16 October 2012
Rio Tinto chief executive Tom Albanese said "We have delivered another strong set of production results in the third quarter, including record quarterly Pilbara iron ore production. Copper, bauxite, alumina, and titanium dioxide production were all higher than in the same quarter of 2011.
"As we said at our Investor Seminar last week, markets remain volatile, but our business is resilient and our operations are performing strongly, reflecting our consistent strategy of running large, long-life, cost-competitive operations."
· Record quarterly Pilbara iron ore production of 63 million tonnes (Rio Tinto share 50 million tonnes), five per cent higher than the third quarter of 2011. Global iron ore production for the quarter totalled 67 million tonnes (Rio Tinto share 53 million tonnes), five per cent higher than the third quarter of 2011. Production continued to exceed sales in preparation for the expansion to 283 Mt/a, with a measured build-up of stocks across the mines.
· Total mined copper production was 21 per cent higher than the third quarter of 2011, due to expected higher copper grades at Escondida and Kennecott Utah Copper and increased ore delivered at Escondida.
· Bauxite and alumina production were 13 per cent and 20 per cent higher than the third quarter of 2011, driven by increased third party demand for bauxite, expanded refining capacity at Yarwun and record production at Gove. First bauxite was processed at Yarwun 2 on 5 July 2012, and the Yarwun refinery was operating at 90% of its nameplate capacity of 3.4 million tonnes per annum in September. Aluminium production was ten per cent lower than the corresponding quarter in 2011, as ramp up to normal capacity continued following resolution of the Alma labour dispute.
· Thermal coal production increased 21 per cent compared with the third quarter of 2011, as Clermont continued its ramp-up and increased plant capacity came on line at Bengalla. Hard coking coal production was 13 per cent below the third quarter of 2011, due to the impact of dragline mechanical issues at Hail Creek and a major plant shutdown at Kestrel as part of the mine extension project.
· Titanium dioxide feedstock production increased five per cent from the corresponding period in 2011, following a successful furnace rebuild at Rio Tinto Fer et Titane and an increase in attributable volumes from Richards Bay Minerals (RBM). This followed the acquisition of BHP Billiton's entire interest in RBM, which completed on 7 September 2012. The purchase price paid by Rio Tinto on completion of the acquisition was $1.7 billion.
· During the quarter, Rio Tinto completed the sale of several non-core businesses, including its Specialty Alumina division, the North American portion of its Alcan Cable business and Borax Argentina. Rio Tinto also agreed to sell its interest in the Zululand Anthracite Colliery in South Africa.
All currency figures in this report are US dollars, and comments refer to Rio Tinto's share of production, unless otherwise stated
IRON ORE
Rio Tinto share of production (million tonnes)
|
Q3 12 |
vs Q3 11 |
vs Q2 12 |
9 mths 12 |
vs 9mths 11 |
Pilbara Blend Lump |
12.5 |
-3% |
-1% |
36.3 |
+1% |
Pilbara Blend Fines |
18.8 |
+8% |
+7% |
52.1 |
+10% |
Robe Valley Lump |
1.4 |
-2% |
+22% |
4.0 |
+3% |
Robe Valley Fines |
3.1 |
+4% |
+31% |
8.3 |
-1% |
Yandicoogina Fines (HIY) |
14.5 |
+13% |
+11% |
40.2 |
+3% |
IOC (pellets and concentrate) |
2.4 |
-2% |
+23% |
6.0 |
+2% |
Global iron ore production of 67 million tonnes (Rio Tinto share 53 million tonnes) was up five per cent on the third quarter of 2011. Year to date global iron ore production of 187 million tonnes (Rio Tinto share 147 million tonnes) was up four per cent on the same period of 2011.
Pilbara operations
In the third quarter of 2012 the Pilbara mines achieved record quarterly production of 62.9 million tonnes (Rio Tinto share 50.3 million tonnes), five per cent higher than the third quarter of 2011. Production for the nine months to September was 177.1 million tonnes (Rio Tinto share 140.9 million tonnes), also five per cent higher than the corresponding period in 2011. Production continued to exceed sales as the business prepared itself for the expansion to 283 Mt/a, with a measured build-up of stocks at the mine sites.
Pilbara marketing
Third quarter sales of 61 million tonnes (100 per cent basis) were three per cent higher than the third quarter of 2011, and year to date sales of 170 million tonnes (100 per cent basis) were four per cent higher than the corresponding period in 2011.
Pilbara expansion
The expansions of the Pilbara infrastructure to 283 Mt/a by the end of 2013 and 353 Mt/a by H1 2015 remain on track, with the following progress during the quarter:
· Brockman 4 Phase 2 now fully commissioned and running at full rate of mine capacity (40 Mt/a)
· Sixth rail consist for Robe Valley fleet commissioned
· New rail siding at Rosella junction commissioned
· Cape Lambert piling needed for expansion to 283 Mt/a is now 95 per cent complete
· Cape Lambert dredging for 283 Mt/a and 353 Mt/a expansions is complete
· Cape Lambert power station has been decommissioned and demolition work has commenced.
Rio Tinto's integrated operations will be progressively updated as follows:
· 230 Mt/a - current operating capacity
· 283 Mt/a by end of 2013 - Cape Lambert 53 Mt/a increment (in implementation)
· 353 Mt/a by H1 2015 - Cape Lambert 70 Mt/a increment (port, rail and power components fully approved)
Iron Ore Company of Canada (IOC)
Third quarter saleable iron ore production was two per cent lower than the third quarter of 2011 but 23 per cent higher than the second quarter of 2012, due to continuing improvements in mine productivity and commissioning of the Parallel Ore Delivery System (PODS), which links a crusher at the mine site to the concentrator.
Commissioning of the first phase expansion project, lifting concentrate production capacity to 22 Mt/a, continued. The phase two expansion to 23.3 Mt/a is progressing, with first production expected in the first quarter of 2013.
Simandou
In September, the Social and Environmental Impact Assessment for the Simandou mine and rail line was submitted for approval to the Government of Guinea. On 15 October 2012, Rio Tinto announced that the Government of Guinea had issued a decree declaring the Simandou infrastructure a 'Project of National Interest' ('Projet d' Interet National', or 'PIN'). PIN project status protects the area of land needed to develop the rail and port infrastructure (including the 670 kilometre route of the proposed rail line linking Simandou to the new port south of Conakry) from being bought or developed by third parties.
2012 iron ore production guidance
In 2012, Rio Tinto expects to produce approximately 250 million tonnes (100 per cent basis) from its global operations in Australia and Canada, subject to weather constraints.
COPPER
Rio Tinto share of production
|
Q3 12 |
vs Q3 11 |
vs Q2 12 |
9 mths 12 |
vs 9 mths 11 |
Kennecott Utah Copper |
|
|
|
|
|
Mined copper (000 tonnes) |
42.9 |
+2% |
+44% |
103.9 |
-30% |
Refined copper (000 tonnes) |
45.3 |
0% |
+169% |
102.8 |
-38% |
Molybdenum (000 tonnes) |
2.5 |
-25% |
-4% |
8.3 |
-27% |
Mined gold (000 ozs) |
48 |
-48% |
-6% |
152 |
-48% |
Refined gold (000 ozs) |
46 |
-47% |
-15% |
201 |
-31% |
Escondida |
|
|
|
|
|
Mined copper (000 tonnes) |
75.2 |
+68% |
-10% |
227.4 |
+40% |
Refined copper (000 tonnes) |
21.7 |
+26% |
-15% |
71.8 |
+15% |
Northparkes |
|
|
|
|
|
Mined copper (000 tonnes) |
10.7 |
+1% |
-4% |
32.3 |
+9% |
Palabora |
|
|
|
|
|
Mined copper (000 tonnes) |
3.2 |
-69% |
-65% |
21.3 |
-32% |
Refined copper (000 tonnes) |
2.7 |
-54% |
-62% |
18.5 |
-24% |
Kennecott Utah Copper (KUC)
Third quarter production of copper contained in concentrate was level with the third quarter of 2011 but exceeded the preceding quarters of 2012, due to improved ore grades. Refined copper production also recovered, following the successful maintenance shut down of the smelter during the second quarter. Copper production is expected to increase further during the fourth quarter of 2012 as ore grades continue to improve.
Gold and molybdenum production were lower than the third quarter of 2011, reflecting lower grades as a result of mine sequencing.
Escondida
Mined copper increased 68 per cent compared with the third quarter of 2011 and 40 per cent compared with the first nine months of 2011, due to higher grades, increased ore delivered to the concentrator attributable to improved material handling, and industrial action in the third quarter of 2011.
Oyu Tolgoi / Turquoise Hill Resources
Construction of the Oyu Tolgoi copper gold project is currently 97 per cent complete. Mining and stockpiling of first ore began in April 2012. Negotiations with Chinese authorities on a power purchase agreement (PPA) for the Oyu Tolgoi Project are actively progressing. Once a final power agreement has been concluded, first ore is expected to be processed through the concentrator within six weeks. First concentrate production will follow within one month and the start of commercial production is expected three to five months thereafter. Oyu Tolgoi has entered into sales contracts for 75 per cent of concentrate production from the project.
On 30 July 2012 Rio Tinto announced that it had invested $935 million to acquire additional shares under the rights offering conducted by Turquoise Hill Resources (formerly Ivanhoe Mines), so as to maintain its 51 per cent interest in Turquoise Hill.
On 15 October 2012, Turquoise Hill Resources announced that Rio Tinto, Turquoise Hill and Oyu Tolgoi LLC, had jointly rejected a request from the Government of Mongolia to renegotiate the Oyu Tolgoi Investment Agreement. This followed receipt of a letter from the Minister of Mining requesting the parties renegotiate the landmark agreement that was signed in October 2009 and became fully effective in March 2010. As recently as October 2011, the Mongolian Government reaffirmed that the Investment Agreement was signed in full compliance with all laws and regulations of Mongolia.
Grasberg
Based on the latest available Freeport estimates, 2012 production from Grasberg is not expected to exceed the metal attributable to Rio Tinto's joint venture partner, because of planned mine sequencing in areas with lower metal grades. Accordingly, Rio Tinto's share of joint venture production is expected to be zero for the year 2012.
Northparkes
Third quarter mined copper production was consistent with the same quarter of 2011, but decreased four per cent compared with the previous quarter due to lower grades.
