Chief executive Tom Albanese said: "We have set new quarterly records for iron ore sales and hard coking coal production as our operations recovered from the severe weather experienced earlier in the year. Whilst we are mindful of current market volatility, the fundamentals are holding up well, particularly for bulk-traded commodities. We are operating at full capacity, selling all we produce and our growth programme is on track, supported by the strength of our balance sheet."
· Global iron ore production of 64 million tonnes (50 million tonnes attributable) was up five per cent on the third quarter of 2010.
· Third quarter iron ore sales of 60 million tonnes (100 per cent basis) from the Pilbara operations in Western Australia set a new quarterly record as the ports and rail recovered strongly from the inclement weather experienced earlier in the year .
· Mined copper continued to be impacted by lower grades at Escondida and Kennecott Utah Copper and was down 32 per cent on the third quarter of 2010.
· Bauxite production was up seven per cent compared with the same quarter of 2010. Aluminium was two per cent higher whilst alumina was five per cent lower.
· Coal production from the Queensland and New South Wales coal mines rebounded from the severe rains in the first half of the year.
Ø Australian hard coking coal production set a new quarterly record and was 14 per cent higher than third quarter of 2010 and 55 per cent higher than the second quarter.
Ø Other production from the Australian coal operations favoured semi-soft coal which was 57 per cent higher than the third quarter of 2010 with thermal coal three per cent lower.
· In the first nine months of 2011 Rio Tinto increased its interest in Ivanhoe Mines Ltd from 40.5 per cent to 49.0 per cent and participated in Ivanhoe's rights offering for a total cost of $1.9 billion.
· Rio Tinto completed the $3.7 billion Riversdale acquisition on 1 August: Benga is on track to be commissioned by year-end with substantial growth options ahead.
· On 12 October, ERA announced it is to raise A$500 million via an accelerated renounceable entitlement offer. Rio Tinto has committed to subscribe for its 68.4 per cent entitlement in full and has indicated that it intends to participate in sub-underwriting any shortfall in the retail entitlement offer.
· On 10 February, Rio Tinto announced a $5 billion capital management programme, which was subsequently increased to $7 billion to be completed by the end of the first quarter of 2012. By 12 October, 69 million Rio Tinto plc shares had been bought back at a total cost of $4.4 billion.
All currency figures in this report are US dollars, and comments refer to Rio Tinto's share of production, unless otherwise stated
IRON ORE
Rio Tinto share of production (000 tonnes)
|
Q3 11 |
vs Q3 10 |
vs Q2 11 |
9 mths 11 |
vs 9 mths 10 |
Pilbara Blend Lump |
12,819 |
+16% |
+3% |
35,962 |
+9% |
Pilbara Blend Fines |
17,332 |
+9% |
+6% |
47,556 |
+10% |
Robe Valley Lump |
1,420 |
-1% |
+7% |
3,837 |
-7% |
Robe Valley Fines |
3,015 |
+7% |
+4% |
8,295 |
+5% |
Yandicoogina Fines (HIY) |
12,829 |
-9% |
-8% |
39,036 |
-2% |
IOC (pellets and concentrate) |
2,421 |
+6% |
+24% |
5,874 |
-9% |
Global iron ore production of 64 million tonnes (50 million tonnes attributable) was up five per cent on the third quarter of 2010. Year to date global iron ore production of 179 million tonnes (141 million tonnes attributable) was up three per cent on the same period of 2010.
Pilbara operations
The Pilbara mines continued to operate at above capacity and produced 60 million tonnes (50 million tonnes attributable), the second highest quarter on record. Production for the nine months to September was 169 million tonnes (141 million tonnes attributable).
Third quarter sales of 60 million tonnes (100 per cent basis) set a new quarterly record as rail and port infrastructure recovered strongly from the inclement weather experienced earlier in the year.
Pilbara marketing
During the third quarter Rio Tinto priced the majority of its iron ore using a quarterly index-linked price, set at the prior quarter's average lagged by one month, as a reference. Prices are adjusted for product characteristics and iron and moisture content. The approximate iron and moisture content for Rio Tinto's major iron ore products from the first to the third quarter of 2011 were:
|
Fe (dry basis) |
Moisture |
Pilbara Blend Lump |
62.5% |
4% |
Pilbara Blend Fines |
61.5% |
8.5% |
Robe Valley Lump |
57.0% |
6.0% |
Robe Valley Fines |
57.0% |
7.0% |
Yandicoogina Fines |
58.5% |
9.0% |
Pilbara expansion
The expansion of the Pilbara to 283 Mt/a by the second half of 2013 remains on track. Early works for the expansion to 333 Mt/a proceeded, with earthworks for the new stockyard and car dumper well advanced. The feasibility study to expand the Pilbara to 333 Mt/a is on track for a full decision in early 2012.
On 9 September, Rio Tinto announced an investment of $310 million to assure a sustainable water supply for its iron ore operations in the Pilbara, ensuring a sufficient resource to accommodate the expansion of annual production capacity up to 333 Mt/a.
On 15 September, Rio Tinto announced an investment of $833 million (Rio Tinto share $706 million) in major power and fuel supply projects in the Pilbara, of which approximately half relates to sustaining capex and half to growth capex. Rio Tinto's integrated Pilbara power and gas network will be upgraded with a $520 million investment and a further $313 million will be allocated to fuel infrastructure facilities. The projects are needed to support annual production capacity of 283 million tonnes. The fuel infrastructure project will also help support the next phase of potential expansion, to 333 Mt/a in 2015.
Rio Tinto's integrated operations will be progressively upgraded as follows:
· 225 Mt/a - current operating capacity
· 230 Mt/a by end of Q1 2012 - Dampier port incremental (in implementation)
· 283 Mt/a by end of H2 2013 - Cape Lambert first 53 Mt/a increment (in implementation)
· 333 Mt/a by end of H1 2015 - Cape Lambert second 50 Mt/a increment (in feasibility)
Iron Ore Company of Canada (IOC)
Third quarter saleable iron ore production was six per cent higher than the same quarter of 2010 and 24 per cent higher than the second quarter of 2011 as a result of improved production reliability. Concentrate for sinter production was maximised in the quarter to respond to market demand, and this resulted in lower pellet production relative to the third quarter of 2010.
The Concentrator Expansion Project Phase 1, lifting capacity to 22 Mt/a, is on track for completion in late 2011 and Phase 2, improving the magnetite recovery circuit, is progressing as planned, with first production expected in late 2012.
2011 production guidance
In 2011, Rio Tinto expects to produce in excess of 240 million tonnes (100 per cent basis) from its global operations in Australia and Canada, subject to weather constraints.
COPPER
Rio Tinto share of production
|
Q3 11 |
vs Q3 10 |
vs Q2 11 |
9 mths 11 |
vs 9 mths 10 |
Kennecott Utah Copper |
|
|
|
|
|
Mined copper (000 tonnes) |
41.9 |
-36% |
-8% |
147.9 |
-18% |
Refined copper (000 tonnes) |
45.2 |
-40% |
-22% |
166.5 |
-19% |
Molybdenum (000 tonnes) |
3.4 |
+25% |
-21% |
11.3 |
+30% |
Mined gold (000 ozs) |
92 |
-12% |
-8% |
294 |
-21% |
Refined gold (000 ozs) |
88 |
-47% |
-17% |
292 |
-40% |
Escondida |
|
|
|
|
|
Mined copper (000 tonnes) |
44.7 |
-39% |
-20% |
162.5 |
-28% |
Refined copper (000 tonnes) |
17.2 |
-27% |
-23% |
62.6 |
-4% |
Grasberg JV |
|
|
|
|
|
Mined copper (000 tonnes) |
1.6 |
-27% |
-68% |
11.5 |
-61% |
Mined gold (000 ozs) |
53 |
+1% |
+29% |
142 |
+22% |
Northparkes |
|
|
|
|
|
Mined copper (000 tonnes) |
10.6 |
+31% |
+10% |
29.6 |
+28% |
Palabora |
|
|
|
|
|
Mined copper (000 tonnes) |
10.5 |
-4% |
-3% |
31.2 |
-2% |
Kennecott Utah Copper (KUC)
Mill throughput in the third quarter was lower than all comparable periods, due to a scheduled move of the in-pit crusher. Copper and gold contained in concentrates was below prior periods due to a combination of lower mill throughput and lower ore grades, whilst variability in molybdenum production reflected fluctuations in ore grades and recoveries.
Production of copper, gold and silver will remain at lower levels as mining progresses through lower grade areas of the open pit, before rebounding during the second half of 2012 and into 2013.
On 20 September, Rio Tinto announced an increase in its copper mineral resources by 20 million tonnes to 106 million tonnes at KUC. The mineral resource addition, known as the North Rim Skarn, increases contained metal in mineral resources by 0.73 million tonnes of copper, 1.0 million ounces of gold and 13 million ounces of silver over the 2010 year-end mineral resource estimate.
Escondida
Third quarter mined copper production decreased 39 per cent compared with the same quarter of 2010, as a consequence of a work stoppage which halted operations for 15 days, coupled with lower copper grades.
