WEI 6-12S-1, OIL DISCOVERY, OFFSHORE CHINA
KEY POINTS
• Preliminary appraisal results from the second sidetrack well drilled at
the recent Wei 6-12S-1 oil discovery in Block 22/12 in the Beibu Gulf,
offshore China, range from encouraging to as expected.
• Encouragingly, four oil-filled sands, representing a total of 22 metres
gross and 16 metres net oil pay, were encountered in the Upper Sand Package,
more than 45 metres downdip from the original well and outside structural
closure as presently mapped. Two of these sands are not present in the
discovery well.
• Information from the two sidetrack wells, taken in conjunction with the
latest analysis of data from the discovery well, confirms that the Upper
Sand Package is not a single reservoir system but is made up of as many as
seven distinct oil sands, all with different oil-water contacts and separate
oil - and in two cases, oil and gas - columns. In six cases individual oil
columns are inferred to range in height from 40 metres to 60 metres while
one column, in a five metre sand, is inferred to be possibly as much as 180
metres.
• As expected, the Middle and Lower Sand packages were encountered between
100 metres and 230 metres downdip from the discovery well and are therefore
water-wet. Drill and pressure data from the two sidetracks and the discovery
well established a 60 metre oil column in the Middle Sand package and infer
a possible 105 metre oil column in the Lower Sand Package updip from the
second sidetrack.
• A deep stratigraphic exploration target proved to be a reservoir quality
sand sequence without hydrocarbons.
1. OPERATIONS
Since the last Stock Exchange Release on 26 July 2006 regarding the Wei 6-12S-1
exploration well in Block 22/12, Beibu Gulf, offshore China, the second
sidetrack hole, Wei 6-12S-1Sb ('1Sb') has drilled to Total Depth of 2,950 metres
below Rotary Table.
As at midnight (local time) on 31 July 2006, logging operations were almost
complete.
2. SIDETRACK DRILLING PROGRAMME RATIONALE
Following the discovery of 95 metres of net hydrocarbon pay, including 80.5
metres net oil pay, within a 477 metre gross reservoir sequence drilled by the
Wei 6-12S-1 exploration well, the Block 22/12, Joint Venture immediately
embarked on a two month appraisal drilling programme. As a result, two
sidetracks were drilled from the original discovery well, both of which achieved
their main objective: the acceleration of data gathering so as to provide
maximum information with regard to determining the field's commercial potential.
3. OVERALL OBJECTIVES AND RESULTS
The primary objective of the first sidetrack, Wei 6-12S-1Sa ('1Sa'), was to
obtain core data from the main reservoirs encountered in the discovery well. To
achieve this objective 1Sa was located about 50 metres to the east of the
original hole. Five cores were cut with 100% recovery, representing 79 metres of
reservoir section and additional logs and pressure data were also acquired.
The main aim of the second sidetrack well, 1Sb, was to define more precisely the
vertical and lateral extent of the oil accumulations in the Upper Sand Package
by penetrating that sequence more than 45 metres downdip from the discovery
well. As a result of drilling 1Sb, as many as seven separate reservoir sands,
all with different oil-water contacts and separate oil - and in two cases, oil
and gas - columns, are now recognised in the Upper Sand Package. In six cases
individual oil columns are inferred to range in height from 40 metres to 60
metres, with one column, in a five metre sand, inferred to be possibly as much
as 180 metres. This contrasts with the provisional interpretation of the initial
data obtained from the discovery well that suggested that the sands seen in the
Upper Sand Package might be part of a single main reservoir with a common oil
water contact (see CEO's Comments in Section 5).
A secondary objective of 1Sb was to test a relatively deep, stratigraphic
exploration target, not present in the discovery well, which proved to be a
reservoir quality sand without oil shows.
In order to achieve these dual objectives 1Sb's trajectory was designed so that
it would encounter the oil reservoirs in the Middle and Lower Sand Packages
drilled by the discovery well respectively 100 metres to 230 metres downdip from
that well and therefore, below their respective oil-water contacts; this proved
to be the case.