Palabora
Mined copper production was significantly lower than the third quarter and year to date in 2011, due to the failure of an ore-hoisting shaft guide rope on 4 July 2012. Following this incident, ore milling was restricted to running down leach pads and slag processing until normal production was restored on 9 September. Opportune equipment maintenance was carried out during this period.
On 15 October 2012, Palabora halted underground production following a safety incident on site.
2012 production guidance
In 2012, Rio Tinto share of mined and refined copper production is expected to be approximately 560,000 tonnes and 290,000 tonnes, respectively.
ALUMINIUM
Rio Tinto share of production (000 tonnes)
|
Q3 12 |
vs Q3 11 |
vs Q2 12 |
9 mths 12 |
vs 9 mths 11 |
Bauxite |
|
|
|
|
|
Rio Tinto Alcan |
8,263 |
+13% |
+10% |
22,757 |
+10% |
Pacific Aluminium |
2,086 |
+12% |
+8% |
5,876 |
+10% |
Alumina |
|
|
|
|
|
Rio Tinto Alcan |
1,898 |
+29% |
+23% |
5,034 |
+18% |
Pacific Aluminium / Other |
777 |
+1% |
-5% |
2,390 |
+3% |
Aluminium |
|
|
|
|
|
Rio Tinto Alcan |
538 |
-10% |
+2% |
1,587 |
-11% |
Pacific Aluminium / Other |
317 |
-13% |
+1% |
963 |
-11% |
Bauxite and alumina
Rio Tinto Alcan's bauxite production was 13 per cent higher than the same quarter of 2011, achieving record production levels at Weipa and in Guinea. The increase in production was mainly driven by increased third party demand.
Rio Tinto Alcan's alumina production was 29 per cent higher than the third quarter of 2011 and 18 per cent higher year to date than in 2011, as expanded alumina refining capacity at Yarwun came on line from July 2012. First bauxite was injected into Yarwun 2 on 5 July 2012. The Yarwun refinery was operating at 90% of its nameplate capacity of 3.4 million tonnes per annum in September, having achieved successive record monthly alumina production in July, August and September 2012. The ramp-up is expected to be completed by mid-2013.
Pacific Aluminium's Gove operation achieved record quarterly production of 2.1 million tonnes of bauxite and 723 thousand tonnes of alumina, representing increases of 12 and 16 per cent respectively over the third quarter of 2011.
Aluminium
Rio Tinto Alcan's aluminium production was 10 per cent lower than the third quarter of 2011 and 11 per cent lower year to date than in 2011. This was largely due to the Alma lockout, where an agreement was reached in July 2012, together with power process issues at the Dunkerque and Saint-Jean-de-Maurienne smelters in France.
2012 production guidance
In 2012, Rio Tinto Alcan's share of bauxite, alumina and aluminium production is expected to be 30.7 million tonnes, 7.0 million tonnes and 2.2 million tonnes, respectively. These numbers exclude the 13 assets that have been identified for divestment or closure.
ENERGY
Coal
Rio Tinto share of production (000 tonnes)
|
Q3 12 |
vs Q3 11 |
vs Q2 12 |
9 mths 12 |
vs 9 mths 11 |
Rio Tinto Coal Australia |
|
|
|
|
|
Hard coking coal |
2,320 |
-16% |
+16% |
6,025 |
-2% |
Semi-soft coking coal |
714 |
-3% |
-29% |
2,323 |
+10% |
Thermal coal
Rio Tinto Coal Mozambique Hard coking coal Thermal coal |
5,402
87 112 |
+18%
N/A N/A |
+13%
N/A N/A |
14,314
87 112 |
+7%
N/A N/A |
Hard coking coal production in Australia was 16 per cent below the third quarter of 2011, due to the impact of dragline maintenance at Hail Creek and a major preparation plant shutdown at Kestrel as part of the mine extension project.
Thermal coal production was 18 per cent higher than the third quarter of 2011 and seven per cent higher than the year to date in 2011. This reflected increased plant capacity at Bengalla, the continuing ramp-up at Clermont, and changes in mine sequence following the revised mine closure plan at Blair Athol. On 8 August 2012, Rio Tinto announced that the Blair Athol thermal coal mine will finish mining operations by the end of 2012.
In response to ongoing cost pressures and high inflation impacting the coal business in Australia, Rio Tinto is taking actions to reduce controllable costs and increase productivity.
During the quarter, production at the Benga mine in the Moatize Basin in Mozambique continued to ramp up. Work is progressing to expand capacity on the Sena railway line, which remains the system bottleneck.
2012 production guidance
In 2012, Rio Tinto's share of Australian hard coking, semi soft coking and thermal coal production is expected to be 8.5 million tonnes, 3.5 million tonnes and 19.5 million tonnes, respectively.
Uranium
Rio Tinto share of production (000 lbs)
|
Q3 12 |
vs Q3 11 |
vs Q2 12 |
9 mths 12 |
vs 9 mths 11 |
Energy Resources of Australia |
1,980 |
+29% |
+108% |
3,840 |
+69% |
Rössing |
1,132 |
+35% |
+32% |
3,068 |
+19% |
Third quarter production at ERA was 29 per cent higher than the third quarter of 2011, and production for the nine months to September was 69 per cent higher than the corresponding period last year. This followed the completion of dewatering operations in June 2012, which facilitated access to higher grade ore. Uranium oxide production in 2011 was impacted by the suspension of processing operations from 28 January 2011 until 15 June 2011.
Production at Rössing is higher than the corresponding quarter and year to date in 2011, as a result of improved milling activity, higher mill head grade and improved operational performance.
2012 production guidance
In 2012, Rio Tinto's share of uranium production is expected to be 9.7 million pounds.
DIAMONDS & MINERALS
Rio Tinto share of production
|
Q3 12 |
vs Q3 11 |
vs Q2 12 |
9 mths 12 |
vs 9 mths 11 |
Diamonds (000 carats) |
|
|
|
|
|
Argyle |
2,454 |
+7% |
+46% |
6,461 |
+17% |
Diavik |
1,160 |
0% |
+8% |
3,197 |
+5% |
|
|
|
|
|
|
Minerals (000 tonnes) |
|
|
|
|
|
Borates - B2O3 content |
111 |
-12% |
-15% |
363 |
-7% |
Titanium dioxide feedstock
Salt (000 tonnes) |
401
1,836 |
+5%
+2% |
+8%
-1% |
1,145
5,155 |
+8%
+10% |
At Argyle, rough diamond production for the third quarter of 2012 was seven per cent higher than the corresponding period of 2011, as marginally lower tonnes processed were more than offset by higher grades. Production was 46 per cent higher than the second quarter of 2012 due to a combination of access to a high grade region of the pit and increased plant reliability. Construction of the underground mine is proceeding and production is scheduled to commence in the first half of 2013, with ramp up to full operation to be completed by 2015.
Diavik's carats recovered for the third quarter were in line with the corresponding period in 2011. Improved grades across the operation were offset by lower processing volumes due to bottlenecks in the processing plant as a result of ore mix. Production was 8 per cent higher than the second quarter of 2012 as increased volumes of higher grade, more easily processed ore became available from the ramp up of underground mining in the A154S pipe.
Borates production was 12 per cent lower than the third quarter of 2011, in response to current market conditions. The sale of Borax Argentina was completed in August. It has historically contributed around 4 per cent of Rio Tinto Borate production.
Titanium dioxide feedstock production was five per cent higher than the third quarter of 2011 and eight per cent higher than the first nine months of 2011, reflecting higher production at Rio Tinto Fer et Titane following a furnace rebuild in 2011, and increased attributable volumes at RBM.
On 7 September 2012, Rio Tinto announced that it had doubled its holding in RBM to 74 per cent following the acquisition of BHP Billiton's entire interest. The purchase price paid by Rio Tinto on completion was $1.7 billion. The acquisition price was $1.9 billion before contractual adjustments for cash payments made by RBM to BHP Billiton since the effective transaction date of 1 February 2012. This price includes $0.6 billion for BHP Billiton's 37 per cent equity interest in RBM, $1.0 billion for a 50 per cent interest in outstanding RBM shareholder finance arrangements and $0.3 billion for a royalty stream.
The acquisition was triggered on 1 February 2012 by BHP Billiton exercising a put option agreed with Rio Tinto as part of RBM's restructuring in 2009. The price was determined through a previously agreed expert valuation process. Following this transaction, Rio Tinto's share of production from RBM is 74 per cent.
Third quarter production of 1.8 million tonnes at Dampier Salt was two per cent higher than the third quarter of 2011. Year to date production of 5.2 million tonnes was 10 per cent higher than the corresponding period in 2011, due to the impact of adverse weather during the first quarter of 2011.
2012 production guidance
In 2012, Rio Tinto's share of production is expected to be as follows:
· Diamonds - 12.6 million carats
· Titanium dioxide feedstocks - 1.6 million tonnes
· Borates - 0.5 million tonnes boric oxide equivalent.
· Salt - 6.6 million tonnes
OTHER CORPORATE
During the quarter, Rio Tinto completed the sale of several non-core businesses, including its Specialty Alumina division, the North American portion of its Alcan Cable business and Borax Argentina. Rio Tinto also agreed to sell its interest in the Zululand Anthracite Colliery in South Africa.
On 17 August 2012 Rio Tinto priced $3.0 billion of fixed rate bonds with a weighted average coupon of 2.67 per cent and a weighted average maturity of 12.9 years. The offering comprised $1.25 billion of 5-year, $1.0 billion of 10-year and $750 million of 30-year SEC-registered debt securities.
Pre-tax and pre-divestment expenditure on exploration and evaluation charged to the profit and loss account in the first nine months of 2012 was $1,503 million compared with $798 million in the same period of 2011. Of this 2012 expenditure, approximately 39 per cent was incurred by the Copper group, 25 per cent by Iron Ore, 14 per cent by Energy, seven per cent by Diamonds & Minerals, three per cent by Aluminium and the balance was incurred by Central Exploration.
During the first nine months of 2012, the Group realised $11 million (pre-tax) from the divestment of central exploration properties, compared with $88 million in the same period of 2011. This included the Chapudi and Kwezi property in South Africa.
