17 January 2017
Rio Tinto chief executive J-S Jacques said "We have delivered a strong operational performance in 2016, underpinned by our drive for efficiency and maximising cash flow. Our disciplined approach remains in place in 2017, with the continued focus on productivity, cost reduction and commercial excellence. This will ensure that we continue to deliver value for our shareholders."
|
|
Q4 2016 |
vs Q4 2015 |
vs Q3 2016 |
2016 |
vs 2015 |
Pilbara iron ore shipments (100% basis) |
Mt |
87.7 |
+1% |
+8% |
327.6 |
+3% |
Pilbara iron ore production (100% basis) |
Mt |
85.5 |
+4% |
+3% |
329.5 |
+6% |
Bauxite |
kt |
12,120 |
+8% |
-2% |
47,703 |
+9% |
Aluminium |
kt |
925 |
+7% |
+0% |
3,646 |
+10% |
Mined copper |
kt |
133.8 |
+20% |
+7% |
523.3 |
+4% |
Hard coking coal |
kt |
2,187 |
+15% |
+1% |
8,141 |
+4% |
Semi-soft and thermal coal |
kt |
5,223 |
-13% |
-3% |
21,356 |
-4% |
Titanium dioxide slag |
kt |
300 |
+35% |
+12% |
1,048 |
-4% |
Highlights |
· Pilbara iron ore shipments of 327.6 million tonnes (100 per cent basis) were in line with guidance and three per cent higher than 2015. · Record bauxite production of 47.7 million tonnes exceeded full year guidance of 47 million tonnes, whilst third party shipments increased to 29.3 million tonnes. · Aluminium production was ten per cent higher than 2015, with record annual production at ten smelters, notably at the modernised and expanded Kitimat smelter, which has produced at nameplate capacity since April 2016. · Mined copper production was four per cent higher than 2015 at 523 thousand tonnes. This was below full year guidance, with no metal share delivered from Grasberg and lower than expected production at Kennecott. · Rio Tinto's share of hard coking coal production was slightly above the top end of the guidance range due to strong operational performance, while semi-soft coking and thermal coal production of 21.4 million tonnes was in line. · Titanium dioxide slag production continued to be aligned with market demand with a four per cent reduction on 2015. · Production and shipments guidance for 2017 remains unchanged from the update given at our London investor seminar on 6 December 2016. · On 23 November 2016, Rio Tinto announced it had reached an agreement to sell its aluminium assets at Lochaber, Scotland for a consideration totalling $410 million. The sale was finalised on 16 December 2016. |
|
All figures in this report are unaudited. All currency figures in this report are US dollars, and comments refer to Rio Tinto's share of production, unless otherwise stated. To allow production numbers to be compared on a like-for-like basis, production from asset divestments completed in 2015 have been excluded from Rio Tinto share of production data but assets sold in 2016 remain in comparisons.
IRON ORE
Rio Tinto share of production (million tonnes)
|
Q4 2016 |
vs Q4 2015 |
vs Q3 2016 |
2016 |
vs 2015 |
Pilbara Blend Lump |
20.4 |
+4% |
+2% |
77.8 |
+7% |
Pilbara Blend Fines |
30.8 |
+3% |
+4% |
117.6 |
+8% |
Robe Valley Lump |
1.6 |
+15% |
+10% |
6.1 |
+3% |
Robe Valley Fines |
2.9 |
+0% |
+5% |
11.2 |
0% |
Yandicoogina Fines (HIY) |
15.2 |
+11% |
+3% |
58.0 |
+7% |
Pilbara operations
Pilbara operations produced 329.5 million tonnes (Rio Tinto share 270.7 million tonnes) in 2016, six per cent higher than in 2015. Fourth quarter production of 85.5 million tonnes (Rio Tinto share 70.9 million tonnes) was four per cent higher than the same quarter of 2015. The strong production performance in 2016 is attributable to the ramp-up of expanded mines, operational productivity improvements and minimal disruption from weather events.
Pilbara sales
Sales of 327.6 million tonnes (Rio Tinto share 268.9 million tonnes) in 2016 were three per cent higher than 2015, attributable to the newly expanded infrastructure and minimal disruption from weather events. Fourth quarter sales of 87.7 million tonnes (Rio Tinto share 72.4 million tonnes) were one per cent higher than the same quarter of 2015.
Sales in the quarter exceeded production by 2.2 million tonnes, primarily drawing down on inventories built at the ports in the third quarter due to maintenance.
Approximately 20 per cent of sales in 2016 were priced with reference to the prior quarter's average index lagged by one month. The remainder was sold either on current quarter average, current month average or on the spot market.
Approximately 62 per cent of 2016 sales were made on a cost and freight (CFR) basis, with the remainder sold free on board (FOB).
Achieved average pricing in 2016 was $49.30 per wet metric tonne on an FOB basis (equivalent to $53.60 per dry metric tonne).
Pilbara projects
The second phase of the Nammuldi Incremental Tonnes (NIT) project was delivered in October, six weeks ahead of schedule, with an annual mine capacity of ten million tonnes. The Silvergrass project incrementally increases the Nammuldi operation by a further ten million tonnes a year, delivering high grade, low phosphorus ore into the Pilbara Blend. First ore is expected in the second half of 2017.
The AutoHaul® project will continue to progress during 2017 with extensive running of trains in automated mode, but with a driver remaining on board until all safety and reliability systems are thoroughly demonstrated.
2017 guidance
Rio Tinto's Pilbara shipments in 2017 are expected to be between 330 and 340 million tonnes (100 per cent basis), subject to weather conditions.
ALUMINIUM
Rio Tinto share of production ('000 tonnes)
|
Q4 2016 |
vs Q4 2015 |
vs Q3 2016 |
2016 |
vs 2015 |
Rio Tinto Aluminium |
|
|
|
|
|
Bauxite |
12,120 |
+8% |
-2% |
47,703 |
+9% |
Alumina |
2,104 |
+5% |
+6% |
8,192 |
+5% |
Aluminium |
925 |
+7% |
+0% |
3,646 |
+10% |
Bauxite
Bauxite production of 47.7 million tonnes during 2016 was nine per cent higher than 2015. Annual production records were achieved at Weipa (up six per cent), benefiting from increased plant throughput, as well as at Gove (up 21 per cent) through system improvements.
The strong production performance and healthy demand from China enabled the Group to ship 29.3 million tonnes to third parties in 2016, ten per cent higher than 2015, whilst fourth quarter shipments were 12 per cent higher than the corresponding quarter in 2015.
Amrun
The Amrun project is advancing to schedule in both engineering and construction. All major contracts have been committed as planned. Site establishment continues with the construction accommodation village operational to 470 beds. The 40 kilometre main access road was completed in December 2016, with the river terminals expected to be operational in the first quarter of 2017.
Alumina
Alumina production for 2016 increased five per cent compared with 2015, primarily due to operational improvements driving record production at the Yarwun refinery (up 11 per cent). The Jonquière and Alumar refineries also achieved record annual production.
Aluminium
Aluminium production was ten per cent higher in 2016, due largely to Kitimat, which produced at nameplate capacity for a third consecutive quarter. Record annual production was achieved at ten smelters, whilst quarterly production records at seven smelters resulted in a seven per cent increase in production compared with the corresponding period in 2015.
On 23 November 2016, Rio Tinto announced it had reached an agreement to sell its assets at Lochaber, Scotland to SIMEC for consideration totalling $410 million. The sale was finalised on 16 December 2016, with final proceeds to be received not later than 28 February 2017.
2017 guidance
Rio Tinto's share of production in 2017 is expected to be 48 to 50 million tonnes of bauxite, 8.0 to 8.2 million tonnes of alumina and 3.5 to 3.7 million tonnes of aluminium.
