Rio Tinto and Sinosteel sign Heads of Agreement for Channar JV further extension discussions
Rio Tinto and Sinosteel Corporation today announced their intention to advance discussions for a second extension to the Channar Mining iron ore joint venture in Western Australia's Pilbara region.
This followed the signing of a Heads of Agreement at Parliament House in Canberra today by Rio Tinto chief executive Sam Walsh and Sinosteel Corporation president Xu Siwei. Chinese President Xi Jinping and Australian Prime Minister Tony Abbott attended the signing.
The original Channar joint venture was signed in 1987 and provided for the production of 200 million tonnes of iron ore. It was extended in 2010 to produce a further 50 million tonnes of iron ore.
Mr Walsh said "The Channar joint venture was a ground-breaking partnership formed in the early stages of the development of the Chinese steel industry.
"It's now one of China's longest running and most successful partnerships with Australia and a model for economic co-operation between our two countries.
"The signing demonstrates the commitment by Rio Tinto and Sinosteel to continue exploring opportunities that build on a mutually beneficial partnership that has developed over many years."
Mr Xu said "The signing of this agreement is another milestone in 27 years of successful cooperation between Sinosteel and Rio Tinto. As a large international enterprise providing comprehensive services for the Chinese iron and steel industry, Sinosteel is committed to developing broader and deeper cooperation with Rio Tinto."
The Channar joint venture (Rio Tinto has a 60 per cent share, Sinosteel 40 per cent) owns the Channar mine, 60 kilometres south of Tom Price in the Pilbara region. The operation is managed by Rio Tinto. Sinosteel has 100 per cent offtake rights to Channar joint venture production (Channar ore feeds into Pilbara Blend).
The original Channar joint venture was one of the largest Chinese investments in the world and it was the first overseas mineral resource project entered into by a Chinese enterprise.
The timetable for reaching a mutually acceptable agreement for a second extension is before the end of the current extension term, which is currently expected to be during 2016.
media.enquiries@riotinto.com
www.riotinto.com
Follow @RioTinto on Twitter
Media Relations, EMEA/AmericasIlltud Harri T +44 20 7781 1152 M +44 7920 503 600
David Outhwaite T +44 20 7781 1623 M +44 7787 597 493
David Luff T + 44 20 7781 1177
Investor Relations, EMEA/AmericasJohn Smelt T +44 20 7781 1654 M +44 7879 642 675
David Ovington T +44 20 7781 2051 M +44 7920 010 978
Grant Donald T +44 20 7781 1262 M +44 7920 587 805 |
Media Relations, Australia/AsiaBen Mitchell T +61 3 9283 3620 M +61 419 850 212
Bruce Tobin T +61 3 9283 3612 M +61 419 103 454
Matthew Klar T +61 7 3625 4244 M +61 457 525 578
Investor Relations, Australia/AsiaRachel Storrs T +61 3 9283 3628 M +61 417 401 018
Galina Rogova T +86 21 6103 3550 M +86 152 2118 3942
|
|
|
|
|
Rio Tinto plc2 Eastbourne Terrace London W2 6LG United Kingdom
T +44 20 7781 2000 No. 719885 |
Rio Tinto Limited120 Collins Street Melbourne 3000 Australia
T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 |