17 January 2012
Chief executive Tom Albanese said "This was another record-breaking year in the Pilbara with both quarterly and full year iron ore production and shipments beating previous achievements, as our expansion programme continues apace. Across the Group, production has bounced back from the severe weather conditions experienced in the first half which had the biggest impact on Australian iron ore, coal and uranium."
· Record global iron ore shipments of 239 million tonnes in 2011 were below production due to extreme weather conditions experienced in the first half of the year. Despite this, Rio Tinto's Pilbara ports operated at above annualised capacity rates and shipped record volumes of 61 million tonnes in the fourth quarter and 225 million tonnes for the full year.
· Record global iron ore production of 65 million tonnes was achieved in the quarter (51 million tonnes attributable) and 245 million tonnes for the full year (192 million tonnes attributable).
· Lower grades at Escondida and Kennecott Utah Copper impacted mined copper throughout most of 2011, driving production down 23 per cent year on year, in line with guidance.
· Full year bauxite production was seven per cent higher than 2010. Aluminium was one per cent higher whilst alumina was one per cent lower. The Group's annual aluminium capacity has been reduced by 462,000 tonnes across the entire portfolio, due to the orderly shutdown of two thirds of Alma and power issues at Lynemouth and Shawinigan.
· Australian hard coking coal production was 16 per cent higher than fourth quarter of 2010 and two per cent lower year on year. Australian thermal coal was three per cent lower year on year whilst semi-soft coal production slipped seven per cent compared with 2010.
· On 19 October 2011, Rio Tinto made a recommended all-cash offer for Hathor Exploration and successfully completed the acquisition on 12 January 2012.
· Following the approval of an additional $2.7 billion capital investment to modernise the Kitimat aluminium smelter, total capital expenditure for 2012, on approved projects and sustaining capital, is expected to be $15 billion. Further project approvals are likely to increase this level of investment.
· On 13 December 2011, Rio Tinto announced that an independent arbitrator upheld Rio Tinto's claim in respect of Ivanhoe Mines' Shareholder Rights Plan. After the standstill agreement expires on 18 January 2012, Rio Tinto will have the ability to purchase additional shares in Ivanhoe beyond its current holding of 49 per cent without being diluted.
· At 31 December 2011, Rio Tinto had bought back $5.5 billion or 91 million of its plc shares under its $7 billion buy-back programme to be completed by the end of the first quarter of 2012.
All currency figures in this report are US dollars, and comments refer to Rio Tinto's share of production, unless otherwise stated
IRON ORE
Rio Tinto share of production (000 tonnes)
|
Q4 11 |
vs Q4 10 |
vs Q3 11 |
FY 11 |
vs FY 10 |
Pilbara Blend Lump |
12,826 |
+1% |
+0% |
48,789 |
+7% |
Pilbara Blend Fines |
17,600 |
+5% |
+2% |
65,156 |
+9% |
Robe Valley Lump |
1,265 |
-13% |
-11% |
5,103 |
-8% |
Robe Valley Fines |
3,038 |
-2% |
+1% |
11,333 |
+3% |
Yandicoogina Fines (HIY) |
14,449 |
+5% |
+13% |
53,486 |
-0% |
IOC (pellets and concentrate) |
2,028 |
-8% |
-16% |
7,902 |
-9% |
Global iron ore production set new records at 65 million tonnes in the fourth quarter and 245 million tonnes for the full year. On an attributable basis, production was two per cent higher than the fourth quarter of 2010 at 51 million tonnes and four per cent higher than 2010 at 192 million tonnes.
Pilbara operations
The Pilbara mines operated at record levels, producing 62 million tonnes (49 million tonnes attributable) in the fourth quarter and 231 million tonnes (184 million tonnes attributable) for the full year 2011.
Fourth quarter sales of 61 million tonnes (100 per cent basis) and full year sales of 225 million tonnes also set new records despite the impact of inclement weather in the first half of the year.
Pilbara marketing
Rio Tinto transitioned to a more diversified sales contract portfolio. In the fourth quarter, approximately 40 per cent of sales were priced with reference to a quarterly average index set at the prior quarter's average lagged by one month. The remainder was sold on a shorter term price basis linked to current quarter average, current month average or spot index prices. Index prices are adjusted for product characteristics and iron and moisture content. The approximate iron and moisture content for Rio Tinto's major iron ore products in 2011 were:
|
Fe (dry basis) |
Moisture |
Pilbara Blend Lump |
62.5% |
4.0% |
Pilbara Blend Fines |
61.5% |
8.5% |
Robe Valley Lump |
57.0% |
6.0% |
Robe Valley Fines |
57.0% |
7.0% |
Yandicoogina Fines |
58.5% |
9.0% |
Pilbara expansion
The expansion of the Pilbara to 283 Mt/a by the end of 2013 remains on track. The feasibility study for the second phase of the Cape Lambert expansion continued to make good progress. It is expected to increase the Pilbara's capacity to 353 Mt/a and now incorporates the replacement of an old car dumper, with associated mine and infrastructure development.
On 2 November 2011, Rio Tinto announced that it is to become the owner of the world's largest fleet of driverless trucks after it signed a deal to buy at least 150 from Komatsu Limited over the next four years. The new trucks, which will start arriving in 2012, will be used in Rio Tinto's Pilbara iron ore mines and can be managed from its Operations Centre in Perth more than 1500 kilometres away. The move follows the successful trial of driverless trucks and represents a 15-fold expansion from the previous plan to double the fleet to ten trucks.
Rio Tinto's integrated operations will be progressively upgraded as follows:
· 225 Mt/a - current operating capacity
· 230 Mt/a by end of Q1 2012 - Dampier port incremental (in implementation)
· 283 Mt/a by end of H2 2013 - Cape Lambert 53 Mt/a increment (in implementation)
· 353 Mt/a by end of H1 2015 - Cape Lambert 70 Mt/a increment (in feasibility)
Iron Ore Company of Canada (IOC)
Fourth quarter saleable iron ore production was eight per cent lower than the same quarter of 2010 and 16 per cent lower than the third quarter of 2011 Concentrate for sinter production was maximised in the quarter to respond to market demand, and this resulted in lower pellet production relative to the fourth quarter of 2010. The nine per cent year on year decrease in production is due to a combination of lower equipment availability, pit sequencing (higher waste to ore) and maintenance work at the pellet plant.
The Concentrator Expansion Project Phase 1, lifting capacity to 22 Mt/a, is being commissioned as planned and Phase 2, improving the magnetite recovery circuit, is progressing with first production expected in late 2012.
Simandou
On 18 October 2011, Rio Tinto announced the acceleration of the development of the Simandou iron ore project in Guinea with the approval of a further $211 million for continued studies and $1.1 billion of funding for commitments for early works and procurement of long-lead items. This funding will allow the project to move forward towards first shipment of ore by mid-2015.
COPPER
Rio Tinto share of production
|
Q4 11 |
vs Q4 10 |
vs Q3 11 |
FY 11 |
vs FY 10 |
Kennecott Utah Copper |
|
|
|
|
|
Mined copper (000 tonnes) |
47.1 |
-31% |
+12% |
195.0 |
-22% |
Refined copper (000 tonnes) |
48.8 |
-25% |
+8% |
215.3 |
-20% |
Molybdenum (000 tonnes) |
2.3 |
-45% |
-31% |
13.6 |
+6% |
Mined gold (000 ozs) |
93 |
-4% |
+0% |
386 |
-18% |
Refined gold (000 ozs) |
87 |
-22% |
-0% |
379 |
-36% |
Escondida |
|
|
|
|
|
Mined copper (000 tonnes) |
65.3 |
-14% |
+46% |
227.7 |
-25% |
Refined copper (000 tonnes) |
22.4 |
-9% |
+31% |
85.0 |
-6% |
Grasberg JV |
|
|
|
|
|
Mined copper (000 tonnes) |
5.3 |
-75% |
+238% |
16.9 |
-67% |
Mined gold (000 ozs) |
36 |
-47% |
-33% |
178 |
-3% |
Northparkes |
|
|
|
|
|
Mined copper (000 tonnes) |
10.7 |
+34% |
+1% |
40.3 |
+29% |
Palabora |
|
|
|
|
|
Mined copper (000 tonnes) |
8.6 |
-22% |
-17% |
39.9 |
-7% |
Refined copper (000 tonnes) |
9.6 |
-5% |
+61% |
34.0 |
+2% |
Kennecott Utah Copper
Copper contained in concentrates was higher than the prior two quarters but was lower than the fourth quarter of 2010 due to variability in ore grades. Fourth quarter molybdenum production was below prior periods due to lower grades.
Full year production of copper, gold and silver was lower than 2010 as mining progressed through lower grade areas of the open pit, as previously guided. Molybdenum production in 2011 was higher than 2010 due to higher recoveries.
Higher ore grades are expected in the second half of 2012 and into 2013. A 26 day maintenance shutdown at the smelter is planned for the second quarter of 2012 to take advantage of the mining of lower grade areas of the pit.
Escondida
Fourth quarter mined copper production rebounded from the third quarter which was impacted by a work stoppage, halting operations for 15 days. Lower ore grades and the work stoppage impacted full year production.
Grasberg
Freeport is due to release its 100 per cent operating data for the fourth quarter on 19 January 2012.
Rio Tinto's share of production in 2011 was impacted by industrial action and damage to concentrate and fuel pipelines in the second half of the year.
Northparkes
Fourth quarter mined copper production rose by 34 per cent compared with the same quarter of 2010 and increased 29 per cent year on year due to higher grades from the E48 block cave and improvement in performance through mine to mill optimisation projects, including the commissioning of the new pebble crusher, leading to higher ore treatment volumes.