COPPER & DIAMONDS
Rio Tinto share of production ('000 tonnes)
|
Q4 2016 |
vs Q4 2015 |
vs Q3 2016 |
2016 |
vs 2015 |
Mined copper |
|
|
|
|
|
Rio Tinto Kennecott |
45.1 |
+76% |
+25% |
152.7 |
+66% |
Escondida |
73.4 |
+11% |
+1% |
303.1 |
-12% |
Grasberg |
0.0 |
N/A |
N/A |
0.0 |
N/A |
Oyu Tolgoi |
15.2 |
-21% |
-2% |
67.5 |
0% |
|
|
|
|
|
|
Refined copper |
|
|
|
|
|
Rio Tinto Kennecott |
67.0 |
+196% |
+71% |
156.5 |
+36% |
Escondida |
21.5 |
-19% |
+1% |
93.6 |
-4% |
|
|
|
|
|
|
Diamonds ('000 carats) |
|
|
|
|
|
Argyle |
3,584 |
+6% |
+3% |
13,958 |
+4% |
Diavik |
989 |
+10% |
+7% |
3,995 |
+4% |
Rio Tinto Kennecott
Mined copper production in 2016 was significantly higher than 2015 as mining progressed through an area of higher grades. Whilst fourth quarter production was 25 per cent higher than the previous quarter, it was below expectations due to lower throughput following reduced pit access at Bingham Canyon.
The higher mined production in 2016 resulted in improved refined copper production of 156.5 thousand tonnes, up 36 per cent.
Kennecott continues to toll third party concentrate to optimise smelter utilisation, with 315 thousand tonnes received for processing in 2016. Tolled copper concentrate, which is smelted and returned to customers, is excluded from reported production figures.
Escondida
Mined copper production at Escondida in 2016 was 12 per cent below 2015 due to lower grades and slightly reduced mill throughput. For the fourth quarter, improved mill throughput resulted in production being 11 per cent higher than the corresponding quarter in 2015. Refined copper production in the quarter was lower than the same period in 2015 due to lower oxide ore treated and lower grade material leached on the sulphide leach pad.
Oyu Tolgoi
Mined copper production for 2016 was in line with 2015, as the impact of lower grades was offset by higher throughput, a new record for the mill. Copper production in the fourth quarter was in line with the previous quarter, albeit 21 per cent lower than the corresponding quarter of 2015 as a result of lower grades and challenges with processing and recovering copper from high pyrite ore.
Oyu Tolgoi Underground Project
Contractor mobilisation has continued to ramp up during the fourth quarter, with over 2000 personnel mobilised, 87 per cent of whom are Mongolian nationals. Works on underground mine development, the accommodation camp, conveyor to surface decline, sinking of shaft #2 and shaft #5 and critical facilities continue to progress. Focus is on completing the underground crusher and de-watering system to enable increased lateral development rates.
Grasberg
Through a joint venture agreement with Freeport-McMoRan Inc. (Freeport), Rio Tinto is entitled to 40 per cent of material mined above an agreed threshold as a consequence of expansions and developments of the Grasberg facilities since 1998. Although 20 thousand tonnes of copper were notionally attributed to Rio Tinto for the nine months to September 2016 and reported in the third quarter operations review, productivity issues continued in the fourth quarter. This resulted in total 2016 copper production not exceeding the threshold and accordingly, Rio Tinto's share of joint venture production for 2016 was revised to zero.
Provisional pricing
At 31 December 2016, the Group had an estimated 235 million pounds of copper sales that were provisionally priced at 250 cents per pound. The final price of these sales will be determined during the first half of 2017. This compares with 252 million pounds of open shipments at 31 December 2015, provisionally priced at 217 cents per pound.
Diamonds
At Argyle, 2016 carat production was four per cent higher than 2015 following the ramp-up of the underground mine, with higher ore throughput partially offset by a lower recovered grade.
Likewise at Diavik, carats recovered in 2016 were four per cent higher than 2015 due to higher ore throughput offsetting lower grades.
2017 guidance
In 2017, Rio Tinto's share of mined copper production is expected to be between 525 and 665 thousand tonnes, with higher production at Escondida, and an expected share of joint venture production at Grasberg. Refined copper production is expected to be between 185 and 225 thousand tonnes.
Diamond production guidance for 2017 is 19 to 24 million carats.
ENERGY & MINERALS
Rio Tinto share of production
|
Q4 2016 |
vs Q4 2015 |
vs Q3 2016 |
2016 |
vs 2015 |
Coal |
|
|
|
|
|
Hard coking coal |
2,187 |
+15% |
+1% |
8,141 |
+4% |
Semi-soft coking coal |
969 |
+22% |
-9% |
4,102 |
+12% |
Thermal coal |
4,254 |
-18% |
-2% |
17,254 |
-7% |
|
|
|
|
|
|
Iron ore pellets and concentrate (million tonnes) |
|
|
|
|
|
IOC |
2.7 |
-5% |
-6% |
10.7 |
+3% |
|
|
|
|
|
|
Minerals ('000 tonnes) |
|
|
|
|
|
Borates - B2O3 content |
121 |
+13% |
-8% |
503 |
+6% |
Salt |
1,386 |
-16% |
+12% |
5,180 |
-6% |
Titanium dioxide slag |
300 |
+35% |
+12% |
1,048 |
-4% |
|
|
|
|
|
|
Uranium ('000 lbs) |
|
|
|
|
|
Energy Resources of Australia |
908 |
-10% |
-10% |
3,544 |
+17% |
Rössing |
781 |
+13% |
+24% |
2,798 |
+49% |
Coal
Hard coking coal production was four per cent higher in 2016 and fourth quarter volumes were 15 per cent higher than the same quarter of 2015 due to longwall and plant outperformance at Kestrel.
Semi-soft coking coal production was 12 per cent higher than 2015 and fourth quarter volumes were 22 per cent higher than the corresponding period of 2015 due to mine production sequencing at Hunter Valley Operations and Mt Thorley Warkworth.
Increased thermal coal production from Hail Creek, Kestrel and Mt Thorley Warkworth partially offset lower volumes, which resulted from the restructure of Coal & Allied and the divestment of Bengalla in early 2016, delivering full year production that was seven per cent lower than 2015. Fourth quarter thermal coal production was 18 per cent lower than the same quarter of 2015 due primarily to these ownership changes.
Coking coal prices achieved in the second half of 2016 averaged $152 per tonne on an FOB basis compared to $79 per tonne in the first half of 2016. Average prices realised for thermal coal were $69 per tonne on an FOB basis in the second half of 2016 compared to $51 per tonne in the first half of 2016.
Iron Ore Company of Canada (IOC)
IOC pellet production of 9.8 million tonnes (Rio Tinto share 5.8 million tonnes) in 2016 was five per cent higher than 2015, while concentrate production of 8.4 million tonnes (Rio Tinto share 4.9 million tonnes) was in line with 2015 production.
The three per cent improvement in total production also resulted in a two per cent improvement in sales to 18.3 million tonnes (Rio Tinto share 10.8 million tonnes) in 2016.
Borates
Borates production in 2016 was six per cent higher than in 2015, driven by higher market demand.
Rio Tinto Iron and Titanium (RTIT)
Titanium dioxide slag production was four per cent lower in 2016 as RTIT continues to optimise production to align to demand and draw down remaining inventories. Fourth quarter volumes were 35 per cent higher than the same quarter of 2015, in line with improving sales. Two of nine furnaces at Rio Tinto Fer et Titane and one of four furnaces at Richards Bay Minerals are currently idled, reflecting lower demand for high grade feedstocks.
Salt
Salt production in 2016 was six per cent lower than in 2015 as a result of lower market demand.
Uranium
Energy Resources of Australia continues to process existing stockpiles. 2016 production was 17 per cent higher than 2015 due to higher mill throughput and recoveries.
Production at Rössing was 49 per cent higher than 2015, due to higher throughput and grades.
2017 guidance
In 2017, Rio Tinto's share of production is expected to be 7.8 to 8.4 million tonnes of hard coking coal, 3.3 to 3.9 million tonnes of semi-soft coking coal, 17 to 18 million tonnes of thermal coal, 11.4 to 12.4 million tonnes of iron ore pellets and concentrates, 1.1 to 1.2 million tonnes of titanium dioxide slag, 0.5 million tonnes of boric oxide equivalent production, and 6.5 to 7.5 million pounds of uranium.
EXPLORATION AND EVALUATION
Pre-tax and pre-divestment expenditure on exploration and evaluation charged to the profit and loss account in 2016 was $497 million (of which $119 million was spent in the fourth quarter), compared with $576 million in 2015. Approximately 41 per cent of 2016 expenditure was incurred by central exploration, 25 per cent by Copper & Diamonds, 25 per cent by Energy & Minerals and the remainder by Iron Ore and Aluminium.
