FIRST DRILL TEST OF GEOPHYSICAL TARGETS AT PIAU...
SERABI MINING plc
("Serabi" or "the Company")
First Drill Test of Geophysical Targets at Piaui Intersects Significant Gold
Mineralisation
Serabi Mining plc (AIM:SRB, TSX:SBI and SBI.WT), the Brazilian focused gold
exploration company, is pleased to release results from the first exploration
diamond drill holes in the Piaui geophysical anomaly at their Jardim do Ouro
Project ("JDO") in the Tapajos region of Brazil.
In December 2010 the Company commenced a 7,500 metre drilling programme designed
to target nine high priority Induced Polarization (IP) targets. To date the
Company has completed seven drill holes at Piaui and received assays from the
first five holes. The drilling has to date tested a 200m strike length of the
500m long geophysical model and has returned significant gold intercepts in all
five drill holes. The style of the mineralization intersected to date appears to
be broader width to mineral resources identified at JDO to date
Mike Hodgson, Chief Executive, commented:
"Piaui, selected first for its relative ease of access, is one  of nine targets
to be drilled in this campaign and to obtain consistent intersections in all
holes drilled to date, in this, our first target, is a great result. What is
most appealing is the indication that for the first time, we are discovering
broader width mineralization extending to surface at JDO. The apparent
structural and grade continuity over the first 200m bodes well for the remainder
of the Piaui programme and also gives us confidence of further success on the
remaining eight targets".
+------------------------------------------------------------------------------+
| Hole |
| Hole East North RL Depth Dip/Azm From To Width Au |
| |
| Â (UTM) (UTM) (UTM) (m) Â (m) (m) (m) g/t |
+------------------------------------------------------------------------------+
|PDD0455 633176 9300456 221.69 175.0 -62/032 3.50 8.00 4.5 2.75 |
| |
|Â Â Â Â Â Â 17.00 19.50 2.5 1.06 |
| |
| Â Â Â Â Â Â 28.40 31.90 3.5 1.58 |
| |
| Â Â Â Â Â Â 115.70 116.40 0.7 0.93 |
+------------------------------------------------------------------------------+
|PDD0456 633162 9300431 218.36 255.0 -62/032 4.90 5.90 1 3.2 |
| |
|Â Â Â Â Â Â 179.50 190.20 10.7 1.17 |
| |
| Â Â Â Â Â Â 200.00 205.50 5.5 1.22 |
+-------+------+-------+------+------------------------------------------------+
|PDD0457|632994|9300528|217.83| 145.5 -51/027 66.71 69.71 3 0.81 |
| +------+-------+------+ |
| Â Â Â Â Â Â 71.90 72.73 0.83 0.88 |
+-------+------+-------+------+------------------------------------------------+
|PDD0458|633058|9300494|219.01| 250.5 -62/028 189.20 191.70 2.5 6.22 |
| +------+-------+------+ |
|Â Â Â Â Â Â 198.20 207.30 9.1 2.24 |
| |
|Â Â Â Â Â Â 215.30 216.00 0.7 2.43 |
| |
|Â Â Â Â Â Â 219.00 219.70 0.7 1.3 |
+------------------------------------------------------------------------------+
|PDD0459 633072 9300519 222.37 170.0 -61/018 15.00 16.50 1.5 0.57 |
| |
|Â Â Â Â Â Â 19.54 21.47 1.93 22.86|
| |
|Â Â Â Â Â Â 140.80 141.59 0.79 1.22 |
| |
|Â Â Â Â Â Â 167.41 169.75 2.34 0.84 |
+-------+------+-------+------+------------------------------------------------+
| | | | | Assays    |
|PDD0460|633201|9300357|216.61| 250.5 -52/028 pending    |
| +------+-------+------+ |
|Â Â Â Â Â Â Â Â Â Â |
+-------+------+-------+------+------------------------------------------------+
| | | | | Assays |
|PDD0461|633322|9300303|219.86| 300.0 -66/022 Pending   |
| +------+-------+------+ |
|Â Â Â Â Â Â Â Â Â Â |
+------------------------------------------------------------------------------+
Note: Assay intercepts are calculated based on a minimum weighted average grade
of 0.5g/t Au using a 0.5g/t Au weighted average lower cut and a maximum internal
waste interval of 1.2m. All analysis was completed by EcoTech Laboratory of
Vancouver, Canada using a 30gm Fire Assay charge with an AAS analysis.
