Interim Results for six months ended 30 June 2023

Aterian PLC
28 September 2023
 

28 September 2023

 

Interim Results for the six months ended 30 June 2023

 

Aterian Plc
("Aterian" or the "Company")

 

Aterian Plc (LSE: ATN), the critical and strategic metal-focused exploration and development company, is pleased to announce its unaudited interim results for the six months ended 30 June 2023.

 

Chairman's statement

I am pleased to announce the unaudited Interim Results of the Group for the half-year ending 30 June 2023.

These accounts relate to the Company for the first half of 2023 and reflect a loss of £636,000 arising from administrative costs; this corresponds to the Company's expenditure on overheads, operational and exploration costs. Additional expenditure was incurred on mineral exploration over the HCK project in Rwanda, establishing the mineral trading business in Rwanda, and conducting mineral exploration in Morocco.

Morocco Update

In October 2022, the Company acquired 50 licences covering 15 project areas with a total landholding of 762 km2 in the Kingdom of Morocco ("Morocco"). The licences primarily target critical and strategic minerals such as copper, silver and other base metals and are held 100% by the Company's Moroccan subsidiaries. Elemental Altus Royalty Corporation has a 2.5% net smelter return ("NSR") royalty over each of the licences held by Aterian in Morocco.

In August 2023, the Company announced that 10 additional licences were granted to its Moroccan subsidiaries, expanding the overall portfolio to 17 projects, comprising 60 licences and a landholding of 897 km2.

Below is a brief description of the projects explored during the reporting period.

The Agdz Project

The Agdz Project covers 34.46 km2 and comprises a single mining licence, granted on 21 May 2021 for ten years. The project is located within the Souss-Massa-Drâa region of the Anti-Atlas Mountains of central Morocco, approximately 350 km south of the capital, Rabat, and approximately 35 km east of the city of Ouarzazate, where high-standard infrastructure and services exist, including a regional airport. Agdz lies approximately 14 km southwest of the Bouskour copper-silver mine, with the world-class Imiter silver mine located 80 km to the northeast.

The lithological package at Agdz broadly consists of mostly felsic-intermediate volcano-sedimentary rocks of the Ouarzazate Supergroup with large granodiorite plutons in the north and locally conglomeratic metasedimentary sequences in the south. The units are bisected by a series of sub-parallel NE and NW striking brittle faults and alteration zones, several of which have been historically mined for copper. A recent re-interpretation of the available ground-based geophysics and ground geological mapping indicates that the main prospects identified occur in a potential dilutionary jog structural setting.

Five prospects, namely Makarn, Makarn North, Amzwaro, Miniere and Daoud, have been outlined on the project based on rock chip sampling (the best of which returned grades of up to 26.5 % Cu, 448 g/t Ag, and 3.74 g/t Au). These five significant Cu-Ag prospects cover an area of approximately 8 km2:

• The 2.80 km long Makarn - Markarn North prospects, with results up to 26.5 % Cu and 448 g/t Ag

• The 2.00 km long Amzwaro prospect, with results up to 4.82 % Cu and 189 g/t Ag

• The 0.15 km long Minière prospect, with results up to 14.75 % Cu and 13.8 g/t Ag

• The 0.70 km long Daoud prospect, with results up to 2.98 % Cu, 152 g/t Ag

576 m of reconnaissance trenching has been completed in 13 trenches across two of the five prospects. Results include 14.12 m at 0.65 % Cu and 36.54 g/t Ag at Makarn North and 13.70 m at 0.36 % Cu and 13.26 g/t Ag at Amzwaro.

The Tata Project

The Tata Project covers 154.4 km2 and is located within the western Anti-Atlas Mountains of Morocco and lies 30 km south of the Company's Azrar copper-silver project. The Project is located approximately 465 km south of the capital Rabat, 165 km southeast of the port city of Agadir, and 50 km southeast of the Tizert copper mine, which Managem Group operates.

Late Ediacaran to early Cambrian Adoudou Formation carbonate-rich sediments occurs within the Project along the margins of the Palaeoproterozoic Tagragra de Tata Inlier. Exploration work on the Project has identified copper mineralisation hosted within Adoudoudian sediments and the Cambrian Tata Group sediments.

The Adoudou Formation comprises sediments known to host significant sedimentary copper deposits in the Western and Central Anti-Atlas, including the Tizert mine. The Tizert copper deposit is considered the largest copper deposit in the western Anti-Atlas, with resources estimated to be 57 Mt grading 1.03 % Cu and 23 g/t Ag.