Grasberg
Freeport is due to release its 100 per cent operating data for the third quarter on 19 October 2011.
Rio Tinto's share of joint venture copper in 2011 has been impacted by lower ore grades which substantially reduced the Rio Tinto share of production under the metal sharing agreement.
The labour strike which commenced on 15 September 2011 is still ongoing.
Northparkes
Mined copper production rose by 31 per cent compared with the same quarter of 2010 due to higher grades from the E48 block cave and ongoing mine to mill optimisation projects leading to higher ore treatment volumes.
Palabora
Mined copper production decreased by four per cent compared with the third quarter of 2010 due to significantly lower slag grade material being milled leading to reduced recovery.
On 5 September, Rio Tinto announced its intention to divest its 57.7 per cent shareholding in Palabora and initiated a commercial process to sell its shareholding.
Ivanhoe
On 24 August, Rio Tinto exercised its right to subscribe for and acquire common shares in Ivanhoe Mines Ltd, increasing its ownership by 2.0 per cent to 48.5 per cent for a total consideration of $536 million.
On 27 September, Rio Tinto increased its stake in Ivanhoe to 49 per cent through the acquisition of an additional 3.7 million common shares bringing its total holding to 361,858,442 common shares. The additional shares were purchased for an aggregate of $71 million at a price per share of $19.21.
2011 production guidance
In 2011, Rio Tinto share of mined and refined copper production is expected to be 522 thousand tonnes and 337 thousand tonnes, respectively.
ALUMINIUM
Rio Tinto share of production (000 tonnes)
|
Q3 11 |
vs Q3 10 |
vs Q2 11 |
9 mths 11 |
vs 9 mths 10 |
Bauxite |
9,178 |
+7% |
+5% |
25,971 |
+6% |
Alumina |
2,235 |
-5% |
- |
6,593 |
-3% |
Aluminium |
962 |
+2% |
- |
2,863 |
+1% |
Cost pressures are returning to the aluminium industry, including the effect of stronger currencies, and the higher costs of caustic, coke and pitch.
Bauxite and alumina
Bauxite production was seven per cent higher than the third quarter of 2010, notably at Weipa, driven by increased third party demand.
Alumina production continued its gradual recovery from the abnormally heavy rains between December 2010 and April 2011, which primarily impacted Queensland Alumina's production, affecting bauxite and coal quality, equipment reliability and freight costs. In August 2011, Gove suffered a significant power outage resulting in a loss of 55,000 tonnes of alumina production. The plant has recovered from the outage and is now operating at a stable rate.
Aluminium
Aluminium production was marginally higher than the same quarter of 2010, driven by higher production at Laterrière following a transformer failure in July 2010, partly offset by the loss of production following two subsequent transformer incidents in May 2011 and August 2011 at the Dunkerque smelter in France.
2011 production guidance
In 2011, Rio Tinto's share of bauxite, alumina and aluminium production is expected to be 35.8 million tonnes, 9.2 million tonnes and 3.9 million tonnes, respectively.
ENERGY
Coal
Rio Tinto share of production (000 tonnes)
|
Q3 11 |
vs Q3 10 |
vs Q2 11 |
9 mths 11 |
vs 9 mths 10 |
Rio Tinto Coal Australia |
|
|
|
|
|
Hard coking coal |
2,774 |
+14% |
+56% |
6,177 |
-8% |
Semi-soft coking coal |
733 |
+57% |
+6% |
2,113 |
-7% |
Thermal coal |
4,575 |
-3% |
-4% |
13,355 |
+1% |
Hard coking coal production set a new quarterly record, 14 per cent above the third quarter of 2010, and recovered strongly from the severe flooding earlier in the year. Hail Creek benefited from improved truck performance and additional heavy mobile equipment whilst Kestrel production increased following the one month longwall changeover in the second quarter.
Semi-soft coking coal production was 57 per cent higher than the corresponding quarter of 2010, primarily due to the ongoing expansion at Hunter Valley Operations (HVO).
Thermal coal production was three per cent lower than the third quarter of 2010 and four per cent lower than the second quarter. Clermont was impacted by a four week delay in overburden removal which reduced coal recovery.
2011 production guidance
In 2011, Rio Tinto's share of Australian hard coking, semi soft coking and thermal coal production is expected to be 8 million tonnes, 3 million tonnes and 18 million tonnes, respectively.
Uranium
Rio Tinto share of production (000 lbs)
|
Q3 11 |
vs Q3 10 |
vs Q2 11 |
9 mths 11 |
vs 9 mths 10 |
Energy Resources of Australia |
1,532 |
+8% |
+840% |
2,272 |
-43% |
Rössing |
841 |
-38% |
-4% |
2,568 |
-38% |
Since the resumption of processing activities at ERA in June, production has steadily increased and the plant has been milling at high throughput and utilisation rates.
Rössing production was lower than the third quarter of 2010 due to lower grades and lower extraction rates. The major pre-strip programme which will allow access to higher grade, low strip-ratio reserves is now 50 per cent complete.
2011 production guidance
In 2011, Rio Tinto's share of uranium production is expected to be 7.4 million pounds.
DIAMONDS & MINERALS
Rio Tinto share of production
|
Q3 11 |
vs Q3 10 |
vs Q2 11 |
9 mths 11 |
vs 9 mths 10 |
Diamonds (000 carats) |
|
|
|
|
|
Argyle |
2,302 |
-5% |
+46% |
5,523 |
-27% |
Diavik |
1,160 |
+8% |
+8% |
3,046 |
+2% |
|
|
|
|
|
|
Minerals (000 tonnes) |
|
|
|
|
|
Borates |
127 |
-10% |
-12% |
390 |
+1% |
Titanium dioxide feedstock |
381 |
+14% |
+8% |
1,063 |
+4% |
Argyle rough diamond production was up 46 per cent compared with the previous quarter, and broadly in line with the corresponding period in 2010, following stabilisation of the operation after the impact of heavy rains and flooding in March 2011. Diavik production was eight per cent higher than both the previous quarter and the third quarter of 2010, driven by increased ore throughput, although this was partly offset by lower grades.
Borates production decreased by ten per cent compared with the third quarter of 2010, due to a planned maintenance shutdown in August 2011. Production at Boron operations has now returned to expected levels, having recovered from an inundation event earlier in the year
Titanium dioxide feedstocks production was eight per cent higher than the previous quarter following a furnace rebuild at Rio Tinto Fer et Titane. Production was 14 per cent higher than the corresponding period in 2010, reflecting improved operating performance at each of Richards Bay Minerals, Rio Tinto Fer et Titane and QIT Madagascar Minerals.
2011 production guidance
In 2011, Rio Tinto's share of production is expected to be as follows:
· Diamonds - 13 million carats
· Titanium dioxide feedstocks - 1.4 million tonnes
· Borates - 0.5 million tonnes.
OTHER CORPORATE ACTIVITY
On 1 August, Rio Tinto completed the divestment of its talc business to Imerys for an enterprise value of $340 million.
On 6 August, Rio Tinto and Mitsubishi Corporation made an indicative, conditional, incomplete and non-binding proposal to acquire all of the shares in Coal & Allied they do not already hold under a joint takeover.
In September, Rio Tinto reached an agreement with Western Fuels-Colorado LLC to divest its holding in the Colowyo coal mine. The sale is expected to close by the end of 2011.
Pre-tax and pre-divestment expenditure on exploration and evaluation charged to the profit and loss account in the first nine months of 2011 was $798 million compared with $371 million in the same period of 2010. During the first nine months of 2011, the Group realised $88 million (pre-tax) from the divestment of central exploration properties, compared with $71 million in the same period of 2010. This included the Sari Gunay gold property in Iran and the Altai Nuurs coal project in Mongolia.
Exploration highlights
At the Amargosa bauxite project in Brazil, reports on mine design, infrastructure, beneficiation, geotechnical and hydrology studies have been prepared and final resource block models are under construction. The Order of Magnitude study remains on track for transition to Rio Tinto Alcan in the fourth quarter of 2011.
Rio Tinto Exploration signed a conditional agreement with Tasman Resources Ltd to farm in to their wholly-owned tenement hosting the Vulcan prospect, in close proximity to the Olympic Dam copper-gold-uranium mine, South Australia.
Rio Tinto entered into a joint venture with North Atlantic Potash Inc., a subsidiary of JSC Acron, to explore for potash on nine permitted areas in Saskatchewan, Canada.
Following completion of the Riversdale acquisition, Rio Tinto Coal Mozambique commenced accelerated exploration and evaluation studies on extensive land holdings across the Moatize Basin.