On 28 October 2016, Rio Tinto and Chinalco signed a non-binding agreement to sell Rio Tinto's entire stake in the Simandou project in Guinea to Chinalco.
There were no significant divestments of central exploration properties in 2016.
Exploration highlights
Rio Tinto has a strong portfolio of projects with activity in 14 countries across some eight commodities. Exploration activities were discontinued in China, India and Mexico during this quarter. The bulk of the exploration spend in this quarter was focused on copper targets in Australia, Botswana, Chile, Kazakhstan, Namibia, Peru, Serbia, United States and Zambia. Mine-lease exploration continued at a number of Rio Tinto managed businesses including Pilbara Iron, Rio Tinto Coal Australia, Richards Bay Minerals, Oyu Tolgoi, Kennecott and Weipa.
A summary of activity for the quarter is as follows:
Product Group |
Evaluation projects |
Advanced projects |
Greenfield programmes |
Aluminium |
Cape York, Australia |
Amargosa, Brazil |
Australia, Laos |
Copper & Diamonds |
Copper/molybdenum: Resolution, US Copper: La Granja, Peru Copper/gold: Oyu Tolgoi, Mongolia
|
Nickel: Tamarack, US
|
Copper: Australia, Botswana, Chile, Kazakhstan, Mongolia, Namibia, Papua New Guinea, Peru, Serbia, US, Zambia Nickel: Australia, Canada Diamonds: Canada |
Energy & Minerals |
Coal: Hail Creek, Australia Lithium borates: Jadar, Serbia Heavy mineral sands: Mutamba, Mozambique and Zulti South, South Africa Iron Ore: Simandou, Guinea Uranium: Roughrider, Canada |
Coal: Hunter Valley, Australia Potash: KP405, Canada |
Uranium: Australia, Canada |
Iron Ore |
Pilbara, Australia |
Pilbara, Australia |
|
Forward-looking statements
This announcement may include "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995. All statements other than statements of historical facts included in this announcement, including, without limitation, those regarding Rio Tinto's production forecast or guidance, financial position, business strategy, plans and objectives of management for future operations (including development plans and objectives relating to Rio Tinto's products and reserve and resource positions), are forward-looking statements. The words "intend", "aim", "project", "anticipate", "estimate", "plan", "believes", "expects", "may", "should", "will", "target", "set to", "assumes" or similar expressions, commonly identify such forward looking statements.
Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual production, performance or results of Rio Tinto to be materially different from any future production, performance or results expressed or implied by such forward-looking statements. Such forward-looking statements could be influenced by such risk factors as identified in Rio Tinto's most recent Annual Report and Accounts in Australia and the United Kingdom and the most recent Annual Report on Form 20-F filed with the United States Securities and Exchange Commission (the "SEC") or Form 6-Ks furnished to, or filed with, the SEC. Forward-looking statements should, therefore, be construed in light of such risk factors and undue reliance should not be placed on forward-looking statements. These forward-looking statements speak only as of the date of this announcement. Rio Tinto expressly disclaims any obligation or undertaking (except as required by applicable law, the UK Listing Rules, the Disclosure and Transparency Rules of the Financial Conduct Authority and the Listing Rules of the Australian Securities Exchange) to release publicly any updates or revisions to any forward-looking statement contained herein to reflect any change in Rio Tinto's expectations with regard thereto or any change in events, conditions or circumstances on which any such statement is based.
Nothing in this announcement should be interpreted to mean that future earnings per share of Rio Tinto plc or Rio Tinto Limited will necessarily match or exceed its historical published earnings per share.
Contacts
media.enquiries@riotinto.com
www.riotinto.com
Follow @riotinto on Twitter
Media Relations, EMEA/AmericasIlltud Harri T +44 20 7781 1152 M +44 7920 503 600
David Outhwaite T +44 20 7781 1623 M +44 7787 597 493
David Luff
Investor Relations, EMEA/AmericasJohn Smelt T +44 20 7781 1654 M +44 7879 642 675
David Ovington T +44 20 7781 2051 M +44 7920 010 978
Nick Parkinson T +44 20 7781 1552 M +44 7810 657 556 |
Media Relations, Australia/AsiaBen Mitchell T +61 3 9283 3620 M +61 419 850 212
Bruce Tobin T +61 3 9283 3612 M +61 419 103 454
Matt Klar T + 61 7 3625 4244
Investor Relations, Australia/AsiaNatalie Worley T +61 3 9283 3063 M +61 409 210 462
Rachel Storrs T +61 3 9283 3628 M +61 417 401 018
|
|
|
|
|
Rio Tinto plc6 St James's Square London SW1Y 4AD United Kingdom
T +44 20 7781 2000 No. 719885 |
Rio Tinto Limited120 Collins Street Melbourne 3000 Australia
T +61 3 9283 3333 Registered in Australia ABN 96 004 458 404 |
Rio Tinto production summary |
|
|
|
|
|
|
|
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
Rio Tinto share of production |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Quarter |
|
Full Year |
|
% Change |
|||||
|
|
2015 |
2016 |
2016 |
|
2015 |
2016 |
|
Q4 16 |
Q4 16 |
2016 |
Principal Commodities |
|
|
|
|
|
|
|
|
|
|
|
Alumina |
('000 t) |
2,011 |
1,981 |
2,104 |
|
7,788 |
8,192 |
|
5% |
6% |
5% |
Aluminium |
('000 t) |
864 |
924 |
925 |
|
3,322 |
3,646 |
|
7% |
0% |
10% |
Bauxite |
('000 t) |
11,211 |
12,422 |
12,120 |
|
43,677 |
47,703 |
|
8% |
-2% |
9% |
Borates |
('000 t) |
107 |
132 |
121 |
|
476 |
503 |
|
13% |
-8% |
6% |
Coal - hard coking |
('000 t) |
1,900 |
2,175 |
2,187 |
|
7,859 |
8,141 |
|
15% |
1% |
4% |
Coal - semi-soft coking |
('000 t) |
797 |
1,066 |
969 |
|
3,647 |
4,102 |
|
22% |
-9% |
12% |
Coal - thermal |
('000 t) |
5,182 |
4,346 |
4,254 |
|
18,638 |
17,254 |
|
-18% |
-2% |
-7% |
Copper - mined |