Palabora
Full year mined copper production decreased by 7 per cent compared with 2010 due to lower availability of equipment and lower recoveries.
Provisional pricing
The effect of provisional pricing of copper sales is estimated to result in a decrease in underlying earnings of approximately $50 million in the second half of 2011.
At the end of 2011, the Group had an estimated 181 million pounds of copper sales that were provisionally priced at US 344 cents per pound. The final price of these sales will be determined during the first half of 2012. This compared with 212 million pounds of open shipments at 30 June 2011 provisionally priced at US 424 cents per pound.
ALUMINIUM
Rio Tinto share of production (000 tonnes)
|
Q4 11 |
vs Q4 10 |
vs Q3 11 |
FY 11 |
vs FY 10 |
Bauxite |
|
|
|
|
|
Rio Tinto Alcan |
7,550 |
+13% |
+3% |
28,192 |
+9% |
Pacific Aluminium |
1,916 |
+8% |
+3% |
7,246 |
+1% |
Alumina |
|
|
|
|
|
Rio Tinto Alcan |
1,569 |
+2% |
+7% |
5,846 |
-4% |
Pacific Aluminium / Other |
786 |
+4% |
+3% |
3,101 |
+4% |
Aluminium |
|
|
|
|
|
Rio Tinto Alcan |
600 |
-1% |
+0% |
2,386 |
-0% |
Pacific Aluminium / Other |
361 |
+1% |
-1% |
1,438 |
+3% |
Second half 2011 underlying earnings for the Group's aluminium operations (including Rio Tinto Alcan, Pacific Aluminium and Other) are expected to be slightly worse than breakeven due to difficult market conditions and the impact of various one-off costs, including additional closure costs at Lynemouth of approximately $40 million.
On 17 October 2011, Rio Tinto announced that it was streamlining its Aluminium product group following a strategic review. Six Australian and New Zealand assets have been transferred into Pacific Aluminium and seven other non-core assets have now also been transferred out of Rio Tinto Alcan. These assets are managed and reported separately from Rio Tinto Alcan while the Group investigates divestment options.
Bauxite and alumina
Rio Tinto Alcan's bauxite production was 13 per cent higher than the fourth quarter of 2010, and nine per cent higher year on year, driven by increased third party demand, notably at Weipa.
Rio Tinto Alcan's alumina production was seven per cent higher than the third quarter and continued its gradual recovery from the abnormally heavy rains in early 2011, which primarily impacted Queensland Alumina.
Pacific Aluminium's Gove operation set annual records for both bauxite and alumina production.
Aluminium
Rio Tinto Alcan's aluminium production was broadly consistent across all periods. Production was higher year on year at Laterrière following a transformer failure in July 2010. This was partly offset by the loss of production following two transformer incidents at the Dunkerque smelter in France in May and August 2011, and lower production at Kitimat in preparation for the modernisation project.
On 1 December 2011, Rio Tinto announced an additional capital investment of $2.7 billion to modernise its aluminium smelter in Kitimat, British Columbia, Canada. This new investment will allow for completion of the $3.3 billion project in 2014 and increase the smelter's current production capacity by more than 48 per cent to approximately 420,000 tonnes per year.
All four Pacific Aluminium smelters reported quarterly and annual production records.
Reductions in capacity
On 16 November 2011, Rio Tinto announced its intention to close the Lynemouth aluminium smelter, subject to the completion of a 90-day consultation process with employee and union representatives. A power failure in December at Lynemouth resulted in a loss of production from one entire potline and one quarter of the second potline. This equates to a loss of annualised production capacity of 120,000 tonnes.
A circuit breaker failure at the Shawinigan smelter at the end of 2011 reduced capacity at the plant by 50 per cent to 50,000 tonnes.
On 1 January 2012, Rio Tinto Alcan announced that it had initiated a lockout at the Alma smelter, and shut down two thirds (292,000 tonnes) of the smelter's capacity to protect the safety and integrity of aluminium operations after labour negotiations failed to reach agreement.
As a consequence of these actions, a total of 462,000 tonnes of annual capacity have been closed or idled across Rio Tinto's aluminium operations.
ENERGY
Coal
Rio Tinto share of production (000 tonnes)
|
Q4 11 |
vs Q4 10 |
vs Q3 11 |
FY 11 |
vs FY 10 |
Rio Tinto Coal Australia |
|
|
|
|
|
Hard coking coal |
2,638 |
+16% |
-5% |
8,815 |
-2% |
Semi-soft coking coal |
746 |
-6% |
+2% |
2,859 |
-7% |
Thermal coal |
4,436 |
-14% |
-3% |
17,791 |
-3% |
Hard coking coal production was 16 per cent above the fourth quarter of 2010, continuing the strong recovery from the severe flooding earlier in the year.
Thermal coal production was 14 per cent lower than the fourth quarter of 2010 primarily due to maintenance work at Clermont, a temporary shutdown to upgrade the plant at Bengalla as part of expansion activities and a four week failure of a dragline at Mount Thorley Warkworth.
First production from Rio Tinto Coal Mozambique's Benga mine is expected to be processed through the wash plant in the early part of the first quarter with the first shipment of hard coking coal from the Beira port expected around the end of the first quarter. Logistical constraints and upgrade work on the Sena railway line have contributed to revisions to the original timeline.
Uranium
Rio Tinto share of production (000 lbs)
|
Q4 11 |
vs Q4 10 |
vs Q3 11 |
FY 11 |
vs FY 10 |
Energy Resources of Australia |
1,538 |
-20% |
+0% |
3,810 |
-35% |
Rössing |
679 |
-50% |
-19% |
3,248 |
-41% |
Since the resumption of processing activities at ERA in June, production has steadily increased and the plant has been milling at high throughput and utilisation rates.
Rössing production was lower than the fourth quarter of 2010 due to lower grades, lower milled tonnes and lower extraction rates, coupled with a two week maintenance shut down in the quarter. The major pre-strip programme is expected to gradually allow access to higher grade, lower strip-ratio reserves from the second half of 2012.
DIAMONDS & MINERALS
Rio Tinto share of production
|
Q4 11 |
vs Q4 10 |
vs Q3 11 |
FY 11 |
vs FY 10 |
Diamonds (000 carats) |
|
|
|
|
|
Argyle |
1,918 |
-14% |
-17% |
7,441 |
-24% |
Diavik |
961 |
+4% |
-17% |
4,006 |
+3% |
|
|
|
|
|
|
Minerals (000 tonnes) |
|
|
|
|
|
Borates |
114 |
+1% |
-10% |
504 |
+1% |
Titanium dioxide feedstock |
380 |
+2% |
-0% |
1,443 |
+4% |
Argyle rough diamond production was down 14 per cent on the fourth quarter of 2010 due to maintenance shutdowns in the processing plant. Year on year production at Argyle was down 24 per cent due to these shutdowns and the impact of heavy rains and flooding in March 2011.
In December 2011, a further $0.5 billion of capital was approved for the Argyle underground project, bringing the total approved amount to $2.1 billion. This increase primarily reflected project development delays caused by a record 2010/11 wet season and adverse exchange rate movements.
Diavik production was four per cent higher than the fourth quarter of 2010 and three per cent higher year on year, attributable to higher throughput partly offset by lower grades.
Full year borates production was one per cent higher than 2010 despite a ten per cent decline in the fourth quarter compared with the third quarter of 2011, due to a two week planned maintenance shutdown at the primary processing plant.
Titanium dioxide feedstocks production was broadly consistent with the previous quarters and increased four per cent year on year, reflecting improved performance at all three operations, in particular at QMM.
OTHER CORPORATE
A change to the full year risk-free rate used to discount closure and environmental provisions for the Group has resulted in an additional charge to 2011 underlying earnings of approximately $70m. This adjustment mainly impacted Copper, Rio Tinto Alcan and Other operations.
On 28 November 2011, Rio Tinto announced that Coal & Allied shareholders had approved the Scheme of Arrangement under which Rio Tinto and Mitsubishi Development acquired all of the shares in Coal & Allied that they did not previously own. Rio Tinto has consequently increased its interest in Coal & Allied to 80 per cent.
On 1 December 2011, Rio Tinto announced the completion of the divestment of its Colowyo Mine to Western Fuels-Colorado LLC. The parties agreed the sale on 16 September 2011 and its terms are confidential.
Pre-tax and pre-divestment expenditure on exploration and evaluation charged to the profit and loss account in 2011 was $1,387 million compared with $589 million in 2010. Of this 2011 expenditure, approximately 38 per cent was incurred by the Iron Ore group, 33 per cent by Copper, 7 per cent by Energy, 5 per cent by Rio Tinto Alcan and the balance was incurred by Central Exploration. In 2011, the Group realised $89 million (pre-tax) from the divestment of central exploration properties, compared with $86 million in 2010.
Exploration highlights
At the Amargosa bauxite project in Brazil, the Order of Magnitude study was completed. Management of the project will transition from Rio Tinto Exploration to Rio Tinto Alcan.
Drilling commenced to assess potash targets in Saskatchewan in the joint venture with North Atlantic Potash Inc., a subsidiary of JSC Acron. Results to date have been encouraging.
Drill tests of targets in the Democratic Republic of Congo intersected encouraging iron ore mineralisation.
Following the Hathor acquisition reviews of available exploration data and proposed exploration programmes were initiated and are ongoing.
Iron ore mineralisation was intersected at a number of targets in the Labrador Trough, Canada.
CRTX, the exploration joint venture between Chinalco and Rio Tinto was officially registered as a business in China. It will focus initially on exploration for copper.