A summary of activity for the period is as follows:
Product Group |
Evaluation projects |
Advanced projects |
Greenfield programmes |
Aluminium |
|
Amargosa, Brazil |
Australia, Brazil, Laos |
Copper |
Copper/molybdenum: Resolution, US. Copper: La Granja, Peru Copper/gold: Oyu Tolgoi, Mongolia Nickel/copper: Eagle, US |
Nickel: Tamarack, US. |
Copper: Australia, Chile, Kazakhstan, Peru, Russia, US, Zambia Nickel: Canada, South Africa |
Diamonds & Minerals |
Diamonds: Bunder, India Lithium borates: Jadar, Serbia |
|
Diamonds: Canada, Democratic Republic of Congo, India Potash: Canada |
Energy |
Coal: Rio Tinto Coal Mozambique |
Coal: Bowen Basin, Australia |
Coal: Chile, Mozambique, Namibia Uranium: Canada, Namibia |
Iron Ore |
Simandou, Guinea Pilbara, Australia |
Pilbara, Australia. |
Canada, Democratic Republic of Congo |
Mine-lease exploration continued at a number of Rio Tinto businesses including Kennecott Utah Copper, Northparkes, Energy Resources of Australia, Rössing, Diavik and Pilbara Iron.
Rio Tinto is a leading international mining group headquartered in the UK, combining Rio Tinto plc, a London and New York Stock Exchange listed company, and Rio Tinto Limited, which is listed on the Australian Securities Exchange.
Rio Tinto's business is finding, mining, and processing mineral resources. Major products are aluminium, copper, diamonds, thermal and metallurgical coal, uranium, gold, industrial minerals (borax, titanium dioxide and salt) and iron ore. Activities span the world and are strongly represented in Australia and North America with significant businesses in Asia, Europe, Africa and South America.
Media Relations, EMEA / Americas Illtud Harri Office: +44 (0) 20 7781 1152 Mobile: +44 (0)7920 503 600 Tony Shaffer Office: +44 (0) 20 7781 1138 Mobile: +44 (0) 7920 041 003 Christina Mills Office: +44 (0) 20 7781 1154 Mobile: +44 (0) 7825 275 605 |
Investor Relations, London Mark Shannon Office: +44 (0) 20 7781 1178 Mobile: +44 (0) 7917 576597 David Ovington Office: +44 (0) 20 7781 2051 Mobile: +44 (0) 7920 010 978
|
Media Relations, Australia / Asia David Luff Karen Halbert Office: +61 (0) 3 9283 3627 Mobile: +61 (0) 412 119 389 Bruce Tobin Office: +61 (0) 3 9283 3612 Mobile: +61 (0) 419 103 454 |
Investor Relations, Australia Dave Skinner Office: +61 (0) 3 9283 3628 Mobile: +61 (0) 408 335 309 Christopher Maitland Office: +61 (0) 3 9283 3063 Mobile: +61 (0) 459 800 131 |
Media Relations, Canada Bryan Tucker Office: +1 (0) 514 848 8151 Mobile: +1 (0) 514 825 8319 |
Investor Relations, North America Jason Combes Office: +1 (0) 801 204 2919 Mobile: +1 (0) 801 558 2645 |
Website: |
|
Email: |
media.enquiries@riotinto.com enquiries.mediaaustralia@riotinto.com |
Twitter: |
Follow @riotinto on Twitter |
High resolution photographs and media pack available at: www.riotinto.com/media
Rio Tinto production summary
|
|
Quarter |
|
9 Months |
|
% Change |
|||||
|
|
2010 |
2011 |
2011 |
|
2010 |
2011 |
|
Q3 11 |
Q3 11 |
9 MTHS 11 |
|
|
Q3 |
Q2 |
Q3 |
|
9 MTHS |
9 MTHS |
|
vs |
vs |
vs |
|
|
|
|
|
|
|
|
|
Q3 10 |
Q2 11 |
9 MTHS 10 |
Principal Commodities |
|
|
|
|
|
|
|
|
|
|
|
Alumina |
('000 t) |
2,343 |
2,240 |
2,235 |
|
6,785 |
6,593 |
|
-5% |
0% |
-3% |
Aluminium |
('000 t) |
939 |
958 |
962 |
|
2,828 |
2,863 |
|
2% |
0% |
1% |
Bauxite |
('000 t) |
8,604 |
8,726 |
9,178 |
|
24,589 |
25,971 |
|
7% |
5% |
6% |
Borates |
('000 t) |
141 |
144 |
127 |
|
388 |
390 |
|
-10% |
-12% |
1% |
Coal - hard coking |
('000 t) |
2,434 |
1,775 |
2,774 |
|
6,688 |
6,177 |
|
14% |
56% |
-8% |
Coal - semi-soft coking |
('000 t) |
468 |
689 |
733 |
|
2,278 |
2,113 |
|
57% |
6% |
-7% |
Coal - Australian thermal |
('000 t) |
4,694 |
4,758 |
4,575 |
|
13,276 |
13,355 |
|
-3% |
-4% |
1% |
Copper - mined |
('000 t) |
159.7 |
127.2 |
109.3 |
|
492.9 |
382.7 |
|
-32% |
-14% |
-22% |
Copper - refined |
('000 t) |
106.7 |
89.9 |
68.3 |
|
293.3 |
253.5 |
|
-36% |
-24% |
-14% |
Diamonds |
('000 cts) |
3,536 |
2,733 |
3,534 |
|
10,643 |
8,766 |
|
0% |
29% |
-18% |
Iron ore |
('000 t) |
47,608 |
48,851 |
49,834 |
|
134,579 |
140,561 |
|
5% |
2% |
4% |
Titanium dioxide feedstock |
('000 t) |
335 |
352 |
381 |
|
1,019 |
1,063 |
|
14% |
8% |
4% |
Uranium |
('000 lbs) |
2,776 |
1,040 |
2,373 |
|
8,101 |
4,840 |
|
-14% |
128% |
-40% |
Other Metals & Minerals |
|
|
|
|
|
|
|
|
|
|
|
Coal - US thermal |
('000 t) |
684 |
339 |
721 |
|
1,772 |
1,552 |
|
5% |
113% |
-12% |
Gold - mined |
('000 ozs) |
187 |
168 |
169 |
|
572 |
515 |
|
-10% |
0% |
-10% |
Gold - refined |
('000 ozs) |
164 |
105 |
88 |
|
484 |
292 |
|
-47% |
-17% |
-40% |
Molybdenum |
('000 t) |
2.7 |
4.3 |
3.4 |
|
8.7 |
11.3 |
|
25% |
-21% |
30% |
Salt |
('000 t) |
1,115 |
1,732 |
1,797 |
|
3,761 |
4,677 |
|
61% |
4% |
24% |
Silver - mined |
('000 ozs) |
1,595 |
1,281 |
1,088 |
|
4,898 |
3,666 |
|
-32% |
-15% |
-25% |
Silver - refined |
('000 ozs) |
1,207 |
868 |
664 |
|
3,638 |
2,436 |
|
-45% |
-24% |
-33% |
Talc |
('000 t) |
259 |
257 |
84 |
|
763 |
592 |
|
-68% |
-67% |
-22% |
Throughout this report, figures in italics indicate adjustments made since the figure was previously quoted on the equivalent page. Production figures are sometimes more precise than the rounded numbers shown, hence small differences may result between the total of the quarter figures and the nine month figures.