The results indicate the presence of stratiform sedimentary copper at the Project with an unexplored strike length of c. 16 km remaining untested along the northern flank of the inlier and a further c. 9.5 km of strike along the southern margin of the same geological feature. Exploration results from rock chip sampling along 8 km of the strike of the sediments have reported up to 2.05 % Cu from a dolomite float sample located adjacent to the contact between Adoudounian sediments and the Proterozoic inlier. Other results include 0.95 % Cu from a 4 m thick dolomitic sequence and 0.87 % Cu from an 8 m thick sequence of dolomite and marl. More recent fieldwork has observed copper mineralisation along a further 7 km of strike along the northern flank of the inlier (laboratory results from this work are pending).

The Azrar Project

The Azrar Project is situated in the western Anti-Atlas Mountains. It comprises an area of 99.3 km2, located 155 km southeast of the port city of Agadir and 45 km southeast of the Tizert copper mine, which Managem Group operates. The western Anti-Atlas is dominated by Palaeoproterozoic to Neoproterozoic age inliers overlain unconformably by Cambrian to recent sedimentary and volcanic sequences.

Preliminary fieldwork has covered 50% of the project area, with copper and silver mineralisation identified over 5 separate zones, with several historic hard rock artisanal mining occurrences recorded. One target is an ENE-WSW trending fault zone traced along strike for c. 1.5 km, and remains open-ended, cross-cutting dolomitic sediments, and up to 8 m wide, with one sample returning 1.41 % Cu and 41 g/t Ag. The maximum copper value from samples collected along this structure is 3.45 % Cu. High-grade copper and silver have been reported from additional outcrop sampling, including 3.79 % Cu and 23 g/t Ag from a separate fault breccia sample. Results support earlier observations that prospective geological formations for stratiform sediment-hosted copper deposits occur within the project area, in addition to structurally controlled mineralisation features, such as fault zones.

The Jebilet Est Project

This Project covers 73.6 km2 and lies approximately 200 km south of the capital city of Rabat, 35 km northeast of Marrakech, and 15 km from a rail line to the port of Casablanca. The Project occurs approximately 15 km east of the historic Bir N'Hass copper mine, with several known base metal and copper deposits and occurrences identified within the district (mineralisation hosted at Bir n Hass is not necessarily indicative of mineralisation at Jebilet Est).

The Jebilet Est Project is underlain by Palaeozoic metamudstones and quartzites proximal to Variscan (Hercynian)-age granite and mafic intrusive bodies. Initial reconnaissance has identified a significant network of copper-bearing veins and breccia zones. Multiple parallel quartz-carbonate veins with a general ENE orientation are mapped across the licences with the largest vein zone, up to 10 m wide, striking discontinuously for over 3 km. High copper grades, including 4.43 % Cu and 3.11 % Cu, have been returned from outcrop sampling, with an extensive vein system mapped in the western project area.

The Jafra Project

The Jafra Project covers 29.0 km2 in the Western Meseta of north-central Morocco, 36 km northeast of Marrakech, 35 km east of the former Roc Blanc silver mine, and 32 km from the rail line to the port of Casablanca. The project is located on the eastern margin of an intrusive pluton within the metamorphic aureole. It hosts a historically mapped lead occurrence, coincident with apparent former artisanal mining associated with fault zones and a quartz-carbonate vein system. The Project lies 14km south of the Company's Jebilet Est Copper Project.

Reconnaissance has concentrated on two areas within the centre of the project, where several artisanal workings are identified on a prominent topographic feature trending across the project. All mapped workings appear to exploit quartz veins and fault zone breccia with visible sulphide mineralisation.

Surface scree covers much of the high ground; however, individual structures can be traced over 100 m along strike from the workings. Several breccia zones with variable widths up to 3 m have been identified and are typically composed of roughly parallel quartz-carbonate veins and breccia. Veins range from 1 to 30 cm wide with a general NE trend, cross-cutting the host metasiltstones. Rock chip sampling has reported high-grade silver and lead values up to 170 g/t Ag, 22.2 % Pb and 157 g/t Ag, 21.2 % Pb.

Rwanda Update

Aterian, through its 100% owned Rwanda registered subsidiary, Eastinco Limited, is actively engaged in mineral exploration and developing its portfolio of critical metals in Rwanda. The Company has three partnerships exploring and developing the lithium-tantalum(+niobium)-tin opportunities hosted within intrusive pegmatite dykes and sills. Eastinco Limited also holds a metal trading licence issued by the authorities in Rwanda, which will allow for trading metal concentrates from internal supply and third-party producers and suppliers.

Below is a brief description of the operational projects during the reporting period.

The HCK Project

The HCK Project covers 2,750 hectares in southern Rwanda with the licence held by Kinunga Mining Ltd, a Rwanda-registered joint venture company owned 70% by Eastinco Limited and 30% by HCK Mining Company Ltd. Aterian recently entered an earn-in Joint Venture Agreement with Rio Tinto Mining and Exploration Ltd ("Rio") over this project, where Rio can earn up to a 75% interest in the project through funding a two-stage US$ 7.5 million exploration programme. 