Exploration highlights
Drilling programmes to define potential resources continued at two projects in the region around the Amargosa bauxite resource in Brazil and are routinely intercepting encouraging bauxite intervals.
Further assays continued to indicate encouraging potash grade and thickness in the Saskatchewan potash project (Canada), a joint venture with North Atlantic Potash Inc., a subsidiary of JSC Acron. Preparations were advanced for a 3D-seismic survey to aid resource definition planned for Q4.
At Roughrider (Canada) a summer programme of step-out drilling was completed at the Far East resource; results confirmed extensions to the previously known uranium resource.
At Rössing (Namibia) rigs were mobilised to site for the third phase of drilling at the Z20 uranium project.
In the Bowen Basin (Queensland, Australia), drilling programmes to support Order of Magnitude studies at Mt Robert and Elphinstone, near Hail Creek, are nearing completion.
A summer drilling programme over iron ore targets in the Labrador Trough (Canada) was completed with thick intervals of encouraging iron ore mineralisation intersected in several holes.
At Tamarack (USA) a summer drilling programme has intersected further significant zones of nickel sulphide mineralisation outside the currently known resource.
In South Australia RTX partners, Tasman Resources commenced drilling on the Vulcan iron oxide copper-gold target.
In the Democratic Republic of Congo, drilling and other field activities at the Orientale iron ore project were suspended and the project is under review.
A summary of activity for the period is as follows:
Product Group |
Evaluation projects |
Advanced projects |
Greenfield programmes |
Aluminium |
Amargosa, Brazil |
|
Australia, Brazil, Laos |
Copper |
Copper/molybdenum: Resolution, US Copper: La Granja, Peru Copper/gold: Oyu Tolgoi, Mongolia Nickel/copper: Eagle, US |
Nickel: Tamarack, US |
Copper: Australia, Chile, Kazakhstan, Peru, Russia, US, Zambia, Mongolia, Papua New Guinea Nickel: Canada |
Diamonds & Minerals |
Diamonds: Bunder, India Lithium borates: Jadar, Serbia |
|
Diamonds: Canada, Democratic Republic of Congo, India Potash: Canada |
Energy |
Coal: Rio Tinto Coal Mozambique |
Coal: Bowen Basin, Australia Uranium: Canada |
Coal: Chile, Mozambique, Namibia Uranium: Canada, Namibia, Australia |
Iron Ore |
Simandou, Guinea Pilbara, Australia |
Pilbara, Australia |
Canada, Democratic Republic of Congo, Botswana |
Mine-lease exploration continued at a number of Rio Tinto businesses including Kennecott Utah Copper, Northparkes, Energy Resources of Australia, Rössing, Diavik and Pilbara Iron.
Rio Tinto is a leading international mining group headquartered in the UK, combining Rio Tinto plc, a London and New York Stock Exchange listed company, and Rio Tinto Limited, which is listed on the Australian Securities Exchange.
Rio Tinto's business is finding, mining, and processing mineral resources. Major products are aluminium, copper, diamonds, thermal and metallurgical coal, uranium, gold, industrial minerals (borax, titanium dioxide and salt) and iron ore. Activities span the world and are strongly represented in Australia and North America with significant businesses in Asia, Europe, Africa and South America.
Media Relations, EMEA / Americas Illtud Harri Office: +44 (0) 20 7781 1152 Mobile: +44 (0) 7920 503 600 David Outhwaite Office: +44 (0) 20 7781 1623 Mobile: +44 (0) 7787 597493 Christina Mills Office: +44 (0) 20 7781 1154 Mobile: +44 (0) 7825 275 605 |
Investor Relations, London Mark Shannon Office: +44 (0) 20 7781 1178 Mobile: +44 (0) 7917 576597 David Ovington Office: +44 (0) 20 7781 2051 Andrew Field Office: +44 (0) 20 7781 2054 |
Media Relations, Australia / Asia David Luff Karen Halbert Office: +61 (0) 3 9283 3627 Mobile: +61 (0) 412 119 389 Bruce Tobin Office: +61 (0) 3 9283 3612 Mobile: +61 (0) 419 103 454 |
Investor Relations, Australia Christopher Maitland Office: +61 (0) 3 9283 3063 Mobile: +61 (0) 459 800 131 |
Media Relations, Canada Bryan Tucker Office: +1 (0) 514 848 8151 Mobile: +1 (0) 514 825 8319 |
Investor Relations, North America Jason Combes Office: +1 (0) 801 204 2919 Mobile: +1 (0) 801 558 2645 |
Website: |
|
Email: |
|
Twitter: |
Follow @riotinto on Twitter |
High resolution photographs and media pack available at: www.riotinto.com/media
Rio Tinto production summary
|
|
Quarter
|
|
9 Months
|
|
% Change
|
|||||
|
|
2011
|
2012
|
2012
|
|
2011
|
2012
|
|
Q3 12
|
Q3
12 |
9 MTHS 12
|
|
|
Q3
|
Q2
|
Q3
|
|
9 MTHS
|
9 MTHS
|
|
vs
|
vs
|
vs
|
|
|
|
|
|
|
|
|
|
Q3 11
|
Q2
12 |
9 MTHS 11
|
Principal Commodities
|
|
|
|
|
|
|
|
|
|
|
|
Alumina
|
('000 t)
|
2,235
|
2,358
|
2,675
|
|
6,593
|
7,424
|
|
20%
|
13%
|
13%
|
Aluminium
|
('000 t)
|
962
|
841
|
855
|
|
2,863
|
2,550
|
|
-11%
|
2%
|
-11%
|
Bauxite
|
('000 t)
|
9,178
|
9,442
|
10,350
|
|
25,971
|
28,633
|
|
13%
|
10%
|
10%
|
Borates
|
('000 t)
|
127
|
132
|
111
|
|
390
|
363
|
|
-12%
|
-15%
|
-7%
|
Coal - hard coking
|
('000 t)
|
2,774
|
2,001
|
2,407
|
|
6,177
|
6,112
|
|
-13%
|
20%
|
-1%
|
Coal - semi-soft coking
|
('000 t)
|
733
|
1,003
|
714
|
|
2,113
|
2,323
|
|
-3%
|
-29%
|
10%
|
Coal - thermal
|
('000 t)
|
4,575
|
4,773
|
5,514
|
|
13,355
|
14,426
|
|
21%
|
16%
|
8%
|
Copper - mined
|
('000 t)
|
109.3
|
133.5
|
132.0
|
|
382.7
|
384.9
|
|
21%
|
-1%
|
1%
|
Copper - refined
|
('000 t)
|
68.3
|
49.3
|
69.7
|
|
253.5
|
193.1
|
|
2%
|
41%
|
-24%
|
Diamonds
|
('000 cts)
|
3,534
|
2,808
|
3,706
|
|
8,766
|
9,873
|
|
5%
|
32%
|
13%
|
Iron ore
|
('000 t)
|
49,834
|
48,631
|
52,628
|
|
140,561
|
146,902
|
|
6%
|
8%
|
5%
|
Titanium dioxide feedstock
|
('000 t)
|
381
|
370
|
401
|
|
1,063
|
1,145
|
|
5%
|
8%
|
8%
|
Uranium
|
('000 lbs)
|
2,373
|
1,810
|
3,112
|
|
4,840
|
6,907
|
|
31%
|
72%
|
43%
|
Other Metals & Minerals
|
|
|
|
|
|
|
|
|
|
|
|
Gold - mined
|
('000 ozs)
|
169
|
75
|
68
|
|
515
|
222
|
|
-60%
|
-9%
|
-57%
|
Gold - refined
|
('000 ozs)
|
88
|
55
|
46
|
|
292
|
201
|
|
-47%
|
-15%
|
-31%
|
Molybdenum
|
('000 t)
|
3.4
|
2.6
|
2.5
|
|
11.3
|
8.3
|
|
-25%
|
-4%
|
-27%
|
Salt
|
('000 t)
|
1,797
|
1,859
|
1,836
|
|
4,677
|
5,155
|
|
2%
|
-1%
|
10%
|
Silver - mined
|
('000 ozs)
|
1,088
|
877
|
847
|
|
3,666
|
2,659
|
|
-22%
|
-3%
|
-27%
|
Silver - refined
|
('000 ozs)
|
664
|
467
|
357
|
|
2,436
|
1,640
|
|
-46%
|
-23%
|
-33%
|
Throughout this report, figures in italics indicate adjustments made since the figure was previously quoted on the equivalent page. Production figures are sometimes more precise than the rounded numbers shown, hence small differences may result between the total of the quarter figures and the nine month figures.