A summary of activity for the period is as follows:
Product Group |
Evaluation projects |
Advanced projects |
Greenfield programmes |
Aluminium |
Amargosa, Brazil |
|
Australia, Brazil, Laos |
Copper |
Copper/molybdenum: Resolution, US. Copper: La Granja, Peru Copper/gold: Oyu Tolgoi, Mongolia Nickel/copper: Eagle, US |
Nickel: Tamarack, US. |
Copper: Australia, Chile, Kazakhstan, Peru, Russia, US, Zambia Nickel: Canada, South Africa |
Diamonds & Minerals |
Diamonds: Bunder, India Lithium borates: Jadar, Serbia |
|
Diamonds: Canada, Democratic Republic of Congo, India Potash: Canada |
Energy |
Coal: Rio Tinto Coal Mozambique |
Coal: Bowen Basin, Australia Uranium: Canada |
Coal: Chile, Mozambique, Namibia Uranium: Canada, Namibia, Australia |
Iron Ore |
Simandou, Guinea Pilbara, Australia |
Pilbara, Australia. |
Canada, Democratic Republic of Congo |
Mine-lease exploration continued at a number of Rio Tinto businesses including Kennecott Utah Copper, Northparkes, Energy Resources of Australia, Rössing, Diavik and Pilbara Iron.
Rio Tinto is a leading international mining group headquartered in the UK, combining Rio Tinto plc, a London and New York Stock Exchange listed company, and Rio Tinto Limited, which is listed on the Australian Securities Exchange.
Rio Tinto's business is finding, mining, and processing mineral resources. Major products are aluminium, copper, diamonds, thermal and metallurgical coal, uranium, gold, industrial minerals (borax, titanium dioxide and salt) and iron ore. Activities span the world and are strongly represented in Australia and North America with significant businesses in Asia, Europe, Africa and South America.
Media Relations, EMEA / Americas Illtud Harri Office: +44 (0) 20 7781 1152 Mobile: +44 (0) 7920 503 600 Tony Shaffer Office: +44 (0) 20 7781 1138 Mobile: +44 (0) 7920 041 003 Christina Mills Office: +44 (0) 20 7781 1154 Mobile: +44 (0) 7825 275 605 |
Investor Relations, London Mark Shannon Office: +44 (0) 20 7781 1178 Mobile: +44 (0) 7917 576597 David Ovington Office: +44 (0) 20 7781 2051 Mobile: +44 (0) 7920 010 978
|
Media Relations, Australia / Asia David Luff Karen Halbert Office: +61 (0) 3 9283 3627 Mobile: +61 (0) 412 119 389 Bruce Tobin Office: +61 (0) 3 9283 3612 Mobile: +61 (0) 419 103 454 |
Investor Relations, Australia Dave Skinner Office: +61 (0) 3 9283 3628 Mobile: +61 (0) 408 335 309 Christopher Maitland Office: +61 (0) 3 9283 3063 Mobile: +61 (0) 459 800 131 |
Media Relations, Canada Bryan Tucker Office: +1 (0) 514 848 8151 Mobile: +1 (0) 514 825 8319 |
Investor Relations, North America Jason Combes Office: +1 (0) 801 204 2919 Mobile: +1 (0) 801 558 2645 |
Website: |
|
Email: |
media.enquiries@riotinto.com enquiries.mediaaustralia@riotinto.com |
Twitter: |
Follow @riotinto on Twitter |
High resolution photographs and media pack available at: www.riotinto.com/media
Rio Tinto production summary
|
|
Quarter |
|
Full Year |
|
% Change |
|||||
|
|
2010 |
2011 |
2011 |
|
|
|
|
Q4 11 |
Q4 11 |
2011 |
|
|
Q4 |
Q3 |
Q4 |
|
2010 |
2011 |
|
vs |
vs |
vs |
|
|
|
|
|
|
|
|
|
Q4 10 |
Q3 11 |
2010 |
Principal Commodities |
|
|
|
|
|
|
|
|
|
|
|
Alumina |
('000 t) |
2,292 |
2,235 |
2,355 |
|
9,076 |
8,947 |
|
3% |
5% |
-1% |
Aluminium |
('000 t) |
962 |
962 |
961 |
|
3,790 |
3,824 |
|
0% |
0% |
1% |
Bauxite |
('000 t) |
8,462 |
9,178 |
9,466 |
|
33,051 |
35,437 |
|
12% |
3% |
7% |
Borates |
('000 t) |
113 |
127 |
114 |
|
500 |
504 |
|
1% |
-10% |
1% |
Coal - hard coking |
('000 t) |
2,279 |
2,774 |
2,638 |
|
8,967 |
8,815 |
|
16% |
-5% |
-2% |
Coal - semi-soft coking |
('000 t) |
797 |
733 |
746 |
|
3,075 |
2,859 |
|
-6% |
2% |
-7% |
Coal - Australian thermal |
('000 t) |
5,154 |
4,575 |
4,436 |
|
18,430 |
17,791 |
|
-14% |
-3% |
-3% |
Copper - mined |
('000 t) |
185.2 |
109.3 |
137.0 |
|
678.1 |
519.7 |
|
-26% |
25% |
-23% |
Copper - refined |
('000 t) |
99.5 |
68.3 |
80.9 |
|
392.8 |
334.4 |
|
-19% |
18% |
-15% |
Diamonds |
('000 cts) |
3,199 |
3,534 |
2,967 |
|
13,843 |
11,733 |
|
-7% |
-16% |
-15% |
Iron ore |
('000 t) |
50,050 |
49,834 |
51,207 |
|
184,629 |
191,767 |
|
2% |
3% |
4% |
Titanium dioxide feedstock |
('000 t) |
373 |
381 |
380 |
|
1,392 |
1,443 |
|
2% |
0% |
4% |
Uranium |
('000 lbs) |
3,276 |
2,373 |
2,218 |
|
11,377 |
7,058 |
|
-32% |
-7% |
-38% |
Other Metals & Minerals |
|
|
|
|
|
|
|
|
|
|
|
Coal - US thermal |
('000 t) |
599 |
721 |
387 |
|
2,371 |
1,939 |
|
-35% |
-46% |
-18% |
Gold - mined |
('000 ozs) |
191 |
169 |
155 |
|
763 |
669 |
|
-19% |
-9% |
-12% |
Gold - refined |
('000 ozs) |
112 |
88 |
87 |
|
596 |
379 |
|
-22% |
0% |
-36% |
Molybdenum |
('000 t) |
4.2 |
3.4 |
2.3 |
|
12.9 |
13.6 |
|
-45% |
-31% |
6% |
Salt |
('000 t) |
1,427 |
1,797 |
1,931 |
|
5,188 |
6,608 |
|
35% |
7% |
27% |
Silver - mined |
('000 ozs) |
1,849 |
1,088 |
1,257 |
|
6,747 |
4,924 |
|
-32% |
16% |
-27% |
Silver - refined |
('000 ozs) |
1,094 |
664 |
754 |
|
4,732 |
3,189 |
|
-31% |
13% |
-33% |
Talc |
('000 t) |
237 |
84 |
- |
|
1,000 |
592 |
|
- |
- |
-41% |
Throughout this report, figures in italics indicate adjustments made since the figure was previously quoted on the equivalent page. Production figures are sometimes more precise than the rounded numbers shown, hence small differences may result between the total of the quarter figures and the full year figures.
