2009.
(b) Ilmenite mined in Madagascar is being processed in Canada with effect from June 2009.
URANIUM |
|
|
|
|
|
|
|
Energy Resources of Australia Ltd |
|
|
|
|
|
|
|
Ranger mine |
68.4% |
|
|
|
|
|
|
Northern Territory, Australia |
|
|
|
|
|
|
|
Production ('000 lbs U3O8) |
|
2,754 |
3,188 |
3,126 |
2,432 |
1,991 |
11,500 |
Rössing Uranium Ltd |
68.6% |
|
|
|
|
|
|
Namibia |
|
|
|
|
|
|
|
Production ('000 lbs U3O8) |
|
2,154 |
2,130 |
2,391 |
2,475 |
1,948 |
9,150 |
Rio Tinto percentage interest shown above is at 31 March 2010. The data represent full production and sales on a 100% basis unless otherwise stated.