Rio Tinto share of production
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
ALUMINA |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Gove |
100% |
642 |
621 |
608 |
665 |
619 |
1,852 |
1,892 |
Jonquière (Vaudreuil) |
100% |
340 |
335 |
334 |
340 |
337 |
966 |
1,012 |
Queensland Alumina |
80% |
765 |
740 |
596 |
676 |
665 |
2,317 |
1,937 |
São Luis (Alumar) |
10% |
68 |
74 |
82 |
85 |
86 |
177 |
252 |
Yarwun |
100% |
364 |
359 |
338 |
301 |
354 |
1,018 |
993 |
Specialty alumina plants |
100% |
164 |
163 |
159 |
174 |
175 |
455 |
507 |
Rio Tinto total alumina production |
|
2,343 |
2,292 |
2,117 |
2,240 |
2,235 |
6,785 |
6,593 |
ALUMINIUM |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia - Bell Bay |
100% |
45 |
45 |
45 |
45 |
45 |
132 |
135 |
Australia - Boyne Island |
59% |
84 |
83 |
81 |
82 |
83 |
248 |
247 |
Australia - Tomago |
52% |
69 |
69 |
67 |
70 |
70 |
203 |
207 |
Cameroon - Alucam (Edéa) |
47% |
10 |
11 |
7 |
7 |
9 |
24 |
23 |
Canada - six wholly owned |
100% |
315 |
332 |
328 |
332 |
335 |
991 |
995 |
Canada - Alouette (Sept-Îles) |
40% |
56 |
58 |
57 |
57 |
58 |
170 |
173 |
Canada - Bécancour |
25% |
26 |
26 |
26 |
27 |
26 |
78 |
78 |
France - two wholly owned |
100% |
89 |
90 |
89 |
87 |
81 |
267 |
256 |
Iceland - ISAL (Reykjavik) |
100% |
48 |
48 |
46 |
47 |
46 |
142 |
138 |
New Zealand - Tiwai Point |
79% |
70 |
70 |
68 |
70 |
73 |
203 |
211 |
Norway - SØRAL (Husnes) |
50% |
11 |
11 |
11 |
11 |
11 |
33 |
33 |
Oman - Sohar |
20% |
19 |
19 |
18 |
19 |
19 |
55 |
56 |
UK - two wholly owned |
100% |
49 |
49 |
51 |
56 |
57 |
137 |
164 |
USA - Sebree |
100% |
48 |
50 |
49 |
49 |
48 |
146 |
146 |
Rio Tinto total aluminium production |
|
939 |
962 |
944 |
958 |
962 |
2,828 |
2,863 |
BAUXITE |
|
|
|
|
|
|
|
|
Production ('000 tonnes) (a) |
|
|
|
|
|
|
|
|
Gove |
100% |
1,771 |
1,771 |
1,665 |
1,805 |
1,860 |
5,419 |
5,330 |
Porto Trombetas (b) |
12% |
498 |
498 |
453 |
465 |
454 |
1,354 |
1,372 |
Sangaredi (b) |
(c) |
1,373 |
1,380 |
1,281 |
1,395 |
1,461 |
4,038 |
4,137 |
Weipa |
100% |
4,962 |
4,813 |
4,668 |
5,061 |
5,403 |
13,778 |
15,132 |
Rio Tinto total bauxite production |
|
8,604 |
8,462 |
8,067 |
8,726 |
9,178 |
24,589 |
25,971 |
Rio Tinto share of production
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
BORATES |
|
|
|
|
|
|
|
|
Production ('000 tonnes B2O3 content) |
|
|
|
|
|
|
|
|
Rio Tinto Minerals - borates |
100% |
141 |
113 |
120 |
144 |
127 |
388 |
390 |
COAL - hard coking |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Hail Creek Coal |
82% |
1,709 |
1,708 |
854 |
1,457 |
1,906 |
4,182 |
4,217 |
Kestrel Coal |
80% |
726 |
571 |
774 |
318 |
867 |
2,505 |
1,960 |
Rio Tinto total hard coking coal production |
|
2,434 |
2,279 |
1,628 |
1,775 |
2,774 |
6,688 |
6,177 |
COAL - semi-soft coking |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Hunter Valley |
76% |
257 |
443 |
210 |
318 |
364 |
1,426 |
891 |
Mount Thorley |
61% |
191 |
173 |
334 |
309 |
330 |
711 |
973 |
Warkworth |
42% |
19 |
180 |
147 |
63 |
39 |
142 |
249 |
Rio Tinto total semi-soft coking coal production |
|
468 |
797 |
691 |
689 |
733 |
2,278 |
2,113 |
COAL - thermal |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Bengalla |
30% |
337 |
503 |
453 |
406 |
393 |
1,156 |
1,252 |
Blair Athol Coal |
71% |
1,260 |
492 |
521 |
414 |
471 |
4,354 |
1,406 |
Clermont (d) |
50% |
560 |
1,064 |
595 |
1,032 |
484 |
825 |
2,111 |
Hunter Valley |
76% |
1,675 |
1,969 |
1,721 |
2,157 |
2,145 |
4,422 |
6,023 |
Kestrel Coal |
80% |
141 |
104 |
86 |
30 |
84 |
466 |
200 |
Mount Thorley |
61% |
183 |
459 |
178 |
136 |
311 |
461 |
626 |
Warkworth |
42% |
538 |
562 |
468 |
583 |
686 |
1,592 |
1,736 |
Total Australian thermal coal |
|
4,694 |
5,154 |
4,022 |
4,758 |
4,575 |
13,276 |
13,355 |
|
|
|
|
|
|
|
|
|
US Coal ('000 tonnes) |
|
|
|
|
|
|
|
|
Colowyo (e) |
100% |
684 |
599 |
492 |
339 |
721 |
1,772 |
1,552 |
Rio Tinto total thermal coal production |
|
5,378 |
5,753 |
4,514 |
5,097 |
5,296 |
15,048 |
14,907 |
Rio Tinto share of production
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
COPPER |
|
|
|
|
|
|
|
|
Mine production ('000 tonnes) (a) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
65.2 |
68.5 |
60.4 |
45.6 |
41.9 |
181.3 |
147.9 |
Escondida |
30% |
73.3 |
76.2 |
61.7 |
56.1 |
44.7 |
227.1 |
162.5 |
Grasberg - Joint Venture (f) |
40% |
2.2 |
21.4 |
5.0 |
5.0 |
1.6 |
29.4 |
11.5 |
Northparkes |
80% |
8.1 |
8.0 |
9.3 |
9.7 |
10.6 |
23.2 |
29.6 |
Palabora |
58% |
10.9 |
11.1 |
10.0 |
10.8 |
10.5 |
31.9 |
31.2 |
Rio Tinto total mine production |
|
159.7 |
185.2 |
146.3 |
127.2 |
109.3 |
492.9 |
382.7 |
Refined production ('000 tonnes) |
|
|
|
|
|
|
|
|
Escondida |
30% |
23.5 |
24.6 |
23.2 |
22.2 |
17.2 |
65.4 |
62.6 |
Kennecott Utah Copper |
100% |
74.8 |
64.8 |
63.5 |
57.7 |
45.2 |
204.5 |
166.5 |
Palabora |
58% |
8.5 |
10.1 |
8.5 |
10.0 |
5.9 |
23.3 |
24.4 |
Rio Tinto total refined production |
|
106.7 |
99.5 |
95.2 |
89.9 |
68.3 |
293.3 |
253.5 |
DIAMONDS |
|
|
|
|
|
|
|
|
Production ('000 carats) |
|
|
|
|
|
|
|
|
Argyle |
100% |
2,425 |
2,243 |
1,641 |
1,580 |
2,302 |
7,561 |
5,523 |
Diavik |
60% |
1,070 |
926 |
812 |
1,074 |
1,160 |
2,974 |
3,046 |
Murowa |
78% |
42 |
30 |
45 |
80 |
72 |
108 |
198 |
Rio Tinto total diamond production |
|
3,536 |
3,199 |
2,498 |
2,733 |
3,534 |
10,643 |
8,766 |
GOLD |
|
|
|
|
|
|
|
|
Mine production ('000 ounces) (a) |
|
|
|
|
|
|
|
|
Barneys Canyon |
100% |
0.4 |
0.4 |
0.4 |
0.4 |
0.4 |
1.6 |
1.2 |
Bingham Canyon |
100% |
104 |
96 |
101 |
100 |
92 |
370 |
293 |
Escondida |
30% |
14 |
13 |
11 |
10 |
6 |
39 |
28 |
Grasberg - Joint Venture (f) |
40% |
53 |
67 |
48 |
41 |
53 |
117 |
142 |
Northparkes |
80% |
14 |
13 |
15 |
15 |
16 |
39 |
45 |
Palabora |
58% |
2 |
2 |
2 |
2 |
2 |
5 |
5 |
Rio Tinto total mine production |
|
187 |
191 |
177 |
168 |
169 |
572 |
515 |
Refined production ('000 ounces) |
|
|
|
|
|
|
|
|
Kennecott Utah Copper |
100% |
164 |
112 |
99 |
105 |
88 |
484 |
292 |
Rio Tinto share of production
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
IRON ORE & IRON |
|
|
|
|
|
|
|
|
Production ('000 tonnes) (a) |
|
|
|
|
|
|
|
|
Hamersley - six wholly owned mines |
100% |
30,334 |
31,151 |
26,956 |
31,235 |
30,908 |
81,555 |
89,099 |
Hamersley - Channar |
60% |
1,312 |
1,757 |
1,483 |
1,752 |
1,688 |
4,852 |
4,922 |
Hamersley - Eastern Range |
(g) |
2,182 |
2,198 |
1,974 |
2,142 |
2,587 |
7,008 |
6,703 |
Hope Downs |
50% |
3,554 |
4,201 |
3,394 |
4,099 |
4,237 |
11,659 |
11,730 |
Iron Ore Company of Canada |
59% |
2,280 |
2,204 |
1,495 |
1,958 |
2,421 |
6,433 |
5,874 |
Robe River |
53% |
7,947 |
8,539 |
6,574 |
7,665 |
7,994 |
23,071 |
22,233 |
Rio Tinto total mine production |
|
47,608 |
50,050 |
41,876 |
48,851 |
49,834 |
134,579 |
140,561 |
Breakdown: Pilbara Blend Lump |
|
11,061 |
12,746 |
10,731 |
12,412 |
12,819 |
33,030 |
35,962 |
Pilbara Blend Fines |
|
15,852 |
16,753 |
13,898 |
16,326 |
17,332 |
43,194 |
47,556 |
Robe Valley Lump |
|
1,431 |
1,453 |
1,094 |
1,324 |
1,420 |
4,116 |
3,837 |
Robe Valley Fines |
|
2,814 |
3,089 |
2,370 |
2,910 |
3,015 |
7,919 |
8,295 |
Yandicoogina Fines (HIY) |
|
14,170 |
13,804 |
12,288 |
13,920 |
12,829 |
39,888 |
39,036 |
IOC Pellets |
|
412 |
514 |
0 |
762 |
1,111 |
1,129 |
1,873 |
IOC Concentrates |
|
1,868 |
1,690 |
1,495 |
1,197 |
1,309 |
5,305 |
4,001 |
MOLYBDENUM |
|
|
|
|
|
|
|
|
Mine production ('000 tonnes) (a) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
2.7 |
4.2 |
3.7 |
4.3 |
3.4 |
8.7 |
11.3 |
SALT |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Dampier Salt |
68% |
1,115 |
1,427 |
1,148 |
1,732 |
1,797 |
3,761 |
4,677 |
SILVER |
|
|
|
|
|
|
|
|
Mine production ('000 ounces) (a) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
845 |
893 |
777 |
788 |
668 |
2,861 |
2,233 |
Escondida |
30% |
469 |
465 |
392 |
349 |
236 |
1,377 |
978 |
Grasberg - Joint Venture (f) |
40% |
159 |
367 |
5 |
4 |
33 |
322 |
42 |
Others |
- |
121 |
124 |
123 |
140 |
151 |
339 |
413 |
Rio Tinto total mine production |
|
1,595 |
1,849 |
1,297 |
1,281 |
1,088 |
4,898 |
3,666 |
Refined production ('000 ounces) |
|
|
|
|
|
|
|
|
Kennecott Utah Copper |
100% |
1,207 |
1,094 |
903 |
868 |
664 |
3,638 |
2,436 |
TALC |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Rio Tinto Minerals - talc (h) |
0% |
259 |
237 |
251 |
257 |
84 |
763 |
592 |
TITANIUM DIOXIDE FEEDSTOCK |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Rio Tinto Iron & Titanium |
100% |
335 |
373 |
329 |
352 |
381 |
1,019 |
1,063 |
Rio Tinto share of production
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
URANIUM |
|
|
|
|
|
|
|
|
Production ('000 lbs U3O8) |
|
|
|
|
|
|
|
|
Energy Resources of Australia |
68% |
1,421 |
1,912 |
577 |
163 |
1,532 |
3,979 |
2,272 |
Rössing |
69% |
1,354 |
1,363 |
851 |
877 |
841 |
4,122 |
2,568 |
Rio Tinto total uranium production |
|
2,776 |
3,276 |
1,427 |
1,040 |
2,373 |
8,101 |
4,840 |
(a) Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus pellets.