Work conducted during the reporting period by the Company comprised a multi-method geophysical survey, sampling and geological mapping and the completion of an aerial drone topographic survey. From work completed, 19 individual pegmatite zones have been identified, with the main target, HCK-1, having an indicated strike length of c 2,500 m with widths up to 100 m in places.

The ground-based multi-method geophysical survey covered an area of 2.36 km2 over the HCK-1 target and comprised magnetometry, induced polarisation ("IP"), and electrical IP tomography ("IPT"). The survey was designed to provide information on the main geological controlling structures for the emplacement of the pegmatite bodies, the depth of weathering and recommended targets for detailed follow-up. Four sub-cropping pegmatite bodies were identified from the survey, further highlighting the strong structural control on pegmatite emplacement with the interpretation of at least three deformation events.

A pegmatite fertility analysis of the multi-element geochemistry from samples collected across the licence was conducted by an external consultant. The study involved analysing data by assessing metal ratios and associations to predict the lithium prospectivity of the pegmatites occurring on the licence. The study indicates that the HCK-1 pegmatite has encouraging evidence for Li-Ta enrichment, even though the Ta grades generally seem to be < 200 ppm; however, the Ta grades were not unexpected given the irregular metal distribution within these weathered and kaolinised pegmatites, with the samples collected from the near-surface environment. Given the deep tropical weathering, the enrichment of Li (16 samples > 150 ppm) is seen as encouraging for locating Li pegmatites at depth (below the weathering zone). The indicated presence of tourmaline and beryl from several localised zones along the strike of the HCK-1 pegmatite implies internal zonation and that the bedrock source pegmatite may comprise a more 'complex' pegmatites (which are generally the targets in LCT pegmatite exploration). The low Rb levels associated with anomalous Li may imply a non-mica lithium source and the low levels of phosphorus vectors toward a more spodumene-rich bedrock target.

Metal Trading   

In January 2023, the International Tin Supply Chain Initiative ("ITSCI") programme for responsible mineral supply chains approved the Eastinco Limited ("Eastinco") application in Rwanda and granted Membership Status. The ITSCI programme supports better governance, human rights, and stability in conflict-affected areas and monitors supply chains allowing metal users to demonstrate responsible sourcing of raw materials within the framework of the ITSCI principles, aligned with the OECD Due Diligence Guidance for Responsible Supply Chains of Minerals from Conflict-Affected and High-Risk Areas (2016).

Since January, The Company has worked to establish a trading facility in Kigali, where concentrate products from small-scale miners and cooperatives can be received, upgraded and cleaned, processed and packaged for export in compliance with international guidelines. In tandem, the trading team has been building a potential supply chain by visiting and understanding the production capacity of over 30 small-scale mining operations in Rwanda.

Aterian's trading business model is to partner with several suppliers in Rwanda to support their mining operations by providing mining and processing equipment, capital investment and training. The first partner projects have been identified, and the Company is now conducting additional due diligence and technical planning. Basic mineral processing systems will be installed under a lease agreement, with the development of new access tunnels into the deeper levels of the mining areas. This new infrastructure and technical support should result in an immediate uplift in production by processing existing tailings material and a longer-term sustainable production uplift from accessing the deeper mineralised structures.

 

Charles Bray

Executive Chairman

28 September 2023

 

 

- ENDS -

 

This announcement contains information which, prior to its disclosure, was inside information as stipulated under Regulation 11 of the Market Abuse (Amendment) (EU Exit) Regulations 2019/310 (as amended).

 

For further information, please visit the Company's website: www.aterianplc.com or contact:

 

Aterian Plc:

Charles Bray, Executive Chairman - charles.bray@aterianplc.com

Simon Rollason, Director - simon.rollason@aterianplc.com

 

Financial Adviser and Broker:

Novum Securities Limited

David Coffman / George Duxberry

Tel: +44 (0)207 399 9400

 

Financial PR:

Bald Voodoo - ben@baldvoodoo.com
Ben Kilbey
Tel: +44 (0)7811 209 344

Notes to Editors:

About Aterian plc

www.aterianplc.com

 

Aterian plc is an LSE-listed exploration and development company with a diversified African portfolio of critical and strategic metals/minerals projects.


Aterian plc is actively seeking to acquire and develop new critical and strategic metal resources to strengthen its existing asset base whilst supporting ethical and sustainable supply chains as the world transitions to a sustainable, renewable future. The supply of these metals is vital for the development of the renewable energy, automotive and electronic manufacturing sectors that are playing an increasing role in reducing carbon emissions and meeting climate ambitions globally.