('000 t) |
111.1 |
124.4 |
133.8 |
|
504.4 |
523.3 |
|
20% |
7% |
4% |
Copper - refined |
('000 t) |
49.2 |
60.2 |
88.4 |
|
213.0 |
250.1 |
|
80% |
47% |
17% |
Diamonds |
('000 cts) |
4,266 |
4,420 |
4,574 |
|
17,316 |
17,953 |
|
7% |
3% |
4% |
Iron ore |
('000 t) |
70,427 |
71,431 |
73,633 |
|
263,048 |
281,321 |
|
5% |
3% |
7% |
Titanium dioxide slag |
('000 t) |
223 |
267 |
300 |
|
1,089 |
1,048 |
|
35% |
12% |
-4% |
Uranium |
('000 lbs) |
1,699 |
1,633 |
1,690 |
|
4,907 |
6,342 |
|
-1% |
3% |
29% |
Other Metals & Minerals |
|
|
|
|
|
|
|
|
|
|
|
Gold - mined |
('000 oz) |
100.3 |
62.3 |
85.1 |
|
376.4 |
293.5 |
|
-15% |
37% |
-22% |
Gold - refined |
('000 oz) |
31.0 |
29.7 |
40.6 |
|
179.0 |
135.4 |
|
31% |
36% |
-24% |
Molybdenum |
('000 t) |
0.6 |
0.8 |
1.8 |
|
7.6 |
2.8 |
|
213% |
121% |
-63% |
Salt |
('000 t) |
1,647 |
1,240 |
1,386 |
|
5,539 |
5,180 |
|
-16% |
12% |
-6% |
Silver - mined |
('000 oz) |
707 |
1,011 |
1,239 |
|
3,311 |
4,210 |
|
75% |
22% |
27% |
Silver - refined |
('000 oz) |
348 |
415 |
465 |
|
1,843 |
1,815 |
|
34% |
12% |
-2% |
|
|
|
|
|
|
|
|
|
|
|
|
Throughout this report, figures in italics indicate adjustments made since the figure was previously quoted on the equivalent page. Production figures are sometimes more precise than the rounded numbers shown, hence small differences may result between the total of the quarter figures and the year to date figures. |
Rio Tinto share of production |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
ALUMINA |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Jonquière (Vaudreuil) |
100% |
361 |
377 |
353 |
355 |
367 |
1,449 |
1,452 |
Jonquière (Vaudreuil) specialty alumina plant |
100% |
26 |
25 |
29 |
29 |
31 |
110 |
115 |
Queensland Alumina |
80% |
752 |
763 |
769 |
758 |
789 |
2,997 |
3,078 |
São Luis (Alumar) |
10% |
94 |
90 |
93 |
92 |
96 |
367 |
371 |
Yarwun |
100% |
778 |
785 |
823 |
747 |
821 |
2,864 |
3,176 |
Rio Tinto total alumina production |
|
2,011 |
2,040 |
2,067 |
1,981 |
2,104 |
7,788 |
8,192 |
|
|
|
|
|
|
|
|
|
ALUMINIUM |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia - Bell Bay |
100% |
49 |
45 |
45 |
46 |
47 |
191 |
182 |
Australia - Boyne Island |
59% |
86 |
86 |
86 |
87 |
87 |
344 |
346 |
Australia - Tomago |
52% |
75 |
75 |
76 |
77 |
77 |
299 |
304 |
Canada - six wholly owned |
100% |
346 |
375 |
398 |
404 |
405 |
1,273 |
1,582 |
Canada - Alouette (Sept-Îles) |
40% |
61 |
61 |
61 |
61 |
61 |
242 |
244 |
Canada - Bécancour |
25% |
28 |
28 |
27 |
29 |
28 |
109 |
111 |
France - Dunkerque |
100% |
70 |
69 |
69 |
71 |
71 |
275 |
280 |
Iceland - ISAL (Reykjavik) |
100% |
50 |
50 |
52 |
51 |
52 |
201 |
205 |
New Zealand - Tiwai Point |
79% |
67 |
67 |
67 |
68 |
68 |
265 |
269 |
Oman - Sohar |
20% |
19 |
19 |
19 |
19 |
19 |
75 |
77 |
UK - Lochaber (a) |
0% |
12 |
12 |
12 |
12 |
10 |
47 |
46 |
Rio Tinto total aluminium production |
|
864 |
887 |
911 |
924 |
925 |
3,322 |
3,646 |
|
|
|
|
|
|
|
|
|
BAUXITE |
|
|
|
|
|
|
|
|
Production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
Gove |
100% |
1,959 |
2,214 |
2,186 |
2,521 |
2,169 |
7,497 |
9,091 |
Porto Trombetas |
12% |
532 |
457 |
470 |
533 |
516 |
1,939 |
1,975 |
Sangaredi |
(c) |
1,820 |
1,892 |
1,857 |
1,726 |
1,735 |
6,577 |
7,210 |
Weipa |
100% |
6,899 |
6,524 |
7,560 |
7,642 |
7,700 |
27,663 |
29,427 |
Rio Tinto total bauxite production |
|
11,211 |
11,088 |
12,073 |
12,422 |
12,120 |
43,677 |
47,703 |
Rio Tinto share of production |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
BORATES |
|
|
|
|
|
|
|
|
Production ('000 tonnes B2O3 content) |
|
|
|
|
|
|
|
|
Rio Tinto Minerals - borates |
100% |
107 |
127 |
123 |
132 |
121 |
476 |
503 |
|
|
|
|
|
|
|
|
|
COAL - hard coking |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Hail Creek Coal (d) |
82% |
1,134 |
1,224 |
1,202 |
1,248 |
1,205 |
5,099 |
4,879 |
Kestrel Coal (d) |
80% |
766 |
758 |
596 |
926 |
981 |
2,760 |
3,262 |
Rio Tinto total hard coking coal production |
|
1,900 |
1,982 |
1,798 |
2,175 |
2,187 |
7,859 |
8,141 |
|
|
|
|
|
|
|
|
|
COAL - semi-soft coking |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Hunter Valley (e) |
68% |
548 |
677 |
440 |
842 |
581 |
2,373 |
2,540 |
Mount Thorley (e) |
80% |
163 |
363 |
331 |
150 |
283 |
895 |
1,127 |
Warkworth (e) |
56% |
87 |
135 |
121 |
75 |
106 |
380 |
436 |
Rio Tinto total semi-soft coking coal production |
|
797 |
1,175 |
893 |
1,066 |
969 |
3,647 |
4,102 |
|
|
|
|
|
|
|
|
|
COAL - thermal |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Bengalla (f) |
0% |
693 |
527 |
- |
- |
- |
2,662 |
527 |
Hail Creek Coal (d) |
82% |
702 |
895 |
661 |
787 |
746 |
2,661 |
3,089 |
Hunter Valley (e) |
68% |
2,351 |
1,364 |
2,098 |
1,596 |
1,724 |
8,039 |
6,782 |
Kestrel Coal (d) |
80% |
185 |
139 |
96 |
225 |
217 |
509 |
676 |
Mount Thorley (e) |
80% |
385 |
549 |
252 |
606 |
828 |
1,802 |
2,235 |
Warkworth (e) |
56% |
866 |
859 |
1,216 |
1,131 |
739 |
2,965 |
3,945 |
Rio Tinto total thermal coal production |
|
5,182 |
4,331 |
4,323 |
4,346 |
4,254 |
18,638 |
17,254 |
Rio Tinto share of production |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
COPPER |
|
|
|
|
|
|
|
|
Mine production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
25.7 |
34.2 |
37.2 |
36.2 |
45.1 |
92.0 |
152.7 |
Escondida |
30% |
66.2 |
79.4 |
77.7 |
72.6 |
73.4 |
344.7 |
303.1 |
Grasberg - Joint Venture (g) (h) |
40% |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
Oyu Tolgoi (i) |
34% |
19.2 |
19.3 |
17.3 |
15.6 |
15.2 |
67.8 |
67.5 |
Rio Tinto total mine production |
|
111.1 |
132.9 |
132.2 |
124.4 |
133.8 |
504.4 |
523.3 |
Refined production ('000 tonnes) |
|
|
|
|
|
|
|
|
Escondida |
30% |
26.6 |
25.4 |
25.6 |
21.2 |
21.5 |
97.9 |
93.6 |
Rio Tinto Kennecott |
100% |
22.6 |
25.8 |
24.6 |
39.1 |
67.0 |
115.2 |
156.5 |
Rio Tinto total refined production |
|
49.2 |
51.3 |