(b) Bauxite production at non-managed mines has been restated from a wet to a dry tonne basis, in line with the tonnes shown for Rio Tinto managed operations.
(c) Rio Tinto has a 22.95% shareholding in the Sangaredi mine but receives 45.0% of production under the partnership agreement.
(d) Production commenced at Clermont in the second quarter of 2010.
(e) In September 2011, Rio Tinto signed an agreement to sell the Colowyo mine.
(f) Through a joint venture agreement with Freeport-McMoRan Copper & Gold (FCX), Rio Tinto is entitled to 40% of additional material mined as a consequence of expansions and developments of the Grasberg facilities since 1998. Rio Tinto's share of production reflects actual production for the periods shown.
(g) Rio Tinto's share of production includes 100% of the production from the Eastern Range mine. Under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture.
(h) Rio Tinto sold its 100% interest in the talc business with an effective date of 1 August 2011. Production data are shown up to that date.
The Rio Tinto percentage interest shown above is at 30 September 2011.
Rio Tinto's interests in the Brockville specialty alumina plant, Awaso, Rawhide, Antelope, Cordero Rojo, Decker and Spring Creek mines were sold in 2010. No data for these operations are included in the Share of Production table.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
ALUMINIUM |
|
|
|
|
|
|
|
|
Rio Tinto Alcan |
|
|
|
|
|
|
|
|
Bauxite Mines |
|
|
|
|
|
|
|
|
Bauxite production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
Gove mine - Northern Territory |
100.0% |
1,771 |
1,771 |
1,665 |
1,805 |
1,860 |
5,419 |
5,330 |
Weipa mine - Queensland |
100.0% |
4,962 |
4,813 |
4,668 |
5,061 |
5,403 |
13,778 |
15,132 |
Brazil |
|
|
|
|
|
|
|
|
Porto Trombetas (MRN) mine (a) |
12.0% |
4,154 |
4,153 |
3,779 |
3,872 |
3,786 |
11,282 |
11,436 |
Ghana |
|
|
|
|
|
|
|
|
Awaso mine (a) (b) |
0.0% |
- |
- |
- |
- |
- |
39 |
- |
Guinea |
|
|
|
|
|
|
|
|
Sangaredi mine (a) (c) |
23.0% |
3,051 |
3,066 |
2,846 |
3,099 |
3,248 |
8,974 |
9,193 |
Rio Tinto Alcan share of bauxite shipments |
|
|
|
|
|
|
||
Share of bauxite shipments ('000 tonnes) (a) (d) |
8,421 |
8,546 |
8,018 |
8,870 |
9,099 |
24,375 |
25,987 |
(a) Bauxite production and shipments at non-managed mines have been restated from a wet to a dry tonne basis, in line with the tonnes shown for Rio Tinto managed operations.
(b) Rio Tinto Alcan had an 80% interest in the Awaso mine but purchased the additional 20% of production. Rio Tinto Alcan sold its interest in Ghana Bauxite Company, owner of the Awaso mine, with an effective date of 1 February 2010. Production data are shown up to that date.
(c) Rio Tinto has a 22.95% shareholding in the Sangaredi mine but receives 45.0% of production under the partnership agreement.
(d) Bauxite shipments include ore used internally by the refinery at Gove.
|
|
|
|
642 |
|
|
|
|
Alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
Gove refinery - Northern Territory |
100.0% |
642 |
621 |
608 |
665 |
619 |
1,852 |
1,892 |
Queensland Alumina Refinery - Queensland |
80.0% |
956 |
925 |
745 |
845 |
831 |
2,896 |
2,421 |
Yarwun refinery - Queensland |
100.0% |
364 |
359 |
338 |
301 |
354 |
1,018 |
993 |
Brazil |
|
|
|
|
|
|
|
|
São Luis (Alumar) refinery |
10.0% |
676 |
737 |
821 |
846 |
855 |
1,770 |
2,522 |
Canada |
|
|
|
|
|
|
|
|
Jonquière (Vaudreuil) refinery - Quebec (a) |
100.0% |
340 |
335 |
334 |
340 |
337 |
966 |
1,012 |
(a) Jonquière's (Vaudreuil's) production shows smelter grade alumina only and excludes hydrate produced and used for Specialty Alumina.
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
ALUMINIUM (continued) |
|
|
|
|
|
|
|
|
Specialty Alumina Plants |
|
|
|
|
|
|
|
|
Specialty alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
Canada |
|
|
|
|
|
|
|
|
Brockville plant - Ontario (a) |
0.0% |
4 |
- |
- |
- |
- |
13 |
- |
Jonquière (Vaudreuil) plant - Quebec |
100.0% |
31 |
26 |
27 |
30 |
27 |
84 |
84 |
France |
|
|
|
|
|
|
|
|
Beyrède plant |
100.0% |
4 |
5 |
7 |
6 |
6 |
14 |
19 |
Gardanne plant |
100.0% |
114 |
119 |
111 |
123 |
128 |
318 |
362 |
La Bâthie plant |
100.0% |
7 |
6 |
7 |
7 |
7 |
19 |
21 |
Germany |
|
|
|
|
|
|
|
|
Teutschenthal plant |
100.0% |
7 |
7 |
6 |
8 |
7 |
19 |
21 |
Aluminium Smelters |
|
|
|
|
|
|
|
|
Primary aluminium production ('000 tonnes) |
|
|
|
|
|
|
|
|
Australia |
|
|
|
|
|
|
|
|
Bell Bay smelter - Tasmania |
100.0% |
45 |
45 |
45 |
45 |
45 |
132 |
135 |
Boyne Island smelter - Queensland |
59.4% |
141 |
140 |
137 |
139 |
140 |
418 |
416 |
Tomago smelter - New South Wales |
51.6% |
134 |
134 |
130 |
135 |
137 |
394 |
402 |
Cameroon |
|
|
|
|
|
|
|
|
Alucam (Edéa) smelter |
46.7% |
21 |
23 |
15 |
15 |
19 |
52 |
49 |
Canada |
|
|
|
|
|
|
|
|
Alma smelter - Quebec |
100.0% |
109 |
110 |
108 |
107 |
109 |
324 |
324 |
Alouette (Sept-Îles) smelter - Quebec |
40.0% |
141 |
145 |
142 |
143 |
146 |
424 |
432 |
Arvida smelter - Quebec |
100.0% |
44 |
44 |
43 |
44 |
44 |
130 |
131 |
Bécancour smelter - Quebec |
25.1% |
104 |
103 |
102 |
107 |
104 |
313 |
312 |
Grande-Baie smelter - Quebec |
100.0% |
55 |
55 |
55 |
56 |
56 |
163 |
167 |
Kitimat smelter - British Columbia |
100.0% |
44 |
40 |
41 |
41 |
42 |
145 |
124 |
Laterrière smelter - Quebec |
100.0% |
38 |
58 |
57 |
59 |
59 |
154 |
175 |
Shawinigan smelter - Quebec |
100.0% |
25 |
24 |
24 |
25 |
25 |
75 |
74 |
France |
|
|
|
|
|
|
|
|
Dunkerque smelter |
100.0% |
65 |
67 |
65 |
62 |
56 |
194 |
183 |
Saint-Jean-de-Maurienne smelter |
100.0% |
24 |
24 |
24 |
25 |
25 |
73 |
74 |
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
ALUMINIUM (continued) |
|
|
|
|
|
|
|
|
Iceland |
|
|
|
|
|
|
|
|
ISAL (Reykjavik) smelter |
100.0% |
48 |
48 |
46 |
47 |
46 |
142 |
138 |
New Zealand |
|
|
|
|
|
|
|
|
Tiwai Point smelter |
79.4% |
88 |
88 |
86 |
89 |
91 |
256 |
266 |
Norway |
|
|
|
|
|
|
|
|
SØRAL (Husnes) smelter |
50.0% |
22 |
22 |
22 |
22 |
22 |
66 |
67 |
Oman |
|
|
|
|
|
|
|
|
Sohar smelter |
20.0% |
93 |
94 |
92 |
93 |
94 |
274 |
279 |
United Kingdom |
|
|
|
|
|
|
|
|
Lochaber smelter |
100.0% |
11 |
11 |
11 |
11 |
12 |
31 |
34 |
Lynemouth smelter |
100.0% |
38 |
39 |
41 |
44 |
45 |
106 |
130 |
United States |
|
|
|
|
|
|
|
|
Sebree smelter - Kentucky |
100.0% |
48 |
50 |
49 |
49 |
48 |
146 |
146 |
Rio Tinto Alcan share of metal sales |
|
|
|
|
|
|
|
|
Share of primary aluminium sales ('000 tonnes) (b) |
|
1,249 |
1,285 |
1,055 |
1,116 |
1,116 |
3,775 |
3,287 |
(a) Rio Tinto sold its 100% interest in the Brockville specialty alumina plant with an effective date of 20 September 2010.