 

The Company recently entered into a joint venture agreement with Rio Tinto Mining and Exploration Limited for Rio Tinto to earn into the HCK project in southern Rwanda and holds two further partnerships in Rwanda exploring and developing lithium-tantalum-niobium-tin mining operations. In October 2022, the Company acquired Aterian Resources Limited, a wholly owned battery metals-focused subsidiary of Elemental Altus Royalties Corporation. Aterian currently holds a portfolio of 17 copper-silver and base metal projects with a project area of 897 km2 in the Kingdom of Morocco. 

 

The Company's strategy is to seek new exploration and production opportunities across the African continent and to develop new sources of strategic and critical mineral assets for exploration, development, and trading.

 

 

 

UNAUDITED CONDENSED CONSOLIDATED STATEMENT OF COMPREHENSIVE INCOME

SIX MONTHS ENDED 30 JUNE 2023

 


 

 

 

Notes

6 months to

6 months to

 

 

30-Jun-23

30-Jun-22

 

 

(Unaudited)

(Unaudited)

 

 

£'000

£'000

 




Revenue

 

                    -  

                    -  



-

-





Administrative expenses

5

               (813)

               (227)

Share-based payment expense

15

                    (36)  

                    -  


 

               (849)

               (227)





Operating loss

 

               (849)

               (227)





Interest payable and similar charges

6

                   (9)

                   (6)

Loss before tax

 

               (858)

               (233)





Tax expense

7

                    -  

                    -  





Loss after tax

 

               (858)

               (233)





Other comprehensive income:

 

 






Items that may be reclassified to profit or loss

 

 


Loss on translation of foreign operations

 

                   (84)

                   (4)

Total comprehensive loss

 

               (942)

               (237)





Loss per share

 

 


Basic and diluted loss per share (pence)

8

              (0.09)

              (0.04)



 

All activities relate to continuing operations.

 

The accompanying notes form part of these interim condensed financial statements.

 

 

 



 

UNAUDITED CONDENSED CONSOLIDATED STATEMENT OF FINANCIAL POSITION

AS AT 30 JUNE 2023


 

 

 

Notes

30-Jun-23

31-Dec-22

 

 

(Unaudited)

(Audited)

 

 

£'000

£'000

Non-current assets

 

 


Exploration and evaluation assets

 

3,241

3,241

Property, plant and equipment

9

              307

     421

Total non-current assets

 

              3,548

              3,662





Current assets

 

 


Trade and other receivables

10

                 241

                 319

Cash and cash equivalents

 

                 26

              110

Total current assets

 

                 267

                 429





Total assets

 

              3,815

              4,091









Equity and liabilities

 

 


Share capital

14

             9,892

              9,647

Share premium

14

              2,177

              2,177

Share based compensation reserve

 

              2,477

              2,441

Interest in shares in EBT

 

               (839)

               (839)

Translation reserve

 

               (397)

               (313)

Accumulated losses

 

          (11,826)

            (10,968)

Merger relief reserve

 

              1,200

              1,200

Total equity

 

              2,684

              3,345





Current liabilities

 

 


Trade and other payables

11

                 438

                 395

Deferred consideration

12

200

200

Total current liabilities

 

                 638

                 595





Non-current liabilities

 

 


Borrowings

13

493

151

Total non-current liabilities

 

                 493

                 151





Total equity and liabilities

 

              3,815

              4,091

The Interim Condensed Financial Statements were approved and authorised for issue by the Board of Directors on 28 September 2023.

 

 

UNAUDITED CONDENSED CONSOLIDATED STATEMENT OF CHANGES IN EQUITY

FOR THE SIX MONTHS ENDED 30 JUNE 2023

 

 

 










 Share  capital

Share premium

Share-based compensation reserve

Interest in shares in EBT

Translation reserve

Other Reserve

Merger relief reserve

Retained earnings

Total

 

£'000

£'000

£'000

£'000

£'000

£'000

£'000

£'000

£'000

 










At 1 January 2022

        5,671

        2,144

        1,615

          (395)

          (263)

             80

        1,200

       (6,629)

        3,423











Loss for the period

              -  

              -  

              -  

              -  

              -  

              -  

              -  

          (233)

          (233)

Other comprehensive loss

              -  

              -  

              -  

              -  

            (4)

              -  

              -  

              -  

            (4)











Transactions with owners:

 









Transfer from other reserve to accumulated losses

              -  

              -  

              -  

              -  

              -  

              -

              -  

               24

              24  

Issue of new shares

              142  

              -  

              -  

              -  

              -  

              -  

              -  

              -  

              142  

At 30 June 2022

        5,813

        2,144

        1,615

          (395)

          (267)

             80

        1,200

       (6,838)