50.2 |
60.2 |
88.4 |
213.0 |
250.1 |
|
|
|
|
|
|
|
|
|
DIAMONDS |
|
|
|
|
|
|
|
|
Production ('000 carats) |
|
|
|
|
|
|
|
|
Argyle |
100% |
3,368 |
3,391 |
3,489 |
3,493 |
3,584 |
13,472 |
13,958 |
Diavik |
60% |
899 |
1,131 |
948 |
927 |
989 |
3,843 |
3,995 |
Rio Tinto total diamond production |
|
4,266 |
4,522 |
4,436 |
4,420 |
4,574 |
17,316 |
17,953 |
|
|
|
|
|
|
|
|
|
GOLD |
|
|
|
|
|
|
|
|
Mine production ('000 ounces) (b) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
25.6 |
26.2 |
28.3 |
41.5 |
57.2 |
130.8 |
153.2 |
Escondida |
30% |
5.4 |
9.4 |
10.8 |
8.3 |
11.3 |
26.6 |
39.8 |
Grasberg - Joint Venture (g) (h) |
40% |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
0.0 |
Oyu Tolgoi (i) |
34% |
69.4 |
48.1 |
23.3 |
12.5 |
16.6 |
219.0 |
100.5 |
Rio Tinto total mine production |
|
100.3 |
83.7 |
62.4 |
62.3 |
85.1 |
376.4 |
293.5 |
Refined production ('000 ounces) |
|
|
|
|
|
|
|
|
Rio Tinto Kennecott |
100% |
31.0 |
29.8 |
35.3 |
29.7 |
40.6 |
179.0 |
135.4 |
Rio Tinto share of production |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
IRON ORE |
|
|
|
|
|
|
|
|
Production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
Hamersley mines |
(j) |
51,324 |
48,468 |
50,284 |
52,302 |
54,848 |
189,421 |
205,902 |
Hamersley - Channar |
60% |
1,564 |
1,523 |
1,432 |
1,764 |
1,119 |
6,337 |
5,839 |
Hope Downs |
50% |
5,845 |
5,900 |
5,924 |
5,888 |
5,794 |
22,373 |
23,505 |
Iron Ore Company of Canada |
59% |
2,878 |
2,419 |
2,573 |
2,925 |
2,743 |
10,388 |
10,661 |
Robe River - Pannawonica (Mesas J and A) |
53% |
4,273 |
4,450 |
4,221 |
4,208 |
4,493 |
17,216 |
17,371 |
Robe River - West Angelas |
53% |
4,544 |
4,611 |
4,452 |
4,344 |
4,636 |
17,313 |
18,044 |
Rio Tinto iron ore production ('000 tonnes) |
|
70,427 |
67,371 |
68,886 |
71,431 |
73,633 |
263,048 |
281,321 |
Breakdown of Production: |
|
|
|
|
|
|
|
|
Pilbara Blend Lump |
|
19,571 |
18,732 |
18,628 |
19,957 |
20,443 |
72,815 |
77,761 |
Pilbara Blend Fines |
|
30,036 |
28,351 |
28,823 |
29,591 |
30,795 |
108,606 |
117,560 |
Robe Valley Lump |
|
1,410 |
1,573 |
1,440 |
1,484 |
1,625 |
5,937 |
6,122 |
Robe Valley Fines |
|
2,863 |
2,876 |
2,781 |
2,725 |
2,868 |
11,278 |
11,250 |
Yandicoogina Fines (HIY) |
|
13,669 |
13,420 |
14,640 |
14,750 |
15,159 |
54,022 |
57,968 |
IOC Concentrate |
|
1,683 |
1,242 |
1,207 |
1,334 |
1,124 |
4,929 |
4,907 |
IOC Pellets |
|
1,196 |
1,178 |
1,366 |
1,591 |
1,618 |
5,459 |
5,754 |
Breakdown of Sales: |
|
|
|
|
|
|
|
|
Pilbara Blend Lump |
|
18,001 |
15,291 |
17,552 |
17,014 |
18,071 |
63,030 |
67,929 |
Pilbara Blend Fines |
|
34,098 |
30,522 |
31,025 |
30,132 |
34,842 |
125,224 |
126,521 |
Robe Valley Lump |
|
1,334 |
1,272 |
1,276 |
1,346 |
1,502 |
5,317 |
5,397 |
Robe Valley Fines |
|
3,256 |
2,893 |
2,927 |
3,069 |
3,053 |
11,867 |
11,942 |
Yandicoogina Fines (HIY) |
|
14,569 |
12,533 |
14,553 |
15,008 |
14,969 |
54,843 |
57,062 |
IOC Concentrate |
|
1,560 |
1,210 |
1,261 |
1,281 |
1,148 |
4,939 |
4,899 |
IOC Pellets |
|
1,280 |
1,168 |
1,413 |
1,516 |
1,764 |
5,639 |
5,862 |
Rio Tinto iron ore sales ('000 tonnes) |
|
74,097 |
64,889 |
70,007 |
69,366 |
75,350 |
270,858 |
279,613 |
Rio Tinto share of production |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
MOLYBDENUM |
|
|
|
|
|
|
|
|
Mine production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
0.6 |
0.1 |
0.2 |
0.8 |
1.8 |
7.6 |
2.8 |
|
|
|
|
|
|
|
|
|
SALT |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Dampier Salt |
68% |
1,647 |
1,438 |
1,117 |
1,240 |
1,386 |
5,539 |
5,180 |
|
|
|
|
|
|
|
|
|
SILVER |
|
|
|
|
|
|
|
|
Mine production ('000 ounces) (b) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
300 |
342 |
329 |
522 |
751 |
1,458 |
1,943 |
Escondida |
30% |
289 |
463 |
562 |
369 |
397 |
1,443 |
1,791 |
Grasberg - Joint Venture (g) |
40% |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
Oyu Tolgoi (i) |
34% |
119 |
132 |
131 |
121 |
91 |
410 |
476 |
Rio Tinto total mine production |
|
707 |
938 |
1,022 |
1,011 |
1,239 |
3,311 |
4,210 |
Refined production ('000 ounces) |
|
|
|
|
|
|
|
|
Rio Tinto Kennecott |
100% |
348 |
348 |
587 |
415 |
465 |
1,843 |
1,815 |
|
|
|
|
|
|
|
|
|
TITANIUM DIOXIDE SLAG |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Rio Tinto Iron & Titanium (k) |
100% |
223 |
246 |
236 |
267 |
300 |
1,089 |
1,048 |
|
|
|
|
|
|
|
|
|
URANIUM |
|
|
|
|
|
|
|
|
Production ('000 lbs U3O8) (l) |
|
|
|
|
|
|
|
|
Energy Resources of Australia |
68% |
1,008 |
894 |
738 |
1,004 |
908 |
3,023 |
3,544 |
Rössing |
69% |
691 |
687 |
702 |
628 |
781 |
1,884 |
2,798 |
Rio Tinto total uranium production |
|
1,699 |
1,581 |
1,439 |
1,633 |
1,690 |
4,907 |
6,342 |
|
|
|
|
|
|
|
|
|
Production data notes: |
||||||||
Production figures are sometimes more precise than the rounded numbers shown, hence small differences may result between the total of the quarter figures and the year to date figures. |
||||||||
(a) On 16 December 2016, Rio Tinto completed the sale of its 100% interest in the Lochaber aluminium smelter. |
||||||||
(b) Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus concentrates and pellets. |
||||||||
(c) Rio Tinto has a 22.95% shareholding in the Sangaredi mine but benefits from 45.0% of production. |
||||||||
(d) Kestrel and Hail Creek produce hard coking coal and thermal coal through their mining operations. Both mines may blend coal types at ports. |
||||||||
(e) As a result of a restructure of the Coal & Allied group, which completed on 3 February 2016, Rio Tinto obtained 100% ownership of Coal & Allied and Mitsubishi obtained a direct interest of 32.4% in the newly created Hunter Valley Operations joint venture, which owns the Hunter Valley Operations mine. Updated ownership reflects these changes. Historical production prior to the date of the restructure, reflects previous ownership in the Hunter Valley Operations, Mt Thorley and Warkworth mines of 80%, 64% and 44.46% respectively. |