(b) In 2010, the aluminium sales included sales made through Rio Tinto Alcan's Engineered Products division. In 2011, these sales are no longer included, following the disposal of 61% of the Engineered Products division in January 2011.
BORATES |
|
|
|
|
|
|
|
|
Rio Tinto Minerals - borates |
100.0% |
|
|
|
|
|
|
|
California, US and Argentina |
|
|
|
|
|
|
|
|
Borates ('000 tonnes) (a) |
|
141 |
113 |
120 |
144 |
127 |
388 |
390 |
(a) Production is expressed as B2O3 content.
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
COAL |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia |
|
|
|
|
|
|
|
|
Bengalla mine |
30.3% |
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
1,112 |
1,660 |
1,494 |
1,340 |
1,299 |
3,818 |
4,134 |
|
Blair Athol Coal mine |
71.2% |
|
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
1,769 |
691 |
731 |
582 |
661 |
6,112 |
1,974 |
|
Clermont Coal mine (a) |
50.1% |
|
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
1,117 |
2,124 |
1,187 |
2,060 |
966 |
1,646 |
4,213 |
|
Hail Creek Coal mine |
82.0% |
|
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
|
Hard coking coal production ('000 tonnes) |
2,084 |
2,082 |
1,042 |
1,776 |
2,325 |
5,101 |
5,143 |
|
Hunter Valley Operations |
75.7% |
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
Semi-soft coking coal production ('000 tonnes) |
340 |
586 |
277 |
419 |
481 |
1,883 |
1,177 |
|
Thermal coal production ('000 tonnes) |
2,213 |
2,601 |
2,274 |
2,849 |
2,833 |
5,841 |
7,956 |
|
Kestrel Coal mine (b) |
80.0% |
|
|
|
|
|
|
|
Queensland, Australia |
|
|
|
|
|
|
|
|
Hard coking coal production ('000 tonnes) |
907 |
714 |
968 |
398 |
1,084 |
3,132 |
2,449 |
|
Thermal coal production ('000 tonnes) |
176 |
130 |
108 |
37 |
106 |
583 |
250 |
|
Mount Thorley Operations |
60.6% |
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
Semi-soft coking coal production ('000 tonnes) |
316 |
286 |
552 |
510 |
545 |
1,174 |
1,606 |
|
Thermal coal production ('000 tonnes) |
302 |
757 |
294 |
225 |
414 |
761 |
1,033 |
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
COAL (continued) |
|
|
|
|
|
|
|
|
Warkworth mine |
42.1% |
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
Semi-soft coking coal production ('000 tonnes) |
46 |
428 |
349 |
150 |
93 |
336 |
591 |
|
Thermal coal production ('000 tonnes) |
1,279 |
1,337 |
1,112 |
1,385 |
1,631 |
3,784 |
4,128 |
|
|
|
|
|
|
|
|
|
|
Total hard coking coal production ('000 tonnes) |
2,991 |
2,796 |
2,009 |
2,174 |
3,409 |
8,232 |
7,592 |
|
Total semi-soft coking coal production ('000 tonnes) |
701 |
1,299 |
1,178 |
1,079 |
1,118 |
3,394 |
3,374 |
|
Total thermal coal production ('000 tonnes) |
7,968 |
9,300 |
7,200 |
8,479 |
8,009 |
22,544 |
23,688 |
|
Total coal production ('000 tonnes) |
11,660 |
13,396 |
10,387 |
11,731 |
12,537 |
34,170 |
34,655 |
|
|
|
|
|
|
|
|
|
|
Total coal sales ('000 tonnes) |
12,611 |
13,671 |
10,607 |
11,669 |
11,687 |
33,520 |
33,963 |
|
|
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia share |
|
|
|
|
|
|
|
|
Share of hard coking coal sales ('000 tonnes) (b) |
2,459 |
2,996 |
1,644 |
1,880 |
2,253 |
6,504 |
5,776 |
|
Share of semi-soft coking coal sales ('000 tonnes) (c) |
607 |
735 |
703 |
609 |
795 |
2,242 |
2,108 |
|
Share of thermal coal sales ('000 tonnes) (c) |
4,981 |
4,852 |
4,095 |
4,716 |
4,300 |
12,989 |
13,111 |
(a) Production commenced at Clermont in the second quarter of 2010.
(b) Kestrel produces hard-coking coal and thermal coal through its mining operations. These coals may be blended at ports; blended coal sales are included in hard-coking coal sales.
(c) Sales relate only to coal mined by the operations and exclude traded coal.
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
COAL (continued) |
|
|
|
|
|
|
|
|
US Coal |
|
|
|
|
|
|
|
|
Antelope mine (a) |
0.0% |
|
|
|
|
|
|
|
Wyoming, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
8,602 |
6,777 |
- |
- |
- |
24,378 |
- |
Colowyo mine (b) |
100.0% |
|
|
|
|
|
|
|
Colorado, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
684 |
599 |
492 |
339 |
721 |
1,772 |
1,552 |
Cordero Rojo mine (a) |
0.0% |
|
|
|
|
|
|
|
Wyoming, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
9,389 |
6,945 |
- |
- |
- |
26,573 |
- |
Decker mine (a) |
0.0% |
|
|
|
|
|
|
|
Montana, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
709 |
639 |
- |
- |
- |
1,882 |
- |
Spring Creek mine (a) |
0.0% |
|
|
|
|
|
|
|
Montana, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
4,768 |
3,806 |
- |
- |
- |
12,920 |
- |
|
|
|
|
|
|
|
|
|
Total coal production ('000 tonnes) |
|
24,151 |
18,767 |
492 |
339 |
721 |
67,525 |
1,552 |
(a) As a result of the initial public offering of Cloud Peak Energy Inc. on 20 November 2009, Rio Tinto held a 48.3% interest in the Antelope, Cordero Rojo and Spring Creek mines and a 24.1% interest in the Decker mine. These interests were formerly reported under Rio Tinto Energy America but are now managed by Cloud Peak Energy. Following a secondary public offering in December 2010, Rio Tinto completed the divestment of its entire interest in Cloud Peak Energy Inc. with an effective date of 15 December 2010. Production data are shown up to that date.
(b) In September 2011, Rio Tinto signed an agreement to sell the Colowyo mine.