        3,352

 










At 1 January 2023

        9,647

        2,177

        2,441

          (839)

          (313)

             -

        1,200

       (10,968)

        3,345











Loss for the period

              -  

              -  

              -  

              -  

              -  

              -  

              -  

          (858)

          (858)

Other comprehensive income

              -  

              -  

              -  

              -  

             (84)

-

-

-

             (84)











Transactions with owners:

 









Share-based compensation

              -  

              -  

              36  

              -  

              -  

              -  

              -  

              -  

              36  

Issue of new shares

             245

              -  

              -  

              -  

              -  

              -  

              -  

              -  

             245

At 30 June 2023

        9,892

        2,177

        2,477

          (839)

          (397)

             -

        1,200

       (11,826)

        2,684

 

  


 

UNAUDITED CONDENSED CONSOLIDATED STATEMENT OF CASH FLOWS

SIX MONTHS ENDED 30 JUNE 2023

     

 



 

 


6 months to

6 months to

 


30-Jun-23

30-Jun-22

 


(Unaudited)

(Unaudited)

Cash flow from operating activities

 

£'000

£'000

Loss before tax


        (858)

        (237)

Adjustments for:




Depreciation


            11

            11

Share-based payment expense


36

-

Interest expense


9

6

Provisions against loans


        -

        (126)

Foreign exchange losses


            17  

            19  

Costs settled by the issue of shares


            245  

            -  

Operating loss before working capital changes

        (538)

        (327)

Changes in working capital:




Decrease in trade & other receivables


         78

          111

Increase in trade & other payables


           43

            50

Net cash outflows flow from operating activities

 

        (419)

        (166)

Cash flow from investing activities

 



Purchase of property, plant and equipment


             (4)

             (7)

Funds advanced to subsidiary pre-acquisition


        -

        (463)

Net cash used in investing activities

 

        (4)

        (470)

Cash flow from financing activities

 

 


Amounts advanced to subsidiary


          -

          323

Proceeds from borrowings


             342  

             -  

Net proceeds from issue of shares


          -

          142

Net cash flow from financing activities

 

          342

          465

Net decrease in cash & cash equivalents

        (81)

            (171)

Cash & cash equivalents at beginning of the period

          110

            196

Effect of exchange rate movements on cash


             (3)  

             (3)  

Cash & cash equivalents at end of the period

 

            26

            22

 

 



ATERIAN PLC

NOTES TO THE INTERIM CONSOLIDATED FINANCIAL STATEMENTS FOR THE SIX MONTHS ENDED 30 JUNE 2023

1.      General information

Aterian plc ("the Company") is an investment company, focussed on African mineral resource investment opportunities. The Company operates through its 100% owned subsidiary, Eastinco Limited ("EME Ltd"), a Rwandan tantalum, tin and tungsten exploration company and Aterian Resources Limited which holds copper-silver and base metal exploration projects in the Kingdom of Morocco.

The condensed interim financial statements for the period ended 30 June 2023 do not constitute statutory accounts as defined in section 434 of the Companies Act 2006. These financial statements have been prepared in accordance with the accounting policies set out in, and are consistent with, the audited consolidated financial statements for the twelve months ended 31 December 2022. A copy of the statutory accounts for the year ended 31 December 2022 has been delivered to the Registrar of Companies. The auditor's report on those accounts was unqualified and did not contain statements under Section 498 (2) or (3) of the Companies Act 2006 but drew attention, by way of emphasis, without qualifying the report, to the Company's assumptions on going concern which stated that the Group and Parent Company's operational existence is reliant on the ability to raise further funding through equity placing or through the support of the directors through an injection of capital. The impact of this together with other matters indicated that a material uncertainty existed that may cast significant doubt on their ability to continue as a going concern. The auditor's opinion was not modified in respect of this matter.

On 24 October 2022, the Company completed the acquisition of 15 mineral exploration projects covering 762 km2 in the Kingdom of Morocco from Altus Strategies PLC (now called Elemental Altus Royalties Corp). The completion of the acquisition coincided with a move to the Standard Sector of the London Stock Exchange from the AQUIS Stock Exchange, and a change in name from Eastinco Mining and Exploration PLC to Aterian PLC, shortly thereafter.

The Company is incorporated and domiciled in the UK. The address of its registered office is 27-28 Eastcastle Street, London W1W 8DH.

The registered number of the company is 07496976.

2.      Basis of preparation

 

The principal accounting policies applied in the preparation of the Company's Financial Statements are set out below. These policies have been consistently applied to the period presented, unless otherwise stated.

 

This condensed consolidated interim financial statements for the half-year reporting period ended 30 June

2023 have been prepared in accordance with the UK-adopted International Accounting Standard 34, 'Interim Financial Reporting' and the Disclosure Guidance and Transparency Rules sourcebook of the United Kingdom's Financial Conduct Authority.