Rio Tinto share of production
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
ALUMINA |
|
|
|
|
|
|
|
|
Production ('000 tonnes) (a) |
|
|
|
|
|
|
|
|
Rio Tinto Alcan |
|
|
|
|
|
|
|
|
Jonquière (Vaudreuil) |
100% |
335 |
334 |
340 |
337 |
351 |
1,301 |
1,363 |
Queensland Alumina |
80% |
740 |
596 |
676 |
665 |
751 |
3,057 |
2,688 |
São Luis (Alumar) |
10% |
74 |
82 |
85 |
86 |
86 |
251 |
339 |
Yarwun |
100% |
359 |
338 |
301 |
354 |
356 |
1,377 |
1,349 |
Specialty alumina plants |
100% |
26 |
27 |
30 |
27 |
24 |
110 |
108 |
Rio Tinto Alcan alumina production |
|
1,534 |
1,377 |
1,432 |
1,469 |
1,569 |
6,096 |
5,846 |
Pacific Aluminium - Gove |
100% |
621 |
608 |
665 |
619 |
657 |
2,473 |
2,549 |
Other Aluminium - four specialty plants |
100% |
137 |
132 |
144 |
147 |
129 |
507 |
552 |
Rio Tinto total alumina production |
|
2,292 |
2,117 |
2,240 |
2,235 |
2,355 |
9,076 |
8,947 |
ALUMINIUM |
|
|
|
|
|
|
|
|
Production ('000 tonnes) (a) |
|
|
|
|
|
|
|
|
Rio Tinto Alcan |
|
|
|
|
|
|
|
|
Cameroon - Alucam (Edéa) |
47% |
11 |
7 |
7 |
9 |
9 |
35 |
32 |
Canada - six wholly owned |
100% |
332 |
328 |
332 |
335 |
338 |
1,322 |
1,333 |
Canada - Alouette (Sept-Îles) |
40% |
58 |
57 |
57 |
58 |
60 |
228 |
233 |
Canada - Bécancour |
25% |
26 |
26 |
27 |
26 |
25 |
104 |
104 |
France - two wholly owned |
100% |
90 |
89 |
87 |
81 |
78 |
357 |
334 |
Iceland - ISAL (Reykjavik) |
100% |
48 |
46 |
47 |
46 |
47 |
190 |
185 |
Norway - SØRAL (Husnes) |
50% |
11 |
11 |
11 |
11 |
11 |
44 |
45 |
Oman - Sohar |
20% |
19 |
18 |
19 |
19 |
19 |
73 |
75 |
UK - Lochaber |
100% |
11 |
11 |
11 |
12 |
12 |
41 |
45 |
Total Rio Tinto Alcan |
|
605 |
593 |
597 |
597 |
600 |
2,395 |
2,386 |
Pacific Aluminium - four smelters |
Various |
268 |
261 |
267 |
272 |
272 |
1,054 |
1,073 |
Other Aluminium - two smelters |
100% |
89 |
90 |
93 |
93 |
89 |
341 |
365 |
Rio Tinto total aluminium production |
|
962 |
944 |
958 |
962 |
961 |
3,790 |
3,824 |
BAUXITE |
|
|
|
|
|
|
|
|
Production ('000 tonnes) (a) (b) |
|
|
|
|
|
|
|
|
Rio Tinto Alcan |
|
|
|
|
|
|
|
|
Porto Trombetas (c) |
12% |
498 |
453 |
465 |
454 |
455 |
1,852 |
1,827 |
Sangaredi (c) |
(d) |
1,380 |
1,281 |
1,395 |
1,461 |
1,496 |
5,418 |
5,633 |
Weipa |
100% |
4,813 |
4,668 |
5,061 |
5,403 |
5,600 |
18,591 |
20,732 |
Total Rio Tinto Alcan |
|
6,691 |
6,403 |
6,920 |
7,318 |
7,550 |
25,861 |
28,192 |
Pacific Aluminium - Gove |
100% |
1,771 |
1,665 |
1,805 |
1,860 |
1,916 |
7,190 |
7,246 |
Rio Tinto total bauxite production |
|
8,462 |
8,067 |
8,726 |
9,178 |
9,466 |
33,051 |
35,437 |
Rio Tinto share of production
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
BORATES |
|
|
|
|
|
|
|
|
Production ('000 tonnes B2O3 content) |
|
|
|
|
|
|
|
|
Rio Tinto Minerals - borates |
100% |
113 |
120 |
144 |
127 |
114 |
500 |
504 |
COAL - hard coking |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Hail Creek Coal |
82% |
1,708 |
854 |
1,457 |
1,906 |
1,761 |
5,890 |
5,979 |
Kestrel Coal |
80% |
571 |
774 |
318 |
867 |
877 |
3,076 |
2,836 |
Rio Tinto total hard coking coal production |
|
2,279 |
1,628 |
1,775 |
2,774 |
2,638 |
8,967 |
8,815 |
COAL - semi-soft coking |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Hunter Valley (e) |
80% |
443 |
210 |
318 |
364 |
559 |
1,869 |
1,450 |
Mount Thorley (e) |
64% |
173 |
334 |
309 |
330 |
186 |
884 |
1,159 |
Warkworth (e) |
44% |
180 |
147 |
63 |
39 |
1 |
321 |
250 |
Rio Tinto total semi-soft coking coal production |
|
797 |
691 |
689 |
733 |
746 |
3,075 |
2,859 |
COAL - thermal |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Bengalla (e) |
32% |
503 |
453 |
406 |
393 |
377 |
1,659 |
1,629 |
Blair Athol Coal |
71% |
492 |
521 |
414 |
471 |
649 |
4,846 |
2,055 |
Clermont (f) |
50% |
1,064 |
595 |
1,032 |
484 |
790 |
1,889 |
2,901 |
Hunter Valley (e) |
80% |
1,969 |
1,721 |
2,157 |
2,145 |
1,816 |
6,391 |
7,839 |
Kestrel Coal |
80% |
104 |
86 |
30 |
84 |
61 |
571 |
261 |
Mount Thorley (e) |
64% |
459 |
178 |
136 |
311 |
175 |
920 |
801 |
Warkworth (e) |
44% |
562 |
468 |
583 |
686 |
568 |
2,154 |
2,304 |
Total Australian thermal coal |
|
5,154 |
4,022 |
4,758 |
4,575 |
4,436 |
18,430 |
17,791 |
US Coal ('000 tonnes) |
|
|
|
|
|
|
|
|
Colowyo (g) |
0% |
599 |
492 |
339 |
721 |
387 |
2,371 |
1,939 |
Rio Tinto total thermal coal production |
|
5,753 |
4,514 |
5,097 |
5,296 |
4,822 |
20,801 |
19,729 |
Rio Tinto share of production
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
COPPER |
|
|
|
|
|
|
|
|
Mine production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
68.5 |
60.4 |
45.6 |
41.9 |
47.1 |
249.8 |
195.0 |
Escondida |
30% |
76.2 |
61.7 |
56.1 |
44.7 |
65.3 |
303.3 |
227.7 |
Grasberg - Joint Venture (h) |
40% |
21.4 |
5.0 |
5.0 |
1.6 |
5.3 |
50.7 |
16.9 |
Northparkes |
80% |
8.0 |
9.3 |
9.7 |
10.6 |
10.7 |
31.2 |
40.3 |
Palabora |
58% |
11.1 |
10.0 |
10.8 |
10.5 |
8.6 |
43.0 |
39.9 |
Rio Tinto total mine production |
|
185.2 |
146.3 |
127.2 |
109.3 |
137.0 |
678.1 |
519.7 |
Refined production ('000 tonnes) |
|
|
|
|
|
|
|
|
Escondida |
30% |
24.6 |
23.2 |
22.2 |
17.2 |
22.4 |
90.0 |
85.0 |
Kennecott Utah Copper |
100% |
64.8 |
63.5 |
57.7 |
45.2 |
48.8 |
269.3 |
215.3 |
Palabora |
58% |
10.1 |
8.5 |
10.0 |
5.9 |
9.6 |
33.4 |
34.0 |
Rio Tinto total refined production |
|
99.5 |
95.2 |
89.9 |
68.3 |
80.9 |
392.8 |
334.4 |
DIAMONDS |
|
|
|
|
|
|
|
|
Production ('000 carats) |
|
|
|
|
|
|
|
|
Argyle |
100% |
2,243 |
1,641 |
1,580 |
2,302 |
1,918 |
9,804 |
7,441 |
Diavik |
60% |
926 |
812 |
1,074 |
1,160 |
961 |
3,900 |
4,006 |
Murowa |
78% |
30 |
45 |
80 |
72 |
88 |
139 |
285 |
Rio Tinto total diamond production |
|
3,199 |
2,498 |
2,733 |
3,534 |
2,967 |
13,843 |
11,733 |
GOLD |
|
|
|
|
|
|
|
|
Mine production ('000 ounces) (b) |
|
|
|
|
|
|
|
|
Barneys Canyon |
100% |
0.4 |
0.4 |
0.4 |
0.4 |
0.8 |
2.0 |
2.0 |
Bingham Canyon |
100% |
96 |
101 |
100 |
92 |
92 |
466 |
384 |
Escondida |
30% |
13 |
11 |
10 |
6 |
8 |
52 |
37 |
Grasberg - Joint Venture (h) |
40% |
67 |
48 |
41 |
53 |
36 |
183 |
178 |
Northparkes |
80% |
13 |
15 |
15 |
16 |
16 |
52 |
61 |
Palabora |
58% |
2 |
2 |
2 |
2 |
2 |
7 |
8 |
Rio Tinto total mine production |
|
191 |
177 |
168 |
169 |
155 |
763 |
669 |
Refined production ('000 ounces) |
|
|
|
|
|
|
|
|
Kennecott Utah Copper |
100% |
112 |
99 |
105 |
88 |
87 |
596 |
379 |
Rio Tinto share of production
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
IRON ORE & IRON |
|
|
|
|
|
|
|
|
Production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
Hamersley - six wholly owned mines |
100% |
31,151 |
26,956 |
31,235 |
30,908 |
32,426 |
112,706 |
121,525 |
Hamersley - Channar |
60% |
1,757 |
1,483 |
1,752 |
1,688 |
1,687 |
6,610 |
6,609 |
Hamersley - Eastern Range |
(i) |
2,198 |
1,974 |
2,142 |
2,587 |
2,682 |
9,206 |
9,385 |
Hope Downs |
50% |
4,201 |
3,394 |
4,099 |
4,237 |
4,140 |
15,860 |
15,870 |
Iron Ore Company of Canada |
59% |
2,204 |
1,495 |
1,958 |
2,421 |
2,028 |
8,638 |
7,902 |
Robe River |
53% |
8,539 |
6,574 |
7,665 |
7,994 |
8,243 |
31,610 |
30,476 |
Rio Tinto total mine production |
|
50,050 |
41,876 |
48,851 |
49,834 |
51,207 |
184,629 |
191,767 |
Breakdown: Pilbara Blend Lump |
|
12,746 |
10,731 |
12,412 |
12,819 |
12,826 |
45,775 |
48,789 |
Pilbara Blend Fines |
|
16,753 |
13,898 |
16,326 |
17,332 |
17,600 |
59,947 |
65,156 |
Robe Valley Lump |
|
1,453 |
1,094 |
1,324 |
1,420 |
1,265 |
5,569 |
5,103 |
Robe Valley Fines |
|
3,089 |
2,370 |
2,910 |
3,015 |
3,038 |
11,008 |
11,333 |
Yandicoogina Fines (HIY) |
|
13,804 |
12,288 |
13,920 |
12,829 |
14,449 |
53,692 |
53,486 |
IOC Pellets |
|
514 |
0 |
762 |
1,111 |
933 |
1,643 |
2,806 |
IOC Concentrates |
|
1,690 |
1,495 |
1,197 |
1,309 |
1,095 |
6,995 |
5,096 |
MOLYBDENUM |
|
|
|
|
|
|
|
|
Mine production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
4.2 |
3.7 |
4.3 |
3.4 |
2.3 |
12.9 |
13.6 |
SALT |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Dampier Salt |
68% |
1,427 |
1,148 |
1,732 |
1,797 |
1,931 |
5,188 |
6,608 |
SILVER |
|
|
|
|
|
|
|
|
Mine production ('000 ounces) (b) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
893 |
777 |
788 |
668 |
743 |
3,754 |
2,976 |
Escondida |
30% |
465 |
392 |
349 |
236 |
320 |
1,842 |
1,298 |
Grasberg - Joint Venture (h) |
40% |
367 |
5 |
4 |
33 |
41 |
688 |
83 |
Others |
- |
124 |
123 |
140 |
151 |
153 |
463 |
566 |
Rio Tinto total mine production |
|
1,849 |
1,297 |
1,281 |
1,088 |
1,257 |
6,747 |
4,924 |
Refined production ('000 ounces) |
|
|
|
|
|
|
|
|
Kennecott Utah Copper |
100% |
1,094 |
903 |
868 |
664 |
754 |
4,732 |
3,189 |
TALC |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Rio Tinto Minerals - talc (j) |
0% |
237 |
251 |
257 |
84 |
- |
1,000 |
592 |
TITANIUM DIOXIDE FEEDSTOCK |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Rio Tinto Iron & Titanium |
100% |
373 |
329 |
352 |
381 |
380 |
1,392 |
1,443 |
Rio Tinto share of production
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
URANIUM |
|
|
|
|
|
|
|
|
Production ('000 lbs U3O8) |
|
|
|
|
|
|
|
|
Energy Resources of Australia |
68% |
1,912 |
577 |
163 |
1,532 |
1,538 |
5,891 |
3,810 |
Rössing |
69% |
1,363 |
851 |
877 |
841 |
679 |
5,485 |
3,248 |
Rio Tinto total uranium production |
|
3,276 |
1,427 |
1,040 |
2,373 |
2,218 |
11,377 |
7,058 |
(a) On 17 August 2011, Rio Tinto announced a reorganization of its aluminium assets into three business units, Rio Tinto Alcan, Pacific Aluminium and Other Aluminium.