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
COPPER & GOLD |
|
|
|
|
|
|
|
|
Escondida |
30.0% |
|
|
|
|
|
|
|
Chile |
|
|
|
|
|
|
|
|
Sulphide ore to concentrator ('000 tonnes) |
19,697 |
18,789 |
15,993 |
16,399 |
12,029 |
55,105 |
44,420 |
|
Average copper grade (%) |
|
1.24 |
1.26 |
1.15 |
1.06 |
0.97 |
1.31 |
1.07 |
Mill production (metals in concentrates): |
|
|
|
|
|
|
|
|
Contained copper ('000 tonnes) |
|
197.7 |
194.6 |
153.1 |
141.2 |
91.9 |
592.2 |
386.2 |
Contained gold ('000 ounces) |
|
48 |
45 |
38 |
35 |
21 |
130 |
94 |
Contained silver ('000 ounces) |
|
1,565 |
1,551 |
1,308 |
1,164 |
786 |
4,589 |
3,259 |
Recoverable copper in ore stacked for leaching |
47 |
60 |
52 |
46 |
57 |
165 |
155 |
|
Refined production from leach plants: |
|
|
|
|
|
|
|
|
Copper cathode production ('000 tonnes) |
78 |
82 |
77 |
74 |
57 |
218 |
209 |
(a) The calculation of copper in material mined for leaching is based on ore stacked at the leach pad.
Freeport-McMoRan Copper & Gold |
|
|
|
|
|
|
|
|
Grasberg mine (a) |
0.0% (40% of the expansion) |
|
|
|
|
|||
Papua, Indonesia |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
21,062 |
21,560 |
19,998 |
20,024 |
19,016 |
62,449 |
59,038 |
Average mill head grades: |
|
|
|
|
|
|
|
|
Copper (%) |
|
0.92 |
0.88 |
0.77 |
0.77 |
0.76 |
0.84 |
0.77 |
Gold (g/t) |
|
0.92 |
1.17 |
0.89 |
0.79 |
1.03 |
0.81 |
0.90 |
Silver (g/t) |
|
2.75 |
2.91 |
2.38 |
2.20 |
2.65 |
2.75 |
2.40 |
Production of metals in concentrates: |
|
|
|
|
|
|
|
|
Copper in concentrates ('000 tonnes) |
170.1 |
167.0 |
133.7 |
132.5 |
127.7 |
458.3 |
393.9 |
|
Gold in concentrates ('000 ounces) |
|
528 |
687 |
473 |
406 |
510 |
1,338 |
1,389 |
Silver in concentrates ('000 ounces) |
|
1,552 |
1,628 |
1,168 |
1,093 |
930 |
4,389 |
3,191 |
Sales of payable metals in concentrates: (b) |
|
|
|
|
|
|
|
|
Copper in concentrates ('000 tonnes) |
167.7 |
153.5 |
127.2 |
129.4 |
128.4 |
446.3 |
384.9 |
|
Gold in concentrates ('000 ounces) |
|
517 |
625 |
476 |
396 |
506 |
1,317 |
1,377 |
Silver in concentrates ('000 ounces) |
|
1,216 |
1,192 |
905 |
838 |
757 |
3,415 |
2,500 |
(a) Through a joint venture agreement with Freeport-McMoRan Copper & Gold (FCX), Rio Tinto is entitled to 40% of additional material mined as a consequence of expansions and developments of the Grasberg facilities since 1998. The 3Q 2011 results show the forecast from FCX's most recent five-year plan because FCX is not releasing its actual 100% operating data for 3Q 2011 until the release of its 2011 third-quarter results on 19 October 2011.
(b) Net of smelter deductions.
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
Kennecott Minerals Company |
|
|
|
|
|
|
|
|
Rawhide mine (a) |
0% |
|
|
|
|
|
|
|
Nevada, US |
|
|
|
|
|
|
|
|
Metals produced in doré: |
|
|
|
|
|
|
|
|
Gold ('000 ounces) |
|
- |
- |
- |
- |
- |
9 |
- |
Silver ('000 ounces) |
|
- |
- |
- |
- |
- |
114 |
- |
(a) Rio Tinto sold its 100% interest in the Rawhide mine with an effective date of 25 June 2010. Production data are shown up to that date
Kennecott Utah Copper |
|
|
|
|
|
|
|
|
|
Barneys Canyon mine (a) |
100.0% |
|
|
|
|
|
|
|
|
Utah, US |
|
|
|
|
|
|
|
|
|
Gold produced ('000 ounces) |
|
0.4 |
0.4 |
0.4 |
0.4 |
0.4 |
1.6 |
1.2 |
|
Bingham Canyon mine |
100.0% |
|
|
|
|
|
|
|
|
Utah, US |
|
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
13,396 |
13,582 |
13,600 |
13,747 |
12,230 |
39,969 |
39,577 |
|
Average ore grade: |
|
|
|
|
|
|
|
|
|
Copper (%) |
|
0.55 |
0.57 |
0.51 |
0.38 |
0.39 |
0.52 |
0.43 |
|
Gold (g/t) |
|
0.35 |
0.31 |
0.33 |
0.30 |
0.31 |
0.41 |
0.31 |
|
Silver (g/t) |
|
2.75 |
2.70 |
2.24 |
2.21 |
2.23 |
2.86 |
2.23 |
|
Molybdenum (%) |
|
0.043 |
0.054 |
0.046 |
0.050 |
0.043 |
0.041 |
0.047 |
|
Copper concentrates produced ('000 tonnes) |
258 |
263 |
240 |
170 |
176 |
705 |
587 |
||
Average concentrate grade (% Cu) |
25.1 |
26.0 |
25.1 |
26.5 |
23.7 |
25.6 |
25.1 |
||
Production of metals in copper concentrates: |
|
|
|
|
|
|
|
||
Copper ('000 tonnes) (b) |
|
65.2 |
68.5 |
60.4 |
45.6 |
41.9 |
181.3 |
147.9 |
|
Gold ('000 ounces) |
|
104 |
96 |
101 |
100 |
92 |
370 |
293 |
|
Silver ('000 ounces) |
|
845 |
893 |
777 |
788 |
668 |
2,861 |
2,233 |
|
Molybdenum concentrates produced ('000 tonnes): |
5.3 |
7.9 |
6.9 |
8.0 |
6.4 |
16.8 |
21.3 |
||
Molybdenum in concentrates ('000 tonnes) |
2.7 |
4.2 |
3.7 |
4.3 |
3.4 |
8.7 |
11.3 |
||
(a) Mining operations ceased in the first quarter of 2002. Gold continues to be recovered from leach pads.
(b) Includes a small amount of copper in precipitates.
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
Kennecott smelter & refinery |
100.0% |
|
|
|
|
|
|
|
Copper concentrates smelted ('000 tonnes) |
|
288 |
293 |
264 |
205 |
167 |
732 |
636 |
Copper anodes produced ('000 tonnes) (a) |
|
81.0 |
64.4 |
70.1 |
48.3 |
34.5 |
206.9 |
152.9 |
Production of refined metal: |
|
|
|
|
|
|
|
|
Copper ('000 tonnes) |
|
74.8 |
64.8 |
63.5 |
57.7 |
45.2 |
204.5 |
166.5 |
Gold ('000 ounces) (b) |
|
164 |
112 |
99 |
105 |
88 |
484 |
292 |
Silver ('000 ounces) (b) |
|
1,207 |
1,094 |
903 |
868 |
664 |
3,638 |
2,436 |
(a) New metal excluding recycled material
(b) Includes gold and silver in intermediate products.
Northparkes Joint Venture |
80.0% |
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
1,282 |
1,298 |
1,302 |
1,330 |
1,439 |
3,950 |
4,070 |
|
Average ore grades: |
|
|
|
|
|
|
|
|
Copper (%) |
|
0.86 |
0.84 |
0.97 |
0.97 |
1.03 |
0.81 |
0.99 |
Gold (g/t) |
|
0.55 |
0.50 |
0.56 |
0.55 |
0.55 |
0.52 |
0.55 |
Copper concentrates produced ('000 tonnes) |
30.2 |
30.2 |
33.4 |
33.8 |
39.7 |
85.9 |
107.0 |
|
Contained copper in concentrates: |
|
|
|
|
|
|
|
|
Saleable production ('000 tonnes) |
|
10.1 |
10.0 |
11.6 |
12.1 |
13.3 |
29.0 |
37.0 |
Sales ('000 tonnes) (a) |
|
8.4 |
11.3 |
5.4 |
8.7 |
8.4 |
20.4 |
22.6 |
Contained gold in concentrates: |
|
|
|
|
|
|
|
|
Saleable production ('000 ounces) |
|
17.3 |
16.1 |
18.5 |
18.3 |
19.4 |
49.2 |
56.2 |
Sales ('000 ounces) (a) |
|
15.5 |
18.8 |
8.8 |
13.5 |
12.5 |
37.0 |
34.8 |
(a) Rio Tinto's 80% share of material from the Joint Venture.