The reservoir quality and continuity of the three sand packages are broadly
consistent over the ca 400 metres lateral distance represented by the three
reservoir penetrations. The overall section thickens downdip and additional
sands, not seen in the discovery well, are present off-structure.
4. PRELIMINARY DETAILED RESULTS
1Sa and 1Sb have provided drill, log, sample and pressure data which will
require months to analyse properly. However, a preliminary evaluation of the
results of the three wells drilled to date provides useful insights into the
nature and extent of the field. Specifically:
4.1 Upper Sand package
Although it penetrated the top of the sequence some 48 metres downdip from the
discovery well, 1Sb drilled four oil sands within the Upper Sand Package none of
which has an oil-water contact. These sands, which collectively represent 22
metres of gross pay and 16 metres of net oil pay, are detailed below in order of
increasing depth:
• The highest oil sand in 1Sb, has a gross pay of 5.5 metres, 100% net. It
equates to a one metre sand in the discovery well where it occurs above and
separate from, the higher of two gas sands reported in that well. This oil
sand was not specifically referred to in the 17 May 2006 Stock Exchange
release that first detailed the discovery because it was considered to be
immaterial. The fact that the sand has thickened downdip and an oil-water
contact has not been drilled by the downdip sidetrack is encouraging. The
minimum oil column inferred for this sand is 48 metres.
• The higher of two gas sands in the discovery well is also present in 1Sb
where it has a gross pay of six metres and a net pay of 5.5 metres. However,
in 1Sb, this sand is oil-filled, thereby confirming the presence of a down
dip oil leg associated with the highest gas sand in the discovery well. The
minimum inferred oil column for this sand is 53 metres. It is further
inferred that this oil leg underlies a minimum 39 metre gas column part of
which was penetrated by the updip discovery well.
• An oil sand, with six metres of gross pay and about three metres of net
pay, occurs within the Upper Sand Package but is absent from the updip
discovery well. There is no oil-water contact in this sand in 1Sb and the
inferred oil column for the sand is 60 metres.
• The deepest oil sand encountered in 1Sb has a gross pay of 4.5 metres
thick and a net pay of about two metres. This sand is also present in the
discovery well where it provided a pressure reading that was considered to
be possibly spurious because its implied a very long downdip oil column.
This pressure information has been essentially replicated in both sidetracks
thereby increasing the possibility that the oil column in this sand may be
in the order of 180 metres, although further work needs to be done to more
precisely evaluate this scenario.
Three sands which contain hydrocarbons in the Upper Sand Package in the
discovery well are present as water-wet sands in 1Sb. Inferred vertical oil
columns for these sands, up dip from 1Sb, range from 40 metres to about 60
metres.
In two cases, the inferred oil-water contacts are broadly coincident with a
seismic anomaly which suggests that such features may prove to be useful tools
with regard to delineating oil and gas accumulations in and around the field.
All of the oil columns seen in the Upper Sand Package penetrated by the three
wells drilled to date appear to extend below structural closure as currently
mapped. Unless there is a significant unrecognized seismic velocity anomaly to
the east of the three wells it would seem that there is a stratigraphic
component to the trapping mechanism at the level of the Upper Sand Package.
There is no seismic velocity anomaly in the immediate vicinity of the three
wells drilled to date.
4.2 Middle Sand Package
This is the main oil sand drilled by the discovery well. In that well, the
interval has a gross thickness of 60 metres, of which 31 metres is net oil pay.
The discovery well drilled through an oil-water contact - the only one
penetrated by any of the three wells so far drilled in the field - which appears
to be just below structural closure as currently mapped. Because 1Sb was
designed to intersect the Middle Sand Package 106 metres downdip from the
discovery well, it was expected to be water-bearing and that proved to be the
case.
Encouragingly, the first sidetrack, 1Sa, recovered clean oil from near the base
of the main reservoir in this Middle Sand Package which had previously been
considered to be a likely transition zone. The discovery well established a 60
metres oil column in this sand updip from 1Sb.
4.3 Lower Sand Package
Although the discovery well did not drill through an oil-water contact in this
sand package pressure data suggested that 1Sb would be too far (>200 metres)
downdip to encounter oil in the equivalent sands and that proved to be the case.