Rio Tinto share of production
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
ALUMINA |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Rio Tinto Alcan |
|
|
|
|
|
|
|
|
Jonquière (Vaudreuil) |
100% |
337 |
351 |
348 |
342 |
344 |
1,012 |
1,034 |
Queensland Alumina |
80% |
665 |
751 |
766 |
762 |
712 |
1,937 |
2,240 |
São Luis (Alumar) |
10% |
86 |
86 |
87 |
86 |
86 |
252 |
259 |
Yarwun |
100% |
354 |
356 |
364 |
331 |
730 |
993 |
1,425 |
Specialty alumina plant |
100% |
27 |
24 |
27 |
22 |
26 |
84 |
76 |
Rio Tinto Alcan alumina production |
|
1,469 |
1,569 |
1,592 |
1,544 |
1,898 |
4,278 |
5,034 |
Pacific Aluminium - Gove |
100% |
619 |
657 |
668 |
668 |
723 |
1,892 |
2,059 |
Other Aluminium - four specialty plants (a) |
0% |
147 |
129 |
131 |
147 |
53 |
423 |
331 |
Rio Tinto total alumina production |
|
2,235 |
2,355 |
2,391 |
2,358 |
2,675 |
6,593 |
7,424 |
ALUMINIUM |
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
Rio Tinto Alcan |
|
|
|
|
|
|
|
|
Cameroon - Alucam (Edéa) |
47% |
9 |
9 |
5 |
5 |
8 |
23 |
17 |
Canada - six wholly owned |
100% |
335 |
338 |
252 |
261 |
272 |
995 |
785 |
Canada - Alouette (Sept-Îles) |
40% |
58 |
60 |
60 |
60 |
58 |
173 |
178 |
Canada - Bécancour |
25% |
26 |
25 |
27 |
27 |
28 |
78 |
81 |
France - two wholly owned |
100% |
81 |
78 |
89 |
88 |
85 |
256 |
262 |
Iceland - ISAL (Reykjavik) |
100% |
46 |
47 |
47 |
48 |
47 |
138 |
142 |
Norway - SØRAL (Husnes) |
50% |
11 |
11 |
11 |
11 |
12 |
33 |
34 |
Oman - Sohar |
20% |
19 |
19 |
18 |
18 |
18 |
56 |
54 |
UK - Lochaber |
100% |
12 |
12 |
12 |
11 |
11 |
34 |
33 |
Total Rio Tinto Alcan |
|
597 |
600 |
520 |
528 |
538 |
1,786 |
1,587 |
Pacific Aluminium - four smelters |
Various |
272 |
272 |
268 |
262 |
266 |
801 |
795 |
Other Aluminium - two smelters |
100% |
93 |
89 |
66 |
51 |
51 |
276 |
168 |
Rio Tinto total aluminium production |
|
962 |
961 |
854 |
841 |
855 |
2,863 |
2,550 |
BAUXITE |
|
|
|
|
|
|
|
|
Production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
Rio Tinto Alcan |
|
|
|
|
|
|
|
|
Porto Trombetas |
12% |
454 |
455 |
431 |
457 |
492 |
1,372 |
1,380 |
Sangaredi |
(c) |
1,461 |
1,496 |
1,573 |
1,472 |
1,592 |
4,137 |
4,637 |
Weipa |
100% |
5,403 |
5,600 |
4,974 |
5,586 |
6,179 |
15,132 |
16,739 |
Total Rio Tinto Alcan |
|
7,318 |
7,550 |
6,978 |
7,515 |
8,263 |
20,641 |
22,757 |
Pacific Aluminium - Gove |
100% |
1,860 |
1,916 |
1,862 |
1,927 |
2,086 |
5,330 |
5,876 |
Rio Tinto total bauxite production |
|
9,178 |
9,466 |
8,841 |
9,442 |
10,350 |
25,971 |
28,633 |
Rio Tinto share of production
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
BORATES |
|
|
|
|
|
|
|
|
Production ('000 tonnes B2O3 content) |
|
|
|
|
|
|
|
|
Rio Tinto Minerals - borates |
100% |
127 |
114 |
120 |
132 |
111 |
390 |
363 |
COAL - hard coking |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Hail Creek Coal |
82% |
1,906 |
1,761 |
1,403 |
1,211 |
1,679 |
4,217 |
4,294 |
Kestrel Coal |
80% |
867 |
877 |
300 |
790 |
641 |
1,960 |
1,731 |
Total Rio Tinto Coal Australia hard coking coal |
|
2,774 |
2,638 |
1,704 |
2,001 |
2,320 |
6,177 |
6,025 |
Rio Tinto Coal Mozambique ('000 tonnes) |
|
|
|
|
|
|
|
|
Benga (d) |
65% |
- |
- |
- |
- |
87 |
- |
87 |
Rio Tinto total hard coking coal production |
|
2,774 |
2,638 |
1,703 |
2,001 |
2,407 |
6,177 |
6,112 |
COAL - semi-soft coking |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Hunter Valley (e) |
80% |
364 |
559 |
374 |
605 |
255 |
891 |
1,234 |
Mount Thorley (e) |
64% |
330 |
186 |
150 |
291 |
230 |
973 |
670 |
Warkworth (e) |
44% |
39 |
1 |
82 |
107 |
230 |
249 |
419 |
Rio Tinto total semi-soft coking coal production |
|
733 |
746 |
606 |
1,003 |
714 |
2,113 |
2,323 |
COAL - thermal |
|
|
|
|
|
|
|
|
Rio Tinto Coal Australia ('000 tonnes) |
|
|
|
|
|
|
|
|
Bengalla (e) |
32% |
393 |
377 |
450 |
608 |
529 |
1,252 |
1,587 |
Blair Athol Coal |
71% |
471 |
649 |
375 |
366 |
606 |
1,406 |
1,346 |
Clermont |
50% |
484 |
790 |
629 |
910 |
1,148 |
2,111 |
2,687 |
Hunter Valley (e) |
80% |
2,145 |
1,816 |
1,679 |
1,815 |
1,981 |
6,023 |
5,474 |
Kestrel Coal |
80% |
84 |
61 |
42 |
93 |
79 |
200 |
214 |
Mount Thorley (e) |
64% |
311 |
175 |
343 |
429 |
406 |
626 |
1,178 |
Warkworth (e) |
44% |
686 |
568 |
623 |
552 |
653 |
1,736 |
1,828 |
Total Rio Tinto Coal Australia thermal coal |
|
4,575 |
4,436 |
4,139 |
4,773 |
5,402 |
13,355 |
14,314 |
Rio Tinto Coal Mozambique ('000 tonnes) |
|
|
|
|
|
|
|
|
Benga (d) |
65% |
- |
- |
- |
- |
112 |
- |
112 |
Rio Tinto total thermal coal production |
|
4,575 |
4,436 |
4,139 |
4,773 |
5,514 |
13,355 |
14,426 |
Rio Tinto share of production
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
COPPER |
|
|
|
|
|
|
|
|
Mine production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
41.9 |
47.1 |
31.1 |
29.9 |
42.9 |
147.9 |
103.9 |
Escondida |
30% |
44.7 |
65.3 |
68.9 |
83.3 |
75.2 |
162.5 |
227.4 |
Grasberg - Joint Venture (f) |
40% |
1.6 |
5.3 |
0.0 |
0.0 |
0.0 |
11.5 |
0.0 |
Northparkes |
80% |
10.6 |
10.7 |
10.4 |
11.2 |
10.7 |
29.6 |
32.3 |
Palabora |
58% |
10.5 |
8.6 |
9.1 |
9.0 |
3.2 |
31.2 |
21.3 |
Rio Tinto total mine production |
|
109.3 |
137.0 |
119.5 |
133.5 |
132.0 |
382.7 |
384.9 |
Refined production ('000 tonnes) |
|
|
|
|
|
|
|
|
Escondida |
30% |
17.2 |
22.4 |
24.7 |
25.4 |
21.7 |
62.6 |
71.8 |
Kennecott Utah Copper |
100% |
45.2 |
48.8 |
40.7 |
16.8 |
45.3 |
166.5 |
102.8 |
Palabora |
58% |
5.9 |
9.6 |
8.7 |
7.1 |
2.7 |
24.4 |
18.5 |
Rio Tinto total refined production |
|
68.3 |
80.9 |
74.1 |
49.3 |
69.7 |
253.5 |
193.1 |
DIAMONDS |
|
|
|
|
|
|
|
|
Production ('000 carats) |
|
|
|
|
|
|
|
|
Argyle |
100% |
2,302 |
1,918 |
2,329 |
1,677 |
2,454 |
5,523 |
6,461 |
Diavik |
60% |
1,160 |
961 |
963 |
1,075 |
1,160 |
3,046 |
3,197 |
Murowa |
78% |
72 |
88 |
66 |
56 |
92 |
198 |
215 |
Rio Tinto total diamond production |
|
3,534 |
2,967 |
3,359 |
2,808 |
3,706 |
8,766 |
9,873 |
GOLD |
|
|
|
|
|
|
|
|
Mine production ('000 ounces) (b) |
|
|
|
|
|
|
|
|
Barneys Canyon |
100% |
0.4 |
0.8 |
0.0 |
0.4 |
0.0 |
1.2 |
0.4 |
Bingham Canyon |
100% |
92 |
92 |
54 |
50 |
48 |
293 |
152 |
Escondida |
30% |
6 |
8 |
8 |
8 |
6 |
28 |
22 |
Grasberg - Joint Venture (f) |
40% |
53 |
36 |
0 |
0 |
0 |
142 |
0 |
Northparkes |
80% |
16 |
16 |
15 |
15 |
14 |
45 |
43 |
Palabora |
58% |
1.7 |
2.2 |
1.8 |
1.6 |
0.6 |
5.4 |
4.1 |
Rio Tinto total mine production |
|
169 |
155 |
78 |
75 |
68 |
515 |
222 |
Refined production ('000 ounces) |
|
|
|
|
|
|
|
|
Kennecott Utah Copper |
100% |
88 |
87 |
100 |
55 |
46 |
292 |
201 |
Rio Tinto share of production
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
|
IRON ORE |
|
|
|
|
|
|
|
|
|
Production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
|
Hamersley - six wholly owned mines |
100% |
30,908 |
32,426 |
28,638 |
31,138 |
33,832 |
89,099 |
93,608 |
|
Hamersley - Channar |
60% |
1,688 |
1,687 |
1,592 |
1,809 |
1,334 |
4,922 |
4,735 |
|
Hamersley - Eastern Range |
(g) |
2,587 |
2,682 |
2,155 |
2,427 |
2,297 |
6,703 |
6,878 |
|
Hope Downs |
50% |
4,237 |
4,140 |
4,048 |
3,641 |
4,024 |
11,730 |
11,713 |
|
Iron Ore Company of Canada |
59% |
2,421 |
2,028 |
1,672 |
1,928 |
2,370 |
5,874 |
5,970 |
|
Robe River |
53% |
7,994 |
8,243 |
7,539 |
7,688 |
8,771 |
22,233 |
23,998 |
|
Rio Tinto total production |
|
49,834 |
51,207 |
45,643 |
48,631 |
52,628 |
140,561 |
146,902 |
|
Breakdown: Pilbara Blend Lump |
|
12,819 |
12,826 |
11,299 |
12,589 |
12,459 |
35,962 |
36,347 |
|
Pilbara Blend Fines |
|
17,332 |
17,600 |
15,852 |
17,529 |
18,763 |
47,556 |
52,144 |
|
Robe Valley Lump |
|
1,420 |
1,265 |
1,439 |
1,140 |
1,390 |
3,837 |
3,969 |
|
Robe Valley Fines |
|
3,015 |
3,038 |
2,754 |
2,376 |
3,122 |
8,295 |
8,252 |
|
Yandicoogina Fines (HIY) |
|
12,829 |
14,449 |
12,628 |
13,069 |
14,524 |
39,036 |
40,220 |
|
IOC Concentrates |
|
1,111 |
933 |
306 |
506 |
922 |
1,873 |
1,734 |
|
IOC Pellets |
|
1,309 |
1,095 |
1,366 |
1,422 |
1,448 |
4,001 |
4,236 |
|
MOLYBDENUM |
|
|
|
|
|
|
|
|
|
Mine production ('000 tonnes) (b) |
|
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
3.4 |
2.3 |
3.1 |
2.6 |
2.5 |
11.3 |
8.3 |
|
SALT |
|
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
|
Dampier Salt |
68% |
1,797 |
1,931 |
1,460 |
1,859 |
1,836 |
4,677 |
5,155 |
|
SILVER |
|
|
|
|
|
|
|
|
|
Mine production ('000 ounces) (b) |
|
|
|
|
|
|
|
|
|
Bingham Canyon |
100% |
668 |
743 |
517 |
443 |
502 |
2,233 |
1,462 |
|
Escondida |
30% |
236 |
320 |
287 |
292 |
221 |
978 |
800 |
|
Grasberg - Joint Venture (f) |
40% |
33 |
41 |
0 |
0 |
0 |
42 |
0 |
|
Others |
- |
151 |
153 |
131 |
142 |
124 |
413 |
397 |
|
Rio Tinto total mine production |
|
1,088 |
1,257 |
935 |
877 |
847 |
3,666 |
2,659 |
|
Refined production ('000 ounces) |
|
|
|
|
|
|
|
|
|
Kennecott Utah Copper |
100% |
664 |
754 |
817 |
467 |
357 |
2,436 |
1,640 |
|
TITANIUM DIOXIDE FEEDSTOCK |
|
|
|
|
|
|
|
|
|
Production ('000 tonnes) |
|
|
|
|
|
|
|
|
|
Rio Tinto Iron & Titanium (h) |
100% |
381 |
380 |
374 |
370 |
401 |
1,063 |
1,145 |
|
Rio Tinto share of production
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
URANIUM |
|
|
|
|
|
|
|
|
Production ('000 lbs U3O8) |
|
|
|
|
|
|
|
|
Energy Resources of Australia |
68% |
1,532 |
1,538 |
908 |
952 |
1,980 |
2,272 |
3,840 |
Rössing |
69% |
841 |
679 |
1,078 |
858 |
1,132 |
2,568 |
3,068 |
Rio Tinto total uranium production |
|
2,373 |
2,218 |
1,986 |
1,810 |
3,112 |
4,840 |
6,907 |
(a) Rio Tinto sold its interest in these specialty alumina assets with an effective date of 1 August 2012. Production is shown up to that date.
