Chunya Surface Exploration Update

SHANTA GOLD LIMITED ("Shanta Gold" or the "Company") LATEST SURFACE EXPLORATION RESULTS AND DRILLING MOBILIZATION AT CHUNYA 30 June 2010 Shanta Gold is pleased to announce that the Company has received further promising results from surface exploration activities conducted during the first quarter of 2010 at the Chunya project in southern Tanzania. The work tested extensions to known prospects and new targets identified by mapping in 2009, and further extended these and identified additional new targets. Surface trenching tested MK and Black Tree Hill West and mapping has identified three new targets MK West, Kali and V-Vein, also trenched in this period. All returned encouraging gold values. Highlights include: * MK- 3.07g/t over 1.6m, 4.11g/t over 1.6m, 3.30g/t over 3.0m, 3.85g/t over 1.5m  and 5.03g/t over 1.0m; * MK West- 41.35g/t over 1.0m; *  V-Vein- 2.74g/t over 4.2m; * Kali- 3.06g/t over 1.9m; and * Black Tree Hill West- 3.07g/t over 0.7m, 2.88g/t over 1.6m, 6.00g/t over 1.0m (including 10.14g/t over 0.55m), 3.31g/t over 0.65m, 5.23g/t over 1.45m (including 11.40g/t over 0.0.55m), 6.35g/t over 1.4m (including 20.3g/t over 0.40m) and 7.12g/t over 3.1m (including 41.1g/t over 0.4m). * The total potential strike at Chunya has been extended by 3000m to 6,000m. * An RC drilling rig has been mobilized to the project and will test the new targets at depth and evaluate the extensions of the known prospects along 3,000m of additional strike. * Hydrogeological drillholes to provide future process water requirements and environmental monitoring drill holes are also planned during this drilling campaign. MK and MK West Initial mapping and trench sampling during the last quarter of 2009 identified a new target MK. Further detailed mapping and trenching during the first quarter of 2010 tested the MK target and extended the MK target in a westerly direction. Intersections are generally narrow but consistently mineralised. Further potential strike length has been interpreted from mapping and will be trenched. To date 350m of trenching of the strike is complete. The latest trench sampling results are: +-----------------------------------------------------------------------+ | MK WEST TARGET TRENCHES | +---------+----+---+------------+--------------+------------------------+ |TRENCH_ID|FROM|TO |SAMPLE WIDTH|WEIGHTED GRADE| COMMENTS | | |(m) |(m)| (m) | (g/t Au) | | +---------+----+---+------------+--------------+------------------------+ | MKW002 |5.7 |6.9| 1.2 | 41.35 |Including 0.4m at 123g/t| +---------+----+---+------------+--------------+------------------------+ +----------------------------------------------------------------------+ | MK TARGET TRENCHES | +-----------+-------+-------+--------------+----------------+----------+ | TRENCH_ID | FROM | TO | SAMPLE WIDTH | WEIGHTED GRADE | COMMENTS | | | (m) | (m) | (m) | (g/t Au) | | +-----------+-------+-------+--------------+----------------+----------+ | MK002 | 8.70 | 10.30 | 1.60 | 3.07 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK002 | 21.50 | 23.10 | 1.60 | 4.11 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK003 | 29.00 | 32.00 | 3.00 | 3.30 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK004 | 14.20 | 16.00 | 1.80 | 0.98 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK005 | 8.40 | 16.70 | 8.30 | 1.35 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK006 | 9.05 | 9.80 | 0.75 | 1.30 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK007 | 11.10 | 11.60 | 0.50 | 1.15 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK008 | 17.40 | 18.90 | 1.50 | 3.85 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK011 | 15.90 | 17.60 | 1.70 | 1.33 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK012 | 12.30 | 14.20 | 1.90 | 2.21 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK013 | 8.00 | 8.30 | 0.30 | 1.53 |   | +-----------+-------+-------+--------------+----------------+----------+ | MK014 | 9.30 | 10.30 | 1.00 | 5.03 |   | +-----------+-------+-------+--------------+----------------+----------+ V-Vein V-Vein was located during mapping and is an east-west trending structure located 300m east of