(b) Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus pellets.
(c) Bauxite production at non-managed mines has been restated from a wet to a dry tonne basis, in line with the tonnes shown for Rio Tinto managed operations.
(d) Rio Tinto has a 22.95% shareholding in the Sangaredi mine but receives 45.0% of production under the partnership agreement.
(e) Rio Tinto's interest in these mines is held through Coal & Allied Industries Ltd; Rio Tinto increased its interest in Coal & Allied from 75.7% to 80.0% with effect from 16 December 2011. Production data reflect the increased shareholding from that date.
(f) Production commenced at Clermont in the second quarter of 2010.
(g) Rio Tinto sold its 100% interest in Colowyo with an effective date of 1 December 2011. Production is shown up to that date.
(h) Through a joint venture agreement with Freeport-McMoRan Copper & Gold (FCX), Rio Tinto is entitled to 40% of additional material mined as a consequence of expansions and developments of the Grasberg facilities since 1998. Rio Tinto's share of production reflects actual production for the year, after adjustment of the 2011 metal strip in the fourth quarter in order to reflect the impact of labour issues at the mine and the suspension of milling operations during most of fourth-quarter 2011, resulting from damage to concentrate and fuel pipelines.
(i) Rio Tinto's share of production includes 100% of the production from the Eastern Range mine. Under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture.
(j) Rio Tinto sold its 100% interest in the talc business with an effective date of 1 August 2011. Production data are shown up to that date.
The Rio Tinto percentage interest shown above is at 31 December 2011.
Rio Tinto's interests in the Brockville specialty alumina plant, Awaso, Rawhide, Antelope, Cordero Rojo, Decker and Spring Creek mines were sold in 2010. No data for these operations are included in the Share of Production table.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
|
ALUMINIUM (a) |
|
|
|
|
|
|
|
|
|
Rio Tinto Alcan - Bauxite |
|
|
|
|
|
|
|
|
|
Bauxite production ('000 tonnes) |
|
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
|
Weipa mine - Queensland |
100.0% |
4,813 |
4,668 |
5,061 |
5,403 |
5,600 |
18,591 |
20,732 |
|
Brazil |
|
|
|
|
|
|
|
|
|
Porto Trombetas (MRN) mine (b) |
12.0% |
4,153 |
3,779 |
3,872 |
3,786 |
3,788 |
15,435 |
15,224 |
|
Ghana |
|
|
|
|
|
|
|
|
|
Awaso mine (b) (c) |
0.0% |
- |
- |
- |
- |
- |
39 |
- |
|
Guinea |
|
|
|
|
|
|
|
|
|
Sangaredi mine (b) (d) |
23.0% |
3,066 |
2,846 |
3,099 |
3,248 |
3,324 |
12,041 |
12,517 |
|
Rio Tinto Alcan share of bauxite shipments |
|
|
|
|
|
|
|
||
Share of bauxite shipments ('000 tonnes) (b) (e) |
6,895 |
6,287 |
7,012 |
7,268 |
7,565 |
25,801 |
28,133 |
||
(a) On 17 October 2011, Rio Tinto announced the reorganization of its aluminium assets. The three sections below show the assets under Rio Tinto Alcan, Pacific Aluminium and Other Aluminium. (b) Bauxite production and shipments at non-managed mines have been restated from a wet to a dry tonne basis, in line with the tonnes shown for Rio Tinto managed operations. (c) Rio Tinto Alcan had an 80% interest in the Awaso mine but purchased the additional 20% of production. Rio Tinto Alcan sold its interest in Ghana Bauxite Company, owner of the Awaso mine, with an effective date of 1 February 2010. Production data are shown up to that date. (d) Rio Tinto has a 22.95% shareholding in the Sangaredi mine but receives 45.0% of production under the partnership agreement. (e) Restated to reflect the reorganization of Rio Tinto aluminium assets. |
|||||||||
Rio Tinto Alcan - Smelter-Grade Alumina |
|
|
642 |
|
|
|
|
||
Alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
|
Queensland Alumina Refinery - Queensland |
80.0% |
925 |
745 |
845 |
831 |
939 |
3,821 |
3,360 |
|
Yarwun refinery - Queensland |
100.0% |
359 |
338 |
301 |
354 |
356 |
1,377 |
1,349 |
|
Brazil |
|
|
|
|
|
|
|
|
|
São Luis (Alumar) refinery |
10.0% |
737 |
821 |
846 |
855 |
863 |
2,507 |
3,385 |
|
Canada |
|
|
|
|
|
|
|
|
|
Jonquière (Vaudreuil) refinery - Quebec (a) |
100.0% |
335 |
334 |
340 |
337 |
351 |
1,301 |
1,363 |
|
(a) Jonquière's (Vaudreuil's) production shows smelter grade alumina only and excludes hydrate produced and used for Specialty Alumina.
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
ALUMINIUM (continued) |
|
|
|
|
|
|
|
|
Rio Tinto Alcan - Specialty Alumina |
|
|
|
|
|
|
|
|
Specialty alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
Canada |
|
|
|
|
|
|
|
|
Brockville plant - Ontario (a) |
0.0% |
- |
- |
- |
- |
- |
13 |
- |
Jonquière (Vaudreuil) plant - Quebec |
100.0% |
26 |
27 |
30 |
27 |
24 |
110 |
108 |
Rio Tinto Alcan - Primary Aluminium |
|
|
|
|
|
|
|
|
Primary aluminium production ('000 tonnes) |
|
|
|
|
|
|
|
|
Cameroon |
|
|
|
|
|
|
|
|
Alucam (Edéa) smelter |
46.7% |
23 |
15 |
15 |
19 |
20 |
76 |
69 |
Canada |
|
|
|
|
|
|
|
|
Alma smelter - Quebec |
100.0% |
110 |
108 |
107 |
109 |
111 |
434 |
434 |
Alouette (Sept-Îles) smelter - Quebec |
40.0% |
145 |
142 |
143 |
146 |
150 |
569 |
582 |
Arvida smelter - Quebec |
100.0% |
44 |
43 |
44 |
44 |
45 |
174 |
176 |
Bécancour smelter - Quebec |
25.1% |
103 |
102 |
107 |
104 |
102 |
417 |
414 |
Grande-Baie smelter - Quebec |
100.0% |
55 |
55 |
56 |
56 |
56 |
218 |
223 |
Kitimat smelter - British Columbia |
100.0% |
40 |
41 |
41 |
42 |
44 |
184 |
168 |
Laterrière smelter - Quebec |
100.0% |
58 |
57 |
59 |
59 |
59 |
212 |
234 |
Shawinigan smelter - Quebec |
100.0% |
24 |
24 |
25 |
25 |
23 |
100 |
97 |
France |
|
|
|
|
|
|
|
|
Dunkerque smelter |
100.0% |
67 |
65 |
62 |
56 |
52 |
260 |
235 |
Saint-Jean-de-Maurienne smelter |
100.0% |
24 |
24 |
25 |
25 |
26 |
96 |
99 |
Iceland |
|
|
|
|
|
|
|
|
ISAL (Reykjavik) smelter |
100.0% |
48 |
46 |
47 |
46 |
47 |
190 |
185 |
Norway |
|
|
|
|
|
|
|
|
SØRAL (Husnes) smelter |
50.0% |
22 |
22 |
22 |
22 |
23 |
88 |
89 |
Oman |
|
|
|
|
|
|
|
|
Sohar smelter |
20.0% |
94 |
92 |
93 |
94 |
94 |
367 |
373 |
United Kingdom |
|
|
|
|
|
|
|
|
Lochaber smelter |
100.0% |
11 |
11 |
11 |
12 |
12 |
41 |
45 |
Rio Tinto Alcan share of metal sales |
|
|
|
|
|
|
|
|
Share of primary aluminium sales ('000 tonnes) (b) (c) |
930 |
706 |
756 |
737 |
729 |
3,617 |
2,927 |
(a) Rio Tinto sold its 100% interest in the Brockville plant with an effective date of 20 September 2010.