(b) Mine production figures for metals refer to the total quantity of metal produced in concentrates, leach liquor or doré bullion irrespective of whether these products are then refined onsite, except for the data for bauxite and iron ore which represent production of marketable quantities of ore plus pellets.
(c) Rio Tinto has a 22.95% shareholding in the Sangaredi mine but benefits from 45.0% of production.
(d) Benga moved to commercial production during the third quarter of 2012
(e) Rio Tinto's interest in these mines is held through Coal & Allied Industries Ltd; Rio Tinto increased its interest in Coal & Allied from 75.7% to 80.0% with effect from 16 December 2011. Production data reflect the increased shareholding from that date.
(f) Through a joint venture agreement with Freeport-McMoRan Copper & Gold (FCX), Rio Tinto is entitled to 40% of additional material mined as a consequence of expansions and developments of the Grasberg facilities since 1998. Based on the latest available estimates, 2012 production from Grasberg is not expected to exceed the metal attributable to PT Freeport Indonesia per the joint venture agreement for the year 2012. Accordingly, Rio Tinto's share of joint venture production is expected to be zero for the year 2012.
(g) Rio Tinto's share of production includes 100% of the production from the Eastern Range mine. Under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture.
(h) Quantities comprise 100% of Rio Tinto Fer et Titane and Rio Tinto's share of Richards Bay Minerals (RBM). Rio Tinto's share of RBM production reflects increased ownership from 37% to 74% in early September 2012.
The Rio Tinto percentage interest shown above is at 30 September 2012.
Rio Tinto's interests in the Colowyo mine and the Talc business were sold in 2011. No data for these operations are included in the Share of Production table.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
|||||||||
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
|
|||||||||
ALUMINIUM (a) |
|
|
|
|
|
|
|
|
|
|||||||||
Rio Tinto Alcan - Bauxite |
|
|
|
|
|
|
|
|
|
|||||||||
Bauxite production ('000 tonnes) |
|
|
|
|
|
|
|
|
|
|||||||||
Australia |
|
|
|
|
|
|
|
|
|
|||||||||
Weipa mine - Queensland |
100.0% |
5,403 |
5,600 |
4,974 |
5,586 |
6,179 |
15,132 |
16,739 |
|
|||||||||
Brazil |
|
|
|
|
|
|
|
|
|
|||||||||
Porto Trombetas (MRN) mine |
12.0% |
3,786 |
3,788 |
3,592 |
3,807 |
4,104 |
11,436 |
11,503 |
|
|||||||||
Guinea |
|
|
|
|
|
|
|
|
|
|||||||||
Sangaredi mine (b) |
23.0% |
3,248 |
3,324 |
3,497 |
3,272 |
3,537 |
9,193 |
10,305 |
|
|||||||||
Rio Tinto Alcan share of bauxite shipments |
|
|
|
|
|
|
|
|
||||||||||
Share of bauxite shipments ('000 tonnes) |
7,268 |
7,565 |
7,268 |
7,302 |
8,545 |
20,567 |
23,115 |
|
||||||||||
|
(a) On 17 October 2011, Rio Tinto announced the reorganization of its aluminium assets. The three sections below show the assets under Rio Tinto Alcan, Pacific Aluminium and Other Aluminium. (b) Rio Tinto has a 22.95% shareholding in the Sangaredi mine but benefits from 45.0% of production. |
|||||||||||||||||
Rio Tinto Alcan - Smelter-Grade Alumina |
642 |
|
|
|
|
|
|
|
||||||||||
Alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
|
|||||||||
Australia |
|
|
|
|
|
|
|
|
|
|||||||||
Queensland Alumina Refinery - Queensland |
80.0% |
831 |
939 |
957 |
952 |
891 |
2,421 |
2,800 |
|
|||||||||
Yarwun refinery - Queensland |
100.0% |
354 |
356 |
364 |
331 |
730 |
993 |
1,425 |
|
|||||||||
Brazil |
|
|
|
|
|
|
|
|
|
|||||||||
São Luis (Alumar) refinery |
10.0% |
855 |
863 |
869 |
860 |
860 |
2,522 |
2,589 |
|
|||||||||
Canada |
|
|
|
|
|
|
|
|
|
|||||||||
Jonquière (Vaudreuil) refinery - Quebec (a) |
100.0% |
337 |
351 |
348 |
342 |
344 |
1,012 |
1,034 |
|
|||||||||
(a) Jonquière's (Vaudreuil's) production shows smelter grade alumina only and excludes hydrate produced and used for specialty alumina.
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
ALUMINIUM (continued) |
|
|
|
|
|
|
|
|
Rio Tinto Alcan - Specialty Alumina |
|
|
|
|
|
|
|
|
Specialty alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
Canada |
|
|
|
|
|
|
|
|
Jonquière (Vaudreuil) plant - Quebec |
100.0% |
27 |
24 |
27 |
22 |
26 |
84 |
76 |
Rio Tinto Alcan - Primary Aluminium |
|
|
|
|
|
|
|
|
Primary aluminium production ('000 tonnes) |
|
|
|
|
|
|
|
|
Cameroon |
|
|
|
|
|
|
|
|
Alucam (Edéa) smelter |
46.7% |
19 |
20 |
10 |
10 |
16 |
49 |
36 |
Canada |
|
|
|
|
|
|
|
|
Alma smelter - Quebec |
100.0% |
109 |
111 |
37 |
36 |
44 |
324 |
118 |
Alouette (Sept-Îles) smelter - Quebec |
40.0% |
146 |
150 |
149 |
149 |
146 |
432 |
444 |
Arvida smelter - Quebec |
100.0% |
44 |
45 |
44 |
44 |
44 |
131 |
132 |
Bécancour smelter - Quebec |
25.1% |
104 |
102 |
106 |
106 |
110 |
312 |
323 |
Grande-Baie smelter - Quebec |
100.0% |
56 |
56 |
56 |
56 |
56 |
167 |
167 |
Kitimat smelter - British Columbia |
100.0% |
42 |
44 |
45 |
45 |
46 |
124 |
136 |
Laterrière smelter - Quebec |
100.0% |
59 |
59 |
58 |
59 |
58 |
175 |
175 |
Shawinigan smelter - Quebec |
100.0% |
25 |
23 |
12 |
22 |
24 |
74 |
58 |
France |
|
|
|
|
|
|
|
|
Dunkerque smelter |
100.0% |
56 |
52 |
64 |
63 |
64 |
183 |
191 |
Saint-Jean-de-Maurienne smelter |
100.0% |
25 |
26 |
25 |
24 |
21 |
74 |
71 |
Iceland |
|
|
|
|
|
|
|
|
ISAL (Reykjavik) smelter |
100.0% |
46 |
47 |
47 |
48 |
47 |
138 |
142 |
Norway |
|
|
|
|
|
|
|
|
SØRAL (Husnes) smelter |
50.0% |
22 |
23 |
23 |
23 |
23 |
67 |
69 |
Oman |
|
|
|
|
|
|
|
|
Sohar smelter |
20.0% |
94 |
94 |
92 |
90 |
88 |
279 |
270 |
United Kingdom |
|
|
|
|
|
|
|
|
Lochaber smelter |
100.0% |
12 |
12 |
12 |
11 |
11 |
34 |
33 |
Rio Tinto Alcan share of metal sales |
|
|
|
|
|
|
|
|
Share of primary aluminium sales ('000 tonnes) (a) |
701 |
693 |
624 |
629 |
623 |
2,107 |
1,875 |
(a) Restated to reflect the reorganization of Rio Tinto aluminium assets announced on 17 October 2011 and the recent transfer of the Engineered Products Cable division to Other Aluminium.