 

The interim financial statements do not include all of the notes of the type normally included in an annual financial report. Accordingly, this report is to be read in conjunction with the annual report for the year ended 31 December 2022, which has been prepared in accordance with UK-adopted international accounting standards and the requirements of the Companies Act 2006, and any public announcements made by Aterian Plc during the interim reporting period.

 

The condensed interim financial statements are unaudited and have not been reviewed by the auditors and were approved by the Board of Directors on 28 September 2023.

 

The Financial Statements are presented in £'000 unless otherwise stated which is the Company's functional and presentational currency.

 

 

3.      Going concern

 

The financial statements have been prepared on a going concern basis. The Group has not yet earned revenues and as at 30 June 2023 was in the feasibility, optimisation and commissioning phase of its ore processing and trading facility in Rwanda. In Morocco, each of its assets are in the early stages of exploration and feasibility assessment. Continuing operations of the Group are currently financed from funds raised from shareholders and this will likely continue to be the case until revenue is generated from mining and/or trading and subsequent ore sales. In the short term the Chairman of the Company has made available to the Company a working capital facility, but the Group will likely need to raise further funds in order to progress the Group from the exploration phase into feasibility and eventually into production of revenues.

As at 30 June 2023, the Group had cash and cash equivalents of £26,000 and a working capital facility of £500,000 of which £nil remains to be drawn. As at the date of this report, cash balances were approximately £309,000. The Company raised additional equity in August as described in Note 18 and also hopes to generate revenues, monetise assets, and/or raise further equity to fund both day-to-day expenditure and potential growth although there can be no certainty that such funding will be forthcoming.

As part of their assessment, the Directors have prepared financial cash-flow forecasts on the basis that cost reduction and cost deferral measures can be implemented over the going concern period. The Company's base case financial projections show that the Group will continue to operate within the available facilities throughout the next 12 months. Much of the Group's planned exploration expenditure is discretionary and, if necessary, could be scaled back to conserve cash should circumstances coincide with our expectations. 

The Directors have agreed, if circumstances require, to defer payment of their fees until such time as adequate funding is received and if necessary, scale back all discretionary expenditure including exploration expenditure.

Considering recent successful fund raises the Directors are confident that they can continue to adopt the going concern basis in preparing the financial statements.

The financial statements do not include any adjustment that may arise in the event that the Group is unable to raise additional finance, realise its assets and discharge its liabilities in the normal course of business.

 

4.      New standards, interpretations and amendments adopted from 1 January 2023:

 

A number of new or amended standards became applicable for the current reporting period. The Group did not have to change its accounting policies or make retrospective adjustments as a result of adopting these standards.

 

Standards issued but not yet effective:

At the date of authorisation of these interim financial statements, certain standards and interpretations relevant to the Group and which have not been applied in these financial statements, were in issue but were not yet effective. In some cases these standards and guidance have not been endorsed for use in the UK.  The directors are evaluating the impact that these standards will have on the financial statements of the Group.

5.      Operating expenses by nature

 

 

 


 

Administrative expenses



Six months ended

30-Jun-23

Six months ended

30-Jun-22




(Unaudited)

(Unaudited)




£'000

£'000

Directors' salaries



(120)

-

Staff costs



(58)

(50)

Auditor's remuneration



(52)

-

Travel expenses



(6)

(4)

Metallurgical tests



(4)

-

Legal expenses



(24)

(75)

Professional fees



(318)

(41)

Accounting fees



(60)

(13)

Depreciation



(11)

(11)

Geological survey costs



(19)

-

Trading expenses



(49)

-

Security costs



(8)

-

Other expenses



(84)

(33)




(813)

(227)

Fees and salaries

Share-based payment expense

Six months

 ended

30 June 2023

Totals

Six months

 ended

 30 June 2022

Total

 


£'000

£'000

£'000

£'000

 





 

48

-

48

-

 

Simon Rollason

48

-

48

-

 

Non-Executive Directors





 

Simon Retter

-

-

-

-

 

Devon Marais

14

-

14

-

 

Alister Hume

5

-

5

-

 

Kasra Pezeshki

5

-

5

-

 

120

-

120

-

 

 

 

6.      Interest payable and similar charges

 

 

 


 

Interest expense



Six months ended

30-Jun-23

Six months ended

30-Jun-22




(Unaudited)

(Unaudited)




£'000

£'000

Interest expense on loan notes



-

6

Interest on related party loan



9

-




9

6

 

7.      Taxation

 

 

 


 

Tax expense



Six months ended

30-Jun-23

Six months ended

30-Jun-22




(Unaudited)

(Unaudited)




£'000

£'000

Current tax:



 


UK taxation



-

-

Overseas taxation



-

-

Deferred tax



-

-




-

-

 

The Group has made no provision for taxation as it has not yet generated any taxable income.