(b) In 2010, the aluminium sales included sales made through Rio Tinto Alcan's Engineered Products division. In 2011, these sales are no longer included, following the disposal of 61% of the Engineered Products division in January 2011.
(c) Restated to reflect the reorganization of Rio Tinto aluminium assets announced on 17 October 2011.
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
ALUMINIUM (continued) |
|
|
|
|
|
|
|
|
Pacific Aluminium - Bauxite |
|
|
|
|
|
|
|
|
Bauxite Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
Gove mine - Northern Territory (a) |
100% |
1,771 |
1,665 |
1,805 |
1,860 |
1,916 |
7,190 |
7,246 |
Pacific Aluminium - Smelter-Grade Alumina |
|
|
|
|
|
|
|
|
Alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
Gove refinery - Northern Territory, (a) |
100% |
621 |
608 |
665 |
619 |
657 |
2,473 |
2,549 |
Pacific Aluminium - Primary Aluminium |
|
|
|
|
|
|
|
|
Primary aluminium production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
Bell Bay smelter - Tasmania (a) |
100.0% |
45 |
45 |
45 |
45 |
46 |
177 |
181 |
Boyne Island smelter - Queensland (a) |
59.4% |
140 |
137 |
139 |
140 |
142 |
558 |
558 |
Tomago smelter - New South Wales (a) |
51.6% |
134 |
130 |
135 |
137 |
137 |
528 |
539 |
New Zealand |
|
|
|
|
|
|
|
|
Tiwai Point smelter (a) |
79.4% |
88 |
86 |
89 |
91 |
91 |
344 |
357 |
(a) On 17 October 2011, Rio Tinto's interest in these Australian and New Zealand assets were transferred to a new business unit. |
||||||||
Other Aluminium - Specialty Alumina |
|
|
|
|
|
|||
Specialty alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
France |
|
|
|
|
|
|
|
|
Beyrède plant (a) |
100.0% |
5 |
7 |
6 |
6 |
6 |
19 |
25 |
Gardanne plant (a) |
100.0% |
119 |
111 |
123 |
128 |
108 |
437 |
470 |
La Bâthie plant (a) |
100.0% |
6 |
7 |
7 |
7 |
8 |
25 |
29 |
Germany |
|
|
|
|
|
|
|
|
Teutschenthal plant (a) |
100.0% |
7 |
6 |
8 |
7 |
7 |
26 |
28 |
Other Aluminium - Primary Aluminium |
|
|
|
|
|
|||
Primary aluminium production ('000 tonnes) |
|
|
|
|
|
|
|
|
United Kingdom |
|
|
|
|
|
|
|
|
Lynemouth smelter (a) (b) |
100.0% |
39 |
41 |
44 |
45 |
38 |
145 |
168 |
USA |
|
|
|
|
|
|
|
|
Sebree smelter - Kentucky (a) |
100.0% |
50 |
49 |
49 |
48 |
51 |
196 |
197 |
(a) Rio Tinto's interest in these assets has been transferred out of Rio Tinto Alcan. (b) On 16 November 2011, Rio Tinto announced its intention to close the Lynemouth aluminium smelter, subject to the completion of a 90-day consultation process with employee and union representatives. |
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
BORATES |
|
|
|
|
|
|
|
|
Rio Tinto Minerals - borates |
100.0% |
|
|
|
|
|
|
|
California, US and Argentina |
|
|
|
|
|
|
|
|
Borates ('000 tonnes) (a) |
|
113 |
120 |
144 |
127 |
114 |
500 |
504 |
(a) Production is expressed as B2O3 content.
|
||||||||
COAL |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia |
|
|
|
|
|
|
|
|
Bengalla mine (a) |
32.0% |
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
1,660 |
1,494 |
1,340 |
1,299 |
1,234 |
5,477 |
5,368 |
Blair Athol Coal mine |
71.2% |
|
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
691 |
731 |
582 |
661 |
911 |
6,803 |
2,885 |
Clermont Coal mine (b) |
50.1% |
|
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
2,124 |
1,187 |
2,060 |
966 |
1,577 |
3,770 |
5,790 |
Hail Creek Coal mine |
82.0% |
|
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
|
Hard coking coal production ('000 tonnes) |
2,082 |
1,042 |
1,776 |
2,325 |
2,148 |
7,183 |
7,291 |
|
Hunter Valley Operations (a) |
80.0% |
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
Semi-soft coking coal production ('000 tonnes) |
586 |
277 |
419 |
481 |
729 |
2,469 |
1,906 |
|
Thermal coal production ('000 tonnes) |
2,601 |
2,274 |
2,849 |
2,833 |
2,376 |
8,442 |
10,332 |
|
Kestrel Coal mine (c) |
80.0% |
|
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
|
Hard coking coal production ('000 tonnes) |
714 |
968 |
398 |
1,084 |
1,096 |
3,846 |
3,545 |
|
Thermal coal production ('000 tonnes) |
|
130 |
108 |
37 |
106 |
76 |
713 |
326 |
Mount Thorley Operations (a) |
64.0% |
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
Semi-soft coking coal production ('000 tonnes) |
286 |
552 |
510 |
545 |
316 |
1,460 |
1,922 |
|
Thermal coal production ('000 tonnes) |
|
757 |
294 |
225 |
514 |
285 |
1,518 |
1,319 |
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
COAL (continued) |
|
|
|
|
|
|
|
|
Warkworth mine (a) |
44.5% |
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
Semi-soft coking coal production ('000 tonnes) |
428 |
349 |
150 |
93 |
3 |
764 |
594 |
|
Thermal coal production ('000 tonnes) |
|
1,337 |
1,112 |
1,385 |
1,631 |
1,327 |
5,120 |
5,454 |
|
|
|
|
|
|
|
|
|
Total hard coking coal production ('000 tonnes) |
2,796 |
2,009 |
2,174 |
3,409 |
3,244 |
11,029 |
10,836 |
|
Total semi-soft coking coal production ('000 tonnes) |
1,299 |
1,178 |
1,079 |
1,118 |
1,048 |
4,693 |
4,422 |
|
Total thermal coal production ('000 tonnes) |
9,300 |
7,200 |
8,479 |
8,009 |
7,786 |
31,844 |
31,474 |
|
Total coal production ('000 tonnes) |
|
13,396 |
10,387 |
11,731 |
12,537 |
12,077 |
47,566 |
46,732 |
|
|
|
|
|
|
|
|
|
Total coal sales ('000 tonnes) |
|
13,671 |
10,607 |
11,669 |
11,687 |
12,763 |
47,191 |
46,726 |
|
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia share |
|
|
|
|
|
|
|
|
Share of hard coking coal sales ('000 tonnes) (c) |
2,996 |
1,644 |
1,880 |
2,253 |
2,904 |
9,500 |
8,681 |
|
Share of semi-soft coking coal sales ('000 tonnes) (d) |
735 |
703 |
609 |
795 |
779 |
2,977 |
2,887 |
|
Share of thermal coal sales ('000 tonnes) (d) |
4,852 |
4,095 |
4,716 |
4,300 |
4,613 |
17,842 |
17,723 |
(a) Rio Tinto's interest in these mines is held through Coal & Allied Industries Ltd; Rio Tinto increased its interest in Coal & Allied from 75.7% to 80.0% with effect from 16 December 2011. Production data includes the increased shareholding from that date.
(b) Production commenced at Clermont in the second quarter of 2010.
(c) Kestrel produces hard-coking coal and thermal coal through its mining operations. These coals may be blended at ports; blended coal sales are included in hard-coking coal sales.
(d) Sales relate only to coal mined by the operations and exclude traded coal.
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
COAL (continued) |
|
|
|
|
|
|
|
|
US Coal |
|
|
|
|
|
|
|
|
Antelope mine (a) |
0.0% |
|
|
|
|
|
|
|
Wyoming, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
6,777 |
- |
- |
- |
- |
31,156 |
- |
Colowyo mine (b) |
0.0% |
|
|
|
|
|
|
|
Colorado, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
599 |
492 |
339 |
721 |
387 |
2,371 |
1,939 |
Cordero Rojo mine (a) |
0.0% |
|
|
|
|
|
|
|
Wyoming, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
6,945 |
- |
- |
- |
- |
33,518 |
- |
Decker mine (a) |
0.0% |
|
|
|
|
|
|
|
Montana, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
639 |
- |
- |
- |
- |
2,521 |
- |
Spring Creek mine (a) |
0.0% |
|
|
|
|
|
|
|
Montana, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
3,806 |
- |
- |
- |
- |
16,726 |
- |
|
|
|
|
|
|
|
|
|
Total coal production ('000 tonnes) |
|
18,767 |
492 |
339 |
721 |
387 |
86,292 |
1,939 |
(a) As a result of the initial public offering of Cloud Peak Energy Inc. on 20 November 2009, Rio Tinto held a 48.3% interest in the Antelope, Cordero Rojo and Spring Creek mines and a 24.1% interest in the Decker mine. These interests were formerly reported under Rio Tinto Energy America but are now managed by Cloud Peak Energy. Following a secondary public offering in December 2010, Rio Tinto completed the divestment of its entire interest in Cloud Peak Energy Inc. with an effective date of 15 December 2010. Production data are shown up to that date.