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
||||
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
||||
ALUMINIUM (continued) |
|
|
|
|
|
|
|
|
||||
Pacific Aluminium - Bauxite |
|
|
|
|
|
|
|
|
||||
Bauxite Production ('000 tonnes) |
|
|
|
|
|
|
|
|
||||
Australia |
|
|
|
|
|
|
|
|
||||
Gove mine - Northern Territory (a) |
100% |
1,860 |
1,916 |
1,862 |
1,927 |
2,086 |
5,330 |
5,876 |
||||
Pacific Aluminium - Smelter-Grade Alumina |
|
|
|
|
|
|
|
|||||
Alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|
||||
Australia |
|
|
|
|
|
|
|
|
||||
Gove refinery - Northern Territory, (a) |
100% |
619 |
657 |
668 |
668 |
723 |
1,892 |
2,059 |
||||
Pacific Aluminium - Primary Aluminium |
|
|
|
|
|
|
|
|||||
Primary aluminium production ('000 tonnes) |
|
|
|
|
|
|
|
|||||
Australia |
|
|
|
|
|
|
|
|
||||
Bell Bay smelter - Tasmania (a) |
100.0% |
45 |
46 |
46 |
46 |
47 |
135 |
138 |
||||
Boyne Island smelter - Queensland (a) |
59.4% |
140 |
142 |
141 |
141 |
144 |
416 |
426 |
||||
Tomago smelter - New South Wales (a) |
51.6% |
137 |
137 |
135 |
136 |
137 |
402 |
409 |
||||
New Zealand |
|
|
|
|
|
|
|
|
||||
Tiwai Point smelter (a) |
79.4% |
91 |
91 |
86 |
79 |
79 |
266 |
244 |
||||
|
(a) Rio Tinto's interest in these assets was transferred out of Rio Tinto Alcan, in late 2011, into Pacific Aluminium.. |
|
||||||||||
Other Aluminium - Specialty Alumina |
|
|
|
|
|
|||||||
Specialty alumina production ('000 tonnes) |
|
|
|
|
|
|
|
|||||
France |
|
|
|
|
|
|
|
|
||||
Beyrède plant (a) (b) |
0.0% |
6 |
6 |
6 |
7 |
3 |
19 |
16 |
||||
Gardanne plant (a) (b) |
0.0% |
128 |
108 |
113 |
126 |
45 |
362 |
284 |
||||
La Bâthie plant (a) (b) |
0.0% |
7 |
8 |
6 |
6 |
3 |
21 |
15 |
||||
Germany |
|
|
|
|
|
|
|
|
||||
Teutschenthal plant (a) (b) |
0.0% |
7 |
7 |
6 |
7 |
3 |
21 |
16 |
||||
Other Aluminium - Primary Aluminium |
|
|
|
|
|
|||||||
Primary aluminium production ('000 tonnes) |
|
|
|
|
|
|
|
|||||
United Kingdom |
|
|
|
|
|
|
|
|
||||
Lynemouth smelter (a) (c) |
100.0% |
45 |
38 |
15 |
- |
- |
130 |
15 |
||||
USA |
|
|
|
|
|
|
|
|
||||
Sebree smelter - Kentucky (a) |
100.0% |
48 |
51 |
51 |
51 |
51 |
146 |
153 |
||||
|
(a) Rio Tinto's interest in these assets was transferred out of Rio Tinto Alcan in late 2011, while the company investigates divestment options. (b) Rio Tinto sold its interest in these specialty alumina assets with an effective date of 1 August 2012. Production is shown up to that date. (c) Rio Tinto closed the Lynemouth aluminium smelter on 29 March 2012, following an extensive period of consultation with employee representatives. |
|
||||||||||
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|||
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
|||
BORATES |
|
|
|
|
|
|
|
|
|||
Rio Tinto Minerals - borates |
100.0% |
|
|
|
|
|
|
|
|||
US and Argentina |
|
|
|
|
|
|
|
|
|||
Borates ('000 tonnes) (a) (b) |
|
127 |
114 |
120 |
132 |
111 |
390 |
363 |
|||
(a) |
Production is expressed as B2O3 content. |
|
|||||||||
(b) |
Rio Tinto sold its interest in Borax Argentina with an effective date of 20 Aug 2012. Production is shown up to that date. |
|
|||||||||
COAL |
|
|
|
|
|
|
|
|
|||
Rio Tinto Coal Australia |
|
|
|
|
|
|
|
|
|||
Bengalla mine (a) |
32.0% |
|
|
|
|
|
|
|
|||
New South Wales |
|
|
|
|
|
|
|
|
|||
Thermal coal ('000 tonnes) |
|
1,299 |
1,234 |
1,407 |
1,899 |
1,652 |
4,134 |
4,959 |
|||
Blair Athol Coal mine |
71.2% |
|
|
|
|
|
|
|
|||
Queensland |
|
|
|
|
|
|
|
|
|||
Thermal coal ('000 tonnes) |
|
661 |
911 |
526 |
513 |
851 |
1,974 |
1,890 |
|||
Clermont Coal mine |
50.1% |
|
|
|
|
|
|
|
|||
Queensland |
|
|
|
|
|
|
|
|
|||
Thermal coal ('000 tonnes) |
|
966 |
1,577 |
1,255 |
1,817 |
2,292 |
4,213 |
5,363 |
|||
Hail Creek Coal mine |
82.0% |
|
|
|
|
|
|
|
|||
Queensland |
|
|
|
|
|
|
|
|
|||
Hard coking coal ('000 tonnes) |
|
2,325 |
2,148 |
1,711 |
1,477 |
2,048 |
5,143 |
5,236 |
|||
Hunter Valley Operations (a) |
80.0% |
|
|
|
|
|
|
|
|||
New South Wales |
|
|
|
|
|
|
|
|
|||
Semi-soft coking coal ('000 tonnes) |
|
481 |
729 |
468 |
757 |
318 |
1,177 |
1,543 |
|||
Thermal coal ('000 tonnes) |
|
2,833 |
2,376 |
2,098 |
2,268 |
2,476 |
7,956 |
6,843 |
|||
Kestrel Coal mine (b) |
80.0% |
|
|
|
|
|
|
|
|||
Queensland |
|
|
|
|
|
|
|
|
|||
Hard coking coal ('000 tonnes) |
|
1,084 |
1,096 |
375 |
987 |
801 |
2,449 |
2,163 |
|||
Thermal coal ('000 tonnes) |
|
106 |
76 |
52 |
116 |
99 |
250 |
267 |
|||
Mount Thorley Operations (a) |
64.0% |
|
|
|
|
|
|
|
|||
New South Wales |
|
|
|
|
|
|
|
|
|||
Semi-soft coking coal ('000 tonnes) |
|
545 |
316 |
234 |
454 |
358 |
1,606 |
1,047 |
|||
Thermal coal ('000 tonnes) |
|
514 |
285 |
535 |
671 |
635 |
1,033 |
1,840 |
|||
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
COAL (continued) |
|
|
|
|
|
|
|
|
Warkworth mine (a) |
44.5% |
|
|
|
|
|
|
|
New South Wales |
|
|
|
|
|
|
|
|
Semi-soft coking coal ('000 tonnes) |
|
93 |
3 |
184 |
241 |
518 |
591 |
942 |
Thermal coal ('000 tonnes) |
|
1,631 |
1,327 |
1,402 |
1,242 |
1,469 |
4,128 |
4,112 |
Total hard coking coal production ('000 tonnes) |
3,409 |
3,244 |
2,087 |
2,464 |
2,849 |
7,592 |
7,400 |
|
Total semi-soft coking coal production ('000 tonnes) |
1,118 |
1,048 |
886 |
1,452 |
1,194 |
3,374 |
3,532 |
|
Total thermal coal production ('000 tonnes) |
8,009 |
7,786 |
7,275 |
8,526 |
9,473 |
23,688 |
25,274 |
|
Total coal production ('000 tonnes) |
|
12,537 |
12,077 |
10,247 |
12,443 |
13,516 |
34,655 |
36,205 |
|
|
|
|
|
|
|
|
|
Total coal sales ('000 tonnes) |
|
11,687 |
12,763 |
10,140 |
11,857 |
13,296 |
33,963 |
35,293 |
Rio Tinto Coal Australia share |
|
|
|
|
|
|
|
|
Share of hard coking coal sales ('000 tonnes) (b) |
2,253 |
2,904 |
2,006 |
1,926 |
2,436 |
5,776 |
6,368 |
|
Share of semi-soft coking coal sales ('000 tonnes) (c) |
795 |
779 |
597 |
946 |
769 |
2,108 |
2,312 |
|
Share of thermal coal sales ('000 tonnes) (c) |
4,300 |
4,613 |
3,897 |
4,428 |
5,193 |
13,111 |
13,518 |
(a) Rio Tinto's interest in these mines is held through Coal & Allied Industries Ltd; Rio Tinto increased its interest in Coal & Allied from 75.7% to 80.0% with effect from 16 December 2011.
(b) Kestrel produces hard coking coal and thermal coal through its mining operations. These coals may be blended at ports; blended coal sales are included in hard-coking coal sales.
(c) Sales relate only to coal mined by the operations and exclude traded coal.
Rio Tinto Coal Mozambique |
|
|
|
|
|
|
|
|
Benga mine (a) |
65.0% |
|
|
|
|
|
|
|
Hard coking coal production ('000 tonnes) |
|
- |
- |
- |
- |
134 |
- |
134 |
Thermal coal production ('000 tonnes) |
|
- |
- |
- |
- |
173 |
- |
173 |
(a) Benga moved to commercial production during the third quarter of 2012
|
||||||||
US Coal |
|
|
|
|
|
|
|
|
Colowyo mine (a) |
0.0% |
|
|
|
|
|
|
|
Colorado, US |
|
|
|
|
|
|
|
|
Thermal coal production ('000 tonnes) |
|
721 |
387 |
- |
- |
- |
1,552 |
- |
(a) Rio Tinto sold its 100% interest in Colowyo with an effective date of 1 December 2011. Production is shown up to that date.
