Rio Tinto further details on tailings facilities

RNS Number : 9405B
Rio Tinto PLC
12 June 2019
 

Rio Tinto releases further details on tailings facilities

 

12 June 2019

 

Rio Tinto has today disclosed additional information in relation to its global tailings facilities at http://www.riotinto.com/tailings. The latest disclosure builds on the detailed information provided on each of the company's global tailings facilities on 20 February 2019, when Rio Tinto also published its Group Procedure and its Standard for 'Management of tailings and water storage facilities', which was introduced in August 2015.

 

In line with the company's commitment to disclose further detail over time, Rio Tinto has now provided additional information about the construction, management and monitoring of facilities, including independent reviews.

 

All Rio Tinto managed facilities are subject to three levels of governance and assurance:

 

·      First level of assurance takes place at the asset itself with the main tenets being effective facility design, comprehensive operational controls and regular reviews. Independent reviews of the operations must be conducted at least every two years.

·      Second level is assurance to the Rio Tinto Standard through periodic Business Conformance Audits and Technical Reviews, supported by Rio Tinto's Surface Mining Centre of Excellence.

·      Third level of assurance is independent of site management and normally conducted by third parties.

 

All Rio Tinto managed facilities, whether active or inactive, have an external engineer of record or design engineer.

 

In order to align with guidance from the International Council on Mining & Metals (ICMM) some of the information previously disclosed has been updated. This includes limiting the status classifications of facilities to 'active', 'inactive' or 'closed', and ensuring the construction method specified describes the most recent type of embankment raise on the facility. In addition, following a comprehensive review of Rio Tinto's global operations by the company's technical teams, some facilities have been reclassified resulting in some tailings facilities being added to the list and others being removed.

 

All facilities have been given a hazard classification in accordance with the regulatory or industry body that oversees tailings in each region or jurisdiction. Hazard classifications are not a judgment on the condition of a facility or the likelihood of failure but on the potential consequence if there were to be a failure.

 

Full details of all Rio Tinto tailings and water storage facilities are available at www.riotinto.com/tailings.

 

 

 



 

Contacts

 

media.enquiries@riotinto.com 

riotinto.com 

 

  Follow @RioTinto on Twitter

 

 

Media Relations, United Kingdom

Illtud Harri

M +44 7920 503 600

 

David Outhwaite

T +44 20 7781 1623

M +44 7787 597 493

 

Media Relations, Americas

Matthew Klar

T +1 514 608 4429

 

Media Relations, Asia

Grant Donald

T +65 6679 9290

M +65 9722 6028

 

Media Relations, Australia

Jonathan Rose

T +61 3 9283 3088

M +61 447 028 913

 

Matt Chambers

T +61 (0) 3 9283 3087

M +61 433 525 739

 

Jesse Riseborough

T +61 8 6211 6013

M +61 436 653 412

 

Investor Relations, United Kingdom

John Smelt

T +44 20 7781 1654

M +44 7879 642 675

 

David Ovington

T +44 20 7781 2051

M +44 7920 010 978

 

Nick Parkinson

T +44 20 7781 1552

M +44 7810 657 556

 

 

Investor Relations, Australia

Natalie Worley

T +61 3 9283 3063

M +61 409 210 462

 

Rachel Storrs

T +61 3 9283 3628

M +61 417 401 018

 

Rio Tinto plc

6 St James's Square

London SW1Y 4AD

United Kingdom

T +44 20 7781 2000

Registered in England

No. 719885

 

Rio Tinto Limited

Level 7, 360 Collins Street

Melbourne 3000

Australia

T +61 3 9283 3333

Registered in Australia

ABN 96 004 458 404

 


This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
 
END
 
 
MSCFMGMVNZRGLZG

Companies

Rio Tinto (RIO)
UK 100

Latest directors dealings