the Bauhinia Creek prospect. Three trenches have exposed 50m of the structure and further trenching is being carried out that is expected to extend this further. +-------------------------------------------------------------------------+ |  V-VEIN TARGET TRENCHES | +---------+----+----+------------+--------------+-------------------------+ |TRENCH_ID|FROM| TO |SAMPLE WIDTH|WEIGHTED GRADE| COMMENTS | | |(m) |(m) | (m) | (g/t Au) | | +---------+----+----+------------+--------------+-------------------------+ | VV001 |34.8|36.7| 1.9 | 2.01 |   | +---------+----+----+------------+--------------+-------------------------+ | VV003 |9.2 |13.4| 4.2 | 2.74 |Including 0.3m at 11.1g/t| +---------+----+----+------------+--------------+-------------------------+ Kali The east-west striking Kali target is located 200m north east of the Jamhuri prospect.  Initial trench and outcrop channel sampling has revealed a narrow zone of gold mineralization along 30m but the structure is projected to extend in both directions and is being trenched during the current programme. +--------------------------------------------------------------------+ | KALI TARGET TRENCHES AND OUTCROP CHANNELS | +-----------+------+------+--------------+----------------+----------+ | TRENCH_ID | FROM | TO | SAMPLE WIDTH | WEIGHTED GRADE | COMMENTS | | | (m) | (m) | (m) | (g/t Au) | | +-----------+------+------+--------------+----------------+----------+ | KVCS001 | 2.6 | 3.5 | 0.9 | 1.05 |   | +-----------+------+------+--------------+----------------+----------+ | KVCS002 | 1.5 | 3 | 1.5 | 1.88 |   | +-----------+------+------+--------------+----------------+----------+ | KVCS003 | 2.3 | 4.2 | 1.9 | 3.06 |   | +-----------+------+------+--------------+----------------+----------+ | KVOO1 | 4.2 | 4.6 | 0.4 | 1.11 |   | +-----------+------+------+--------------+----------------+----------+ | KV001 | 20.2 | 21.1 | 0.9 | 1.75 |   | +-----------+------+------+--------------+----------------+----------+ Black Tree Hill West During recent detailed surface mapping, three distinct en-echelon shears were identified west of Black Tree Hill. Initial reconnaissance trenching indicates that the structures are mineralized and further detailed in-fill trenching is underway. +-----------------------------------------------------------------------------+ | BLACK TREE HILL WEST TARGET TRENCHES | +---------+-----+-----+------------+--------------+---------------------------+ |TRENCH_ID|FROM | TO |SAMPLE WIDTH|WEIGHTED GRADE| COMMENTS | | | (m) | (m) | (m) | (g/t Au) | | +---------+-----+-----+------------+--------------+---------------------------+ | BTT001 |10.25|10.65| 0.4 | 1.15 |   | +---------+-----+-----+------------+--------------+---------------------------+ | BTT001 | 16 |19.15| 3.15 | 0.93 |   | +---------+-----+-----+------------+--------------+---------------------------+ | BTT002 |1.95 |2.15 | 0.2 | 1.42 |   | +---------+-----+-----+------------+--------------+---------------------------+ | BTT002 | 9.4 |11.45| 2.05 | 2.01 |   | +---------+-----+-----+------------+--------------+---------------------------+ | BTT004 | 6.7 | 7.3 | 0.6 | 3.07 |   | +---------+-----+-----+------------+--------------+---------------------------+ | BTT006 |6.85 |8.45 | 1.6 | 2.88 |   | +---------+-----+-----+------------+--------------+---------------------------+ | BTT007 | 8.6 | 9.6 | 1 | 6.00 |Including 0.55m at 10.14g/t| +---------+-----+-----+------------+--------------+---------------------------+ | BTT008 |6.35 |7.65 | 1.3 | 1.63 |   | +---------+-----+-----+------------+--------------+---------------------------+ | BTT009 | 5 |5.65 | 0.65 | 3.31 |   | +---------+-----+-----+------------+--------------+---------------------------+ | BTT012 | 15 |15.55| 0.55 | 1.34 |   | +---------+-----+-----+------------+--------------+---------------------------+ | BTT012 |50.9 |52.35| 1.45 | 5.23 |Including 0.55m at 11.4g/t | +---------+-----+-----+------------+--------------+---------------------------+ | BTT012 | 217 |218.4| 1.4 | 6.35 | Including 0.4m at 20.3g/t | +---------+-----+-----+------------+--------------+---------------------------+ | BTT013 |10.8 |13.9 | 3.1 | 7.12 | Including 0.4m