The Group had losses for tax purposes of approximately £7.0 million as at 30 June 2023 (£6.4 million as at 31 December 2022) which, subject to agreement with taxation authorities, are available to carry forward against future profits. Such losses have no expiry date. The tax value of such losses amounted to approximately £1.7 million as at 30 June 2023 (£1.6 million as at 31 December 2022). A deferred tax asset has not been recognised in respect of such losses carried forward at the period end, as there is insufficient evidence that taxable profits will be available in the foreseeable future against which the deductible temporary difference can be utilised.

 

8.      Loss per share

 

Basic loss per share is calculated by dividing the earnings attributable to ordinary shareholders by the weighted average number of ordinary shares outstanding during the period.

 

For diluted loss per share, the weighted average number of ordinary shares in issue is adjusted to assume conversion of all dilutive potential ordinary shares.

 

The calculation of basic and diluted loss per share is based on the following figures.

 


 

Six months

 ended

  30-Jun-23

Six months

 ended

30-Jun-22


 

(Unaudited)

(Unaudited)



£'000

£'000

Earnings




Loss from continuing operations for the period attributable to the equity holders of the Company

 

(858)

(233)

Number of shares

 

 

 

Weighted average number of ordinary shares for the purpose of basic and diluted earnings per share


                 

976,870,824

 

 

                 

535,799,217

 

 

Basic and diluted earnings per share (pence)


(0.09p)

(0.04p)

 

 

9.      Property, plant and equipment

 


Mine

Mining Equipment

Office Equipment

Motor Vehicles

Computer Equipment

Processing Equipment

Land

Total

Cost

£'000

£'000

£'000

£'000

£'000

£'000

£'000

£'000

At 1 January 2023

624

671

7

6

2

3

32

1,345

Foreign exchange adjustment

-

(102)

(1)

-

-

-

(4)

(107)

Additions

-

4

-

-

-

-

-

4

At 30 June 2023

624

573

6

6

2

3

28

1,242










Depreciation

 








At 1 January 2023

624

295

4

-

1

-

-

924

Charge for the period

-

9

1

-

1

-

-

11

At 30 June 2023

624

304

5

-

2

-

-

935










Net book value

 








At 30 June 2023

-

269

1

6

-

3

28

307










At 1 January 2023

-

376

3

6

1

3

32

421

 

 

10.     Trade and other receivables

 

 

 



 

 





30-Jun-23

31-Dec-22






(Unaudited)

(Audited)






£'000

£'000

Taxes receivable





81

86

Loan to subsidiary





76

-

Unpaid share capital





12

212

Other debtors





40

-

Prepayments





                  32

                  21






241

319

 

11.     Trade and other payables

 

 

 



 

 

 





30-Jun-23

31-Dec-22

 






(Unaudited)

(Audited)

 






£'000

£'000

 

Trade payables





270

287

 

Other payables





127

33

 

Accruals





41

75

 






438

395

 






 


12.     Deferred consideration

 






 

 

 




30-Jun-23

31-Dec-22






(Unaudited)

(Audited)






£'000

£'000

Deferred consideration





                    200

200






                    200

                    200

 

Deferred consideration is payable to Altus Exploration Management Ltd in respect of the acquisition of Aterian Resources Limited.

 

 

13.     Borrowings

 






 

Non-current liabilities

 




30-Jun-23

31-Dec-22

 

 




(Unaudited)

(Audited)






£'000

£'000

Loan from related party





                    493

               151






                    493

                    151

 

Loan from a related party

 On 17 October 2022, the Company entered into a working capital facility with the trustees of the C Bray Transfer Trust pursuant to which the C Bray Transfer Trust agreed to make available to the Company a working capital facility of up to £500,000.

 

   Up to £150,000 can be drawn down under the facility each quarter starting from 25 October 2022. The facility will be available for two years. The facility is secured by a fixed and floating charge over all the property or undertaking of the Company. Interest of 2% per annum accrues on undrawn amounts and interest of Base Rate + 7.5% per annum will accrue on drawn amounts. Interest will roll up and is repayable with the outstanding principal on the second anniversary of Admission. An arrangement fee of £10,000 was payable and has been added to the principal outstanding. C Bray, a director, is a beneficiary of the C Bray Transfer Trust. Interest of £9,000 was payable for the period ended 30 June 2023.

 

14.     Share capital

 

The Ordinary Shares issued by the Company have a 1p par value. The Ordinary Shares rank pari passu in all respects, including the right to attend and vote in general meetings, to receive dividends and any return of capital.