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
Palabora |
57.7% |
|
|
|
|
|
|
|
Palabora mine |
|
|
|
|
|
|
|
|
South Africa |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
2,887 |
3,126 |
2,845 |
2,964 |
3,133 |
8,531 |
8,942 |
|
Average ore grade: copper (%) |
0.64 |
0.63 |
0.66 |
0.65 |
0.63 |
0.65 |
0.65 |
|
Copper concentrates produced ('000 tonnes) |
61.1 |
65.2 |
58.4 |
61.2 |
58.2 |
180.7 |
177.8 |
|
Average concentrate grade: copper (%) |
31.0 |
29.5 |
29.5 |
30.7 |
31.2 |
30.6 |
30.5 |
|
Copper in concentrates ('000 tonnes) |
18.9 |
19.3 |
17.3 |
18.7 |
18.1 |
56.3 |
54.1 |
|
Palabora smelter/refinery |
|
|
|
|
|
|
|
|
New concentrate smelted on site ('000 tonnes) |
61.4 |
62.1 |
62.3 |
62.6 |
45.4 |
178.7 |
170.3 |
|
New copper anodes produced ('000 tonnes) |
14.3 |
14.4 |
14.7 |
18.3 |
10.8 |
41.3 |
43.7 |
|
Refined new copper produced ('000 tonnes) |
14.7 |
17.5 |
14.8 |
17.3 |
10.3 |
40.5 |
42.4 |
|
By-products: |
|
|
|
|
|
|
|
|
Magnetite concentrate ('000 tonnes) |
764 |
695 |
880 |
820 |
744 |
2,299 |
2,444 |
|
Nickel contained in products (tonnes) |
15 |
24 |
27 |
28 |
23 |
48 |
78 |
|
Vermiculite plant |
|
|
|
|
|
|
|
|
Vermiculite produced ('000 tonnes) |
51 |
45 |
43 |
51 |
48 |
151 |
143 |
DIAMONDS |
|
|
|
|
|
|
|
|
Argyle Diamonds |
100.0% |
|
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
|
AK1 ore processed ('000 tonnes) |
|
1,790 |
1,749 |
1,487 |
1,635 |
1,760 |
5,525 |
4,882 |
AK1 diamonds produced ('000 carats) |
|
2,425 |
2,243 |
1,641 |
1,580 |
2,302 |
7,561 |
5,523 |
Diavik Diamonds |
60.0% |
|
|
|
|
|
|
|
Northwest Territories, Canada |
|
|
|
|
|
|
|
|
Ore processed ('000 tonnes) |
|
626 |
555 |
487 |
542 |
645 |
1,536 |
1,674 |
Diamonds recovered ('000 carats) |
|
1,783 |
1,543 |
1,353 |
1,790 |
1,934 |
4,957 |
5,076 |
Murowa Diamonds |
77.8% |
|
|
|
|
|
|
|
Zimbabwe |
|
|
|
|
|
|
|
|
Ore processed ('000 tonnes) |
|
100 |
87 |
81 |
119 |
139 |
297 |
339 |
Diamonds recovered ('000 carats) |
|
53 |
39 |
58 |
103 |
93 |
139 |
254 |
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
IRON ORE & IRON |
|
|
|
|
|
|
|
|
Rio Tinto Iron Ore |
|
|
|
|
|
|
|
|
Pilbara Operations |
|
|
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
|
Saleable iron ore production ('000 tonnes): |
|
|
|
|
|
|
|
|
Hamersley - Paraburdoo, Mount Tom Price, Marandoo, Yandicoogina, Brockman and Nammuldi |
100.0% |
30,334 |
31,151 |
26,956 |
31,235 |
30,908 |
81,555 |
89,099 |
Hamersley - Channar |
60.0% |
2,186 |
2,929 |
2,471 |
2,919 |
2,813 |
8,087 |
8,204 |
Hamersley - Eastern Range |
(a) |
2,182 |
2,198 |
1,974 |
2,142 |
2,587 |
7,008 |
6,703 |
Hope Downs |
50.0% |
7,108 |
8,401 |
6,788 |
8,199 |
8,473 |
23,319 |
23,460 |
Robe River - Pannawonica (Mesas J and A) |
53.0% |
8,010 |
8,571 |
6,535 |
7,989 |
8,367 |
22,707 |
22,891 |
Robe River - West Angelas |
53.0% |
6,985 |
7,541 |
5,869 |
6,472 |
6,716 |
20,823 |
19,058 |
Total production ('000 tonnes) |
|
56,804 |
60,790 |
50,593 |
58,956 |
59,864 |
163,499 |
169,414 |
Breakdown: Pilbara Blend Lump |
|
14,294 |
16,369 |
13,697 |
15,865 |
16,214 |
43,128 |
45,775 |
Pilbara Blend Fines |
|
20,331 |
22,046 |
18,073 |
21,183 |
22,455 |
57,777 |
61,711 |
Robe Valley Lump |
|
2,700 |
2,742 |
2,063 |
2,498 |
2,679 |
7,776 |
7,241 |
Robe Valley Fines |
|
5,309 |
5,828 |
4,472 |
5,491 |
5,688 |
14,941 |
15,650 |
Yandicoogina Fines (HIY) |
|
14,170 |
13,804 |
12,288 |
13,920 |
12,829 |
39,888 |
39,036 |
|
|
|
|
|
|
|
|
|
Total sales ('000 tonnes) (b) |
|
55,891 |
58,216 |
49,874 |
54,589 |
59,501 |
164,484 |
163,964 |
Breakdown: Pilbara Blend Lump |
|
12,348 |
13,489 |
11,813 |
12,607 |
13,567 |
38,080 |
37,987 |
Pilbara Blend Fines |
|
22,099 |
22,562 |
19,287 |
21,309 |
24,259 |
64,295 |
64,855 |
Robe Valley Lump |
|
2,420 |
2,786 |
1,954 |
2,109 |
2,299 |
6,804 |
6,363 |
Robe Valley Fines |
|
5,380 |
6,220 |
4,785 |
5,611 |
5,981 |
15,607 |
16,377 |
Yandicoogina Fines (HIY) |
|
13,644 |
13,159 |
12,035 |
12,953 |
13,395 |
39,697 |
38,382 |
(a) Rio Tinto owns 54% of the Eastern Range mine. Under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture and therefore all of the production is included in Rio Tinto's share of production.
(b) Sales represent iron ore exported from Western Australian ports.
Iron Ore Company of Canada |
58.7% |
|
|
|
|
|
|
|
Newfoundland & Labrador and Quebec in Canada |
|
|
|
|
|
|
||
Saleable iron ore production: |
|
|
|
|
|
|
|
|
Concentrates ('000 tonnes) |
|
702 |
876 |
0 |
1,297 |
1,892 |
1,922 |
3,189 |
Pellets ('000 tonnes) |
|
3,181 |
2,878 |
2,546 |
2,038 |
2,230 |
9,034 |
6,814 |
Sales: |
|
|
|
|
|
|
|
|
Concentrate ('000 tonnes) |
|
796 |
821 |
281 |
1,051 |
1,940 |
2,194 |
3,272 |
Pellets ('000 tonnes) |
|
2,406 |
3,974 |
2,273 |
1,898 |
2,243 |
8,078 |
6,414 |
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2010 |
2010 |
2011 |
2011 |
2011 |
2010 |
2011 |
SALT |
|
|
|
|
|
|
|
|
Dampier Salt |
68.4% |
|
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
|
Salt production ('000 tonnes) |
|
1,630 |
2,088 |
1,679 |
2,534 |
2,628 |
5,501 |
6,841 |
TALC |
|
|
|
|
|
|
|
|
Rio Tinto Minerals - talc (a) |
0.0% |
|
|
|
|
|
|
|
Australia, Europe, and North America |
|
|
|
|
|
|
|
|
Talc production ('000 tonnes) |
|
259 |
237 |
251 |
257 |
84 |
763 |
592 |
(a) Rio Tinto sold its 100% interest in the talc business with an effective date of 1 August 2011. Production data are shown up to that date.
|
||||||||
TITANIUM DIOXIDE FEEDSTOCK |
|
|
|
|
|
|
|
|
Rio Tinto Iron & Titanium |
100.0% |
|
|
|
|
|
|
|
Canada and South Africa (a) |
|
|
|
|
|
|
|
|
(Rio Tinto share) |
|
|
|
|
|
|
|
|
Titanium dioxide feedstock production ('000 tonnes) |
335 |
373 |
329 |
352 |
381 |
1,019 |
1,063 |
(a) Quantities comprise 100% of Rio Tinto Fer et Titane and 37% of Richards Bay Minerals production. Ilmenite mined in Madagascar is being processed in Canada.
URANIUM |
|
|
|
|
|
|
|
|
Energy Resources of Australia Ltd |
|
|
|
|
|
|
|
|
Ranger mine |
68.4% |
|
|
|
|
|
|
|
Northern Territory, Australia |
|
|
|
|
|
|
|
|
Production ('000 lbs U3O8) |
|
2,078 |
2,796 |
843 |
238 |
2,241 |
5,818 |
3,322 |
Rössing Uranium Ltd |
68.6% |
|
|
|
|
|
|
|
Namibia |
|
|
|
|
|
|
|
|
Production ('000 lbs U3O8) |
|
1,974 |
1,988 |
1,240 |
1,279 |
1,226 |
6,011 |
3,745 |
Rio Tinto percentage interest shown above is at 30 September 2011. The data represent full production and sales on a 100% basis unless otherwise stated.