at 41.1g/t | +---------+-----+-----+------------+--------------+---------------------------+ The detailed mapping and trenching of the past six months has revealed significant extensions and new potential strike on the Chunya licence. The potential strike of the new targets and known prospects is detailed in the table below: +------------------------------------------------------------------------------+ | TOTAL POTENTIAL STRIKE AT CHUNYA | +---------------+-----------------+--------------+-------------+---------------+ | |MAPPED POTENTIAL | TRENCHED | DRILLED |TOTAL POTENTIAL| | PROSPECT | UNTRENCHED | STRIKE | STRIKE | STRIKE | | | (m) | (m) | (m) | (m) | +---------------+-----------------+--------------+-------------+---------------+ |Luika | 200 |   | 600 | 800 | +---------------+-----------------+--------------+-------------+---------------+ |Luika South |   | 500 |   | 500 | +---------------+-----------------+--------------+-------------+---------------+ |Jamhuri |   |   | 800 | 800 | +---------------+-----------------+--------------+-------------+---------------+ |Black Tree Hill| 500 |   | 600 | 1100 | +---------------+-----------------+--------------+-------------+---------------+ |Bauhinia Creek |   | 100 | 200 | 300 | +---------------+-----------------+--------------+-------------+---------------+ |Elizabeth Hill |   | 200 | 1000 | 1200 | +---------------+-----------------+--------------+-------------+---------------+ |Ilunga |   | 900 |   | 900 | +---------------+-----------------+--------------+-------------+---------------+ |Kali |   | 50 |   | 50 | +---------------+-----------------+--------------+-------------+---------------+ |MK/MK West |   | 350 |   | 350 | +---------------+-----------------+--------------+-------------+---------------+ |V-Vein |   | 50 |   |   | +---------------+-----------------+--------------+-------------+---------------+ | Total | 700 | 2150 | 3200 | 6000 | +---------------+-----------------+--------------+-------------+---------------+ (A map locating the extensions will be available on the Shanta Gold website shortly: www.shantagold.com) The initial sampling results have returned very promising results. The 2010 programme of work will include further trenching and sampling of all of these targets. An RC drill rig has been mobilized to Chunya and drilling has commenced. A programme of between 5,000m and 8,000m will test the new targets and evaluate extensions to those prospects that were previously drilled and contain Chunya's resources. It is anticipated, with a high level of confidence, that further near surface resources will be delineated and provide additional resources that will be incorporated in future mine planning and increase the Company's confidence to proceed to production on completion of the feasibility study. Once on site, Shanta Gold plans to utilise the drill rig to drill hydrogeological and environmental boreholes in support of the planned mining operation. The decision to commence the mine is dependent on the final feasibility study results (the study should be received in the near future) and mining licence approval which it is understood is in the final procedural phases. For further information: Shanta Gold Limited http://www.shantagold.com Walton Imrie Mobile: +27 (0) 82 444 2851 David Scott Mobile: + 255 (0) 784 366146 Walter Vorwerk Mobile: +27 (0)83 308 0080 Gareth Taylor Mobile: +255(0)757732484 Fairfax I.S. PLC Ewan Leggat/Laura Littley +44 (0) 20 7598 5368 Glossary RC Drilling - Reverse Circulation Drilling. A variation of the rotary drilling method in which the cuttings are pumped up and out of the drill pipe, an advantage in certain large diameter holes. [HUG#1428367] This announcement is distributed by Thomson Reuters on behalf of Thomson Reuters clients. The owner of this announcement warrants that: (i) the releases contained herein are protected by copyright and other applicable laws; and (ii) they are solely responsible for the content, accuracy and originality of the information contained therein. All reproduction for further distribution is prohibited. Source: Shanta Gold Limited via Thomson Reuters ONE
UK 100

Latest directors dealings