(b) Rio Tinto sold its 100% interest in Colowyo with an effective date of 1 December 2011. Production is shown up to that date.
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
COPPER & GOLD |
|
|
|
|
|
|
|
|
Escondida |
30.0% |
|
|
|
|
|
|
|
Chile |
|
|
|
|
|
|
|
|
Sulphide ore to concentrator ('000 tonnes) |
18,789 |
15,993 |
16,399 |
12,029 |
18,663 |
73,894 |
63,083 |
|
Average copper grade (%) |
|
1.26 |
1.15 |
1.06 |
0.97 |
0.97 |
1.29 |
1.04 |
Mill production (metals in concentrates): |
|
|
|
|
|
|
|
|
Contained copper ('000 tonnes) |
|
194.6 |
153.1 |
141.2 |
91.9 |
144.3 |
786.8 |
530.5 |
Contained gold ('000 ounces) |
|
45 |
38 |
35 |
21 |
28 |
174 |
122 |
Contained silver ('000 ounces) |
|
1,551 |
1,308 |
1,164 |
786 |
1,068 |
6,140 |
4,327 |
Recoverable copper in ore stacked for leaching ('000 tonnes) (a) |
60 |
52 |
46 |
57 |
73 |
224 |
229 |
|
Refined production from leach plants: |
|
|
|
|
|
|
|
|
Copper cathode production ('000 tonnes) |
82 |
77 |
74 |
57 |
75 |
300 |
283 |
|
(a) The calculation of copper in material mined for leaching is based on ore stacked at the leach pad.
|
||||||||
Freeport-McMoRan Copper & Gold |
|
|
|
|
|
|
|
|
Grasberg mine (a) |
0.0% (40% of the expansion) |
|
|
|
|
|||
Papua, Indonesia |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
21,560 |
19,998 |
20,024 |
14,006 |
3,619 |
84,009 |
57,648 |
Average mill head grades: |
|
|
|
|
|
|
|
|
Copper (%) |
|
0.88 |
0.77 |
0.77 |
0.90 |
0.63 |
0.85 |
0.79 |
Gold (g/t) |
|
1.17 |
0.89 |
0.79 |
1.14 |
0.94 |
0.90 |
0.92 |
Silver (g/t) |
|
2.91 |
2.38 |
2.20 |
2.86 |
2.27 |
2.79 |
2.43 |
Production of metals in concentrates: |
|
|
|
|
|
|
|
|
Copper in concentrates ('000 tonnes) |
167.0 |
133.7 |
132.5 |
111.2 |
20.5 |
625.3 |
397.9 |
|
Gold in concentrates ('000 ounces) |
687 |
473 |
406 |
421 |
89 |
2,025 |
1,389 |
|
Silver in concentrates ('000 ounces) |
1,628 |
1,168 |
1,093 |
1,007 |
189 |
6,017 |
3,456 |
|
Sales of payable metals in concentrates: (b) |
|
|
|
|
|
|
|
|
Copper in concentrates ('000 tonnes) |
153.5 |
127.2 |
129.4 |
116.4 |
23.2 |
599.8 |
396.1 |
|
Gold in concentrates ('000 ounces) |
625 |
476 |
396 |
438 |
99 |
1,942 |
1,408 |
|
Silver in concentrates ('000 ounces) |
1,192 |
905 |
838 |
832 |
173 |
4,607 |
2,748 |
(a) Through a joint venture agreement with Freeport-McMoRan Copper & Gold (FCX), Rio Tinto is entitled to 40% of additional material mined as a consequence of expansions and developments of the Grasberg facilities since 1998. The 4Q 2011 results show the forecast from FCX's publicly released December 2012 update because FCX is not releasing its actual 100% operating data for 4Q 2011 until the release of its 2011 fourth-quarter and full year results on 19 January 2012.
(b) Net of smelter deductions.
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
Kennecott Minerals Company |
|
|
|
|
|
|
|
|
Rawhide mine (a) |
0.0% |
|
|
|
|
|
|
|
Nevada, US |
|
|
|
|
|
|
|
|
Metals produced in doré: |
|
|
|
|
|
|
|
|
Gold ('000 ounces) |
|
- |
- |
- |
- |
- |
9 |
- |
Silver ('000 ounces) |
|
- |
- |
- |
- |
- |
114 |
- |
(a) Rio Tinto sold its 100% interest in the Rawhide mine with an effective date of 25 June 2010. Production data are shown up to that date. |
||||||||
Kennecott Utah Copper |
|
|
|
|
|
|
|
|
Barneys Canyon mine (a) |
100.0% |
|
|
|
|
|
|
|
Utah, US |
|
|
|
|
|
|
|
|
Gold produced ('000 ounces) |
|
0.4 |
0.4 |
0.4 |
0.4 |
0.8 |
2.0 |
2.0 |
Bingham Canyon mine |
100.0% |
|
|
|
|
|
|
|
Utah, US |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
13,582 |
13,600 |
13,747 |
12,230 |
13,554 |
53,551 |
53,131 |
Average ore grade: |
|
|
|
|
|
|
|
|
Copper (%) |
|
0.57 |
0.51 |
0.38 |
0.39 |
0.43 |
0.53 |
0.43 |
Gold (g/t) |
|
0.31 |
0.33 |
0.30 |
0.31 |
0.32 |
0.38 |
0.32 |
Silver (g/t) |
|
2.70 |
2.24 |
2.21 |
2.23 |
3.30 |
2.82 |
2.50 |
Molybdenum (%) |
|
0.054 |
0.046 |
0.050 |
0.043 |
0.039 |
0.045 |
0.045 |
Copper concentrates produced ('000 tonnes) |
263 |
240 |
170 |
176 |
216 |
968 |
802 |
|
Average concentrate grade (% Cu) |
26.0 |
25.1 |
26.5 |
23.7 |
21.6 |
25.7 |
24.2 |
|
Production of metals in copper concentrates: |
|
|
|
|
|
|
|
|
Copper ('000 tonnes) (b) |
68.5 |
60.4 |
45.6 |
41.9 |
47.1 |
249.8 |
195.0 |
|
Gold ('000 ounces) |
96 |
101 |
100 |
92 |
92 |
466 |
384 |
|
Silver ('000 ounces) |
893 |
777 |
788 |
668 |
743 |
3,754 |
2,976 |
|
Molybdenum concentrates produced ('000 tonnes): |
7.9 |
6.9 |
8.0 |
6.4 |
4.5 |
24.7 |
25.7 |
|
Molybdenum in concentrates ('000 tonnes) |
4.2 |
3.7 |
4.3 |
3.4 |
2.3 |
12.9 |
13.6 |
(a) Mining operations ceased in the first quarter of 2002. Gold continues to be recovered from leach pads.
(b) Includes a small amount of copper in precipitates.
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
Kennecott smelter & refinery |
100.0% |
|
|
|
|
|
|
|
Copper concentrates smelted ('000 tonnes) |
|
293 |
264 |
205 |
167 |
241 |
1,025 |
877 |
Copper anodes produced ('000 tonnes) (a) |
|
64.4 |
70.1 |
48.3 |
34.5 |
49.8 |
271.4 |
202.7 |
Production of refined metal: |
|
|
|
|
|
|
|
|
Copper ('000 tonnes) |
|
64.8 |
63.5 |
57.7 |
45.2 |
48.8 |
269.3 |
215.3 |
Gold ('000 ounces) (b) |
|
112 |
99 |
105 |
88 |
87 |
596 |
379 |
Silver ('000 ounces) (b) |
|
1,094 |
903 |
868 |
664 |
754 |
4,732 |
3,189 |
(a) New metal excluding recycled material (b) Includes gold and silver in intermediate products.
|
||||||||
|
|
|
|
|
|
|
|
|
Northparkes Joint Venture |
80.0% |
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
1,298 |
1,302 |
1,330 |
1,439 |
1,463 |
5,248 |
5,532 |
Average ore grades: |
|
|
|
|
|
|
|
|
Copper (%) |
|
0.84 |
0.97 |
0.97 |
1.03 |
1.04 |
0.82 |
1.00 |
Gold (g/t) |
|
0.50 |
0.56 |
0.55 |
0.55 |
0.57 |
0.51 |
0.56 |
Copper concentrates produced ('000 tonnes) |
30.2 |
33.4 |
33.8 |
39.7 |
39.7 |
116.1 |
146.6 |
|
Contained copper in concentrates: |
|
|
|
|
|
|
|
|
Saleable production ('000 tonnes) |
|
10.0 |
11.6 |
12.1 |
13.3 |
13.4 |
39.0 |
50.4 |
Sales ('000 tonnes) (a) |
|
11.3 |
5.4 |
8.7 |
8.4 |
15.2 |
31.7 |
37.8 |
Contained gold in concentrates: |
|
|
|
|
|
|
|
|
Saleable production ('000 ounces) |
|
16.1 |
18.5 |
18.3 |
19.4 |
19.8 |
65.3 |
76.0 |
Sales ('000 ounces) (a) |
|
18.8 |
8.8 |
13.5 |
12.5 |
24.3 |
55.8 |
59.1 |
(a) Rio Tinto's 80% share of material from the Joint Venture.