The mineralization encountered at the Piaui target is hosted within local strong
chlorite altered mylonite zones and silica +/- chlorite altered porphyritic
dacites. Mineralisation is associated with 2-15% pyrite +/- chalcopyrite. The
mylonite zones transect a range of host lithologies including gabbros,
granodiorites, monzogranites and porphyritic dacites.
The Piaui anomaly is the first of nine drill targets identified by the Company
and the initial 7,500m discovery drilling programme commenced in December 2010.
The programme of diamond drill holes has been designed to target the centre of
modeled IP chargeability and conductivity anomalies across the nine targets.
Enquiries:
Serabi Mining plc
Michael Hodgson Tel: 020 7246 6830
Chief Executive Mobile: 07799 473621
Clive Line Tel: 020 7246 6830
Finance Director Mobile: 07710 151692
Email: contact@serabimining.com
Website:Â www.serabimining.com
Beaumont Cornish Limited
Nominated Adviser
Roland Cornish Tel: 020 7628 3396
Michael Cornish Tel: 020 7628 3396
Hybridan LLP
UK Broker
Claire Noyce Tel: 020 7947 4350
Farm Street Communications
Public Relations
Simon Robinson Tel: 07593 340107
Fig House Communications
Investor Relations
Rebecca Greco Tel: + 1 416 822 6483
Copies of this release are available from the Company's website at
www.serabimining.com
Forward-looking statements
This press release contains forward-looking statements. All statements, other
than of historical fact, that address activities, events or developments that
the Company believes, expects or anticipates will or may occur in the future
(including, without limitation, statements regarding the estimation of mineral
resources, exploration results, potential mineralization, potential mineral
resources and mineral reserves) are forward-looking statements. Forward-looking
statements are often identifiable by the use of words such as "anticipate",
"believe", "plan", may", "could", "would", "might" or "will", "estimates",
"expect", "intend", "budget", "scheduled", "forecasts" and similar expressions
or variations (including negative variations) of such words and phrases.
Forward-looking statements are subject to a number of risks and uncertainties,
many of differ materially from those discussed in the forward-looking
statements. Factors that could cause actual results or events to differ
materially from current expectations include, among other things, without
limitation, failure to establish estimated mineral resources, the possibility
that future exploration results will not be consistent with the Company's
expectations, the price of gold and other risks identified in the Company's most
recent annual information form filed with the Canadian securities regulatory
authorities on SEDAR.com. Any forward-looking statement speaks only as of the
date on which it is made and, except as may be required by applicable securities
laws, the Company disclaims any intent or obligation to update any forward-
looking statement.
Qualified Persons Statement
The information contained within this announcement has been reviewed and
verified by Michael Hodgson, CEO of the Company.  Mr Hodgson is an Economic
Geologist by training with over 25 years' experience in the mining industry. He
holds a BSc (Hons) Geology, University of London, a MSc Mining Geology,
University of Leicester and is a Fellow of the Institute of Materials, Minerals
and Mining and a Chartered Engineer of the Engineering Council of UK,
recognizing him as both a Qualified Person for the purposes of Canadian National
Instrument 43-101 and by the AIM Guidance Note on Mining. Oil and Gas Companies
dated March 2006
Quality Assurance and Quality Control Procedures Disclosure
The Company has implemented and maintains a Serabi quality assurance/quality
control (QA/QC) protocol at its JDO Project as defined in its "NI 43-101
Technical Report for the Jardim Do Ouro Project, Para State, Brazil" dated 22
December 2010. This ensures best industry practice in sampling and analysis of
exploration and resource definition samples. The insertion of field duplicates,
certified standards and blank samples into the sample stream form part of the
Serabi procedure (these act as an independent check on contamination, precision
and accuracy in the analytical laboratory).
Assay results are reported once rigorous QA/QC procedures have been approved.
Glossary
Azm Azimuth
"Au" Gold
Dip angle of drilling
"g/t" grams per tonne
"IP" or "induced polarization" geophysical technique whereby an electric current
 is induced into the sub-surface and the
conductivity of the sub-surface is recorded
3-D three-dimensional
RL relative elevation
UTM Universal Transverse Mercator - global geographic
co-ordinate system
ENDS
This announcement is distributed by Thomson Reuters on behalf of
Thomson Reuters clients. The owner of this announcement warrants that:
(i) the releases contained herein are protected by copyright and
other applicable laws; and
(ii) they are solely responsible for the content, accuracy and
originality of the information contained therein.
Source: Serabi Mining plc via Thomson Reuters ONE
[HUG#1504183]