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
||||||
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
||||||
COPPER & GOLD |
|
|
|
|
|
|
|
|
||||||
Escondida |
30.0% |
|
|
|
|
|
|
|
||||||
Chile |
|
|
|
|
|
|
|
|
||||||
Sulphide ore to concentrator ('000 tonnes) |
12,029 |
18,663 |
16,449 |
18,640 |
16,850 |
44,420 |
51,940 |
|||||||
Average copper grade (%) |
|
0.97 |
0.97 |
1.14 |
1.36 |
1.34 |
1.07 |
1.29 |
||||||
Mill production (metals in concentrates): |
|
|
|
|
|
|
|
|||||||
Contained copper ('000 tonnes) |
|
91.9 |
144.3 |
153.1 |
211.7 |
185.2 |
386.2 |
550.0 |
||||||
Contained gold ('000 ounces) |
|
21 |
28 |
26 |
26 |
21 |
94 |
73 |
||||||
Contained silver ('000 ounces) |
|
786 |
1,068 |
955 |
972 |
738 |
3,259 |
2,665 |
||||||
Recoverable copper in ore stacked for leaching ('000 tonnes) (a) |
57 |
73 |
77 |
66 |
65 |
155 |
208 |
|||||||
Refined production from leach plants: |
|
|
|
|
|
|
|
|||||||
Copper cathode production ('000 tonnes) |
57 |
75 |
82 |
85 |
72 |
209 |
239 |
|||||||
(a) The calculation of copper in material mined for leaching is based on ore stacked at the leach pad.
|
|
|||||||||||||
Freeport-McMoRan Copper & Gold |
|
|
|
|
|
|
|
|||||||
Grasberg mine (a) |
0.0% (b) |
|
|
|
|
|||||||||
Papua, Indonesia |
|
|
|
|
|
|
|
|
|
|||||
Ore treated ('000 tonnes) |
|
14,006 |
6,610 |
10,443 |
16,337 |
19,346 |
54,029 |
46,126 |
|
|||||
Average mill head grades: |
|
|
|
|
|
|
|
|
|
|||||
Copper (%) |
|
0.90 |
0.65 |
0.64 |
0.57 |
0.63 |
0.80 |
0.61 |
|
|||||
Gold (g/t) |
|
1.14 |
1.09 |
0.84 |
0.58 |
0.51 |
0.92 |
0.61 |
|
|||||
Silver (g/t) |
|
2.86 |
2.33 |
2.21 |
1.57 |
2.14 |
2.44 |
1.96 |
|
|||||
Production of metals in concentrates: |
|
|
|
|
|
|
|
|
||||||
Copper in concentrates ('000 tonnes) |
111.2 |
37.2 |
58.0 |
81.2 |
101.7 |
377.4 |
240.9 |
|
||||||
Gold in concentrates ('000 ounces) |
421 |
189 |
236 |
238 |
227 |
1,300 |
701 |
|
||||||
Silver in concentrates ('000 ounces) |
1,007 |
319 |
524 |
579 |
739 |
3,268 |
1,842 |
|
||||||
Sales of payable metals in concentrates: (c) |
|
|
|
|
|
|
|
|
||||||
Copper in concentrates ('000 tonnes) |
116.4 |
27.6 |
61.6 |
82.8 |
93.9 |
372.9 |
238.3 |
|
||||||
Gold in concentrates ('000 ounces) |
438 |
130 |
271 |
247 |
209 |
1,310 |
727 |
|
||||||
Silver in concentrates ('000 ounces) |
832 |
195 |
456 |
476 |
541 |
2,575 |
1,473 |
|
||||||
(a) Through a joint venture agreement with Freeport-McMoRan Copper & Gold (FCX), Rio Tinto is entitled to 40% of additional material mined as a consequence of expansions and developments of the Grasberg facilities since 1998. The 3Q 2012 results show the forecast from FCX's most recent five-year plan, because FCX is not releasing its actual 100% operating data for 3Q 2012 until the release of its 2012 third-quarter results on 22 October 2012.
(b) Rio Tinto share of Grasberg production is 40% of the expansion.
(c) Net of smelter deductions.
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
Kennecott Utah Copper |
|
|
|
|
|
|
|
|
Barneys Canyon mine (a) |
100.0% |
|
|
|
|
|
|
|
Utah, US |
|
|
|
|
|
|
|
|
Gold produced ('000 ounces) |
|
0.4 |
0.8 |
0.0 |
0.4 |
0.0 |
1.2 |
0.4 |
Bingham Canyon mine |
100.0% |
|
|
|
|
|
|
|
Utah, US |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
12,230 |
13,554 |
11,843 |
11,020 |
10,268 |
39,577 |
33,131 |
Average ore grade: |
|
|
|
|
|
|
|
|
Copper (%) |
|
0.39 |
0.43 |
0.32 |
0.32 |
0.47 |
0.43 |
0.37 |
Gold (g/t) |
|
0.31 |
0.32 |
0.22 |
0.20 |
0.20 |
0.31 |
0.21 |
Silver (g/t) |
|
2.23 |
3.30 |
2.34 |
1.94 |
2.12 |
2.23 |
2.14 |
Molybdenum (%) |
|
0.043 |
0.039 |
0.046 |
0.046 |
0.039 |
0.047 |
0.044 |
Copper concentrates produced ('000 tonnes) |
176 |
216 |
152 |
144 |
190 |
587 |
486 |
|
Average concentrate grade (% Cu) |
23.7 |
21.6 |
20.2 |
20.7 |
22.5 |
25.1 |
21.2 |
|
Production of metals in copper concentrates: |
|
|
|
|
|
|
|
|
Copper ('000 tonnes) (b) |
41.9 |
47.1 |
31.1 |
29.9 |
42.9 |
147.9 |
103.9 |
|
Gold ('000 ounces) |
92 |
92 |
54 |
50 |
48 |
293 |
152 |
|
Silver ('000 ounces) |
668 |
743 |
517 |
443 |
502 |
2,233 |
1,462 |
|
Molybdenum concentrates produced ('000 tonnes): |
6.4 |
4.5 |
6.0 |
5.1 |
5.0 |
21.3 |
16.0 |
|
Molybdenum in concentrates ('000 tonnes) |
3.4 |
2.3 |
3.1 |
2.6 |
2.5 |
11.3 |
8.3 |
(a) Mining operations ceased in the first quarter of 2002. Gold continues to be recovered from leach pads.
(b) Includes a small amount of copper in precipitates.
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
|
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
|
|
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
|
|
Kennecott smelter & refinery |
100.0% |
|
|
|
|
|
|
|
|
|
Copper concentrates smelted ('000 tonnes) |
|
167 |
241 |
188 |
130 |
227 |
636 |
544 |
|
|
Copper anodes produced ('000 tonnes) (a) |
|
34.5 |
49.8 |
40.0 |
9.3 |
55.1 |
152.9 |
104.5 |
|
|
Production of refined metal: |
|
|
|
|
|
|
|
|
|
|
Copper ('000 tonnes) |
|
45.2 |
48.8 |
40.7 |
16.8 |
45.3 |
166.5 |
102.8 |
|
|
Gold ('000 ounces) (b) |
|
88 |
87 |
100 |
55 |
46 |
292 |
201 |
|
|
Silver ('000 ounces) (b) |
|
664 |
754 |
817 |
467 |
357 |
2,436 |
1,640 |
|
|
|
(a) New metal excluding recycled material. (b) Includes gold and silver in intermediate products. |
|||||||||
|
|
|
|
|
|
|
|
|
|
|
Northparkes Joint Venture |
80.0% |
|
|
|
|
|
|
|
|
|
New South Wales, Australia |
|
|
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
1,439 |
1,463 |
1,352 |
1,438 |
1,468 |
4,070 |
4,258 |
|
|
Average ore grades: |
|
|
|
|
|
|
|
|
|
|
Copper (%) |
|
1.03 |
1.04 |
1.08 |
1.09 |
1.04 |
0.99 |
1.07 |
|
|
Gold (g/t) |
|
0.55 |
0.57 |
0.57 |
0.53 |
0.50 |
0.55 |
0.53 |
|
|
Copper concentrates produced ('000 tonnes) |
39.7 |
39.7 |
37.9 |
40.0 |
38.8 |
107.0 |
116.8 |
|
||
Contained copper in concentrates: |
|
|
|
|
|
|
|
|
|
|
Saleable production ('000 tonnes) |
|
13.3 |
13.4 |
13.0 |
14.0 |
13.4 |
37.0 |
40.4 |
|
|
Sales ('000 tonnes) (a) |
|
8.4 |
15.2 |
8.6 |
11.8 |
11.3 |
22.6 |
31.7 |
|
|
Contained gold in concentrates: |
|
|
|
|
|
|
|
|
|
|
Saleable production ('000 ounces) |
|
19.4 |
19.8 |
18.4 |
18.6 |
17.2 |
56.2 |
54.2 |
|
|
Sales ('000 ounces) (a) |
|
12.5 |
24.3 |
12.6 |
16.1 |
15.3 |
34.8 |
44.0 |
|
|
(a) Rio Tinto's 80% share of material from the Joint Venture.