||||||||
(f) Rio Tinto sold its interest in the Bengalla Joint Venture with an effective date of 1 March 2016. |
||||||||
(g) Through a joint venture agreement with Freeport-McMoRan (FCX), Rio Tinto is entitled to 40% of additional material mined as a consequence of expansions and developments of the Grasberg facilities since 1998. |
||||||||
(h) Fourth-quarter 2016 adjustments to Grasberg forecasted full-year 2016 production resulted in adjustments to Rio Tinto's share of previously reported mine production in the first, second and third quarters of 2016. |
||||||||
(i) Rio Tinto owns a 33.52% indirect interest in Oyu Tolgoi through its 50.79% interest in Turquoise Hill Resources Ltd. |
||||||||
(j) Includes 100% of production from Paraburdoo, Mt Tom Price, Marandoo, Yandicoogina, Brockman, Nammuldi and the Eastern Range mines. Whilst Rio Tinto owns 54% of the Eastern Range mine, under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture and therefore all of the production is included in Rio Tinto's share of production. |
||||||||
(k) Quantities comprise 100% of Rio Tinto Fer et Titane and Rio Tinto's 74% interest in Richards Bay Minerals (RBM). |
||||||||
(l) ERA and Rössing production reported are drummed U3O8. |
||||||||
|
|
|
|
|
|
|
|
|
The Rio Tinto percentage shown above is at 31 December 2016. |
||||||||
|
|
|
|
|
|
|
|
|
Rio Tinto's interest in the Murowa mine was sold in 2015. No data for this operation are included in the Share of Production table. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q 2016 |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
ALUMINA |
|
|
|
|
|
|
|
|
Smelter Grade Alumina - Aluminium Group |
|
|
|
|
|
|
|
|
Alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
Queensland Alumina Refinery - Queensland |
80.0% |
940 |
953 |
961 |
947 |
987 |
3,747 |
3,848 |
Yarwun refinery - Queensland |
100.0% |
778 |
785 |
823 |
747 |
821 |
2,864 |
3,176 |
Brazil |
|
|
|
|
|
|
|
|
São Luis (Alumar) refinery |
10.0% |
937 |
903 |
931 |
916 |
957 |
3,667 |
3,707 |
Canada |
|
|
|
|
|
|
|
|
Jonquière (Vaudreuil) refinery - Quebec (a) |
100.0% |
361 |
377 |
353 |
355 |
367 |
1,449 |
1,452 |
|
||||||||
Specialty Alumina - Aluminium Group |
|
|
|
|
|
|
|
|
Specialty alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
Canada |
|
|
|
|
|
|
|
|
Jonquière (Vaudreuil) plant - Quebec |
100.0% |
26 |
25 |
29 |
29 |
31 |
110 |
115 |
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
ALUMINIUM |
|
|
|
|
|
|
|
|
Primary Aluminium |
|
|
|
|
|
|
|
|
Primary aluminium production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
Bell Bay smelter - Tasmania |
100.0% |
49 |
45 |
45 |
46 |
47 |
191 |
182 |
Boyne Island smelter - Queensland |
59.4% |
146 |
145 |
145 |
147 |
147 |
579 |
583 |
Tomago smelter - New South Wales |
51.6% |
146 |
145 |
147 |
149 |
149 |
579 |
589 |
Canada |
|
|
|
|
|
|
|
|
Alma smelter - Quebec |
100.0% |
118 |
117 |
116 |
117 |
117 |
466 |
467 |
Alouette (Sept-Îles) smelter - Quebec |
40.0% |
153 |
152 |
152 |
152 |
153 |
606 |
609 |
Arvida smelter - Quebec |
100.0% |
44 |
43 |
43 |
43 |
43 |
173 |
172 |
Arvida AP60 smelter - Quebec |
100.0% |
15 |
15 |
15 |
15 |
15 |
59 |
60 |
Bécancour smelter - Quebec |
25.1% |
111 |
113 |
108 |
114 |
110 |
437 |
445 |
Grande-Baie smelter - Quebec |
100.0% |
57 |
56 |
56 |
58 |
58 |
221 |
227 |
Kitimat smelter - British Columbia |
100.0% |
51 |
83 |
107 |
109 |
109 |
110 |
408 |
Laterrière smelter - Quebec |
100.0% |
62 |
61 |
61 |
62 |
63 |
244 |
247 |
France |
|
|
|
|
|
|
|
|
Dunkerque smelter |
100.0% |
70 |
69 |
69 |
71 |
71 |
275 |
280 |
Iceland |
|
|
|
|
|
|
|
|
ISAL (Reykjavik) smelter |
100.0% |
50 |
50 |
52 |
51 |
52 |
201 |
205 |
New Zealand |
|
|
|
|
|
|
|
|
Tiwai Point smelter |
79.4% |
85 |
84 |
84 |
85 |
85 |
333 |
339 |
Oman |
|
|
|
|
|
|
|
|
Sohar smelter |
20.0% |
96 |
97 |
97 |
95 |
97 |
377 |
386 |
United Kingdom |
|
|
|
|
|
|
|
|
Lochaber smelter (a) |
0.0% |
12 |
12 |
12 |
12 |
10 |
47 |
46 |
|
||||||||
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
BAUXITE |
|
|
|
|
|
|
|
|
Bauxite production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
Gove mine - Northern Territory |
100.0% |
1,959 |
2,214 |
2,186 |
2,521 |
2,169 |
7,497 |
9,091 |
Weipa mine - Queensland |
100.0% |
6,899 |
6,524 |
7,560 |
7,642 |
7,700 |
27,663 |
29,427 |
Brazil |
|
|
|
|
|
|
|
|
Porto Trombetas (MRN) mine |
12.0% |
4,437 |
3,805 |
3,920 |
4,441 |
4,296 |
16,162 |
16,462 |
Guinea |
|
|
|
|
|
|
|
|
Sangaredi mine (a) |
23.0% |
4,044 |
4,205 |
4,126 |
3,836 |
3,856 |
14,615 |
16,023 |
|
|
|
|
|
|
|
|
|
Rio Tinto share of bauxite shipments |
|
|
|
|
|
|
|
|
Share of total bauxite shipments ('000 tonnes) |
|
10,890 |
11,153 |
11,683 |
12,743 |
11,996 |
43,462 |
47,575 |
Share of third party bauxite shipments ('000 tonnes) |
|
6,576 |
6,768 |
7,101 |
8,093 |
7,345 |
26,569 |
29,308 |
|
||||||||
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
BORATES |
|
|
|
|
|
|
|
|
Rio Tinto Minerals - borates |
100.0% |
|
|
|
|
|
|
|
US |
|
|
|
|
|
|
|
|
Borates ('000 tonnes) (a) |
|
107 |
127 |
123 |
132 |
121 |
476 |
503 |
|
||||||||
|
|
|
|
|
|
|
|
|
COAL |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia |
|
|
|
|
|
|
|
|
Bengalla mine (a) |
0.0% |
|
|
|
|
|
|
|
New South Wales |
|
|
|
|
|
|
|
|
Thermal coal ('000 tonnes) |
|
2,166 |
1,476 |
- |
- |
- |
8,319 |
1,476 |
Hail Creek Coal mine |
82.0% |
|
|
|
|
|
|
|
Queensland |
|
|
|
|
|
|
|
|
Hard coking coal ('000 tonnes) |
|
1,383 |
1,492 |
1,466 |
1,522 |
1,470 |
6,218 |
5,950 |
Thermal coal ('000 tonnes) |
|
856 |
1,091 |
806 |
960 |
910 |
3,245 |
3,767 |
Hunter Valley Operations (b) |
67.6% |
|
|
|
|
|
|
|
New South Wales |
|
|
|
|
|
|
|
|
Semi-soft coking coal ('000 tonnes) |
|
685 |
964 |
651 |
1,245 |
859 |
2,966 |
3,720 |