 


Six months ended 30 June 2023


Number of
shares

Share Capital
£'000

Share Premium
£'000

Brought forward at 1 January 2023

964,694,093

9,647

2,177

Shares issued in the period

24,476,022

245

-

As at 30 June 2023

989,170,115

9,892

2,177

 

On 24 May 2023, the Company issued 24,476,022 New Ordinary Shares at their par value of 1p. The New Ordinary Shares were to compensate certain parties in lieu of cash compensation and serve as long term performance incentivisation. 

 

15.     Share-based payment arrangements

 

The total expense recognised in the Statement of Comprehensive Income during the period in respect of warrants over Ordinary Shares issued pursuant to the 2021 Warrant Instrument in connection with the issue of Pre-IPO Shares was £36,000 (2021: £nil). No warrants were issued, exercised or expired during the period ended 30 June 2023.

 

16.     Related party transactions

 

Transactions with directors:

 

Charles Bray is owed £61,817 by the Company at 30 June 2023 (31 December 2022: £20,514 owed by the Company).

 

The Company received loans from IQ EQ (Jersey) Limited, trustee of Charles Bray Transfer Trust as more fully described above in Note 13. 

 

Edlin Holdings Limited is an Isle of Man company which invests and operates non-US based investments.  The ultimate beneficial owners of Edlin Holdings Limited are Bray family members.

 

Charles Bray subscribed for 5,000,000 Ordinary Shares of the Company as part of the shares issued on 24 May 2023 described in Note 14.

 

Details of Directors' remuneration is set out above in Note 5.

 

17.     Seasonality of the Group's business

 

There are no seasonal factors which materially affect the operations of the Group's business.

 

18.     Subsequent events

 

Lithium Joint Venture with Rio Tinto in Rwanda

 

On 31 July 2023, the Company signed a definitive Earn-In Investment and Joint Venture Agreement ("Agreement") with Rio Tinto Mining and Exploration Ltd ("RIO") and Kinunga Mining Ltd ("Kinunga"). The Agreement is for the exploration and development of lithium and by-products at its HCK Joint Venture project ("Project") holding the HCK licence (the "Licence") in the Republic of Rwanda.

 

 

RIO has the option to incur work expenditure of US$3 million over a two-year period ("Stage 1") to earn an initial 51% interest in the Licence. RIO will also make cash payments to Aterian, totalling US$300,000, to reimburse previous operational expenses incurred by Aterian. An initial payment of US$200,000 is due upon completion of satisfactory due diligence by RIO, and an additional payment of US$100,000 will be due at the start of Stage 2.

 

Upon earning a 51% interest in the Licence, RIO can earn an additional 24% interest in the Licence by funding additional work expenditures of US$4.5 million over a three-year period ("Stage 2"). After Stage 2 RIO will, provided it contributes the additional funding, hold a 75% interest in the Licence.

 

RIO has agreed to a 2% net smelter royalty (NSR) over the project with a US$50 million cap that will be due by the future Joint Venture between RIO and Kinunga to a holder/holders to be notified by Aterian to RIO prior to the NSR agreement being entered into and such holder/holders to be subject to completion of satisfactory due diligence by RIO.

 

Under the terms of the Agreement, RIO has an exclusivity option to invest into Aterian's two other existing Rwandan projects, which will be subject to their own separate agreements. A management committee comprising representatives of both RIO and Aterian will be formed to provide financial and operational oversight. RIO will act as the operator for the Project.

 

Fundraising

On 9 August 2023, the Company raised gross proceeds of £1,000,000 (before expenses) from Directors, management, existing shareholders and new investors through the issue of 100,000,000 new ordinary shares ("New Ordinary Shares") at a price of 1.00 pence each.

The Executive Chairman and largest single individual shareholder, Charles Bray invested £500,000 in the Fundraise consisting of £200,000 of new equity capital and £300,000 from the conversion to equity of a short-term debt utilising a working capital facility provided to the Company. Luke Rogers, the Aterian COO subscribed for 800,000 new Ordinary Shares (£8,000). Simon Rollason, the Company's CEO, converted 3 months' salary into 2,500,000 New Ordinary Shares (£25,000).

For each subscribed New Ordinary Share, investors will receive newly issued warrants on a one-for-one basis. The warrants are split into 50% exercisable at 1p any time up to the first anniversary of Admission, with the remaining 50% exercisable at 1.2p at any time up until the second anniversary of Admission.

 

19.     Reports

 

A copy of this half year interim report, as well as the annual statutory accounts to 31 December 2022 are available on the Company's website at www.aterianplc.com

 

 

This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.

RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services. For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy Policy.
 
END
 
 

Companies

Aterian (ATN)
UK 100

Latest directors dealings