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
COPPER & GOLD (continued) |
|
|
|
|
|
|
|
|
Palabora |
57.7% |
|
|
|
|
|
|
|
Palabora mine |
|
|
|
|
|
|
|
|
South Africa |
|
|
|
|
|
|
|
|
Ore treated ('000 tonnes) |
|
3,133 |
2,845 |
2,921 |
2,889 |
981 |
8,942 |
6,791 |
Average ore grade: copper (%) (a) |
|
0.63 |
0.63 |
0.60 |
0.59 |
0.63 |
0.65 |
0.60 |
Copper concentrates produced ('000 tonnes) |
58.2 |
50.1 |
51.8 |
54.4 |
20.3 |
177.8 |
126.5 |
|
Average concentrate grade: copper (%) |
|
31.2 |
29.9 |
30.4 |
28.8 |
27.3 |
30.5 |
29.2 |
Copper in concentrates ('000 tonnes) |
|
18.1 |
15.0 |
15.7 |
15.6 |
5.5 |
54.1 |
36.9 |
Palabora smelter/refinery |
|
|
|
|
|
|
|
|
New concentrate smelted on site ('000 tonnes) |
45.4 |
60.4 |
56.1 |
51.3 |
6.1 |
170.3 |
113.5 |
|
New copper anodes produced ('000 tonnes) |
10.8 |
15.7 |
14.7 |
13.8 |
1.2 |
43.7 |
29.7 |
|
Refined new copper produced ('000 tonnes) |
10.3 |
16.6 |
15.0 |
12.4 |
4.7 |
42.4 |
32.1 |
|
Gold in Anode Slimes ('000 ounces) |
|
3.0 |
3.9 |
3.2 |
2.8 |
1.1 |
9.4 |
7.1 |
By-products: |
|
|
|
|
|
|
|
|
Magnetite concentrate ('000 tonnes) |
|
744 |
985 |
957 |
1,420 |
1,475 |
2,444 |
3,851 |
Nickel contained in products (tonnes) |
|
23 |
9 |
14 |
13 |
2 |
78 |
29 |
Vermiculite plant |
|
|
|
|
|
|
|
|
Vermiculite produced ('000 tonnes) |
|
48 |
22 |
47 |
29 |
27 |
143 |
103 |
(a) Includes some higher grade slag processed in 3Q 2012. |
||||||||
DIAMONDS |
|
|
|
|
|
|
|
|
Argyle Diamonds |
100.0% |
|
|
|
|
|
|
|
Western Australia |
|
|
|
|
|
|
|
|
AK1 ore processed ('000 tonnes) |
|
1,760 |
1,497 |
1,798 |
1,663 |
1,728 |
4,882 |
5,189 |
AK1 diamonds produced ('000 carats) |
|
2,302 |
1,918 |
2,329 |
1,677 |
2,454 |
5,523 |
6,461 |
Diavik Diamonds |
60.0% |
|
|
|
|
|
|
|
Northwest Territories, Canada |
|
|
|
|
|
|
|
|
Ore processed ('000 tonnes) |
|
645 |
560 |
530 |
538 |
525 |
1,674 |
1,592 |
Diamonds recovered ('000 carats) |
|
1,934 |
1,601 |
1,606 |
1,791 |
1,933 |
5,076 |
5,329 |
Murowa Diamonds |
77.8% |
|
|
|
|
|
|
|
Zimbabwe |
|
|
|
|
|
|
|
|
Ore processed ('000 tonnes) |
|
139 |
134 |
126 |
120 |
142 |
339 |
388 |
Diamonds recovered ('000 carats) |
|
93 |
113 |
85 |
73 |
119 |
254 |
277 |
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
|||
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
|
|||
IRON ORE |
|
|
|
|
|
|
|
|
|
|||
Rio Tinto Iron Ore |
|
|
|
|
|
|
|
|
|
|||
Pilbara Operations |
|
|
|
|
|
|
|
|
|
|||
Western Australia |
|
|
|
|
|
|
|
|
|
|||
Saleable iron ore production ('000 tonnes): |
|
|
|
|
|
|
|
|
||||
Hamersley - Paraburdoo, Mount Tom Price, Marandoo, Yandicoogina, Brockman and Nammuldi |
100.0% |
30,908 |
32,426 |
28,638 |
31,138 |
33,832 |
89,099 |
93,608 |
|
|||
Hamersley - Channar |
60.0% |
2,813 |
2,812 |
2,653 |
3,016 |
2,224 |
8,204 |
7,892 |
|
|||
Hamersley - Eastern Range |
(a) |
2,587 |
2,682 |
2,155 |
2,427 |
2,297 |
6,703 |
6,878 |
|
|||
Hope Downs |
50.0% |
8,473 |
8,281 |
8,097 |
7,281 |
8,048 |
23,460 |
23,426 |
|
|||
Robe River - Pannawonica (Mesas J and A) |
53.0% |
8,367 |
8,119 |
7,910 |
6,635 |
8,513 |
22,891 |
23,058 |
|
|||
Robe River - West Angelas |
53.0% |
6,716 |
7,435 |
6,313 |
7,871 |
8,037 |
19,058 |
22,221 |
|
|||
Total production ('000 tonnes) |
|
59,864 |
61,754 |
55,766 |
58,367 |
62,949 |
169,414 |
177,083 |
|
|||
Breakdown: Pilbara Blend Lump |
|
16,214 |
16,436 |
14,564 |
16,050 |
15,890 |
45,775 |
46,503 |
|
|||
Pilbara Blend Fines |
|
22,455 |
22,750 |
20,664 |
22,615 |
24,023 |
61,711 |
67,302 |
|
|||
Robe Valley Lump |
|
2,679 |
2,387 |
2,715 |
2,151 |
2,622 |
7,241 |
7,488 |
|
|||
Robe Valley Fines |
|
5,688 |
5,732 |
5,196 |
4,484 |
5,890 |
15,650 |
15,570 |
|
|||
Yandicoogina Fines (HIY) |
|
12,829 |
14,449 |
12,628 |
13,069 |
14,524 |
39,036 |
40,220 |
|
|||
|
|
|
|
|
|
|
|
|
|
|||
Total sales ('000 tonnes) (b) |
|
59,501 |
61,411 |
51,346 |
57,418 |
61,020 |
163,964 |
169,784 |
|
|||
Breakdown: Pilbara Blend Lump |
|
13,567 |
14,295 |
11,939 |
13,376 |
14,014 |
37,987 |
39,329 |
|
|||
Pilbara Blend Fines |
|
24,259 |
25,056 |
20,730 |
22,949 |
24,856 |
64,855 |
68,535 |
|
|||
Robe Valley Lump |
|
2,299 |
2,317 |
1,939 |
2,220 |
2,290 |
6,363 |
6,449 |
|
|||
Robe Valley Fines |
|
5,981 |
6,072 |
4,812 |
5,222 |
6,260 |
16,377 |
16,293 |
|
|||
Yandicoogina Fines (HIY) |
|
13,395 |
13,672 |
11,927 |
13,651 |
13,601 |
38,382 |
39,179 |
|
|||
|
(a) Rio Tinto owns 54% of the Eastern Range mine. Under the terms of the joint venture agreement, Hamersley Iron manages the operation and is obliged to purchase all mine production from the joint venture and therefore all of the production is included in Rio Tinto's share of production. (b) Sales represent iron ore exported from Western Australian ports. |
|||||||||||
Iron Ore Company of Canada |
58.7% |
|
|
|
|
|
|
|
|
|||
Newfoundland & Labrador and Quebec in Canada |
|
|
|
|
|
|
|
|||||
Saleable iron ore production: |
|
|
|
|
|
|
|
|
|
|||
Concentrates ('000 tonnes) |
|
1,892 |
1,589 |
521 |
862 |
1,570 |
3,189 |
2,953 |
|
|||
Pellets ('000 tonnes) |
|
2,230 |
1,864 |
2,326 |
2,422 |
2,466 |
6,814 |
7,213 |
|
|||
Sales: |
|
|
|
|
|
|
|
|
|
|||
Concentrate ('000 tonnes) |
|
1,940 |
1,601 |
501 |
698 |
1,723 |
3,272 |
2,921 |
|
|||
Pellets ('000 tonnes) |
|
2,243 |
2,295 |
1,853 |
2,740 |
2,774 |
6,414 |
7,367 |
|
|||
Global Iron Ore Totals |
|
|
|
|
|
|
|
|
|
|||
Iron Ore Production ('000 tonnes) |
|
63,987 |
65,207 |
58,613 |
61,651 |
66,985 |
179,417 |
187,249 |
|
|||
Iron Ore Sales ('000 tonnes) |
|
63,683 |
65,308 |
53,700 |
60,855 |
65,517 |
173,649 |
180,072 |
|
|||
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.
Rio Tinto operational data
|
Rio Tinto |
3Q |
4Q |
1Q |
2Q |
3Q |
9 MTHS |
9 MTHS |
|
|||||||||||||||||
|
interest |
2011 |
2011 |
2012 |
2012 |
2012 |
2011 |
2012 |
|
|||||||||||||||||
SALT |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
Dampier Salt |
68.4% |
|
|
|
|
|
|
|
|
|||||||||||||||||
Western Australia |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
Salt production ('000 tonnes) |
|
2,628 |
2,825 |
2,136 |
2,720 |
2,686 |
6,841 |
7,541 |
|
|||||||||||||||||
TALC |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
Rio Tinto Minerals - talc (a) |
0.0% |
|
|
|
|
|
|
|
|
|||||||||||||||||
Australia, Europe, and North America |
|
|
|
|
|
|
|
|
||||||||||||||||||
Talc production ('000 tonnes) |
|
84 |
- |
- |
- |
- |
592 |
- |
|
|||||||||||||||||
|
(a) Rio Tinto sold its 100% interest in the Talc business with an effective date of 1 August 2011. Production data are shown up to that date.
|
|
||||||||||||||||||||||||
TITANIUM DIOXIDE FEEDSTOCK |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
Rio Tinto Iron & Titanium |
100% |
|
|
|
|
|
|
|
|
|||||||||||||||||
Canada and South Africa (a) |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
(Rio Tinto Share) (b) |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
Titanium dioxide feedstock ('000 tonnes) |
381 |
380 |
374 |
370 |
401 |
1,063 |
1,145 |
|
||||||||||||||||||
|
(a) On 7 September 2012, Rio Tinto increased its stake in Richards Bay Minerals from 37% to 74% through the acquisition of BHP Billiton's interest in RBM. (b) Quantities comprise 100% of Rio Tinto Fer et Titane and Rio Tinto's share of Richards Bay Minerals' production. Ilmenite mined in Madagascar is being processed in Canada. |
|
||||||||||||||||||||||||
|
|
|
|
|
|
|||||||||||||||||||||
URANIUM |
|
|
|
|
|
|||||||||||||||||||||
Energy Resources of Australia Ltd |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
Ranger mine |
68.4% |
|
|
|
|
|
|
|
|
|||||||||||||||||
Northern Territory, Australia |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
U3O8 Production ('000 lbs) |
|
2,241 |
2,249 |
1,327 |
1,392 |
2,895 |
3,322 |
5,614 |
|
|||||||||||||||||
Rössing Uranium Ltd |
68.6% |
|
|
|
|
|
|
|
|
|||||||||||||||||
Namibia |
|
|
|
|
|
|
|
|
|
|||||||||||||||||
U3O8 Production ('000 lbs) |
|
1,226 |
991 |
1,572 |
1,251 |
1,650 |
3,745 |
4,473 |
|
|||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|||||||||||||||||
Rio Tinto percentage interest shown above is at 30 September 2012. The data represent full production and sales on a 100% basis unless otherwise stated.