Thermal coal ('000 tonnes) |
|
2,939 |
1,911 |
3,104 |
2,361 |
2,550 |
10,048 |
9,925 |
Kestrel Coal mine |
80.0% |
|
|
|
|
|
|
|
Queensland |
|
|
|
|
|
|
|
|
Hard coking coal ('000 tonnes) |
|
957 |
948 |
745 |
1,158 |
1,227 |
3,450 |
4,077 |
Thermal coal ('000 tonnes) |
|
231 |
173 |
120 |
281 |
271 |
637 |
846 |
Mount Thorley Operations (b) |
80.0% |
|
|
|
|
|
|
|
New South Wales |
|
|
|
|
|
|
|
|
Semi-soft coking coal ('000 tonnes) |
|
254 |
466 |
414 |
187 |
353 |
1,398 |
1,420 |
Thermal coal ('000 tonnes) |
|
602 |
742 |
315 |
758 |
1,035 |
2,815 |
2,850 |
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
COAL (continued) |
|
|
|
|
|
|
|
|
Warkworth mine (b) |
55.6% |
|
|
|
|
|
|
|
New South Wales |
|
|
|
|
|
|
|
|
Semi-soft coking coal ('000 tonnes) |
|
194 |
267 |
218 |
135 |
190 |
853 |
809 |
Thermal coal ('000 tonnes) |
|
1,945 |
1,672 |
2,188 |
2,035 |
1,330 |
6,663 |
7,225 |
Total hard coking coal production ('000 tonnes) |
|
2,340 |
2,440 |
2,210 |
2,680 |
2,697 |
9,668 |
10,027 |
Total semi-soft coking coal production ('000 tonnes) |
|
1,133 |
1,697 |
1,284 |
1,567 |
1,402 |
5,217 |
5,950 |
Total thermal coal production ('000 tonnes) |
|
8,739 |
7,065 |
6,533 |
6,395 |
6,096 |
31,727 |
26,090 |
Total coal production ('000 tonnes) |
|
12,212 |
11,202 |
10,026 |
10,642 |
10,196 |
46,612 |
42,067 |
|
|
|
|
|
|
|
|
|
Total coal sales ('000 tonnes) |
|
12,261 |
11,047 |
10,357 |
10,129 |
10,241 |
46,658 |
41,773 |
Rio Tinto Coal Australia share (c) |
|
|
|
|
|
|
|
|
Share of hard coking coal sales ('000 tonnes) |
|
2,018 |
2,099 |
1,879 |
2,332 |
2,395 |
8,070 |
8,704 |
Share of semi-soft coal sales ('000 tonnes) (d) |
|
784 |
1,122 |
1,075 |
904 |
1,043 |
3,609 |
4,144 |
Share of thermal coal sales ('000 tonnes) (d) |
|
5,037 |
4,287 |
4,260 |
3,958 |
3,979 |
18,420 |
16,484 |
|
||||||||
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
COPPER & GOLD |
|
|
|
|
|
|
|
|
Escondida |
30.0% |
|
|
|
|
|
|
|
Chile |
|
|
|
|
|
|
|
|
Sulphide ore to concentrator ('000 tonnes) |
|
18,076 |
21,188 |
22,905 |
20,787 |
19,866 |
85,186 |
84,746 |
Average copper grade (%) |
|
0.99 |
0.99 |
0.94 |
0.87 |
1.02 |
1.21 |
0.96 |
Mill production (metals in concentrates): |
|
|
|
|
|
|
|
|
Contained copper ('000 tonnes) |
|
138.6 |
175.8 |
181.7 |
153.2 |
168.6 |
828.5 |
679.3 |
Contained gold ('000 ounces) |
|
18 |
31 |
36 |
28 |
38 |
89 |
133 |
Contained silver ('000 ounces) |
|
962 |
1,544 |
1,874 |
1,229 |
1,323 |
4,812 |
5,971 |
Recoverable copper in ore stacked for leaching ('000 tonnes) (a) |
|
81.8 |
88.8 |
77.4 |
88.9 |
76.4 |
320.3 |
331.4 |
Refined production from leach plants: |
|
|
|
|
|
|
|
|
Copper cathode production ('000 tonnes) |
|
88.7 |
84.8 |
85.3 |
70.5 |
71.5 |
326.3 |
312.1 |
|
||||||||
Freeport-McMoRan Copper & Gold |
|
|
|
|
|
|
|
|
Grasberg mine (a) |
0.0% (b) |
|
|
|
|
|
|
|
Papua, Indonesia |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
14,248 |
14,249 |
14,141 |
16,608 |
18,446 |
59,322 |
63,445 |
Average mill head grades: |
|
|
|
|
|
|
|
|
Copper (%) |
|
0.75 |
0.69 |
0.84 |
1.02 |
1.29 |
0.67 |
0.98 |
Gold (g/t) |
|
0.92 |
0.53 |
0.48 |
0.69 |
1.32 |
0.79 |
0.79 |
Silver (g/t) |
|
2.92 |
2.23 |
2.88 |
3.45 |
3.45 |
2.50 |
3.05 |
Production of metals in concentrates: |
|
|
|
|
|
|
|
|
Copper in concentrates ('000 tonnes) |
|
94.5 |
85.8 |
106.5 |
153.8 |
223.0 |
353.3 |
569.2 |
Gold in concentrates ('000 ounces) |
|
355 |
196 |
179 |
310 |
651 |
1,270 |
1,336 |
Silver in concentrates ('000 ounces) |
|
778 |
613 |
776 |
1,170 |
1,247 |
2,818 |
3,805 |
Sales of payable metals in concentrates: (c) |
|
|
|
|
|
|
|
|
Copper in concentrates ('000 tonnes) |
|
88.7 |
86.9 |
96.8 |
153.7 |
206.2 |
337.8 |
543.6 |
Gold in concentrates ('000 ounces) |
|
332 |
207 |
166 |
307 |
601 |
1,224 |
1,282 |
Silver in concentrates ('000 ounces) |
|
567 |
510 |
562 |
928 |
920 |
2,134 |
2,921 |
|
||||||||
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
Rio Tinto Kennecott |
|
|
|
|
|
|
|
|
Bingham Canyon mine |
100.0% |
|
|
|
|
|
|
|
Utah, US |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
8,224 |
7,386 |
7,512 |
9,698 |
8,827 |
34,831 |
33,423 |
Average ore grade: |
|
|
|
|
|
|
|
|
Copper (%) |
|
0.35 |
0.51 |
0.55 |
0.41 |
0.56 |
0.30 |
0.50 |
Gold (g/t) |
|
0.15 |
0.19 |
0.18 |
0.25 |
0.31 |
0.18 |
0.24 |
Silver (g/t) |
|
1.45 |
1.85 |
1.70 |
2.56 |
3.33 |
1.95 |
2.41 |
Molybdenum (%) |
|
0.023 |
0.015 |
0.023 |
0.031 |
0.040 |
0.037 |
0.028 |
Copper concentrates produced ('000 tonnes) |
|
136 |
153 |
152 |
154 |
190 |
470 |
648 |
Average concentrate grade (% Cu) |
|
18.8 |
22.4 |
24.5 |
23.4 |
23.8 |
19.5 |
23.5 |
Production of metals in copper concentrates: |
|
|
|
|
|
|
|
|
Copper ('000 tonnes) (a) |
|
25.7 |
34.2 |
37.2 |
36.2 |
45.1 |
92.0 |
152.7 |
Gold ('000 ounces) |
|
26 |
26 |
28 |
41 |
57 |
131 |
153 |
Silver ('000 ounces) |
|
300 |
342 |
329 |
522 |
751 |
1,458 |
1,943 |
Molybdenum concentrates produced ('000 tonnes): |
|
1.2 |
0.2 |
0.3 |
1.6 |
3.4 |
14.9 |
5.6 |
Molybdenum in concentrates ('000 tonnes) |
|
0.6 |
0.1 |
0.2 |
0.8 |
1.8 |
7.6 |
2.8 |
|
||||||||
Kennecott smelter & refinery |
100.0% |
|
|
|
|
|
|
|
Copper concentrates smelted ('000 tonnes) |
|
143 |
158 |
167 |
220 |
207 |
503 |
752 |
Copper anodes produced ('000 tonnes) (a) |
|
24.7 |
32.0 |
33.1 |
56.1 |
42.7 |
96.0 |
163.8 |
Production of refined metal: |
|
|
|
|
|
|
|
|
Copper ('000 tonnes) |
|
22.6 |
25.8 |
24.6 |
39.1 |
67.0 |
115.2 |
156.5 |
Gold ('000 ounces) (b) |
|
31.0 |
29.8 |
35.3 |
29.7 |
40.6 |
179.0 |
135.4 |
Silver ('000 ounces) (b) |
|
348 |
348 |
587 |
415 |
465 |
1,843 |
1,815 |
|
||||||||
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
Turquoise Hill Resources |
|
|
|
|
|
|
|
|
Oyu Tolgoi mine (a) |
33.5% |
|
|
|
|
|
|
|
Mongolia |
|
|
|
|
|
|
|
|
Ore Treated ('000 tonnes) |
|
9,369 |
9,662 |
9,525 |
9,146 |