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
Palabora |
57.7% |
|
|
|
|
|
|
|
Palabora mine |
|
|
|
|
|
|
|
|
South Africa |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
3,126 |
2,845 |
2,964 |
3,133 |
2,845 |
11,657 |
11,787 |
|
Average ore grade: copper (%) |
0.63 |
0.66 |
0.65 |
0.63 |
0.63 |
0.64 |
0.64 |
|
Copper concentrates produced ('000 tonnes) |
65.2 |
58.4 |
61.2 |
58.2 |
50.1 |
246.0 |
227.9 |
|
Average concentrate grade: copper (%) |
29.5 |
29.5 |
30.7 |
31.2 |
29.9 |
30.3 |
30.3 |
|
Copper in concentrates ('000 tonnes) |
19.3 |
17.3 |
18.7 |
18.1 |
15.0 |
74.6 |
69.1 |
|
Palabora smelter/refinery |
|
|
|
|
|
|
|
|
New concentrate smelted on site ('000 tonnes) |
62.1 |
62.3 |
62.6 |
45.4 |
60.4 |
240.8 |
230.7 |
|
New copper anodes produced ('000 tonnes) |
14.4 |
14.7 |
18.3 |
10.8 |
15.7 |
55.7 |
59.4 |
|
Refined new copper produced ('000 tonnes) |
17.5 |
14.8 |
17.3 |
10.3 |
16.6 |
58.0 |
59.0 |
|
By-products: |
|
|
|
|
|
|
|
|
Magnetite concentrate ('000 tonnes) |
695 |
880 |
820 |
744 |
985 |
2,993 |
3,428 |
|
Nickel contained in products (tonnes) |
24 |
27 |
28 |
23 |
9 |
72 |
86 |
|
Vermiculite plant |
|
|
|
|
|
|
|
|
Vermiculite produced ('000 tonnes) |
45 |
43 |
51 |
48 |
22 |
196 |
165 |
|
|
|
|
|
|
|
|
|
|
DIAMONDS |
|
|
|
|
|
|
|
|
Argyle Diamonds |
100.0% |
|
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
|
AK1 ore processed ('000 tonnes) |
|
1,749 |
1,487 |
1,635 |
1,760 |
1,497 |
7,274 |
6,379 |
AK1 diamonds produced ('000 carats) |
|
2,243 |
1,641 |
1,580 |
2,302 |
1,918 |
9,804 |
7,441 |
Diavik Diamonds |
60.0% |
|
|
|
|
|
|
|
Northwest Territories, Canada |
|
|
|
|
|
|
|
|
Ore processed ('000 tonnes) |
|
555 |
487 |
542 |
645 |
560 |
2,091 |
2,234 |
Diamonds recovered ('000 carats) |
|
1,543 |
1,353 |
1,790 |
1,934 |
1,601 |
6,500 |
6,677 |
Murowa Diamonds |
77.8% |
|
|
|
|
|
|
|
Zimbabwe |
|
|
|
|
|
|
|
|
Ore processed ('000 tonnes) |
|
87 |
81 |
119 |
139 |
134 |
384 |
473 |
Diamonds recovered ('000 carats) |
|
39 |
58 |
103 |
93 |
113 |
178 |
367 |
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
IRON ORE & IRON |
|
|
|
|
|
|
|
|
Rio Tinto Iron Ore |
|
|
|
|
|
|
|
|
Pilbara Operations |
|
|
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
|
Saleable iron ore production ('000 tonnes): |
|
|
|
|
|
|
|
|
Hamersley - Paraburdoo, Mount Tom Price, Marandoo, Yandicoogina, Brockman and Nammuldi |
100.0% |
31,151 |
26,956 |
31,235 |
30,908 |
32,426 |
112,706 |
121,525 |
Hamersley - Channar |
60.0% |
2,929 |
2,471 |
2,919 |
2,813 |
2,812 |
11,016 |
11,015 |
Hamersley - Eastern Range |
(a) |
2,198 |
1,974 |
2,142 |
2,587 |
2,682 |
9,206 |
9,385 |
Hope Downs |
50.0% |
8,401 |
6,788 |
8,199 |
8,473 |
8,281 |
31,720 |
31,740 |
Robe River - Pannawonica (Mesas J and A) |
53.0% |
8,571 |
6,535 |
7,989 |
8,367 |
8,119 |
31,277 |
31,010 |
Robe River - West Angelas |
53.0% |
7,541 |
5,869 |
6,472 |
6,716 |
7,435 |
28,363 |
26,492 |
Total production ('000 tonnes) |
|
60,790 |
50,593 |
58,956 |
59,864 |
61,754 |
224,289 |
231,168 |
Breakdown: Pilbara Blend Lump |
|
16,369 |
13,697 |
15,865 |
16,214 |
16,436 |
59,497 |
62,212 |
Pilbara Blend Fines |
|
22,046 |
18,073 |
21,183 |
22,455 |
22,750 |
79,823 |
84,461 |
Robe Valley Lump |
|
2,742 |
2,063 |
2,498 |
2,679 |
2,387 |
10,508 |
9,628 |
Robe Valley Fines |
|
5,828 |
4,472 |
5,491 |
5,688 |
5,732 |
20,770 |
21,382 |
Yandicoogina Fines (HIY) |
|
13,804 |
12,288 |
13,920 |
12,829 |
14,449 |
53,692 |
53,486 |
|
|
|
|
|
|
|
|
|
Total sales ('000 tonnes) (b) |
|
58,216 |
49,874 |
54,589 |
59,501 |
61,411 |
222,700 |
225,375 |
Breakdown: Pilbara Blend Lump |
|
13,489 |
11,813 |
12,607 |
13,567 |
14,295 |
51,569 |
52,282 |
Pilbara Blend Fines |
|
22,562 |
19,287 |
21,309 |
24,259 |
25,056 |
86,857 |
89,911 |
Robe Valley Lump |
|
2,786 |
1,954 |
2,109 |
2,299 |
2,317 |
9,590 |
8,680 |
Robe Valley Fines |
|
6,220 |
4,785 |
5,611 |
5,981 |
6,072 |
21,827 |
22,448 |
Yandicoogina Fines (HIY) |
|
13,159 |
12,035 |
12,953 |
13,395 |
13,672 |
52,856 |
52,054 |
(a) Rio Tinto owns 54% of the Eastern Range mine. Under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture and therefore all of the production is included in Rio Tinto's share of production. (b) Sales represent iron ore exported from Western Australian ports. |
||||||||
Iron Ore Company of Canada |
58.7% |
|
|
|
|
|
|
|
Newfoundland & Labrador and Quebec in Canada |
|
|
|
|
|
|
||
Saleable iron ore production: |
|
|
|
|
|
|
|
|
Concentrates ('000 tonnes) |
|
876 |
0 |
1,297 |
1,892 |
1,589 |
2,798 |
4,778 |
Pellets ('000 tonnes) |
|
2,878 |
2,546 |
2,038 |
2,230 |
1,864 |
11,912 |
8,678 |
Sales: |
|
|
|
|
|
|
|
|
Concentrate ('000 tonnes) |
|
821 |
281 |
1,051 |
1,940 |
1,601 |
3,015 |
4,873 |
Pellets ('000 tonnes) |
|
3,974 |
2,273 |
1,898 |
2,243 |
2,295 |
12,052 |
8,709 |
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
||||
|
interest |
2010 |
2011 |
2011 |
2011 |
2011 |
2010 |
2011 |
||||
SALT |
|
|
|
|
|
|
|
|
||||
Dampier Salt |
68.4% |
|
|
|
|
|
|
|
||||
Western Australia |
|
|
|
|
|
|
|
|
||||
Salt production ('000 tonnes) |
|
2,088 |
1,679 |
2,534 |
2,628 |
2,825 |
7,589 |
9,666 |
||||
TALC |
|
|
|
|
|
|
|
|
||||
Rio Tinto Minerals - talc (a) |
0.0% |
|
|
|
|
|
|
|
||||
Australia, Europe, and North America |
|
|
|
|
|
|
|
|||||
Talc production ('000 tonnes) |
|
237 |
251 |
257 |
84 |
- |
1,000 |
592 |
||||
(a) Rio Tinto sold its 100% interest in the talc business with an effective date of 1 August 2011. Production data are shown up to that date.
|
||||||||||||
TITANIUM DIOXIDE FEEDSTOCK |
|
|
|
|
|
|
|
|
||||
Rio Tinto Iron & Titanium |
100.0% |
|
|
|
|
|
|
|
||||
Canada and South Africa (a) |
|
|
|
|
|
|
|
|
||||
(Rio Tinto share) |
|
|
|
|
|
|
|
|
||||
Titanium dioxide feedstock production ('000 tonnes) |
373 |
329 |
352 |
381 |
380 |
1,392 |
1,443 |
|||||
(a) Quantities comprise 100% of Rio Tinto Fer et Titane and 37% of Richards Bay Minerals production. Ilmenite mined in Madagascar is being processed in Canada. |
||||||||||||
URANIUM |
|
|
|
|
|
|
|
|
||||
Energy Resources of Australia Ltd |
|
|
|
|
|
|
|
|
||||
Ranger mine |
68.4% |
|
|
|
|
|
|
|
||||
Northern Territory, Australia |
|
|
|
|
|
|
|
|
||||
Production ('000 lbs U3O8) |
|
2,796 |
843 |
238 |
2,241 |
2,249 |
8,614 |
5,571 |
||||
Rössing Uranium Ltd |
68.6% |
|
|
|
|
|
|
|
||||
Namibia |
|
|
|
|
|
|
|
|
||||
Production ('000 lbs U3O8) |
|
1,988 |
1,240 |
1,279 |
1,226 |
991 |
7,999 |
4,736 |
||||
Rio Tinto percentage interest shown above is at 31 December 2011. The data represent full production and sales on a 100% basis unless otherwise stated.