However, 1Sa cored part of this interval and a preliminary review of these data
suggests that the reservoir quality is better than the test flow rate of 1,720
BOPD might indicate and that the test result was constrained by formation
damage. Pressure data gathered from 1Sb infer that there is potentially a 105
metre oil column in this sand updip from that well. The lower part of this oil
column appears to be below structural closure as presently mapped.
5. CEO'S COMMENTS.
Commenting on the drilling results to date ROC's Chief Executive Officer, John
Doran, stated that:
'Overall, this appraisal programme has provided encouraging results and no
unpleasant surprises.
The recognition of multiple oil reservoirs in the Upper Sand Package with
substantial individual oil columns is a significant step forward in our
understanding of the size and nature of the field.
One of the challenges of the discovery is explaining in non-technical terms what
is going on in a field which has a variety of different sands, the vast majority
of which contain oil, spread out over hundreds of metres vertically within a
trap that, although associated with a structure that is well defined by 3D
seismic, seems to have a significant stratigraphic component, the exact extent
of which is unknown. This is, however, a welcome challenge compared to
explaining a dry hole.
As a result of three months of continuous operations on a well that was expected
to be have been finished within a few weeks if it had been dry, the Joint
Venture has been left with three important reservoir penetrations, a wealth of
subsurface data that requires detailed analysis and strong evidence that this
newly discovered oil accumulation may extend beyond structural closure as
presently mapped.
If the field had a single reservoir and was confined by structural closure,
assessing its true nature would have been quicker and simpler. In all
probability, we would now have a fairly good idea as to the ultimate size of the
accumulation. The fact that the field seems to be at least partly defined by
stratigraphic elements means that although the data gathered to date is expected
to confirm the commerciality of the discovery, more appraisal and/or development
drilling will be required before accurate recoverable reserve numbers can be
provided for the field as a whole. This is not to say that the field will
necessarily prove to be huge, just that it is likely to be bigger than if it was
limited by structural closure.
A lack of specific recoverable reserve figures can be frustrating for
shareholders and potential investors but, in the long run, it is considered
better to admit that such precise numbers are beyond our technical reach at this
particular moment rather than generate figures which may inadvertently mislead
and cause a reserve downgrade in the future.
Although exact numbers for recoverable reserves are not yet available it is
possible to provide a tentative sense of direction as to the likely order of
magnitude of in-place oil and the commercial potential of the field. The balance
of current probabilities suggests that the oil in-place is likely to be measured
in terms of many tens of millions of barrels and, if this proves to be the case,
a commercial development would be anticipated.'
6. JOINT VENTURE COMPOSITION
The Block 22/12 Joint Venture comprises*:
Roc Oil (China) Company 40% and Operator
Horizon Oil Limited 30%
Petsec Energy Ltd 25%
Oil Australia Pty Ltd** 5%
*The China National Offshore Oil Company ('CNOOC') is entitled to participate up
to a 51% funding equity level in any commercial development within Block 22/12.
** A subsidiary of First Australian Resources
In accordance with new Alternative Investment Market of the London Stock
Exchange ('AIM') rules the information in this report has been reviewed by an
appropriately qualified person with more than five years relevant industry
experience, specifically, Dr John Doran, Bsc (Hons) Geology; M.Sc; PhD, Chief
Executive Officer, Roc Oil Company Limited, and a member of the Society of
Petroleum Engineers.
John Doran For further information please contact:
Chief Executive Officer Dr John Doran on
Tel: +61-2-8356-2000
Fax: +61-2-9380-2635
Email: jdoran@rocoil.com.au
Or visit ROC's website: www.rocoil.com.au
Dr Kevin Hird
General Manager Business Development
Tel: +44 (0)207 586 7935
Fax: +44 (0)207 722 3919
Email: khird@rocoil.com.au
Nick Lambert
Bell Pottinger Corporate & Financial
Tel: +44 (0)207 861 3232
This information is provided by RNS
The company news service from the London Stock Exchange
EN
DRLGXGDIRUGGGLB