On 3 March 2016 Rio Tinto announced to the Australian Securities Exchange (ASX) increases in Ore Reserves in West Australian iron ore deposits and increases in Rio Tinto Coal Australia's Mineral Resources and Ore Reserves in New South Wales and Queensland.
These announcements were made in compliance with Chapter 5 of the ASX Listing Rules and the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves, 2012 (JORC Code).
Copies of the announcements are available on Rio Tinto's website at: www.riotinto.com/mediareleases
As at the end of 2015, the estimated iron ore Ore Reserves increased by 309 million tonnes (Mt) after depletion from mining. The increases in iron ore Ore Reserves have been delivered as part of the ongoing resource development drilling program designed to maintain Ore Reserves coverage ahead of mining depletion rates. Increases in Ore Reserves are reported for:
· Yandicoogina (Pisolite Ore) which has increased from 247 Mt to 642 Mt following the completion of feasibility-level studies within the Oxbow portion of the channel and prefeasibility-level studies for the Billiard South portion of the channel.
· Brockman 2 (Brockman ore) which has increased from 62 Mt to 93 Mt due to additional drilling, modelling and mine planning studies within the existing operations.
· West Angelas (Marra Mamba ore) which has increased from 185 Mt to 209 Mt due to the first time reporting of the Deposit F deposit, following the completion of a prefeasibility-level study.
As at the end of 2015, total coal Ore Reserves for all deposits increased from 2,106 Mt to 2,504 Mt. Increases in Ore Reserves are reported for:
· Hunter Valley Operations (HVO) Ore Reserves which has increased from 581 Mt to 890 Mt.
· Hail Creek Ore Reserves which has increased from 126 Mt to 253 Mt.
Total coal Mineral Resources exclusive of Ore Reserves have increased from 5,429 Mt to 6,805 Mt. Increases to Mineral Resources are reported for:
· HVO Mineral Resources which has increased from 1,373 Mt to 1,831 Mt.
· Warkworth Mineral Resources which has increased from 475 Mt to 613 Mt.
· Hail Creek Mineral Resources which has increased from 172 Mt to 591 Mt.
· Kestrel and Kestrel West Mineral Resources which has increased from 142 Mt to 306 Mt.
· Winchester South Mineral Resources which has increased from 192 Mt to 356 Mt.
Mt Robert contains a maiden coal Mineral Resource estimate of 31 Mt.
The coal upgrades have resulted from a programme of orebody knowledge and strategic mine planning optimisation undertaken at Rio Tinto Coal Australia.
Mineral Resources and Ore Reserves are quoted on a 100% basis.
media.enquiries@riotinto.com
www.riotinto.com
Follow @RioTinto on Twitter
Media Relations, EMEA/AmericasIlltud Harri T +44 20 7781 1152 M +44 7920 503 600
David Outhwaite T +44 20 7781 1623 M +44 7787 597 493
David Luff T + 44 20 7781 1177
Investor Relations, EMEA/AmericasJohn Smelt T +44 20 7781 1178 M +44 7917 576597
David Ovington T +44 20 7781 2051 M +44 7920 010 978
Grant Donald T +44 20 7781 1262 M +44 7920 587 805 |
Media Relations, Australia/AsiaBen Mitchell T +61 3 9283 3620 M +61 419 850 212
Bruce Tobin T +61 3 9283 3612 M +61 419 103 454
Matthew Klar T +61 7 3625 4244 M +61 457 525 578
Investor Relations, Australia/AsiaNatalie Worley T +61 3 9283 3063 M +61 409 210 462
T +61 3 9283 3628 M +61 417 401 018
|
|
|
|
|
Rio Tinto plc6 St James's Square London SW1Y 4AD United Kingdom
T +44 20 7781 2000 No. 719885 |
Rio Tinto Limited120 Collins Street Melbourne 3000 Australia
T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 |