9,819 |
34,537 |
38,152 |
Average mill head grades: |
|
|
|
|
|
|
|
|
Copper (%) |
|
0.69 |
0.70 |
0.64 |
0.66 |
0.61 |
0.67 |
0.65 |
Gold (g/t) |
|
0.92 |
0.63 |
0.33 |
0.21 |
0.25 |
0.78 |
0.36 |
Silver (g/t) |
|
1.67 |
1.92 |
1.92 |
1.99 |
1.50 |
1.56 |
1.83 |
Copper concentrates produced ('000 tonnes) |
|
231.8 |
229.5 |
207.1 |
203.2 |
206.7 |
788.5 |
846.6 |
Average concentrate grade (% Cu) |
|
24.7 |
25.1 |
24.9 |
22.9 |
22.0 |
25.6 |
23.8 |
Production of metals in concentrates: |
|
|
|
|
|
|
|
|
Copper in concentrates ('000 tonnes) |
|
57.3 |
57.6 |
51.7 |
46.6 |
45.5 |
202.2 |
201.3 |
Gold in concentrates ('000 ounces) |
|
207.1 |
143.5 |
69.6 |
37.4 |
49.4 |
653.4 |
300.0 |
Silver in concentrates ('000 ounces) |
|
355 |
395 |
391 |
361 |
273 |
1,223 |
1,420 |
Sales of metals in concentrates: |
|
|
|
|
|
|
|
|
Copper in concentrates ('000 tonnes) |
|
54.7 |
51.2 |
54.4 |
45.7 |
37.6 |
201.3 |
188.9 |
Gold in concentrates ('000 ounces) |
|
160 |
175 |
95 |
38 |
39 |
737 |
347 |
Silver in concentrates ('000 ounces) |
|
360 |
305 |
395 |
341 |
239 |
1,158 |
1,280 |
|
||||||||
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
DIAMONDS |
|
|
|
|
|
|
|
|
Argyle Diamonds |
100.0% |
|
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
|
AK1 ore processed ('000 tonnes) |
|
1,127 |
1,151 |
1,314 |
1,349 |
1,283 |
4,843 |
5,097 |
AK1 diamonds produced ('000 carats) |
|
3,368 |
3,391 |
3,489 |
3,493 |
3,584 |
13,472 |
13,958 |
Diavik Diamonds |
60.0% |
|
|
|
|
|
|
|
Northwest Territories, Canada |
|
|
|
|
|
|
|
|
Ore processed ('000 tonnes) |
|
465 |
557 |
535 |
582 |
539 |
1,984 |
2,214 |
Diamonds recovered ('000 carats) |
|
1,498 |
1,885 |
1,579 |
1,545 |
1,649 |
6,406 |
6,658 |
Murowa Diamonds (a) |
0.0% |
|
|
|
|
|
|
|
Zimbabwe |
|
|
|
|
|
|
|
|
Ore processed ('000 tonnes) |
|
- |
- |
- |
- |
- |
212 |
- |
Diamonds recovered ('000 carats) |
|
- |
- |
- |
- |
- |
99 |
- |
|
||||||||
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
IRON ORE |
|
|
|
|
|
|
|
|
Rio Tinto Iron Ore |
|
|
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
|
Pilbara Operations |
|
|
|
|
|
|
|
|
Saleable iron ore production ('000 tonnes) |
|
|
|
|
|
|
|
|
Hamersley mines |
(a) |
51,324 |
48,468 |
50,284 |
52,302 |
54,848 |
189,421 |
205,902 |
Hamersley - Channar |
60.0% |
2,606 |
2,539 |
2,386 |
2,941 |
1,866 |
10,561 |
9,731 |
Hope Downs |
50.0% |
11,690 |
11,799 |
11,847 |
11,775 |
11,588 |
44,745 |
47,010 |
Robe River - Pannawonica (Mesas J and A) |
53.0% |
8,062 |
8,395 |
7,964 |
7,940 |
8,477 |
32,482 |
32,776 |
Robe River - West Angelas |
53.0% |
8,573 |
8,700 |
8,400 |
8,196 |
8,748 |
32,665 |
34,044 |
Total production ('000 tonnes) |
|
82,255 |
79,902 |
80,882 |
83,154 |
85,526 |
309,876 |
329,463 |
Breakdown of total production: |
|
|
|
|
|
|
|
|
Pilbara Blend Lump |
|
24,116 |
23,355 |
23,180 |
24,478 |
24,902 |
90,643 |
95,915 |
Pilbara Blend Fines |
|
36,408 |
34,732 |
35,098 |
35,986 |
36,988 |
132,728 |
142,804 |
Robe Valley Lump |
|
2,660 |
2,969 |
2,717 |
2,799 |
3,066 |
11,202 |
11,551 |
Robe Valley Fines |
|
5,402 |
5,427 |
5,248 |
5,141 |
5,411 |
21,280 |
21,226 |
Yandicoogina Fines (HIY) |
|
13,669 |
13,420 |
14,640 |
14,750 |
15,159 |
54,022 |
57,968 |
Breakdown of total sales: |
|
|
|
|
|
|
|
|
Pilbara Blend Lump |
|
21,960 |
19,149 |
20,914 |
20,377 |
21,943 |
78,574 |
82,383 |
Pilbara Blend Fines |
|
41,266 |
37,199 |
38,807 |
37,200 |
42,225 |
152,706 |
155,431 |
Robe Valley Lump |
|
2,516 |
2,400 |
2,408 |
2,540 |
2,835 |
10,031 |
10,183 |
Robe Valley Fines |
|
6,144 |
5,459 |
5,523 |
5,790 |
5,761 |
22,390 |
22,533 |
Yandicoogina Fines (HIY) |
|
14,569 |
12,533 |
14,553 |
15,008 |
14,969 |
54,843 |
57,062 |
Total sales ('000 tonnes) (b) |
|
86,454 |
76,739 |
82,205 |
80,916 |
87,732 |
318,544 |
327,592 |
|
||||||||
Iron Ore Company of Canada |
58.7% |
|
|
|
|
|
|
|
Newfoundland & Labrador and Quebec in Canada |
|
|
|
|
|
|
|
|
Saleable iron ore production: |
|
|
|
|
|
|
|
|
Concentrates ('000 tonnes) |
|
2,865 |
2,114 |
2,056 |
2,272 |
1,915 |
8,394 |
8,357 |
Pellets ('000 tonnes) |
|
2,036 |
2,006 |
2,326 |
2,710 |
2,756 |
9,297 |
9,798 |
Sales: |
|
|
|
|
|
|
|
|
Concentrates ('000 tonnes) |
|
2,656 |
2,060 |
2,147 |
2,182 |
1,955 |
8,411 |
8,344 |
Pellets ('000 tonnes) |
|
2,180 |
1,990 |
2,407 |
2,582 |
3,004 |
9,603 |
9,983 |
Global Iron Ore Totals |
|
|
|
|
|
|
|
|
Iron Ore Production ('000 tonnes) |
|
87,157 |
84,022 |
85,265 |
88,136 |
90,196 |
327,567 |
347,619 |
Iron Ore Sales ('000 tonnes) |
|
91,291 |
80,789 |
86,759 |
85,679 |
92,692 |
336,558 |
345,918 |
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |
Rio Tinto operational data |
|
|
|
|
||||
|
|
|
|
|
|
|
|
|
|
Rio Tinto |
4Q |
1Q |
2Q |
3Q |
4Q |
Full Year |
Full Year |
|
|
|
|
|
|
|
|
|
SALT |
|
|
|
|
|
|
|
|
Dampier Salt |
68.4% |
|
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
|
Salt production ('000 tonnes) |
|
2,409 |
2,103 |
1,634 |
1,813 |
2,028 |
8,103 |
7,578 |
|
|
|
|
|
|
|
|
|
TITANIUM DIOXIDE SLAG |
|
|
|
|
|
|
|
|
Rio Tinto Iron & Titanium |
100.0% |
|
|
|
|
|
|
|
Canada and South Africa |
|
|
|
|
|
|
|
|
(Rio Tinto share) (a) |
|
|
|
|
|
|
|
|
Titanium dioxide slag ('000 tonnes) |
|
223 |
246 |
236 |
267 |
300 |
1,089 |
1,048 |
|
||||||||
|
|
|
|
|
|
|
|
|
URANIUM |
|
|
|
|
|
|
|
|
Energy Resources of Australia Ltd |
|
|
|
|
|
|
|
|
Ranger mine (a) |
68.4% |
|
|
|
|
|
|
|
Northern Territory, Australia |
|
|
|
|
|
|
|
|
U3O8 Production ('000 lbs) |
|
1,474 |
1,307 |
1,078 |
1,468 |
1,328 |
4,421 |
5,182 |
|
||||||||
Rössing Uranium Ltd |
68.6% |
|
|
|
|
|
|
|
Namibia |
|
|
|
|
|
|
|
|
U3O8 Production ('000 lbs) |
|
1,007 |
1,001 |
1,023 |
916 |
1,138 |
2,747 |
4,078 |
|
|
|
|
|
|
|
|
|
Rio Tinto percentage interest shown above is at 31 December 2016. The data represent full production and sales on a 100% basis unless otherwise stated. |